Working Practices Product Set - MRA

Working Practice Product Set (WPPS)
Version : 5.4
Status : Approved
Date : 01 November 2007
Document Reference : WPPS
1998 MRA Service Company Limited, 7th Floor, Centurion House, 24 Monument Street, London EC3R 8AJ. Tel:
+44-(0)20-7090-1004. All rights reserved. No part of this publication may be reproduced or transmitted in any material form
(including photocopying or storing it in any medium, by electronic means and whether or not transiently or incidentally to
some other use or publication) without the permission of MRA Service Company Limited, whose address is set out above.
Working Practices Product Set (WPPS)
Change History
Details of changes incorporated in this version are provided in the summary below and in the
version history on individual Working Practices. For details on the related Change Proposals
please refer to the appropriate Change Proposal form or contact the MRA Helpdesk on 020 7090
1029 or email: helpdesk@gemserv.co.uk
Version
Number
Status
Date of
Issue
Reason for Change
1.0
Approved
19 Feb 99
Addition of changes approved at CCG
Meeting 26
1.1
Approved
19 Mar 99
Addition of changes approved at CCG
Meeting 27
1.2
Approved
23 Apr 99
Addition of changes approved at CCG
Meeting 28
1.3
Approved
15 June 99
Addition of changes approved at CCG
Meeting 29
1.4
Approved
20 July 99
Addition of changes approved at CCG
Meeting 30
1.5
Approved
29 Oct 99
Addition of changes approved at CCG
Meeting 31
2.0
Approved
01 Apr 00
Addition of changes approved at MDB_00_01
and_00_02 & MEC_00_01 and_00_02
2.1
Approved
01 Jul 00
Addition of changes approved at MDB_00_03
and_00_05 & MEC_00_03
2.2
Approved
01 Oct 00
Addition of changes accepted at MDB_00_06
and MDB_00_08
2.3
Approved
25 Jan 01
Addition of changes accepted at MDB_00_10
and MDB_00_11
3.0
Approved
01 Apr 01
NETA ‘Go Live’ version and addition of
changes accepted at MDB_01_02 and
MDB_01_03
4.0
Approved
29 Nov 01
Addition of changes accepted at MDB_01_08
and MDB_01_10
4.1
Approved
28 Feb 02
Addition of changes accepted at MDB_01_10
and MDB_02_01
4.2
Approved
29 Aug 02
Addition of changes accepted at MDB_02_04
and MDB_02_06
4.3
Approved
30 Nov 02
Addition of change accepted at MDB_02_08
4.4
Approved
29 May 03
Addition of changes accepted at
MDB_03_01, MDB_03_02, MDB_03_03 and
MDB_03_04
4.5
Approved
28 Aug 03
Addition of changes accepted at MDB_03_05
and MDB_03_08
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 2 of 227
Working Practices Product Set (WPPS)
Version
Number
Status
Date of
Issue
Reason for Change
4.6
Approved
26 Feb 04
Addition of changes approved at MDB_03_11
For implementation on 26/02/04
WPPS CP 71 – New WP142
4.7
Approved
24 Jun 04
Referencing Updates.
Addition of changes agreed at MDB_04_05
For implementation on 24/06/04 – WPPS CP
0072
4.8
Approved
24 Feb 05
Addition of changes agreed at MDB_04_11
For implementation on 24/02/05 – WPPS CP
0073
4.9
Approved
30 Jun 05
Addition of changes agreed at MDB_05_03
For implementation on 25/4/05 – WPPS
CP0074 v1.1 – new WP143
5.0
Approved
23 Feb 06
Addition of changes agreed at MDB 05_03
For implementation on 23/2/06 – WPPS
CP0075 v1.1 – revised WP6
Addition of changes agreed at MDB 05_10
For implementation on 23/2/06 – WPPS
CP0077 – revised WP141
5.1
Approved
29 Jun 06
Addition of changes agreed at MDB 05_10
For implementation on 29/6/06 – WPPS
CP0078 v1.0 – revised WP59
Addition of changes agreed at MDB 05_11
For implementation on 29/6/06 – WPPS
CP0079 v1.0 – removal of WP10
Addition of changes agreed at MDB 06_01
For implementation on 29/6/06 – WPPS
CP0080 v1.1 – revised WP99
Addition of changes agreed at MDB 06_02
For implementation on 29/6/06 – WPPS
CP0081 v1.0
Addition of changes agreed at MDB 06_04
For implementation on 29/6/06 – WPPS
CP0082 v1.0 – revised WP99
5.2
Approved
22 Feb 07
Addition of changes agreed at MDB 06_07
For implementation on 22/2/07 – WPPS
CP0083 v1.1 – new WP144
5.3
Approved
28 Jun 07
Addition of changes agreed at MDB 07_04
For implementation on 28/6/07 – WPPS
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 3 of 227
Working Practices Product Set (WPPS)
Version
Number
Status
Date of
Issue
Reason for Change
CP0084 v1.1 – revised WP140
5.4
Approved
01 Nov 07
Addition of changes approved at MDB_07_06
For implementation on 23/8/07 – WPPS
CO0086 v1.0 – revised WP116 in line with
BSC Approved Modification P197 (SVA
Qualification Processes Review)
Quality Assurance
Name
Role & Responsibility
Signature
Date
Custodian:
MRASCo
Reviewer:
MRA Delivery Team
Approved:
MRA Delivery Manager
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 4 of 227
Working Practices Product Set (WPPS)
1.
