report Rita Elementary School Development Plan Prepared for Republic of the Marshall Islands Government By Beca International Consultants Ltd October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Revision History Revision Nº Prepared By A Richard Woods Description Date Document Acceptance Action Name Prepared by Richard Woods Reviewed by Fraser Vickers Signed Date Approved by 4532511 Final Beca International Consultants Ltd Page i October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Table of Contents Executive Summary ..............................................................................................................1 1 Introduction ..................................................................................................................2 2 Basic Brief.....................................................................................................................3 3 Site .................................................................................................................................5 4 Buildings .......................................................................................................................9 5 Site Utilities .................................................................................................................12 6 Project Implementation and Costs ...........................................................................13 7 Maintenance................................................................................................................17 4532511 Final Beca International Consultants Ltd Page i October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan List of Figures Figure 1 – Location Map ....................................................................................................................3 Figure 2 – Classroom Requirements ................................................................................................4 Figure 3 – Open Space towards Entry .............................................................................................5 Figure 4 – Open Space towards East ................................................................................................5 Figure 5 – Neighbouring Uncladded Building ...............................................................................5 Figure 6 – Entry Fence ........................................................................................................................6 Figure 7 – Police Substation ..............................................................................................................6 Figure 8 – Trees to South East ...........................................................................................................6 Figure 9 – Site Zoning ........................................................................................................................7 Figure 10 – Site Ventilation ...............................................................................................................8 Figure 11 – Building 1 ........................................................................................................................9 Figure 12 – Building 2 ........................................................................................................................9 Figure 13 – Building 1 Clerestory .....................................................................................................9 Figure 14 – Building 3 to be Demolished ......................................................................................10 Figure 15 – Interior of Building 3 to be Demolished ...................................................................10 Figure 16 – Water Tank to be Demolished ....................................................................................10 Figure 17 – Ventilation Analyses ....................................................................................................11 Figure 18 – Window/Ventilation Detail .......................................................................................11 Figure 19 – Staging of Existing Infrastructure Works .................................................................13 Figure 20 – Staging of New Works .................................................................................................14 Figure 21 – Cost Estimate (US$) Summary ...................................................................................15 Figure 22 - Building Element Lifespans ........................................................................................17 Figure 23 - Expected 20 Year Maintenance Expenditure -Classroom Building at Rita ES.....18 Appendices Appendix A – Existing Site Plan Appendix B – Proposed Site Plan Appendix C – Proposed Classroom Building 10 - Floor Plans Appendix D – Proposed Classroom Building 10 - Elevations Appendix E – Proposed Classroom Buildings 7, 8 and 9 - Floor Plans Appendix F – Proposed Classroom Buildings 7, 8 and 9 - Elevations 4532511 Final Beca International Consultants Ltd Page ii October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Executive Summary Development of Rita Elementary School for its planned enrolment of 692 students requires extensive building removals and replacements. All required civil works can be done in two stages, without interruption to academic operations. Some modifications to existing buildings, beyond these two stages, would also improve retained building performance. Backlog maintenance and need for specific demolitions and/or alterations has been assessed by Beca’s Asset Information Management System (AIMS). The development plan is predicated on the assumption that backlog maintenance will be funded and carried out, and that a programme of routine maintenance will be sustained in the future. The development plan proposes the retention of the large open central area for recreation purposes, with minimal encroachment by new construction. New tree plantings, walkways and a designated parking area will further enhance the school’s image and performance. Building design focuses on good response to climatic concerns. Natural ventilation and lighting are introduced via windows and clerestory roof features. Time proven construction materials (e.g. concrete blockwork walls and wood truss roofs) are usually specified. 