Minutes of the 68th meeting of the Committee Constituted for Deciding
the Consent under Orange Category, held on 17.07.2008 in the
Conference Room of Chairman, DPCC.
The following persons attended the meeting:
1.
2.
3.
4.
5.
6.
7.
8.
Sh. J. K Dadoo, Chairman DPCC
Sh. K. Mahesh, Member Secretary, DPCC
Sh. S.K.Gupta, Head Chemical Engineering Deptt. ,IIT Delhi
Sh. B. Kumar, SEE, DPCC
Sh. M. Dwarakanth, SSO, Dept. of Env,. GNCTD.
EEs of CMC – I, II & III.
EE & AEEs of PGRC.
AEEs & JEE of CMC – I, II & III.
Following decisions were taken in the said meeting:Agenda Item No. 1- ATR of previous CMC meetings.
This agenda could not be taken up due to paucity of time and it was
decided by the Committee to take up the same in the next CMC meeting to
be held on 12.08.2008.
Agenda Item No.2Personal hearings of (i) Gahoi Build Well Ltd
Proposed Commercial Complex name East Centre Mall at Plot no 10 Laxmi
Nagar District Centre (ii) M/s Suncity Project Pvt. Ltd.Vasant Square Mall
Construction Project Pocket 5, Vasant Kunj, Delhi (iii) M/s Aditya Mall,
CBD Ground, Near Karkardooma Court, Delhi-92 (iv) Paliwal Developers
Ltd (DLF), Galleria shopping Mall Plot no 1 B Mayur Vihar (v) Parsvnath
Developers Ltd in collabration with M/s OCL Ltd Construction of Integrated
Station Building and Commercial development at games Village,Near
Akshardham Temple, Delhi (vi) MGF Developers Ltd Proposed Commercial
Mall Namely MGF City Mall at Khyberpass, New Delhi (vii) Aditya
Infracon (P) Ltd , at Plot no 8 Jasola District New Delhi (viii) Maruti Udyog
Limited , Plot No. 1 Vasant Kunj Mall, Vasant Kunj, New Delhi (ix)
Vardhman Land Developers Private Limited Pushpanjali Promoters Private
Limited Construction of TDI Mall , Plot no 11, Shivaji Place, District
Centre, Rajouri Garden, New Delhi (x) Aditya Infracon (P) Ltd , at Plot no 5
Jasola District New Delhi. (xi) Construction of 5 star Hotel project at Plot
No. 15 and 15 A, Non-Heirachial Commercial Complex, Jasola, Delhi by
M/s Emmar MGF Land Pvt. Ltd.
(i)
Gahoi Build Well Ltd Proposed Commercial Complex name East
Centre Mall at Plot no 10 Laxmi Nagar District Centre
The unit came for personal hearing today. It has been sourcing ground
water for more than two years without CGWA clearance. The adequacy
report also indicates that the standards are not being met w.r.t. TSS & BOD.
The unit has also filed wrong affidavit w.r.t effluent discharge and filing of
Consent to Establish.
In view of the above, the unit is directed to pay damages of 0.5 % of
project cost as cash penalty & 0.5 % of project cost as Bank Guarantee valid
for three years. To be complied by 31.07.2008. Call on 31.07.2008.
(ii)
M/s Suncity Project Pvt. Ltd.Vasant Square Mall Construction
Project Pocket 5, Vasant Kunj, Delhi
The unit could not come for personal hearing since the General
Manager is hospitalized. SIT report found several deficiencies which may be
communicated to the unit for correction by 31.07.2008. The unit has
proposed an STP of 100 KLD while the premises is more or less complete.
Unit may be asked to confirm by when STP will be ready. Call on
31.07.2008, at 5.00 PM for personal hearing.
(iii)
M/s Aditya Mall, CBD Ground, Near Karkardooma Court, Delhi92
The unit did not come for personal hearing but sent a clerk for seeking
a date. The unit has already filed a case in the High Court but has not been
granted stay. The inspection done by MS indicates a large number of
deficiencies which are adequate to warrant a notice for closure to prevent the
environment from being affected adversely. The unit had approached both
MS & Chairman and in the meeting with Chairman had indicated that he
will withdraw the court case if a lenient view can be taken. Case may be
called on 24.07.2008 to ascertain if the court case has been withdrawn. Call
on 24.07.2008.