2.
INTRODUCTION................................................................................................................................................ 7
1.1
SCOPE AND PURPOSE ................................................................................................................................. 7
1.2
W ORKING PRACTICE TYPES ....................................................................................................................... 7
1.3
W ORKING PRACTICE STATUS ..................................................................................................................... 7
1.4
APPROVED W ORKING PRACTICES W ITHDRAWN FROM OPERATION ......................................................... 8
1.5
W ORKING PRACTICES BY BUSINESS AREA ................................................................................................ 9
1.6
DTC FLOWS REFERENCED IN WORKING PRACTICES ............................................................................... 10
THE WORKING PRACTICES........................................................................................................................ 16
WP 6. DETERMINING THE METER READING ON CHANGE OF SUPPLIER (MROCOS) .......................................... 16
WP 7. CHECKSUM TO CONFIRM SUCCESSFUL E2E TRANSFER TO POOL DEVELOPED APPLICATIONS ............... 21
WP 9. RELATED METERING POINTS ...................................................................................................................... 23
WP 16. MPAS - DIFFERENTIATION BETWEEN SUPPLIER FULL OR PARTIAL REFRESH (D0204) ........................ 26
WP 20. USE OF CHECKSUM WITH UFF FLOWS .................................................................................................... 28
WP 21. PROVISION OF METERING POINT CHANGES TO AGENTS ........................................................................ 29
WP 28. USAGE OF SERVICE REFERENCE AND SERVICE LEVEL REFERENCE ..................................................... 30
WP 30. NHH METER READINGS FOLLOWING A SITE VISIT - METER OPERATOR AND DISTRIBUTOR ................. 32
WP 33. PROVIDING CUSTOMER DETAILS TO THE DISTRIBUTOR DURING REGISTRATION ................................... 35
WP 34. TERMINATION OF NEW SUPPLIER AGENTS DURING THE OBJECTION PROCESS .................................... 36
WP 35. PREPAYMENT METERING - CLARIFICATION OF USE OF ITEM J0582 IN D0188 ....................................... 39
WP 36. NHH DA REQUIREMENT AND MPAS USAGE OF FILE AND INSTRUCTION NUMBER ................................. 41
WP 37. MPAS INPUT AND OUTPUT FILE PROCESSING ........................................................................................ 42
WP 38. PROCESSING MPAS CHANGES WITH FUTURE EFFECTIVE DATES .......................................................... 43
WP 39. AMENDMENTS TO MPAS DURING OBJECTION PERIOD ........................................................................... 45
WP 45. NHH METERING - TIMING OF WHEN D0052 MAY BE SENT ...................................................................... 46
WP 52. BULK TARIFF CHANGES - TOKEN METERS .............................................................................................. 48
WP 53. CHANGE OF NHH METERING TYPE (CREDIT AND PREPAYMENT METERS)............................................ 49
WP 55. USE OF TARIFF CODE FOR NOTIFYING THE MOP OF TOKEN METER AND SMARTCARD SETUP ............. 50
ASSOCIATED DOCUMENT FOR WP 55. USE OF PPM TARIFF AND CONFIGURATION DATA ................................. 51
WP 56. PAN NUMBER FORMAT (USED FOR TOKEN METERS)............................................................................. 54
WP 57. ERROR HANDLING - NOTIFICATION .......................................................................................................... 58
WP 58. ERROR HANDLING - W HOLE FILE RETRANSMISSION............................................................................... 60
WP 59. ERROR HANDLING - CORRECTION OF ERRORS ....................................................................................... 61
ASSOCIATED DOCUMENT FOR WP 59. DATA FLOWS FOR SPECIFIC ERROR HANDLING ..................................... 63
WP 60. BULK TARIFF CHANGES - SMARTCARD AND KEY METERS ...................................................................... 66
WP 61. CONTENT OF D0148 BETWEEN A SUPPLIER AND ITS AGENTS................................................................ 67
WP 63. USE OF PROFILE CLASS AND SSC FOR HH METERS IN MPAS FLOWS ................................................ 73
WP 66. CHANGE OF MEASUREMENT CLASS - NHH TO HH ................................................................................. 76
WP 69. USE OF D0221, D0139 OR D0179 TO SUPPLIER RE FAILURE TO ENERGISE A METER ......................... 81
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 5 of 227
Working Practices Product Set (WPPS)
WP 71. NEED TO ENSURE MOP HAS DETAILS OF A CHANGE TO KEYS OR SMARTCARD METER SSC .............. 83
WP 73. VALUE OF J0171 'READING TYPE' TAKEN ON A CHANGE TO ENERGISATION STATUS ........................... 85
WP 74. USE OF D0010 AND J0171 ON A CHANGE TO METERING SYSTEM CONFIGURATION ............................ 86
WP 75. USE OF ‘DATE AND TIME’ IN D0010 FOR HH MARKET ............................................................................. 88
WP 76. DISTRIBUTION BUSINESS ALLOCATION OF NHH METER SERIAL NOS. (J0004) .................................... 89
ASSOCIATED DOCUMENT FOR WP 76. TABLE OF USAGE OF METER ID (SERIAL NUMBER) (J0004) ................. 91
