Campsbourne Estate Projects

advertisement
Campsbourne Estate Projects
Page 1 of 5
(Estimated Budget) £1,000-£10,000
Project Title
Bedale House Entrance
(Ref: 1010a)
Rhein House Arches
and Car Park
(Ref: 1015)
Central Pathway
improvements
(Ref: 1020)
Stokley Court Courtyard
Garden
(Ref: 1012b
Estate Maps
(Ref: 1029)
Bedale House Rear
Garden
(Ref: 1010b)
Project Location
Bedale House front
garden
Project Description
Small and welcoming entrance
feature including manageable
planters with flowering shrubs and
bulbs.
Rhein House Arches
To remove vehicle bollards to
(open area underneath
enable parking from both the road
first floor flats) and Car
and car park. To add central barrier
Park.
under arches and to mark parking
bays in car park.
Path from Harvey
Addition of low level wooden fence
House to Boyton Close to delineate private garden of 18
Boyton Close and public footpath.
(Crime Prevention advice)
Installation curved mirror
Stokley Court central
To add new benches, fresh gravel
communal garden
to seating areas and dig out and
replant old shrub bed along one
side of garden.
Four key entry points on To design and install a series of
the estate
signs showing a map of the whole
estate.
Bedale House (rear)
Landscaping to rear garden
including flowering shrubs, bulbs
and seating. This space is well used
by residents throughout the year
and especially when it is warmer,
but there are currently few seats on
uneven ground and the area is
mainly just laid to lawn.
Costings estimate
£2000
My Choice!
£2000
£2000 - £3000
£3000
£3000
£5000
1
(Estimated Budget) £1,000-£10,000
Project Title
Stokley Court Gates
Project
continued from page 1
Project Location
Stokley Court (rear by
end of Pembroke Road)
(Ref: 1011)
Fence between Shelley
and Harvey House
(Ref: 1001b)
Improvements to rear of
Campsfield - Fencing
project (Ref: 1009)
Stokley Court Entrance
(Ref: 1012a)
Newlands House
Courtyard
Top of wall between
Shelley and Harvey
House
Campsfield House
(rear)
Stokley Court Car Park,
off Brook Road
Newlands House
(Ref: 1014)
Newlands and Moselle
Play areas
(Ref: 1024)
Old play areas in
Moselle Close and
Newland Road
Project Description
High gated fence encompassing
area to rear and sides of the
scheme. The residents of Stokley
Court suffer from people using this
open access to cut through the
scheme and this is a genuine safety
concern for residents.
To install attractive 6ft fence on top
of brick wall to rear of Shelley
House. Design to be approved by
Crime Prevention Officer.
Unify fencing around rear garden,
with single style, open green railings
with nice bespoke design
Tarmac car-park area to create
smooth and safe surface
Resurface central courtyard with
safer material (currently lose stones
on old tarmac). This project would
make the courtyard a safe and
pleasant space, not only for the
mature residents but the many
young people and children who live
here.
Re-landscaping of several small
areas where play equipment was
removed. When old equipment was
removed, nothing was done with the
areas which were left redundant
and unsightly.
Costings estimate
£7,500
My Choice!
£10,000
£10,000
£10,000
£10,000
£10,000
2
(Estimated Budget) £10,000-£20,000
Project Title
Play Centre Ball Play
area
Project Location
Campsbourne Play
Centre, Newland Road
(Ref: 1027)
Redesign of rear of
Myddleton House
Myddleton House
(Ref: 1007)
Alexandra Palace Park
Entrance Project
(Ref: 1016b)
Wat Tyler Community
Green
Newlands Field
(Ref: 1004)
Wat Tyler Greenspace
between main block
and Campsbourne
Road carpark
Honeymead House
Garden
Honeymead House
(rear)
Project Description
To create a small tarmaced area for
ball play to the back of the outdoor
play area within the grounds of the
play centre.
Increase height of wooden fencing
and remove fencing around
tarmaced area to improve access to
rear garden. Put tarmac area back
to grass.
New welcoming entrance feature –
gate or archway with sign at top of
Boyton Road
Redesign green space/ create nicer
and more useable community
space. To involve residents in the
design to ensure the garden is in
keeping with residents wishes and
reflects their needs.
Redesign green space / Create
nicer and more useable community
space
(Ref: 1008)
Tivendale Gardens
(Ref: 1013)
Tivendale House (rear)
Create two dog free fenced green
spaces in rear gardens, remove or
repair all pram sheds and fence off
bin area to make it safer for children
to play in rear garden
Costings estimate
£13,000
My Choice!
£10,000 - £20,000
£10,000 - £20,000
(costing varies
depending on the extent
of the project.)
£20,000
(subject to the design
agreed for basic work
without play equipment /
furniture).
£20,000
(subject to the design
agreed for basic work
without play equipment /
furniture).
£20,000
3
(Estimated Budget) £20,000-£50,000
Project Title
Redesign of front of
Myddleton House
(Ref: 1006)
School and Community
Gym
(Ref: 1017)
Allotments Project
(Ref: 1023)
Wat Tyler Communal
Garden
(Ref: 1005)
New play area project
(Ref: 1028)
Project Location
Myddlelton House
Project Description
Potentially remove existing green
railings and extend front security
panel across to the block (leaving
ground floor flats un-gated). In
discussion with residents, consider
re-surfacing area in front of ground
floor flats and adding low level
fence with gates to denote private
space area, or leave open as
Campsfield House.
Campsbourne School
Upgrade gym and shower and toilet
block to enable community use and
link in with use of swimming pool.
School has input £38,000 to project.
Potentially the car park
Change of use of car park to
on Newland Road
allocated allotments
Wat Tyler Rear Garden Create a nice garden space for Wat
to North of block
Tyler residents with seating and
planting. Remove or reduce trees
and resolve drainage and replace
metal fencing. Redesign area /
Create nicer and more useable
space
To be decided Creation of new community play
Newlands Field,
area for children with full age
Alexandra Palace Park? ranges catered for.
Beside Wat Tyler
(0-5’s, 5-12’s, MUGA)
House? Harvey House
Green? Other?
Costings estimate
£20,000 - £30,000
My Choice!
£20,000 - £30,000
(project is currently
being costed)
£30,000 - £40,000
£50,000
(subject to the design
agreed for basic work
without play equipment /
furniture).
£40,000 - £60,000
Please vote for a
location if you are
voting for this project!
.
4
(Estimated Budget) £50,000-£100,000
Project Title
Highways Project
Project Location
Estate Highways
(Ref: 1021)
New Neighbourhood
Square/ Green
(Ref: 1001)
Front and side of
Harvey House/ Corner
of Campsbourne and
Pembroke Road
Project Description
Full consultation on one-way
system, opening Myddleton Road,
traffic calming, parking and
implementation of results of
consultation
To create a welcome entrance to
the estate. To design a space with
seating, improved walkways and
attractive planting. Redesign area to
create an outdoor space for
resident’s events and gatherings.
Costings estimate
£100,000
My Choice!
£75,000 - £100,000
(The cost of this project
will vary according to
the specification agreed)
To involve residents in the design to
ensure the garden is in keeping with
residents wishes and reflects their
needs.
Please e-mail back to Karen at Campsbourne@haringey.gov.uk or print off and use our
freepost (no stamp required) address below:Campsbourne Consultation, Area Assemblies Team, Freepost RYLE-BGJE-XJJS, 2nd Floor,
Alexandra House, 10 Station Road, Wood Green, London, N22 7TR
5
6
Download