(iv)
Paliwal Developers Ltd (DLF), Galleria shopping Mall Plot no 1
B Mayur Vihar
A letter has been received from DLF stating that the unit is busy w.r.t.
presentations before Expert Appraisal Committees of MOEF, Tamil Nadu
and Andhra Pradesh. He has, therefore, sought postponement of the personal
hearing. The date of his preoccupation in his chart indicates that he is free on
24.07.2008 which is the next date of CMC meeting. Call on 24.07.2008 at
5.45 PM for personal hearing.
(v)
Parsvnath Developers Ltd in collabration with M/s OCL Ltd
Construction of Integrated Station Building and Commercial
development at games Village, Near Akshardham Temple, Delhi
The unit was called for personal hearing today but he has written a
letter seeking postponement due to outstation commitments. The SIT
inspection report indicates the following:(a) D.G. Sets do not have adequate stack height.
(b) 40 KLD of waste water generation without a separate STP.
(c) One bore-well exists for which CGWA clearance is required.
(d) Environmental Clearance has not yet been granted.
(e) The entire 20000 sqm has been constructed which includes the area of
the mall also.
The unit may be asked to file the EC immediately and correct the
deficiencies noted by the SIT. Call for personal hearing on 20.08.2008 at
5.30 PM.
(vi)
MGF Developers Ltd Proposed Commercial Mall Namely MGF
City Mall at Khyberpass, New Delhi
The unit came for personal hearing today. The cost of the project is
Rs 125 Crores. The unit has carried out excavation work. Cash penalty of 10
% of the 0.5 % of the project cost i.e. Rs. 6 Lakhs and equivalent amount as
Bank Guarantee valid for three years may be deposited by the unit by
24.07.2008. Call on 24.07.2008.
(vii) Aditya Infracon (P) Ltd , at Plot no 8 Jasola District New Delhi
The unit came for personal hearing today. It still believes that the total
built up area is less than 20,000 sqm, therefore, a copy of our letter written
to Addl. Secretary, MOEF may be given to the unit immediately for filing
the application for Environmental Clearance to MOEF. The IIT survey
report indicates that the total built up is 20356 sqm.
The unit used ground water during construction without CGWA
clearance. If the unit is drawing any ground water from any source, it must
provide the permission from CGWA immediately. Unit has waste water
generation of 212 KLD and no STP provided so far. The unit claims one of
the floors is already operational. It is a great environmental damage if waste
water of this magnitude is released in the drain without treating it properly.
The unit must close down all its operation till the STP is installed and run it
as per the norms. Let the unit file a compliance report by 31.07.2008.
The unit must also indicate having applied for Environmental
Clearance to MOEF by 31.07.2008. Informed to the unit accordingly. Call
on 31.07.2008.
(viii) Maruti Udyog Limited , Plot No. 1 Vasant Kunj Mall, Vasant
Kunj, New Delhi
The unit came for personal hearing. The unit started construction in
March, 2006 about 8 months before grant of Environmental Clearance. The
unit is almost on the verge of completion without obtaining Consent to
Establish. The unit has total water consumption and discharge of 49 KLD
which will be fully treated through an STP. Total project cost is Rs. 90
crores and considering that in similarly placed cases damages of 0.5 % of the
project cost as cash penalty and 0.5 % of the project cost as Bank Guarantee
has been taken, unit may be asked to do the same which amounts to Rs. 45
Lakhs as cash penalty and Rs. 45 Lakhs as Bank Guarantee valid for 3 years
for complying with all environmental legislations applicable in the city. If,
the unit complies these conditions before 24.07.2008, Consent to Establish
may be granted to them at the same time and the compliance report will be
filed before CMC on 24.07.2008. Call on 24.07.2008.
(ix)
Vardhman Land Developers Private Limited Pushpanjali
Promoters Private Limited Construction of TDI Mall , Plot no 11,
Shivaji Place, District Centre, Rajouri Garden, New Delhi
The unit came for personal hearing today. It seeks 15 days time to
take the Shopkeepers Association on board for meeting environmental
legislation in the future. SIT report indicates groundwater drawl of 25 KLD
without CGWA clearance Let the unit get the CGWA clearance by
31.07.2008 and the case will be heard on that day. Let the unit also file the
noise monitoring report of D.G. Sets and the adequacy report of STP by
31.07.2008. Call on 31.07.2008.
(x)
Aditya Infracon (P) Ltd , at Plot no 5 Jasola District New Delhi.