WP 77. IDENTIFICATION OF NEW AGENT ON FLOW D0170 .................................................................................. 95
WP 94. TOKEN METER CUSTOMER ID CARD - LAYOUT OF EMBOSSED AREA .................................................... 96
WP 99. SHUTTING DOWN A KEY METER ............................................................................................................... 98
WP 100. TERMINATION/CANCELLATION DATES ON AGENT APPOINTMENT ....................................................... 100
WP 102. GUIDELINE FOR IDENTIFYING ANY METER REGISTER IN THE HH MARKET ......................................... 102
WP 104. POPULATION OF D0086 FOR NON SETTLEMENT REGISTERS ............................................................. 106
WP 106. KNOWING THE DATE FOR LIVENING UP A KEY METER AFTER SHUTDOWN ......................................... 109
WP 107. CHANGES TO EXISTING AGENT APPOINTMENT DETAILS ..................................................................... 111
WP 108. VALIDATION OF STANDING DATA IN MPAS SYSTEMS ......................................................................... 113
WP 109. USE OF D0012 IN CONJUNCTION WITH SMARTCARD AND KEY METERS ............................................ 115
WP 111. OLD SUPPLIER CHANGES TO MPAD PRIOR TO COS .......................................................................... 117
WP 113. POSITIONING OF KEY METER SERIAL NUMBER IN DTC METER ID .................................................... 119
WP 116. CHANGE OF MEASUREMENT CLASS FROM NHH TO HH COINCIDENT WITH COS.............................. 121
WP 119. CHANGE OF SUPPLIER WITH SHORTENED REGISTRATION .................................................................. 126
WP 122. NHH NEW CONNECTION OBLIGATIONS ............................................................................................... 131
WP 123. TRANSFERENCE OF NON SETTLEMENT HISTORICAL INFORMATION .............................................. 145
WP 124. ALLOCATION OF PREPAYMENT METER PAYMENTS FOLLOWING COS ................................................ 147
ASSOCIATED DOCUMENT TO WP 124 - ANNEX 1 TO W ORKING PRACTICE 124 ................................................ 153
WP 125. MTC FOR NO METER PRESENT ........................................................................................................... 162
WP 126. SUPPLY CONTRACT CANCELLATION FORMS ....................................................................................... 165
WP 129. USAGE OF DTC FLOW D0290 “INSTRUCTION TO READ METER” (DP TO DR)................................... 168
WP 131. USE OF NOTIFICATION OF REGISTER READINGS ON COMC COINCIDENT WITH COS ........................ 169
WP 132. LOGICAL VS PHYSICAL DISCONNECTION AND NOTIFICATION TO THE DISTRIBUTOR THEREOF .......... 175
WP 134. COMPLETION OF D0142 IN HH AND NHH MARKETS .......................................................................... 178
WP 137. PASSING OF HISTORICAL DATA USING THE D0010 AND D0152 ......................................................... 181
WP 140. CONVENTIONS FOR THE COMPLETION OF METER REGISTER ID (J0010) ........................................... 191
ASSOCIATED DOCUMENT TO WP 140 – TABLE OF METER REGISTER ID (J0010) CONVENTIONS ................... 192
WP 141. HH MTD – CLARIFICATION OF USE OF SPECIFIC DATA ITEMS IN D0268. ........................................... 200
ASSOCIATED DOCUMENT FOR WP 141 - EXAMPLES .......................................................................................... 203
WP 142. THE CO-OPERATIVE OBJECTIONS PROCESS ...................................................................................... 219
WP 143. LARGE SCALE DISCONNECTIONS INITIATED BY LOCAL AUTHORITIES................................................. 223
WP 144. THE USE OF SITE VISIT CHECK CODES 02 AND 20 .............................................................................. 225
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 6 of 227
Working Practices Product Set (WPPS)
1.
INTRODUCTION
1.1 Scope and Purpose
This document includes all Working Practices (WPs) and their associated documents
that have been approved by industry through the MRA Change Co-ordination
Procedure.
This Product Set is issued and maintained by the MRA Service Management Team.
1.2 Working Practice Types
Working Practices are classified as follows:
Type
Working Practice Type
S
Statement of Operation – Where participants’ processes vary, but
the variation is not sufficiently material to require a wholly
consistent approach, the participants’ modes of operation are
described. In general there is no acceptable alternative.
W
Working Practice – Where participants’ processes could vary
significantly, and a common approach is necessary to ensure
robust inter-operation.
A
Workarounds - Where Industry agrees that a Working Practice is
preferable to changing another Design Baseline product. It is
planned to remove these in due course.
G
Guideline – Where participants either elect to make use of a nonmandatory aspect of market operation; or seek clarification or
improved understanding of some mandatory aspect.
1.3 Working Practice Status
Working Practices are developed as a result of the MRA Issue resolution process
(MAP07) and are then passed through the MRA Change Co-ordination procedure
(MAP06) for approval and implementation. The status of a Working Practice within this
document is classified as follows:
Status
Description
Approved for
Implementation
The Working Practice & Implementation Date have been
approved via the MRA Change Co-ordination Procedure.