4532511 Final Beca International Consultants Ltd Page 1 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan 1 Introduction This Project Development Plan (PDP) provides a guide for the future development of the existing Rita Elementary School (Rita ES) on Majuro Atoll, Republic of the Marshall Islands (RMI). Rita ES is administered and maintained by the RMI Ministry of Education (MOE) which is also responsible for its further development. The PDP identifies site and facility development requirements for both the short and long term. Site development focuses primarily upon the location and relationship of existing and proposed buildings as well as site circulation, external facilities and site services. Facility development identifies the type and intended use of proposed buildings, their layouts and elevations, general dimensions and key construction details. The PDP also discusses critical aspects of project implementation. The Rita ES base data and development brief derive mainly from information obtained from MOE, the ADB Education Project Manager and Beca’s site investigations in March and April 2003. 4532511 Final Beca International Consultants Ltd Page 2 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan 2 Basic Brief Rita Elementary School is located at Djarrit on Rita Island, Majuro Atoll in the Ralik group of atolls. Figure 1 – Location Map The current elementary enrolment of 521 is projected to increase to 600, plus 92 kindergarten students. All students and staff live off site. There is no brief for housing on the site although a local request for two staff apartments is noted. As Section 4 elaborates below, two existing classroom buildings (both badly deteriorated “Enewetak” buildings), a toilet block and two large water storage tanks are in poor condition. They should be 4532511 Final Beca International Consultants Ltd Page 3 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan demolished and removed. Two other buildings can be retained with proper backlog maintenance. They provide classrooms, a computer room, administration space, small stage and auditorium, storage and toilets. In light of the planned 692 student enrolment, the 30:1 students/classroom ratio, buildings to be retained or demolished, and requested other space, a total of 16 new classrooms should be provided, along with associated facilities. Existing facilities can provide for all other built space requirements. Figure 2 – Classroom Requirements Room Description Subtotals Required Elementary Classrooms (600 students ÷ 30 students/ classroom) Required Kindergarten Classrooms (92 ÷ 30 students/ classroom) Required Computer Rooms Required Library Existing Classrooms Classrooms to be Demolished New Classrooms required Totals 20 3 1 1 18 -9 25 9 16 Site development requires clearance of the demolished buildings and siting of proposed new buildings. Further requirements include surfacing of a ball court, as well as upgrades to walkways, landscaping and site utilities. 4532511 Final Beca International Consultants Ltd Page 4 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan 3 Site The existing Rita Elementary School site layout is shown in Appendix A. Other site features include: Large 2.3284 acre partially fenced site with open recreational area in centre and public road on the southwest. Ocean to northeast and lagoon to southwest across road. Generally flat site about 9’ above sea level, potentially subject to flooding by extreme tidal surges. Palm trees along the northeast and southeast boundaries, a few large trees in front of Buildings 1 and 3. Police substation and two roofed containers used by school between Building 2 and the road. Bus stop along the road between entry gate and Building 1. Sewerage pumping station (use not confirmed) on site near entry and bus stop. Cladding stripped from previous school buildings mostly on landowner’s property across northwest boundary. LDS church to northwest behind neighbouring landlord’s stripped buildings. 4532511 Final Figure 3 – Open Space towards Entry Figure 4 – Open Space towards East Figure 5 – Neighbouring Uncladded Building Beca International Consultants Ltd Page 5 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Figure 6 – Entry Fence Figure 7 – Police Substation Figure 8 – Trees to South East Assessment The Rita ES site provides adequate space to accommodate its planned development and possible future expansion. Conclusions include: Potential for siting planned new construction to take advantage of winds and to avoid disruption of academic operations during implementation. Little conflict between school functions and the police station or bus stop. The former may improve security. The latter provides a pick up and drop off area for students. Containers in bad location for air circulation and public image of school. Proposed new construction will eliminate their need. 4532511 Final Beca International Consultants Ltd Page 6 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Sewerage pumping station inappropriately located on site. Need to preserve some but not all of the open space in centre of site. Recommendations Appendix B shows a Proposed Site Plan which addresses known difficulties and proposes new construction and landscaping. The 16 new classrooms are housed in four separate buildings arranged at an angle to the prevailing wind for good site and building air circulation. Figure 9 – Site Zoning 4532511 Final Beca International Consultants Ltd Page 7 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Figure 10 – Site Ventilation Proposed features include: Designated parking for administration in Building 2, directly related to the entry gate and public road. Retention of the central open space and shade trees. Removal of the containers and sewerage pumping station. Construction of a ball court in the southeast corner. Provision for a flagpole near the entry and rubbish collection area near the road. Relocation of playground equipment and softball screen. Upgraded boundary fence. 