The unit came for personal hearing today. It still believes that the total
built up area is less than 20,000 sqm, therefore, a copy of our letter written
to Addl. Secretary, MOEF may be given to the unit immediately for filing
the application for Environmental Clearance to MOEF. The IIT survey
report indicates that the total built up is 20323 sqm.
The Consent to Establish application indicates ground water drawl of
120 KLD without CGWA clearance. This must be obtained immediately. It
also talks about waste water generation of 80 KLD. Total water
consumption recorded in CTE is 230 LD for which 80 % should be the
waste water generation i.e. about 180 KLD. The unit however has installed
an STP of only 80 KLD. The unit must file an adequacy report of the same
and also clarify the difference through an affidavit. The unit must also file
the noise monitoring report of the D.G. Set(s). Call on 20.08.2008 for
compliance of the above including the application of Environmental
Clearance. Informed to the unit accordingly.
(xi)
Construction of 5 star Hotel project at Plot No. 15 and 15 A, NonHeirachial Commercial Complex, Jasola, Delhi by M/s Emmar
MGF Land Pvt. Ltd.
The unit came for personal hearing today. The cost of the project is
Rs 779 Crores. SIT report indicates excavation going on and completed upto
10 meters below ground level.
In view of the above, cash penalty of 10 % of the 0.5 % of the project
cost i.e. Rs. 39 Lakhs and equivalent amount as Bank Guarantee valid for
three years may be deposited by the unit by 31.07.2008. Call on 31.07.2008.
Agenda Item No. 3- PGRC Cases
This agenda could not be taken up due to paucity of time and it was
decided by the Committee to take up the same in the next CMC meeting to
be held on 12.08.2008.
Agenda Item No. 4- Cases of Wazirpur Industrial Area
This agenda could not be taken up due to paucity of time and it was
decided by the Committee to take up the same in the next CMC meeting to
be held on 06.08.2008.
Agenda Item No. 5- Special reference cases.
Decisions taken with respect to this agenda are tabulated and annexed
as Annexure – 1.
Agenda Item No. 6- Shopping Mall cases
This agenda could not be taken up due to paucity of time and it was
decided by the Committee to take up the same in the next CMC meeting to
be held on 12.08.2008.
Agenda Item No. 7- Construction Projects cases
This agenda could not be taken up due to paucity of time and it was
decided by the Committee to take up the same in the next CMC meeting to
be held on 12.08.2008.
Table Agenda Item No 1: City Square Mall, Plot No -8, Shivaji Place,
Rajouri Garden, Delhi
During the course of CMC meeting, the unit filed a cash penalty of
Rs. 25.80 Lakhs in one case (plot no 7) and Rs. 21.07 for another case (plot
no 8) to comply with the decision of CMC in its meeting dated 11.07.2008.
The unit says that he will file Bank Guarantee in 03-04 days. If, the unit files
the Bank Guarantee before the next CMC, Consent to Establish may be
issued at the same time. Call on 24.07.2008 for compliance report.
Table Agenda Item No 2: Brightways Housing & Land Development,
Construction of Office Cum Shopping Mall at Plot no 7 Distt Centre Jasola
New Delhi
The unit has filed a letter seeking 15 days time to consult the
shopkeepers association as all the shops have been sold. Meanwhile, the unit
has been delisted by MOEF and the mater will have to be taken up through a
D.O. letter to Addl. Secretary, MOEF with a copy to Secretary, MOEF,
Govt. of India stating that in such cases delisting is not the correct option
and action should be proposed against the unit for violating and continuous
violation of EPA. Call on 31.07.2008 for personal hearing at 8.30 PM.
Table Agenda Item No 3: Ess Cee & Associates (India)Pvt Ltd
Construction of Paragon Mall , Cinema Plot no 2, District Centre, Shivaji
Place, Near Raja Garden Crossing, New Delhi
The unit has filed a letter seeking 15 days time to consult the
shopkeepers association as all the shops have been sold. Call on 31.07.2008
for personal hearing at 8.15 PM.
The Committee decided to take up the today’s remaining agenda items
and agenda items of 24.07.2008, except personal hearings, in the meeting to
be held on 12.08.2008 at 5.00 PM.
Meeting ended with thanks to the Chair.