The implementation date for the Working Practice set by
MDB is after the date of issue of the WP Product Set.
Implemented by
Industry
The implementation date for the Working Practice is on or
prior to the date of issue of this document.
To be withdrawn
from operation
The Working Practice has been withdrawn from operation
and the withdrawal date has not yet passed.
When MDB approve a WP an implementation date is also agreed. A Working Practice
remains in the Product Set until it is withdrawn from operation and the implementation
date for withdrawal has passed.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 7 of 227
Working Practices Product Set (WPPS)
1.4 Approved Working Practices Withdrawn From Operation
The following Working Practices have been withdrawn from operation. The reason for
withdrawal is included.
No
Title (withdrawal reason in italics)
Type
WP
CR
At CC/MDB
Meeting
4
Restricted use of the ‘Underscore’ character (Notes
added to Annex A of the DTC)
W
24
MDB_00_06
10
Format of MPAN Address file (CD-ROM) (The sourcing S
of MPAN addresses now comes from ECOES)
79
MDB_05_11
15
Format and Medium of Full (or Selective) Data
Aggregator Refresh (D0209) (DA Refresh details
outlined in the MRA)
W
24
MDB_00_06
17
Processing of Meter Timeswitch Codes with an SSC of S
“0000” (replaced by MOP document 20016 handed
over to the Pool)
20
27
18
Meter Time Switch Code Reference Table Format
S
(replaced by MOP document 20016 handed over to the
Pool)
20
27
19
Printing the Supply Number (Incorporated into
Schedule 5 of the MRA – MCP 96)
W
50
MDB_02_01
27
Forwarding Meter Technical and Mapping Details
W
(Incorporated into Annex C of the DTC – DTC CP3093)
37
MDB_01_03
29
Setting Communications Method (J0386) for Non Half
Hourly Meters (CR 2730 accepted in Version 4.0 of
DTC makes J0386 optional)
A
21
27
32
Inability to Transmit EAC in D0052 in HH Market
A
(HHDC instance of D0052 removed from DTC and E2E
diagrams by CRs 2956 and 20001 respectively)
17
26
40
Data Content of D0148 between a Supplier and its
W
Agents in the HH Market (Population of D0148 is now
documented in Annex C of the DTC (DTC CP3082),
and WP61 now incorporates the HH aspects previously
covered by WP40)
35
MDB_00_11
47
NHH Meter Technical Details Effective Date
W
(Incorporated into Annex C of the DTC – DTC CP3093)
37
MDB_01_03
48
Treatment of CT and VT Ratio in flow D0150
A
(Incorporated into Annex C of the DTC – DTC CP3105)
37
MDB_01_03
50
Sending of D0149 in conjunction with D0150
W
(Incorporated into Annex C of the DTC – DTC CP3093)
37
MDB_01_03
64
Resolution of a Meter Reading on Change of Supplier
Dispute (The relevant information has been agreed to
be incorporated into the MRA and MAP_08)
W
38
MDB_01_03
68
Default Values for Key Transaction Details on D0188
(Notes added to D0188 - DTC CP 3114)
W
44
MDB_01_10
78
Sending the Metering Point Address (Notes
added/amended to all flows containing Metering Point
Address DTC CP 3145).
W
54
MDB_02_06
80
Sending D0149/D0150 on Change of Supplier (WP
becomes redundant following changes to WP 61 and
the introduction of Agent Competition in April 2000)
W
45
30
82
Gateway Configuration for Scottish Variant D0276 (CR A
2978 added new instance of D0276 IARA to Supplier)
22
27
83
Gateway Configuration for Scottish MDD flows (CR
22
27
Version :
5.4
Status :
Approved
A
Date :
01 Nov 2007
Page 8 of 227
Working Practices Product Set (WPPS)
No
Title (withdrawal reason in italics)
Type
WP
CR
At CC/MDB
Meeting
2975 added MDD flows to/from IARA)
87
Amending the MPAN address (WP becomes redundant W
following work to develop Standard Address Format –
MRA 24.19 and MAP09)
62
MDB_03_03
88
Measurement Units for “Within Area Transfers” in
A
Scotland (CR 2977 changed units of J0982 and J1057
from MWh to MW)
22
27
89
D0255 will not be sent to “Scottish Company” (CR
2976 removed flow D0255 from GA Agent to Scottish
Company)
A
22
27
98
Reading Type to be used with D0010 flows following a S
PSU reset (CR 2951 introduces 2 new reading types to
the DTC valid set for the data item J0171).
25
28
114 Initial Credit and Total Debt on a Key Meter (Notes
added to data items J0554,J0544,& J0539 – DTC CP
3115)
W
43
MDB_01_10
118 Use of Contract Reference for Customer Mop
appointments (Notes added to ContractReference
J0048 – DTC CP 3120)
W
46
MDB_02_01
127 Usage of Measurement Class Id in D0268
W
(Measurement Claas Id deleted from D0268 – DTC CP
3188)
59
MDB_03_01
133 Token Meter Debt (Logical format and physical length
amended of data item J0554 – DTC CP 3035)
A
47
MDB_02_01
139 Timescales for the Old Supplier to Re-register
Erroneous Transfers (The relevant information has
been agreed to be included into the MRA and
MAP_10)
W
51
MDB_02_01
1.5 Working Practices by Business Area
The following table categorises the Working Practices by Business Area. It should be
noted that some Working Practices appear in more than one category. This table is
intended as an indicative guide and should not be considered to be an exhaustive list.
