Request for Quotation Supply of Road & Bridge Making Equipment Council Address: Telephone: E-mail address: Fax: Contact Person: Local Buy Contract Number Request for Quotation (RFQ) RFQ Number: Closing Time for RFQ: Quotes to be returned to: Complete all details here BUS 212- 0111 Detail Request Here: Supply 1 x Multi-Tyre Roller Place RFQ Number Here. 5pm - 2nd April 2011 Minimum 5 days Via Vendor Panel Only A contractor’s quotation is to remain valid for 30 days. LGA Procurement/Local Buy Contract BUS 212- 0511 Request for Quotation Specification INTRODUCTION This Request for Quotation is issued under the terms and conditions of the Local Buy Contract No. BUS 212-0511 Quotations are to be supplied in an electronic format only. SCOPE OF PROJECT Supply and Deliver One Only Multi-tyre roller A Dynapac may be offered as trade. Photos and details will be supplied upon request. EQUIPMENT TO BE DELIVERED BY Supply Details of when you wish the machine to be delivered and operational EG. Within 8 week of date of Purchase Order EQUIPMENT BEING REPLACED Supply Details of Machine currently in use. Make: Model: Power: Capacity: No Cylinders: Transmission Type: NEW EQUIPMENT SPECIFICATIONS Provide details of the specifications for the NEW EQUIPMENT required. NOT TO EXCEED 2 PAGES Vandalism Kit Required: Y/N -2- LGA Procurement/Local Buy Contract BUS 212- 0511 Request for Quotation Specification OPTIONAL EXTRAS (DELETE IF NOT REQUIRED) Provide details of the OPTIONAL EXTRAS required for the NEW EQUIPMENT. NOT TO EXCEED 1 PAGE Contractors for the supply of Front End Loaders are not to fit lifting hooks to loader buckets ACCESSORIES (DELETE IF NOT REQUIRED) Provide details of the Accessories required for the NEW EQUIPMENT. NOT TO EXCEED 1 PAGE EXTENDED WARRANTY REQUIRMENTS (DELETE IF NOT REQUIRED) If Council seeks an Extended Warranty please provide details of what you are seeking. TRAINING REQUIRED (DELETE IF NOT REQUIRED) Purchasers are to supply Contractors with Training Form; Contractors must complete in detail a schedule of the training to be supplied. This form must be completed as part of their Quotation SERVICING AUTHORISATION (DELETE IF NOT REQUIRED) -3- LGA Procurement/Local Buy Contract BUS 212- 0511 Request for Quotation Specification Council seeks to conduct Warranty repairs at the supplier’s expense. FINAL TESTING AND INSPECTION LOCATION Council to advise if they wish final testing to occur at their location or at the contractors location. (If testing and final inspection occurs at the Contractors premises final acceptance must occur at the nominated delivery location as advised by council refer) DELIVERY AND PRICING If the Contractor fails to deliver the ordered goods and / or services by the agreed delivery date, a Purchaser may cancel the Purchase Order. The quoted Price is inclusive of all charges for packaging, packing, insurance and delivery of the Goods in accordance with this Agreement; and all Taxes except GST. Price may not be increased without the Purchaser’s prior consent. The Purchaser has the right to refuse to give its consent. PAYMENT SCHEDULE In accordance with General Conditions of Contract Payment is required within 30 days of receipt of invoice. QUOTATION COMPONENTS TO BE SUPPLIED BY THE QUOTING CONTRACTOR (DELETE SPECIFIC LINE ITEMS IF NOT REQUIRED) The contractor must supply the following as part of their complete quotation to council. 1. Expected delivery date if order is placed within 30 days of the date of the Quotation. 2. Illustrations of proposed machine 3. Drawings of proposed machine 4. Brochures of proposed machine 5. Engine performance data on proposed machine -4- LGA Procurement/Local Buy Contract BUS 212- 0511 Request for Quotation Specification 6. Weight and performance calculations on proposed machine 7. Details of oils and coolants used in the proposed machine 8. The contractor is to complete any attached proformas as supplied by the Purchaser. 9. Contractors must supply with every quotation to the Purchaser a detailed and itemised list showing the service interval of the equipment, number and cost of relevant parts and their part numbers required per service, volume of coolants and lubricants required per service to a total of 6yrs / 6000 hrs, a Service Contract maybe formed on the basis of costs supplied. 10. A Contractor’s whose equipment runs engines that are based on Selective catalytic reduction (SCR) technology must supply usage figures for AdBlue in their engines. 11. Contractors must submit with their quotations an Operating Noise Schedule. 12. Contractors must supply with their quotation a detailed assessment and supporting documentation on the Market Resale Value @ 6yrs / 6000 hrs for the Equipment being quoted on, this is also to be present as % of purchase price in current Australian Dollars. NOTE: “buy back” pricing will not be accepted 13. The Contractor must attach to all Quotations forwarded to Purchasers a Fit for Duty Statement in which they guarantee the Equipment outlined in the Quotation shall offer satisfactory performance to recognised benchmarks for availability and productivity to Council after the equipment is commissioned. 14. Any free services which the Contractor nominates to supply, additional to those specified, shall be carried out in accordance with the details supplied by the Contractor at a site approved by the Purchaser 15. Contractors must supply with their quotation a detailed list and pricing of specialist tools required to service and maintain the equipment being quoted on. -5- LGA Procurement/Local Buy Contract BUS 212- 0511 Request for Quotation Specification REGIONAL LOCATION OF OPERATION Supply Details of physical geographical location equipment will be located and used. EG: Scenic Rim Regional Council, Boonah Kalbar, Aratula, Moogerah Area OPERATIONAL USE OF MACHINE Supply details of what work the equipment will be doing. EG: Resurfacing of gravel road network. – Shale to Blue Metal Rock prominent substructure CLIMATIC CONDITIONS Supply Details of climate conditions equipment will be operated in. Winter Minimum: Summer Maximum Humidity Max -5 Degrees Celsius 40 Degree Celsius 95% REGISTRATION OF MACHINE Supply details of council’s current registration requirements. Common Date: 3rd Party Insurance Company: -6- LGA Procurement/Local Buy Contract BUS 212- 0511 Request for Quotation Specification COUNCIL AUTHORISATION AUTHORISED BY: COUNCIL NAME: COUNCIL OFFICER: POSITION: PH: FAX: SIGNATURE: DATE : SUPPLIER ACCEPTANCE I/we accept and understand all specifications relating to this Request for Quotation and understand and agree this Request for Quotation is not regarded as an order, contract or approval to initiate works. All replies to this Request for Quotation are subject to approval. SUPPLIER ACCEPTANCE BY: COMPANY NAME: REPRESENTATIVE: POSITION: PH: FAX: SIGNATURE: DATE: Please return this Request for Quotation document along with your quotation response to the above mentioned Council Representative. The Quotation will not be accepted without receiving this document signed. -7-