Sl.No
1
2
Name of the unit
Activity
Earlier Decision, if any
ATR/Remarks
Decision on 17.7.2008
Mc-Donold
Restaurant,
West Punjabi
Bagh
Restaurant
03.4.2008
In view of the above, the Committee felt that the cash penalty
of Rupees One Lakh each under the Air & the Water Acts and
Bank Guarantee of Rupees One Lakh each under the Air &
the Water Acts for one year period may be taken by
30.04.2008. The unit’s consent to operate lapsed on
23.03.2008. Unit may be asked to apply for Consent to
Establish so that both matters can be decided in CMC(Orange)
on 30.04.2008. Issue letter accordingly.
01.5.2008
MS to draft a counter reply which is strong and which lays
down the factual position both w.r.t. inspection and CMC
decision. Call on 03.06.2008.
11.6.08
Unit has asked for time of two weeks for compliance. Call on
18.06.2008.
18.06.2008
Issue notice for closure. Call on 18.07.2008.
Notice for closure issued on
01.07.2008
No reply received. However, unit has
applied for CTE on 03.07.2008.
The unit has given
contradictory data about
waste water generation in
the affidavit and Consent to
Establish . Unit has also not
filed the cash penalty &
Bank Guarantee. Call for
personal hearing on
20.08.2008 at 5.00 PM.
LPG Pressuer
Regulator
18.06.2008
The unit has not properly clarified the total waste water generation in
his affidavit and CTE application. Therefore, the unit must clarify the
exact waste water generation. The unit must also install
channelization facility during the die casting and painting process.
Call on 18.07.2008.
Applied
for
CTE.
As decideed, a letter issued on
27.06.2008.
Unit has submitted its reply.
The unit claims its process
does not require large
quantity of water while in
the affidavit he is stating that
he will draw 50 KLD water
everyday from ground. Let
the unit clarify this
contradictory statement and
also ask the CGWA
Clearance. Call on
20.08.2008.
Jindal & Sons
3
Delhi International
Airport Ltd
(Restructuring &
Modernisation of
IGI Airport)
Airport
07.12.2007
The relaxation sought by DIAL may be referred to Prof. Mukesh Khare, IIT,
Delhi for formal report/comments. All expenses will be borne by DPCC. He
may be requested to file the report within one month. Put up in January, 2008
CMC.
29.02.2008
Take up in
CMC on 25.3.2008 with Dr. Khare's report.
18.06.2008
Ask Dr. Khare to file his report immediately. Call on 18.07.2008.
Work order dt 27.02.08 issued to Dr. Mukesh
Kare, IIT, Delhi as per the decision of CMC dt
07.12.07.
Letter dt 12.02.08, from DIAL, received with
a report of Air Quality modelling for DG sets.
News paper clipping to be discussed in this
meeting.
As per emission standard for
diesel engine (engine rating
more than 0.8 MW), there are
three conditions (i) 14 Q0.3, Q =
Total SO2 emission from the
plant in kg/hr. (ii) Minimum 6m
above the building where
generator set is installed (iii)
30m.
As per details available the stack
height of the D.G. Set of
capacity of 1000 KVA, stack
height is 5.8 meter above the
roof level. The total stack height
form the ground has not been
mentioned which should be 30
meters.
In view of the request for
relaxation in stack height, the
unit should install wet scrubber
for all the D.G. Sets so that
pollution should be controlled
adequately. In such case, the
stack height may be relaxed.
Unit may file compliance report
by 20.08.2008. Call on
20.08.2008.
4
Metakrafts, 2206,
Sector-I, Narela
Industrial Area,
Delhi
Mfg of Labels &
Nameplates
23.5.2008
Refuse consent and direct the owner of the land not to allow any unit
without pollution control clearance.
11.06.2008
The unit has already been refused consent and Consent to Establish
cannot be issued twice as per the law. Inform the unit accordingly.
18.06.2008
The case was reexamined and it was found that the unit is not giving
clear detail on the process of making the plates. Let the unit file the
detailed process and case will be taken up on 18.07.2008.
CTE obtained on 27.02.2003 (valid upto
25.02.2004).
Applicant
has
submitted
its
representation again
seeking CTE.
As decided by CMC on 18.06.08, letter
issued.
Reply received on 08.07.2008
The issue of granting
Consent to Establish twice
has already been decided.
The unit may seek CTO at
the appropriate time.
5
BHARAT
PETROLEUM
CORPN.LTD.,
BIJWASAN
INSTALLATION
BIJWASAN
STORAGE OF OIL
06.02.2007
Consent issued & SCN also issued for annual return.
