Tender to SolaSure “Result 3” Design of a code of practice for SWH installation, operation and maintenance. Background South African solar water heating (SWH) industry is facing the challenge to develop the local and the regional markets by increasing the number quality products and services. At the moment the existing market is very fragile and underdeveloped and producing of quality products is absolutely essential for the sustaining of the industry. Quality Management (QM) is to play an important part in the above process and to strengthen the promotion of quality SWH products and related installation, operation & maintenance (OM) codes of practices (CP). The overview and updating of the latter is needed and to be presented for evaluation to the relevant SABS committees.. On the other hand, establishment of the function of the ombudsman for the SWH industry becomes essential for the support of independent quality control and customer complains related issues. Thus the South African manufacturers, retailers, installers and maintainers will follow a broadly agreed and accepted infrastructure based on a new code of practice and ombudsman’s functions leading to product quality and wider customer support on the local and export markets. Desciption of work Deliviries 3.A. Work plan - Design a code of practice for SWH installation, operation and maintenance Below is given the detailed work plan including the deliveries for “Result 3.A” organized in work packages (WP’s) according to the pregiven list of activities. 3.A.WP1 Discuss, revise and agree on detailed work plan WP.1.1. Revised work plan WP.1.2. Agreement on detailed work plan The work plan proposed below will be discussed amongst all stakeholders at the kickoff meeting. The (revised) work plan will be agreed upon at this meeting. Mr. AS Sliep & Consortium (Mr. J.E. Nielsen and Prof. O.D.Dintchev) Page 1 of 6 3.A. WP2 Review present codes, their application WP.2.1. Report: Overview of and compliance amongst stakeholders national/international codes of practice An international survey of relevant existing WP2.2. Report: Further analysis of a few of guidelines and codes of practice for installing, the most relevant codes of practice operating and maintaining DHW systems is made. Work done already by international expert groups (IEA) and projects (EU) will be utilised. The most relevant/promising/successful ones are chosen for further analysis: Direct contacts are taken to the people and associations with experiences in the different codes in order to put up pro’s et contra’s for each code 3.A.WP3 Incorporate lessons learned from ongoing work in neighboring and appropriate countries Special attention will be given experience gained and lessons learned in neighboring countries. Contacts will be made and information gathered. Possibilities for (future) co-operation on “harmonized codes” in the regions will be investigated. WP3.1. Report: Status and lessons learned in neighboring countries. WP3.2. A framework based on contacts with SADC countries established. WP3.3. An advisory forum established based on all potential key players in the field in the region – for regional co-operation in the field of SWH. 3.A. WP4 Attain consensus on an industry-wide WP4.1. A document containing principles code of practice for SWH installation and and overall content of new/updated national maintenance code of practice for SWH installation, Discussion amongst stakeholders based on operation and maintenance. investigations done in 3.A.2 and 3. Agreement on principles and overall content of new/updated national codes. 3.A. WP5 Update codes Update national codes of practice according to WP5.1. Updated national codes of practice principles and overall content decided in 3.A.4. for SHW installation, operation and maintenance. 3.A.WP6 Interact with SA SWH industry to WP6.1. A document containing inputs to disseminate and introduce code of practice as promotion material WP6.2. Organized participation in workshops industry-wide standard Assist South African SWH industry in the and seminars in the related field.. promotion of new national codes of practice. Give input to promotion material, participation in workshops and seminars. Mr. AS Sliep & Consortium (Mr. J.E. Nielsen and Prof. O.D.Dintchev) Page 2 of 6 3.B.Work Plan - Design a quality assurance system for SWH industry in SA Below is given the detailed work plan including the deliveries for “Result 3.B” organised in work packages (WP’s) according to the pregiven list of activities. WP1.1. Revised work plan 3.B.WP1 Discuss, revise and agree on WP1.2. Agreement on detailed work plan detailed work plan The work plan proposed below will be discussed amongst all stakeholders at the kickoff meeting. The (revised) work plan will be agreed upon at this meeting. 3.B.WP2 Review international QS and QM schemes (e.g. “Keymark”) Product standards: ISO and EN solar thermal product standards are reviewed and analyzed with respect to applicability, complexibility, costs, etc.. It is already at this stage recommended to choose directly (parts of) the international standards and not to establish special national standards. Product certification: Existing product certification schemes (including the CEN Solar Keymark) are evaluated with respect to applicability, complexibility, costs, etc. The relevance of different elements in the schemes are analyzed and discussed (e.g level of factory production control). It is already at this stage recommended to consider starting with a simple scheme. Installer certification: Installer certification schemes in other countries are reviewed and analyzed with respect to applicability, complexibility, costs, etc.. The relevance of different elements in the schemes are analysed and discussed. It is already at this stage recommended to consider starting with a simple scheme WP2.1. Recommendations for product standards WP2.2. Recommendations for product certification scheme WP2.3. Recommendations for installer certification scheme Mr. AS Sliep & Consortium (Mr. J.E. Nielsen and Prof. O.D.Dintchev) Page 3 of 6 WP3.1. A document containing decisions on 3.B.WP3 Prepare QA and QM pro forma for all the principles and overall content of SWH role players standards and certification schemes The recommendations and analysis from WP3.2. First draft document for the whole WP3.B.2 are presented to all stakeholders and quality assurance chain and its elements. discussed. Decisions are taking on the principles and overall content of standards and certification schemes.Based upon this a draft for the whole quality assurance chain and its elements is developed. 3.B.WP4 Interact with stakeholders and obtain WP4.1. Presentation of first draft document buy-in WP4.2. Presentation of the second draft The first draft for the whole quality assurance document chain and its elements is presented to all WP4.3. Completion of the Final version stakeholders. Based on discussion/input and document comments from stakeholders a second draft and finally the final version is made. 3.B.WP5 Develop ombudsman function and procedures The functions and organisation of the independent body/bodies are discussed and agreed upon with all stake holders Procedures for complaints and appeal are discussed and agreed upon with all stakeholders WP5.1. Functions and organisation of independent body/bodies defined and described WP5.2. Procedures for complaints WP5.3. Appeal procedures Mr. AS Sliep & Consortium (Mr. J.E. Nielsen and Prof. O.D.Dintchev) Page 4 of 6 Requirements on production control Inspection / surveillance Check against requirements QMS Factory Requirements on manuals etc. Check manuals, marketing material and guarantee Product Inst. manual User manual Guarantee Marketing material Guidelines / code of practice Spot check manuals, marketing material and guarantee Distributor Product Inst. manual User manual Guarantee Training and examination Control of examination / censor Requirements on examination Installer Product User manual Guarantee Installed system at the user Installation / Maintenance Service contract Spot check againts check list Test product according to product standards*) Guarantee Test report Check test report/results against requirements Requirements on product Check list Flow chart: Example of a quality assurance scheme for solar water heaters. *) Products for testing should be picked by independent body from stock or production line Mr. AS Sliep & Consortium (Mr. J.E. Nielsen and Prof. O.D.Dintchev) Page 5 of 6 Check/ control/ inspect ... Blue box: Independent body (e.g., ombudsman, certification body). Green box: Independent test institute. Yellow box: Training “centre”. Could be the manufacturer, independent training centre or others (see also “Tender to SolaSure - Result 4.2”) Test ... Train …. NB. The “QA-chain” presented in the flow chart is just an example showing principles – it will be revised/simplified/extended according to inputs from and agreement amongst stakeholders. Mr. AS Sliep & Consortium (Mr. J.E. Nielsen and Prof. O.D.Dintchev) Page 6 of 6