Plan of Action 2012 Mongolia PROGRAMME INFORMATION Implementing Host National Society: Mongolian Red Cross Society Number of people to be reached: Budget total: 290,000 CHF 945,763 1. Executive Summary The IFRC’s Mongolia country office has been successfully supporting a range of initiatives of the Mongolia Red Cross Society (MRCS) in different areas such as health and care, disaster preparedness and response, and youth development over the past 15 years. A key enabling factor has been the comprehensive legal status granted to IFRC’s Mongolia country office by the Mongolian government, which allows a high-level of efficient support to be provided in times of crises and country-wide disasters. IFRC personnel are embedded within the National Society. The following key areas are deemed as continued priority for the next four years: 1. Organizational development and capacity building 2. Disaster management – strengthening of systems and implementation of activities 3. Health and care programme – capacity development and implementation of activities As the largest humanitarian organization in Mongolia, MRCS tackles key social issues in Mongolia and advocates for the need of governmental action in areas related to key vulnerable populations both in urban and rural areas of the country. Mongolia has experienced a series of rapid social changes which are the result of a combination of socio-political, economic factors and natural disasters. The displacement and relocation of a large percentage of the country’s population to the capital city – Ulaanbaatar – has put immense pressure on existing public services, and in some respects, could lead to significant social challenges for the nation as a whole within the next decade or so. The exponential economic growth driven by the mining industry, coupled with an immature social policy framework and a weak safety net, is resulting in a widening social gap which has the potential to lead to a possible social crisis if not addressed. To date, large numbers of people who appear not to have benefited from the current mining ventures relocate in urban areas, particularly the outskirts of Ulaanbaatar. Against this social background, MRCS continues to strive to deliver services which are relevant and sustainable in an effort to continually improve its organizational capacities. To that effect the Mongolia country office supports MRCS to implement their Strategy 2011-2015 and assist with the alignment of their activities with Strategy 2020. For the past 12 months the office has adopted a new approach to the provision of organizational development support by way of using local talent to introduce and where possible build on existing knowledge and policy/operational frameworks. The country office continues to work closely with MRCS in reviewing their legal framework and operational structures. The core challenges to MRCS are similar to that faced by many Red Cross Red Crescent Societies around the world – unclear roles in a changing socio-economic environment, limited resources and the dilution of traditional sources of support. The Zone and Regional offices have, over the past 24 months, contributed significantly to continue the provision of specialist/expert support by sponsoring the presence of the Head of Delegation. 2. The Programme 2.1 Business Line 1 “To raise humanitarian standards” In order to improve its efficiency in the delivery of relevant services to the vulnerable groups in Mongolia MRCS is supported by the IFRC in undertaking organizational development strategies to strengthen and build on its existing capacities. MRCS has embarked on a process of modernization which, whilst it will deliver important improvements in performance and efficiency, will see the organization continue to experience lag issues. Objectives Project Code Targets for 2012 Outcome 1: MRCS is a well-functioning National Society delivering relevant and efficient services in support of the Mongolian population in adherence with Red Cross Red Crescent Movement Principles and Policies. Output 1.1: MRCS has participated in the programmes oriented to standardizing practices across National Societies including having completed a review of its statutes following established processes and inputs from the Joint Commission. PMN005 A national consultation process of the Statutes of the MRCS is implemented Output 1.2: MRCS has successfully implemented a review of its activities ensuring these are in alignment with the decisions adopted at the IFRC General Assembly, the Council of Delegates and the resolutions of the Red Cross Red Crescent Movement international conferences. PMN005 A national vulnerability assessment is conducted 2.2 Business Line 2 “To grow Red Cross Red Crescent services for vulnerable people” A key factor in ensuring MRCS services remain relevant and focused on the needs of the most vulnerable people in Mongolia is the engagement of the organization with national and local authorities to allow for the MRCS role and mandate to be clearly understood and better supported. The inclusion of the organization in processes of preparation and response are dependant on the closer