4532511 Final Beca International Consultants Ltd Page 8 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan 4 Buildings Building 1 is a recent two storey construction of typical concrete block with a clerestory roof profile clad in aluminium sheets. However, there are few vents in the clerestory which could have been used for better air circulation. Building 2 is older but in fair condition. Its single storey construction is of concrete frame, concrete block walls and aluminium roofing over a wood frame. Both of these buildings can be retained if backlog maintenance is carried out. However, some modifications could enhance their performance. Figure 11 – Building 1 Existing Rita ES facilities consist of four large and six smaller buildings. Building 3 and 4 are old “Enewetak” constructions in poor condition and performance. Their aluminium cladding is especially environment and user unfriendly. Both should be demolished and removed. Figure 12 – Building 2 Building 5 is a water storage construction which is in poor condition, as is the toilet Building 6. Both should be replaced with new facilities. Similarly, the concrete water tank near the entry should be demolished and removed in order to improve school appearance and in light of proposed new water storage in retrofitted polyethylene tanks – part of a comprehensive upgrading of water and sanitation systems. Figure 13 – Building 1 Clerestory Floor levels of most existing buildings are about 1’ above ground level which is a little less than preferred for flood protection. 4532511 Final Beca International Consultants Ltd Page 9 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Construction of 16 new classrooms in four buildings is proposed. Appendices C and D show their floor plans and elevations. They are two storey designs sited at an angle to prevailing winds, with similar profile and layout to Building 1 but with better natural ventilation and light. Other features include: Window designs and clerestory vents to provide natural light and cool the interior without need for air conditioning or ceiling fans (see Figure 17 and Figure 18). Floor levels 1’-6” above ground level for flood protection. Toilet (one per classroom) access from within classroom for improved hygiene and maintenance. Standard 20’x30’ classroom and spacious lockable storage. Durable watersealed concrete block wall and non-corrosive Onduline roof construction. Non-corrosive fittings specified throughout, including fibreglass rebar in reinforced concrete. Rainwater collection from all roofs and storage in polyethylene tanks. Building 1 should be retrofitted with additional clerestory vents. 4532511 Final Figure 14 – Building 3 to be Demolished Figure 15 – Interior of Building 3 to be Demolished Figure 16 – Water Tank to be Demolished Beca International Consultants Ltd Page 10 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Figure 17 – Ventilation Analyses Typical Existing Ventilation Proposed Ventilation Light Still/hot air zones trapped above/ below air stream Air stream too high to flow over sitting bodies Radiant heat from poorly ventilated ceiling space Raked ceiling gives extra room volume Clerestorey louvres exhaust hot air Natural light introduced through clerestorey Hot air ducted to clerestorey vents Low sill height eliminates still air zones Figure 18 – Window/Ventilation Detail Light Air Plywood sliding panel Louvres 4532511 Final Ventilation separated from natural light Air supply controlled by plywood sliding panel Beca International Consultants Ltd Page 11 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan 5 Site Utilities Site development will require revisions and extensions to water and power networks. Existing water tanks are in poor condition and require removal and replacement. Specific observations include: New construction to feature polyethylene tanks for rainwater collection from every roof. Existing Buildings 1 and 2 to be retrofitted with polyethylene tanks. Local water mains supply to act as backup for rainwater. Local power supply to be extended to all new construction. 4532511 Final Beca International Consultants Ltd Page 12 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan 6 Project Implementation and Costs Overall, implementation is not negatively impacted by site conditions. New buildings and site works can be undertaken without interruption to academic operations, if new classroom buildings are built in two stages. Staged implementation of new classrooms and associated works will spread funding requirements over several years with some benefit to overall budgeting. An economy of scale can perhaps be achieved by bundling all Rita ES works into one contract specifying staged implementation and a mid-term contractor performance evaluation. Figures 19 and 20 graphically indicate the two stages of recommended works on site plans, starting with construction of two four classroom buildings in an open area of the site, followed by demolition of badly deteriorated buildings and construction of two more four classroom buildings in their place. Figure 19 – Staging of Existing Infrastructure Works 4532511 Final Beca International Consultants Ltd Page 13 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Figure 20 – Staging of New Works Figure 21 shows that estimated costs for works total US$2,555,000, of which $1,240,000 represents first stage implementation in 2004. The remaining $1,315,000 would fund the second stage in 2005. These totals are comparable to those indicated by RMI in the 10-Sep Executive Summary to its “The Portfolio Budget Statements FY2004 – Infrastructure Development and Maintenance”. Given the noted 10-15% margin of error in estimation, development of Rita ES works (e.g. final design and documentation) can now proceed toward implementation without major revisions to the design brief or recommended works. 