CTO(R)
issued
on
21.02.2007
Unit has submittd a representation on
14.07.2008
The unit has sought
permission for disposal of
sludge by bio remediation
involving recycling of oily
sludge into useful manure.
This is being done by using
the latest technology which
is environment friendly and
its being followed at their
Bharatpur installation.
RPCB has permitted the
technology. If they are
converting the oil sludge
without polluting the
environment into manure,
the authorization issued to
them under HWM Rules will
hold good. The Bharat
Petroleum is hereby advised
to install the awareness
scroller in all their petrol
pumps at their own cost.
6
Commercial noise
monitoring of
D.G. Sets carried
out by DPCC lab
7
AM Automobiles
(A unit of Blue
Bird Enterprise
Pvt. Ltd.), Plot No
189-91, Lawrence
Road Industrial
Area
8
Mansfield
Conveyors P Ltd
S - 77, Badli Indl
estate, Delhi - 42
18.06.2008
Issue notices to the concerned violators by the concerned CMC for
correction of deficiencies. If there are any cases of BMW in this list,
concerned EE, BMW will issue the notice. Call on 18.07.2008.
SSO(Air) has provided a list of 28 cases
wherein monitoring of D.G. Sets is
conducted on commercial basis and as
per report furnished by DPCC lab,
ambient air standards are not meeting.
As per decision of CMC dated
18.06.2008,
Letter
issued.
Reply awaited.
Call on 06.08.2008 for
compliance in 15 cases.
Automobiles
Service Centre with
washifng, denting
& painting &
repairing
03.4.2008
Ask him to apply for authorization under HWM Rules.
17.04.2008
The unit may be asked to file a Bank Guarantee of Rupees One Lakh
under HWM Rules to ensure that he is not understating the
production of hazardous waste in the unit where he claims to be
servicing 40-42 cars per day.
29.05.2008
Ask the unit to file permission from Central Ground Water Authority
for ground water drawl.
Unit has applied for Consent to Establish
on 17.12.2007 vide I.D. No. 24514.
Bank is seeking a copy of CTE for
sanctioning the loan.
Unit applied for authorisation under HW
Rules.
As per CMC decision dated 18.06.2008,
letter isued 18.06.2008.
Reply along with affidavit & test report
of ETP on 07.07.2008 and informed that
the unit will use MCD water for washing
activity and will not use ground water.
They have a valid MCD connection for
bulk water.
Insist on CGWA permission.
Call on 20.08.2008.
Safety/toughned glass
01.05.2008
The unit must clarify the capacity of the oven. Call on 03.06.2008.
29.05.2008
Consent to Establish will be granted if he files permission from
Central Ground Water Authority for ground water drawl. Call on
03.07.2008 for documentary proof.
Unit was issued CTO on 20.8.04 valid up
to
31.8.07.
Applied for CTO (Renewal) on 27.8.07.
Applied for CTE in March 2008 vide ID
No.
25104
Letter issued on 18.06.2008 regarding
permission from CGWA for ground
water
drawl.
Reply
received
on
01.07.2008
Ground water consumption indicated in
the consent form is 1000 lt/day.
Insist on CGWA permission.
Call on 06.08.2008.
9
Chime Elctronics,
E-17, Sector-3,
DSIDC, Bawana
Industrial Area
Mfg. of Electronics
& Electrical Goods
07.12.2008
Inpsection by CMC and report.
29.05.2008
Consent to Operate will be granted if the unit submits the permission
for ground water drawl from Central Ground Water Authority
Applied for CTO on 30.11.2006 vide I.D.
No.
20021.
CTE obtained on 11.09.2006 (valid upto
07.09.2007).
Inspected by CMC officials on
01.02.2008.
As per CMC decision dated 29.05.2008,
letter
issued
on
18.06.2008.
Reply along with affidavit recevied on
04.07.2008 stating that they are not using
the ground water and using the water
supply
by
DSIDC.
Ground water consumption indicated in
the consent form is 200 lt/day.
Insist on CGWA permission.
Call on 06.08.2008.
10
Rajdhan Floor
Mills Pvt. Ltd., C32, Lawrence
Road Industrial
Area
Flour Mill
_
Unit has obtained CTO on 12.09.2005
(valid
upto
15.04.2008)
Unit has applied for CTO(R) on
12.03.2008 vide I.D. No. 25164.