Business Area
WPs
Pre-Payment Meter and PPMIP
activity
35, 52, 53, 55, 56, 60, 71, 94, 99, 106, 109, 113,
124, 134
Exclusively HH Market
63, 75, 102, 141
Supplier/Agent Communication not
relating to Meter functionality
21, 28, 34, 61, 77, 100, 107, 122, 144
DTC Flow Population relating to
Metering details and CoMC
9, 30, 45, 53, 63, 66, 69, 73, 74, 76, 102, 116, 123,
125, 132, 134, 140, 141
MPAS functionality and
Address/Customer Details
16, 33, 36, 37, 38, 39, 63, 108, 111, 119, 122
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 9 of 227
Working Practices Product Set (WPPS)
Business Area
WPs
Change of Supplier
6, 104, 111, 116, 119, 123, 124, 131, 137, 142
Meter Readings
6, 73, 74, 75, 123, 129, 131, 137
DTC File format and Error Handling
7, 20, 57, 58, 59
Supplier/Customer communication
122, 126, 142
1.6 DTC Flows referenced in working Practices
The following table lists all those flows in the DTC that are referenced in a Working
Practice. It should be noted that some DTC flows are referenced in the context
section of a Working Practice and therefore may not necessarily contain any practice
for population of that flow.
Flow
Flow Name
WPs
D0001 Request Metering System Investigation
76, 113
D0002 Fault Resolution Report or Request for Decision on
Further Action
30, 76, 113
D0003 Half Hourly Advances
76, 113
D0004 Notification of Failure to Obtain Reading
76, 113
D0005 Instruction on Action
71, 76, 106, 113, 129
D0008 Meter Advance Reconciliation Report
76, 113
D0010 Meter Readings
6, 30, 52, 66, 73, 74, 75, 76,
102, 109, 113, 116, 119, 123,
137
D0011 Agreement of Contractual Terms
28, 66, 107, 109, 116, 119,
122
D0012 Confirmation of the Inclusion of the Metering Point in
the Reading Schedules
107, 109, 116
D0018 Daily Profile Data Report
59
D0019 Metering System EAC/AA Data
36, 45, 59, 106, 109
D0023 Failed Instructions
59
D0028 Standing Profile Data Report
59
D0029 Standard Settlement Configuration Report
59
D0030 Non Half Hourly DUoS Report
59
D0036 Validated Half Hourly Advances for Inclusion in
Aggregated Supplier Matrix
59
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 10 of 227
Working Practices Product Set (WPPS)
Flow
Flow Name
WPs
D0039 Daily Profile Coefficient File
59
D0040 Aggregated Half Hour Data File
59
D0041 Supplier Purchase Matrix Data File
59
D0043 Supplier Deemed Take Report
59
D0051 Affirmation of Half Hour Data Retrieval Method and
Associated Details
116
D0052 Affirmation of Metering System Settlement Details
45
D0055 Registration of Supplier to Specified Metering Point
36, 38, 59, 63, 108, 116, 119,
122
D0057 Rejection of Registration
36, 108
D0058 Notification of Termination of Supply Registration
34, 36, 116
D0064 Notification of an Objection to Change of Supplier
Made By the Old Supplier
36, 59
D0065 Confirmation of Receipt of a Registration Objection
36
D0066 Rejection of a Registration Objection
36
D0067 Notification of an Objection to Change of Supplier
Sent to the New Supplier
36
D0068 Removal of Registration Objection
36, 59
D0069 Rejection of Registration Objection Removal
36
D0071 Customer Own Reading on Change of Supplier
6, 76, 113, 119
D0072 Instruction to Obtain Change of Supplier Reading
6, 129
D0079 Supplier Purchase Report
59
D0081 Supplier Half Hourly Demand Report
59
D0082 Supplier - Supplier Purchase Matrix Report
59
D0083 TUoS Report
59
D0086 Notification of Change of Supplier Readings
6, 76, 104, 113, 116, 119
D0089 Notification from MPAS of Changed Metering Point
Details
36, 39, 111
D0090 Confirmation of the Removal of a Registration
Objection
36
D0091 Notification of Removal of a Registration Objection
36
D0092 Advice to an Old Supplier of a Change of Supply
Registration Deletion
36
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 11 of 227
Working Practices Product Set (WPPS)
Flow
Flow Name
WPs
D0093 Advice to a New Supplier of a Change of Supply
Registration Deletion
36
D0095 Non Half Hourly Data Aggregation Exception Report
59
D0125 Confirmation of Disconnection of Supply
132
D0131 Notification of Customer Details
21, 33, 66, 116
D0132 Request for Disconnection of Supply
9, 132, 143
D0134 Request to Change Energisation Status
69, 76, 113, 122
D0135 Report Possible Safety Problem
76, 113
D0136 Report to Supplier of Possible Irregularity
76, 113
D0139 Confirmation or Rejection of Energisation Status
Change
30, 69, 73, 76, 106, 113, 122
D0142 Request for Installation or Change to a Metering
System Functionality or the Removal of All Meters
9, 45, 53, 66, 74, 116, 134
D0148 Notification of Change to Other Parties
61, 66, 116, 119
D0149 Notification of Mapping Details
9, 45, 71, 74, 76, 102, 113,