cooperation and coordination with the different authorities and government agencies as well as the upkeeping of a constant state of readiness to respond to emerging situations. To that effect MRCS, with the support of IFRC, strives to improve its dialogue with the government and increase its response capacity. Objectives Project Code Targets for 2012 Outcome 1: MRCS is better prepared to adequately respond to major disasters including the provision of emergency health. Output 1.1: MRCS’s mandate in disaster preparedness and response becomes clear and is reflected in the state disaster law or other relevant documents and disseminated to concerned parties PMN160 Greater cooperation with the National Emergency Management Agency (NEMA) as the principal National Coordination body for disaster response and preparedness in Mongolia is furthered through monthly coordination meetings leading to better understanding of the role and mandate of National Society. MRCS actively participates in all relevant clusters meetings, and its Objectives Project Code Targets for 2012 Output 1.2: MRCS has the capacity to provide timely relief, emergency health and water sanitation services to affected populations in an efficient manner PMN160 role better reflected in the existing contingency plans An adequate information sharing system is established with local partners such as ministries in order to improve understanding about MRCS and Red Cross as a worldwide movement; Ongoing briefings are conducted internally in order to facilitate a greater and better understanding of the MRCS role in the cluster approach; key personnel are assigned roles as focal points for relevant clusters MRCS plays a lead agency role in coordination of the Shelter cluster MRCS contingency plan is finalized National disaster response team’s (NDRT) terms of reference and standard operational procedure are finalized At least 10 NDRT members are identified and adequately equipped Specialized teams within NDRT on relief, emergency health, psychosocial service support (PSS), and water and sanitation, and blood supply in emergencies are formed At least 10 people in each sector mentioned above are trained and adequately equipped NDRT field school with participation of at least 40 people is organized to assess effectiveness of developed procedures and trained human resource An induction training on disaster response is organized for at least 80 youth members to increase a human resource pool to be deployed in disasters and emergencies Emergency stock in MRCS’s seven regional disaster preparedness centers are replenished and increased to be able to meet emergency non-food item (NFI) needs of at least 1,000 households Outcome 2: MRCS is better positioned and has stronger capacity to achieve the vital goal of helping to protect the most vulnerable and increasing and safeguarding humanitarian space. Output 2.1: MRCS has actively advocated decision makers in respect to the humanitarian imperatives in Mongolia in alignment with the resolutions acquired at the International Red Cross Red Crescent Conference. PMN005 Regular meetings are held with key members of government at national and local level to brief them on issues of concern and interest for the MRCS MRCS membership and active Objectives Project Code Targets for 2012 participation in key bodies of coordination such as National Emergency Council and Earthquake Council enable a greater understanding of the role and work of the Red Cross Red Crescent 2.3 Business Line 3 “To strengthen the specific Red Cross Red Crescent contribution to development” MRCS, with technical and financial support from the IFRC has been implementing community-based disaster preparedness programmes aiming at increased knowledge, awareness and practice of locally appropriate disaster preparedness, protection and mitigation methodologies among the community members in order to build up community resilience, protect livelihoods and reduce the incidence of preventable life threatening and debilitating injuries. Objectives Project Code Targets for 2012 Outcome 1: MRCS improves health awareness and enhances disaster resilience of a wider community through its integrated communitybased approach (combination of communitybased health and first aid (CBHFA), water and sanitation, livelihoods, community-based disaster preparedness (CBDP) and other community-based programmes and branch development). Output 1.1: MRCS branches have piloted communitybased programme based on community needs prioritization and local context as well as taking into consideration the existing capacities, experience and resources within MRCS. PMN002 Number of people with improved knowledge, awareness and practices on disease prevention, positive health behavior, first aid and disaster preparedness and response is increased at least by 10 per cent in 12 sub-provinces through CBHFA integrated project At least 20,000 people in Ulaanbaatar have improved knowledge, awareness and practices on disease prevention, positive health behavior, first aid and disaster preparedness and response as a result of replicating CBHFA integrated project into 3 central districts