PRIME MINISTER’S SECRETARIAT NATIONAL DISASTER MANAGEMENT AUTHORITY ISLAMABAD UPDATE ON LANDSLIDING / LAKE (VILLAGE ATTA ABAD) - PERIOD COVERED UPTO 1800 HOURS 18 MAY 2010 Latest Situation Blockade. FWO has completed excavation work on the spillway and has pulledout its elements since 15 May 10. Current details of the lake are as under:o Height of Water surface from River bed 340 Ft o Length of Reservoir 16.5 Kms o Rise in last 24 hours 0.27 Ms o Seepage of water 153 Cusecs o Free Board 5.32 M Expected time of over flow is likely b/w 20-30 May 2010. Upstream Area. Following villages have been inundated and population shifted to safer places:o Ainabad 342 o Shishkat 532 o Gulmit 50 Total 924 (Individuals) Downstream Area. Basing on worst case scenario (dam breaches within one hour of overtopping of water). Following number of population centres and communication infrastructure are likely to be affected:o Population Centers District Hunza-Nagar 25 villages (including Atta Abad & Sarat) District Gilgit 14 villages o Bridges RCC 9 (Ganesh and Hini most vulnerable) Suspension 7 Bailay 1 KKH. 22 Kms of KKH has submerged in the lake. Response by NDMA/GBDMA Monitoring mechanism / early warning system established at the site / Hunza. Army troops deployed in Hunza, Gilgit and Chillas to assist civil administration. Boat operation cancelled due to safety considerations. 2 x Helicopters (6 Aviation Sqn), 2 x MI17 (Army) and 2 x Helicopters of Agha Khan foundation has been / are being deployed to cater for any unforeseen. Food / NFI provided to GBDMA by ERC (PRCS and FOCUS also contributing). Army Engineer Corps made responsible for maintenance of bridges. FWO made responsible for road maintenance. UNICEF asked to despatch 500 x Toilets for probable camps and potable water supply (treatment, storage & bowzer delivery) for upto 30,000 persons. Coordination Mechanism. To coordinate response three tier command and control system devised. In that regard 3 x Control Rooms established at Hunza, Gilgit and NDMA (Islamabad). Evacuations o Overall resp of evacuation and early warning lies with GBDMA, (Army will facilitate GBDMA). o 4647 Individuals (558 families) evacuated from 25 x Villages of District Hunza Nagar and shifted to 15 x Camps. o 35% population of affected villages (14 in number) of District Gilgit have also been shifted to safer places. Future Challenges IDPs Rehabilitation o Survey of IDPs concerning village Sarat and Attaabad completed and rehabilitation plan is in process. o Survey of IDPs concerning villages (submerged) upstream will be conducted once the water recedes. o Downstream villages which gets affected due to flooding of water (after the overtopping of the lake) would be carried out only on materialization of flooding. Opening of KKH. A total of 22 kms of KKH has been submerged in the lake. After overtopping of the lake, once the water recedes, then detail survey for opening of KKH would be carried out. Important Telephone Numbers - NDMA: 051-9205035, 9213083, Fax: 9213082, Web: www.ndma.gov.pk , NDMA Spokes Person 03315657773, NDMA Media Coordinator 03008569229 Chief Minister Gilgit-Baltistan Disaster Relief Fund Account Number = 4932-6, National Bank of Pakistan, NLI Market Branch, Gilgit e Important Telephone Numbers - NDMA: 051-9205035, 9213083/ 0302-8518714, Fax: 9213082, Web: www.ndma.gov.pk Chief Minister Gilgit-Baltistan Disaster Relief Fund Account Number = 4932-6, National Bank of Pakistan, NLI Market Branch, Gilgit