119, 122, 123
D0150 Non Half-hourly Meter Technical Details
45, 66, 71, 74, 76, 102, 113,
116, 119, 122, 123
D0151 Termination of Appointment or Contract by Supplier
34, 66, 100, 116
D0152 Metering System EAC/AA Historical Data
119, 123, 137
D0153 Notification of Data Aggregator Appointment and
Terms
21, 28, 66, 100, 107, 116, 122
D0155 Notification of Meter Operator or Data Collector
Appointment and Terms
21, 28, 34, 66, 100, 107, 109,
116, 122
D0168 Request for Additional/New MPAN Core(s)
122
D0170 Request for Metering System Related Details
45, 61, 77, 116, 119
D0171 Notification of Distributor Changes to Metering Point
Details
36, 87, 116, 132
D0172 Confirmation of Changes
36
D0173 Token Transaction Data
56
D0174 Issue Identity Card for Token Meter Customer
56, 94
D0176 Request Tariff/Debt Change on Token Meter
55, 76, 113
D0178 Confirmation of Token Meter Installation
55, 76, 113
D0179 Confirmation of Energisation/De-Energisation of
Prepayment Meter
55, 69, 76, 99, 106, 113, 122
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 12 of 227
Working Practices Product Set (WPPS)
Flow
Flow Name
WPs
D0180 Request to Energise/De-Energise/Shut Down
Prepayment Meter
55, 69, 76, 99, 113, 122
D0182 Smart Card Meter Readings
76, 113
D0183 Issue New Customer Smart Card
55, 71
D0184 Issue Replacement Smart Card
76, 113
D0187 Status Message for Tariff Update, Mode Change,
Tariff Change or Debt Clearance
71
D0188 Key Transaction Details
35, 60, 71, 76, 106, 113,
D0189 Adjust Key Meter Debt/Recovery Rate at Specific
Locations
35, 60, 76, 113
D0190 Issue Customer Key
35, 71, 76, 113
D0191 Request Special Visit to Read/Reset Key Meter
76, 113
D0192 Readings and Settings from a Token or Key Meter
76, 113
D0193 Confirmation of Key Meter Installation
76, 113
D0194 Request for Installation of Key Meter
53
D0197 Smart Card Commands to Remote Terminals
55, 60, 71
D0199 Status Message Report for Previous Card/Security
Event Report or Previous Customer/Requested
Snapshot
60
D0200 Request Installation of Smart Card Meter
53, 55
D0201 Confirmation of Smart Card Meter Installation
55, 76, 113
D0202 Readings and Settings from a Removed Smart Card
Meter
76, 113
D0203 Rejection of Changes to Metering Point Details
36, 63
D0204 Selective or Full Refresh of MPAS Details
16, 36, 59
D0205 Update Registration Details
36, 38, 39, 45, 59, 63, 66,
106, 108, 111, 116, 122
D0209 Instruction(s) to Non Half Hourly or Half Hourly Data
Aggregator
36, 45, 59, 111, 116
D0213 Advice from MPAS of Changed Metering Point Details 36, 111
D0214 Confirmation of Proving Tests
116
D0215 Provision of Site Technical Details
116
D0216 Request Installation of Token Meter
53, 55
D0217 Confirmation of the Registration of a Metering Point
36, 116, 122
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 13 of 227
Working Practices Product Set (WPPS)
Flow
Flow Name
WPs
D0221 Notification of Failure to Install or Energise Metering
System
30, 69
D0222 Change in Customer Details
129
D0223 Request to Install Check Meter or Carry Out Accuracy 76, 113
Tests
D0225 Customer Special Needs
33
D0227 BSCCo Market Domain Data File
59
D0238 Request and Information for Revenue Protection
Investigation
76, 113
D0239 Revenue Protection Report on Action Taken
76, 113
D0242 Supercustomer DUoS Daily Statement
59
D0259 Notification to New Supplier of Future Changes
36, 39
D0260 Notification from MPAS of Old Supplier Registration
Details
36, 108, 116, 119
D0261 Rejection of Agent Appointment
28, 107
D0262 Rejection of Disconnection
76, 113
D0265 Line Loss Factor Data File
59
D0266 Supplier Settlement Header Report
59
D0268 Half Hourly Meter Technical Details
66, 76, 102, 116, 141
D0269 Market Domain Data Complete Set
59
D0270 Market Domain Data Incremental Set
59
D0271 Request Contact Notice
36, 59
D0272 Reject Contact Notice Request
36
D0273 Contact Notice to Suppliers
36
D0289 Notification of MC/EAC/PC
116
D0290 Instruction to Read Meter
76, 113, 129
D0291 Notification of Register Readings on Change of
Measurement Class coincident with Change of
Supplier
76, 113, 116, 131
D0294 Confirmation of BM Unit Allocation
36
D0295 Rejection of BM Unit Allocation
36
D0297 Notification of BM Unit Allocation
36
D0300 Disputed Readings on Change of Supplier
76, 113
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 14 of 227
Working Practices Product Set (WPPS)
Flow
Flow Name
WPs
D0302 Notification of Customer Details
33, 66, 116
D0303 Notification of Meter Operator, Supplier and Metering
Assets installed / removed by the MOP to the MAP
34
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 15 of 227
Working Practices Product Set (WPPS)
2.