of Ulaanbaatar CBHFA integrated project methodologies are introduced to other 26 mid-level branches At least 40,000 people both in rural and urban areas have vulnerabilities reduced and resilience built as a result of piloting community-based programming in six selected locations At least 16,000 people both in rural and urban areas have enhanced capacity to plan for disasters, mitigate their impact, respond to and effectively cope with their consequences as a result of Objectives Project Code Targets for 2012 implementing community-based disaster preparedness project in four locations A review to assess strengths and weaknesses of all existing community-based programmes is conducted by the end 2012 in order to decide if there is any need to develop a national communitybased programme At least 8,000 children in both rural and urban areas have improved knowledge, awareness and skills on disaster preparedness, earthquake response, first aid and road safety through school-based integrated programming A first aid center in Ulaanbaatar is established to ensure continuous promotion of first aid awareness, knowledge and skills among general population Number of junior and youth Red Cross members is increased by 20 per cent through Red Cross open days, and other international/national Red Cross events A programme is initiated to increase health awareness of at least 3,000 illegal miners through dissemination, trainings and other appropriate measures in order to reduce risk of injuries and accidents Current blood donors are retained 35 per cent through awareness raising and motivation activities Number of potential blood donors is increased by 10 per cent Output 1.2: An adequate volunteer recruitment and management framework and specific policies are in place at a national and local level. PMN005 Output 1.3: The social care programme offers comprehensive social service which is widely accessed by vulnerable groups in the rural and urban areas. PMN160 A volunteer management policy is developed based on current terms of reference for volunteers Current volunteer/membership database is reviewed A volunteer management training is organized for key MRCS staff At least 450 people with special needs are assisted through regular home visits, referral to hospitals, food assistance and PSS provided by adequately trained volunteers At least 40 per cent of mid-level branches make a Memorandum of Understanding with local social welfare departments on funding grant for activities that address needs of the most vulnerable groups such as the elderly, disabled, single parents and Objectives Project Code Targets for 2012 2.4 extreme poor At least 100 children that are members to Helpful groups are trained to provide better quality services to people with special needs 1,000 volunteers participate in a national MRCS volunteers’ conference Business Line 4 “To heighten Red Cross Red Crescent influence and support for our work” As the largest humanitarian organization in Mongolia, MRCS tackles key social issues in Mongolia and advocates for the need of governmental action in areas related to key vulnerable populations both in urban and rural areas of the country. Objectives Project Code Targets for 2012 Outcome 1: MRCS’s communications are utilized to highlight key areas of interest and concern for the Red Cross Red Crescent Movement stressing its competitive advantage in the humanitarian market place. Output 1.1: Closer cooperation takes place with relevant stakeholders to highlight the humanitarian imperatives in Mongolia. PMN005 Output 1.2: The National Society is better positioned through a comprehensive resource mobilization strategy 2.5 PMN005 A national fundraising campaign to be held by mid-2012 MRCS staff and volunteers have better knowledge on Red Cross mandate, values and structure as well as the National Society's vision and mission by taking part in a national conference MRCS personnel are encouraged to hold regular meetings with local authorities to represent Red Cross and promote Red Cross work. A national MRCS resource mobilization strategy is developed. Long-term plans for each core programme is developed reflecting on key priorities agreed upon by the National Society, Mongolian government and other partners. Business Line 5 “To deepen our tradition of togetherness through joint working and accountability” The core challenges to MRCS are similar to that faced by many Red Cross Red Crescent Societies around the world – unclear roles in a changing socio-economic environment, limited resources and the dilution of traditional sources of support. It is therefore necessary to bring greater cohesion to our work by improving the communication between partners of the MRCS and seek to develop more strategically aligned processes. Objectives Outcome 1: MRCS has increased capacity to deliver services by maximizing its support through a permanent coordination structure. Project Code Targets for 2012 Objectives Output 1.1: Partnership agreements are executed with relevant partners under a comprehensive cooperation framework Project Code PMN000 Targets for 2012 A partnership meeting of MRCS is held ensuring participation of all partner national societies, IFRC and ICRC. All staff both at headquarters and mid-level branches are trained on effective utilization of existing PMER tools. Outcome 2: MRCS practices systematic planning, monitoring, evaluations and reporting (PMER) approach in order to ensure greater accountability to donors, partners and people reached. Output 2.1: A four-year PMER plan for the National Society is developed and implemented efficiently and effectively. 