The unit draws 6 KLD of
ground water. Ask the unit
to file CGWA clearance.
Call on 20.08.2008.
11
Premier Fine
Printers
Publishers Pvt.
Ltd., A-244,
Phase-I, Okhla
Industrial Area,
Delhi
Alpana
Varnishing Co.
Pvt. Ltd., C-10,
Phase-I, Okhla
Industrial Area
Offset printing
including washing
03.04.2008
Ask him to apply for Consent to Establish.
Unit has obtained CTO under Green
category on 13.03.2003 (valid kupto
18.06.2007)
Letter issued for CTE on 17.04.2008
Applied for CTE on 04.04.2008 vide I.D.
No. 25421.
The unit draws 3 KLD of
ground water. Ask the unit
to file CGWA clearance.
Call on 20.08.2008.
Job work of
overprint coating of
printed paper /
board (without
heating)
_
Unit has obtained CTO under Green
category on 23.12.2002 (valid upto
28.07.2007)
Unit has appleid for CTO(R) under
Green category on 11.07.2007 vide I.D.
No. 22341.
Shift the case to Green
Committee.
Unit has applied for Consent to
Establish/ Renewal and also has applied
for under HWM Rules.
Consent to Establish,
Renewal of Consent &
authorization under HWM
Rules granted.
12
13
DTC Hari Nagar,
Depot-II, New
Delhi
Repair and
maintainance of
DTC Buses
14-11-07
Ask the unit to apply for Consent to establish.
14
Vinayak
International, A115, Wazirpur
Industrial Area
Mfg. of S.S.
Utensils with
buffing and
polishing
_
Appied for CTE on 16.11.2007 vide I.D.
No.
24218.
Production capacity : 4000 Pc/day (as per
affidavit)
Unit has submitted a representation on
10.06.2008 & requested to issue CTE.
Ask the unit to file Bank
Guarantee of Rs. 1 Lakh
under Air Act. Call on
06.08.2008.
15
Dev Steels, A-19,
Wazirpur Industrial
Area
Pickling of SS sheets
05.07.2007
Authorization Granted under HW Rules.
11.6.08
Issue letter for correction of minor deficiencies observed during the
inspection. Also ask the unit to file Bank Guarantee of Rupees One Lakh each
under Air Act, Water Act & HWM Rules. Issue notice for closure to M/s
Durga Enterprises for not applying for Consent to Establish. Call on
03.07.2008.
CTO(R) issued on 20.07.2006 (valid upto
13.06.2009)
Authorization issued on 20.08.2007 as decided
by CMC on 05.07.2007.
Inspection carried out by SIT on 09.05.2008.
Letter along with affidavit received on
12.05.2008
Letter as decided by CMC on 11.6.08 issued
to the unit.
Unit has submitted its reply on 30.06.2008 &
requested to withdrawal of BG as production
capacity is very low i.e. 25 tonne / month. As
per applicaiton submitted by unit production
capacity is 1 tonne/day, however, SIT
inspection report not mentioned about the
production capacity.
In view of his own
admission in the Consent to
Establish for production of 1
tonne/day, Bank Guarantee
cannot be reduced. Issue
fresh letter for filing Bank
Guarantee of Rs. 1 Lakh.
Call on 06.08.2008. Check if
M/s Durga Enterprises has
filed the Consent to
Establish. Call on
06.08.2008.
16
SBL Plastic Pvt.
Ltd., 51-B, Rama
Road, Najafgarh
Road Indl. Area,
Delhi
Mfg .of plastic
products & PVC
Compount
_
Unit has obtained CTO on 04.03.2004
(valid
upto
29.01.2007)
Unit has applied for CTO(R) on
10.07.2007
Wait for High Court order.
17
Haldi Ram
Products Pvt.
Ltd., A-19,
Shivaji Marg,
Najafgarh Road,
New Delhi
Sweets, snakcs &
other eatable items
_
Applied for CTE on 03.12.2007 vide I.D.
No. 24392.
Unit has submitted its representation on
10.07.2008 & requested to issue CTE.
The unit is drawing 93 KLD
from the ground without
CGWA clearance. Unit is
also releasing 105 KLD of
waste water without an ETP.
Ask the unit to file CGWA
clearance & install ETP
immediately and confirm.
The D.G. Sets must have
adequate stack height and
acoustic enclosure. Ask the
unit to comply with all three
conditions by 20.08.2008.
Call on 20.08.2008.