THE WORKING PRACTICES
WP 6. Determining the Meter Reading on Change of Supplier (MRoCoS)
WP no:
Status:
6
Implemented
by Industry
Implementation
Date:
27/03/2001
Title:
Determining the Meter Reading on Change of Supplier (MRoCoS)
Version:
8
Originator:
NHHDC DRG
WP type:
W
Originator Ref:
MRoCoS v1.1
Date raised:
18 Nov 97
DST Ref:
Issue 33
Product Area:
NHHDC
Parties Affected:
NHHDCs
Baseline Products
Impacted:
E2E’s - NHH Meters: Obtain Readings, New NHH DC Obtain and
Generate Change of Supplier meter reading, Meter Reading on
Change of Supplier Dispute. DTC, BSCP502, BSCP504, PSL120,
PSL110, MRA (Clause 29)
Date last amended
23/2/06
Change History:
V1 approved at CCG 16 on 05/06/98 – see Design Note: 12
V2 with WP CR 12 approved at CCG 24 on 09/11/98 – see DN 20
V3 with WP CR 24 approved at CCG 28 on 16/04/99 – see DN
24.
V5 with WP CR 23 and WP CR 29 approved at CCG 29 on
21/05/99 – see DN 25 and with WP CR 35 approved at CCG 30
on 9/07/99 – see DN 26
V6 with WPPS CP 18 at MDB_00_06 on 30/06/00
V7 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
V8 with WPPS CP 75 accepted modified at MDB 05_03 on
31/3/05
Context:
Determining the Meter Reading to be used on Change of Supply (MRoCoS) is an important
activity governed by a small number of rules (set by the MRA, OFGEM and the BSC), but affected
by a wide range of scenarios. The NHH DC Design Review Group has established a Working
Practice to be used to establish the MRoCoS that is robust against all scenarios tested and meets
the following objectives:
1.
Multiple site visits by different agents should be avoided, both on grounds of customer
confusion and supplier cost.
2.
The procedure should encourage the obtaining of actual reads and discourage the use of
deemed reads unless unavoidable.
3.
The amount of Data Collector to Supplier interaction during the CoS process should be kept
to a minimum, consistent with contractual obligations.
4.
Procedures should recognise the time delays inherent in the following transactions:

between obtaining a read in the field and returning it to base;

passing readings/data between Old and New Agents.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 16 of 227
Working Practices Product Set (WPPS)
5.
Procedures should handle readings taken during the Change of Supplier process, including
those taken by the old DC, by customers, by the old MOp (e.g. on a Periodic Meter Change
(PMC)), or in limited circumstances agreed between Suppliers.
6.
It is more important to pass all CoS EAC/AAs to the NHH DA by Initial Settlement (SF) than
it is to have these readings endorsed by old and new Suppliers, though it should be noted
that, wherever possible, Supplier billing and Settlements readings should be aligned.
7.
The Working Practice is consistent with BSCP504, PSL120 and PSL110, the E2E, the DTC,
and the MRA.
Working Practice:
The following logical procedure, which is ‘overlaid over’ old and new NHHDCs routine data
collection procedures, should be used to determine the MRoCoS. Note all days and day
windows refer to working days.
1. The New Supplier (NS) should appoint the new NHHDC to the MPAN (as defined in the
E2E’s, NHH ONLY Appoint Agents to the Metering Point (new supplier – CoS) and by
BSCP504).
2. The NS should advise the New NHHDC of other agents on a D0148 (as defined on page 46 of
the E2E’s, WP 61 and BSCP504). Once the New NHHDC has requested historical data from
the old NHHDC, the Old NHHDC should forward the historical data as soon as practically
possible (as defined by BSCP504 and PSL120) to allow for receipt by the New NHHDC of all
cyclic/special reads for the SSD-5 to SSD time period.
3. The NS should initiate the MRoCoS process by instructing the New NHHDC. In accordance
with BSCP504, the NS must send either:

a D0071 (of which the NS should ensure receipt by the new NHHDC, as soon as
possible, but by the operational end of day on SSD +7).Where the NS has more than
one reading or type of reading, they should submit the reading based upon the following
rules of precedence:
1. a meter reading taken from the meter closest to (ignoring sign) or on SSD
(irrespective of whether this reading is captured before or during the meter read
window). A NS may choose not to submit the Meter Reading if it believes it has
been reported inaccurately. If two reads fall equally either side of SSD, then the
+SSD read is used. The read should be submitted using the “C” Reading Type; or
2. an Old Supplier Estimated CoS Reading.
or
 a D0072 (containing a request to collect / await a reading).