3. Programme support strategy 3.1 Finance and Administration MRCS’s capacity to deliver its life saving services needs the ongoing support of the IFRC to improve the accountability and financial management of its structures. Ongoing training and audit support will continue to be provided across the country. A specialist (local person) has been engaged full time to provide daily support at a national and local level to the management and administration of MRCS’s programmes. In 2011 this focused process resulted in the development of HR policy, rules and procedures. 3.2 PMER and Resource Mobilization One of the ongoing challenges in Mongolia remains the minimal amount of financial support received by MRCS from partnerships from outside and within Mongolia. Despite multiple attempts to secure sustainable income sources, the National Society remains heavily dependant on the support of foreign partners to be able to deliver core services to communities who are in very vulnerable situations and who need significant amounts of support. The IFRC is supporting the MRCS by strengthening MRCS’s capacities in relation to planning, monitoring, evaluation and reporting (PMER), and resource mobilization processes inclusive of in-country and regional trainings as well as placing expert personnel to support MRCS counterparts. 4. Monitoring and Evaluation The MRCS and IFRC personnel implementing programmes/projects will continuously monitor the activities carried out. Each project will develop its monitoring and evaluation plan in order to be able to track implementation in an effective and efficient manner. At the end of 2011, there will be an organized PMER capacity building visit from Asia Pacific Zone office. Priorities for this onsite mentoring process will be a training on project/programme planning, on-the-job coaching with individual project staff, and assessment of branch level monitoring and evaluation capacity. This process will be continued throughout 2012. Regular communication will be maintained with all level stakeholders so that their feedback and inputs are reflected in the implementation process. Both financial and narrative reporting for the programmes will be covered in the IFRC’s regular mid-year programme updates and final annual report. Also, main programmatic highlights will be communicated to and disseminated by East Asia regional office on a monthly basis. No major evaluation/review/assessment is planned for 2012. 5. Budget summary Project code BL 1. Humanitarian Standards 2012 2013 20142015 Total 10,810 214,000 476,100 700,910 Project code Outcome 1: MRCS is a well-functioning National Society delivering relevant and efficient services in support of the Mongolian population in adherence with Red Cross Red Crescent Movement Principles and Policies. PMN005 2012 10,810 BL 2. Grow services for vulnerable people Outcome 1: Outcome 2: MRCS is better prepared to adequately respond to major disasters including the provision of emergency health. MRCS is better positioned and has stronger capacity to achieve the vital goal of helping to protect the most vulnerable and increasing and safeguarding humanitarian space. 0 PMN160 2013 20142015 Total 214,000 476,100 700,910 642,000 1,421,965 2,063,965 1,421,965 2,063,965 0 642,000 0 701808 791,000 1,751,220 3’244’028 PMN002 365,066 1,751,220 1,751,220 3’244’028 Outcome 2: PMN005 10,810 Outcome 3: PMN160 325,932 791,000 3’244’028 21,559 450,000 960,000 1,431,559 960,000 740,559 BL 3. Contribution to development Outcome 1: MRCS improves health awareness and enhances disaster resilience of a wider community through its integrated community-based approach (combination of communitybased health and first aid (CBHFA), water and sanitation, livelihoods, community-based disaster preparedness (CBDP) and other community-based programmes and branch development). BL 4. Heighten influence and support Outcome 1: MRCS’s communications are utilized to highlight key areas of interest and concern for the Red Cross Red Crescent Movement stressing its competitive advantage in the humanitarian market place. PMN005 0 21,559 Outcome 2: BL 5. Joint working and accountability Outcome 1: Outcome 2: 211,586 MRCS has increased capacity to deliver services by maximizing its support through a permanent coordination structure. MRCS practices systematic planning, monitoring, evaluations and reporting (PMER) approach in order to ensure greater accountability to donors, partners and people reached. Total Budget 6. Annexes 1. 2. 3. 4. 5. 6. Logframes Resource mobilization plan Workshops and trainings plan Personnel plan Vehicle plan Detailed budget 0 211,586 450,000 211,586 0 945,763 2,097,000 4,609,285 7,652,048