AGENCY REQUEST FOR BUILDING COMMISSION ACTION February 2007 Agency: Department of Corrections Locations: Southern Oaks Girls School Union Grove, Wisconsin Request Request authority to construct facility maintenance and repair projects at various correctional facilities at an estimated total project cost of $2,525,100 General Fund Supported BorrowingFacilities Maintenance and Repair and authority to permit the Division of State Facilities (DSF) to adjust individual project budgets. Project No. Institution Project Title Facilities Maintenance and Repair: 07A2U SOGS Heating & Ventilation Improvements Project Budget $256,800 Southern Oaks Girls School Heating and Ventilation Improvements (Project No. 07A2U). Request authority to construct a Heating and Ventilation Improvement project at Southern Oaks Girls School (SOGS) at a total project cost of $256,800 GFSB-Facilities Maintenance and Repair. This project will make heating and ventilation improvements to Buildings 12 and 13 at SOGS on the grounds of Southern Wisconsin Center. The project will install hot water radiant heat piping on the underside of the first floor slab at the perimeter resident rooms. Existing pneumatic zone controls for hot water booster coils will be replaced with digital controls. Air supply grilles in a number of resident rooms will be lowered. Perimeter heat will be added to a Computer Lab space. The basement/crawlspace will receive dehumidifiers piped to drain to the plumbing system as well as new area wells with fans for ventilation. Sump pumps and pit modifications will be added to the electrical pit serving the building. Buildings 12 and 13 are historic buildings constructed in 1928 and are connected into a single building with 31,453 gross square feet in area. They were remodeled in 1994 for the Department of Corrections Southern Oaks Girls School Program. Due to the historic nature of the building, the walls and building perimeter are largely uninsulated. Wall and floor temperatures in the perimeter resident rooms ranged between 48 degrees to 55 degrees with an outside air temperature of 25 degrees. While average air temperatures in the rooms meet the code minimum 68 degrees, the temperature at resident beds and desks placed along outside walls does not. This project will add radiant heat to the floors along the perimeter to raise the temperature of the floor slab. In addition the supply grilles were installed near the ceiling adjacent to the return grilles. This project will lower the supply grilles in the most problematic resident rooms to near the floor to better distribute heat from the existing air system. Existing pneumatic zone controls for resident rooms drift out of calibration and are located throughout the basement/crawlspace and are not readily resettable between the winter and summer seasons. The basement/crawlspace has dirt and gravel floors and has a history of water, high humidity and mold growth. The electrical service entrance pit floods under heavy rain conditions resulting in water flooding in the electrical equipment room. Construction Design (8%) Management (4%) Contingency (12%) Total $206,300 16,500 9,200 24,800 $256,800 Project Approval A/E Selection Design Report Receive Bids Construction Start Construction Completion Previous Building Commission Action None Agency Contact Deb Aschauer, (262) 878-6506, Deborah.Aschauer@wisconsin.gov Feb. 2007 Apr. 2007 July 2007 Oct. 2007 Nov. 2007 May 2008