4532511 Final Beca International Consultants Ltd Page 14 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Figure 21 – Cost Estimate (US$) Summary Description Total Construction of buildings 7 and 8 Demolitions Construction of buildings 9 and 10 Site Works Construction Contract Total FF&E Fees (15% for A & E and Project Management) Project Contingency (15%) Estimated Project Totals 765,000 65,000 765,000 105,000 1,700,000 230,000 290,000 335,000 2,555,000 Stage 1 Stage 2 FY2004 FY2005 765,000 55,000 820,000 115,000 140,000 165,000 1,240,000 65,000 765,000 50,000 880,000 115,000 150,000 170,000 1,315,000 Notes: Estimates are based on present day costs and have an accuracy range of plus or minus 10-15%. Construction works for each stage will be carried out under competitively bid contracts. It has been assumed that the FF&E will be purchased direct by the client and in such a fashion as to optimise shipping costs. The FF&E allowance for Rita ES is based on 30 students per classroom and includes the following: A desk & chair per student One teachers desk & chair per classroom Two blackboards per classroom One cabinet per classroom A sundries allowance (5% of the cost of the above) It has been assumed that planting and landscaping will be carried out as part of a community project and accordingly no allowance has been made in the estimate. An allowance has been included in the construction costs for GRT (3%). No allowance has been made for the following: Escalation Planting and landscaping Re-use of existing FF&E Temporary student re-location Legal fees 4532511 Final Beca International Consultants Ltd Page 15 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Consent costs Land purchase 4532511 Final Beca International Consultants Ltd Page 16 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Maintenance 7 The purpose of this section is to give an indication of the maintenance expenditure required to keep each new building in an appropriate condition (termed as “very good” by AIMS in its separately presented report) during its life. This required maintenance expenditure should be recognised and budgeted for in addition to the capital works cost set out in Section 6. It should be noted that the expenditure requirements for existing buildings are reported separately in other documents. Each element of a new building has an expected lifespan during which it deteriorates to a point where it no longer meets its service potential. At that point, it is necessary to maintain or renew the element to return it to “very good” condition. This life cycle approach to maintenance at the element level has been adopted for the purposes of maintenance programming and budgeting on a 20 year timeframe. The elements included for maintenance in this PDP are listed in Figure 22. Figure 22 - Building Element Lifespans Building Element Expected Lifespan (in years) Roof Cladding External Windows Doors Stairs Floor Finishes Wall Finishes Ceiling Finishes Sanitary Plumbing Fire Services Electrical External Works and Sundries 20 20 20 10 10 3 3 10 10 8 20 It is assumed that: No maintenance will be required on the roof structure, foundations, framing or site works, as these elements have a lifespan well beyond the 20 year programming and budgeting timeframe. The above elements will start service in “very good” condition and planned maintenance work will return the elements to the same condition. The condition of all elements will be regularly monitored and unexpected problems will be identified and resolved promptly, regardless of expected lifespans. 4532511 Final Beca International Consultants Ltd Page 17 October 2003 RMI Infrastructure Development and Maintenance Plan – Rita Elementary School Development Plan Using the above lifespans and assumed condition information, the AIMS methodology (see the separately presented AIMS report for elaboration) gives the following maintenance forecast for a 20 year period. As the four new buildings at Rita ES will be essentially the same, expected expenditures for only one building are illustrated. Figure 23 - Expected 20 Year Maintenance Expenditure Classroom Building at Rita ES 20 Year Maintenance Expenditure 100,000 90,000 80,000 $ (USD) 70,000 60,000 50,000 40,000 30,000 20,000 Maintenance Expenditure Year 20 Year 19 Year 18 Year 17 Year 16 Year 15 Year 14 Year 13 Year 12 Year 11 Year 10 Year 9 Year 8 Year 7 Year 6 Year 5 Year 4 Year 3 Year 2 - Year 1 10,000 20 Year Average Cost of Building Maintenance Figure 23 shows that the total cost of maintaining one of the new classroom buildings at Rita ES over its first 20 years of service is expected to be $135,000, or an annual average of $6,750. The total for the four new buildings is $540,000, or $27,000 annually. This equates to 1.07% per annum of the total construction contract cost including fees and contingency. Actual expenditure per year will of course be determined by how the required maintenance is packaged into contracts. Cost of FF&E Maintenance In addition to the building elements, FF&E (furniture, fixtures and equipment) also deteriorates over time. For the new buildings at Rita ES, the initial cost of FF&E is calculated to be $230,000. FF&E is assumed to require replacement three times in 20 years for a total additional maintenance budget requirement of $690,000, or $34,500 annually. 4532511 Final Beca International Consultants Ltd Page 18 October 2003 Appendix A Existing Site Plan Drawing A801 Drawing A801 Key 01 Existing Classroom Block 02 Existing Administration/Library Building 03 Existing “Enewetak” Classroom Building 04 Existing “Enewetak” Classroom Building 05 Existing Water Storage Building 06 Existing Toilet Block Appendix B Proposed Site Plan Drawing A802 Drawing A802 Key 01 Existing Classroom Block 02 Existing Administration/Library Building 07 Proposed Classroom Block 08 Proposed Classroom Block 09 Proposed Classroom Block 10 Proposed Classroom Block Appendix C Proposed Classroom Building 10 - Floor Plans Drawing A803 Appendix D Proposed Classroom Building 10 - Elevations Drawing A805 Appendix E Proposed Classroom Buildings 7, 8 and 9 - Floor Plans Drawing A804 Appendix F Proposed Classroom Buildings 7, 8 and 9 - Elevations Drawing A806