Note 1: Where the NS expects a CoR from the Customer but one does not become
available, it should be recognised that the subsequent D0072 sent to the New NHHDC will
probably be received by the New NHHDC outside of the +/- 5 day window for obtaining an
actual read by NHHDC site visit.
Note 2: Where the NS sends a D0072 requesting an actual reading, Appointment
information (Group 28B) should be populated only where the NS has made an appointment
with the Customer for the New NHHDC to make a site visit. Where the New NHHDC is
unable to make this appointment, or has an alternative reading available, then they should
contact the NS outwith the DTC to enable the NS to contact the Customer.
Where Group 28B is not populated, then the New NHHDC can interpret this as authorisation
to make an appointment with the Customer, where one is required - unless the NS
specifically withholds authorisation, for example, by a bilateral agreement. It should also be
noted that some NHHDCs, especially for business customers, interpret the absence of
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 17 of 227
Working Practices Product Set (WPPS)
appointment date as a requirement to attempt to visit the site within the CoS window without
making a customer appointment, as none is required.
Note 3: Where submitting a Customer Read, the earliest date permitted should be no earlier
than the point at which the contract was signed by the customer.
4.
On receipt of a D0071 (when the NS has agreed a COR with the customer or in the absence
of an agreed COR, where both Suppliers have agreed the supplier estimate) the new
NHHDC should use that reading (if valid) as a candidate for the MRoCoS. Go to step 6.
5.
On receipt of a D0072 (when a COR is not available from the NS and/or the NS wants a
NHHDC read) the new NHHDC should check the reading type value (A, D, F or S) and take
the appropriate action:
A - use existing actual read or obtain one if required: The NHHDC should check to see
if there is a previous reading within the CoS reading window that can be re-used as the
MRoCoS. If there is no previous reading (or no history has been received) then the new
NHHDC should arrange to obtain an actual read in accordance with standing instructions
from the NS.
This might entail a site visit or, at the discretion of bilateral commercial agreements between
the Supplier and its NHHDC, entail other options such as the NHHDC contacting the
customer to obtain a COR. Go to step 6.
D - deem CoS reading: (instructed by the Supplier in unusual circumstances, e.g. known
that Customer is away for extended period). Go to step 6.
F - expect Final read from MOp / Supplier: (instructed by the Supplier when the MOp has
been instructed to change meter functionality, and thus will furnish a final reading). Go to
step 6.
S - obtain ‘special’ read: The new NHHDC should obtain an actual read in accordance with
standing instructions from the Supplier. Go to step 6.
6.
By the operational end of day on SSD +7 all field readings to SSD+5 should have been
received by the new NHHDC (from field staff or the new MOp), previous data should have
been obtained from the old NHHDC or new Supplier, and the Daily Profile Coefficients
should now be firm. By the end of day on SSD +8 the new NHHDC should take the following
action, considering as candidates all remote, MOp, NHHDC and Customer Own, or Old
Supplier’s Estimated reads taken within the SSD  5 day window:
a)
if no valid meter reading is available by the operational end of day on SSD +7 then the
new NHHDC should determine the MRoCoS based on a deemed read at SSD (then go to
step 7). This deemed read should be based upon meter reading history received from the
old NHHDC and any validated readings (Customer own) received that fall outside the ±5 day
window: (then go to step 7).
b)
In all other cases the new NHHDC should determine the MRoCoS based on the
following rules:
1. All valid actual (remote, MOp, NHHDC, and Customer Own) readings are potential
candidates for the MRoCoS, provided they were read within the SSD ±5 days.
2. The reading closest to (ignoring sign) or on SSD is used to determine the MRoCoS,
unless the reading on SSD or the first reading after SSD is a Final read in which case
the Final read should be used (irrespective of the proximity of other reads prior to SSD).
3. If two reads fall equally either side of SSD, then the +SSD read is used.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 18 of 227
Working Practices Product Set (WPPS)
4. If there are multiple reads on the same day then the precedence (if systems can cope),
is remote(1st choice), MOp Final NHHDC, Customer Own reading (last choice).
5. If no remote, MOp, NHHDC, and Customer Own readings exist within the SSD ±5 days,
the Old Supplier’s Estimated Read is used.
6. Having determined which of the readings is to be used, the new NHHDC creates D0086
as MroCoS using all the values from the reading, excluding Reading Date, which it sets
to SSD, but including Reading Type. Where the Old Supplier’s Estimated Reading is
used, the Read Type on the D0086 shall be “D”. Where a historical read was available
(see Step 5) then the reading type from the historical read should be used. Therefore
where a NS sent a D0072 with a request for an actual reading, 'A', and they receive a
D0086 with a reading type other than 'A' or 'D', this indicates the use of a historical
reading, specifically:

'R', this indicates that an historical routine read (taken by the Old NHHDC for the OS)
was available.

'S', this indicates that an historical special read (taken by the Old NHHDC for the OS)
was available.
Where the Old Supplier does not receive a D0086 from their NHHDC within 30 Working
Days of SSD or the New Supplier does not receive a D0086 from their NHHDC within 32
Working Days of SSD, they may attempt to progress through management of their
Supplier hub or through the use of MAP 08 (“The Procedure for Agreement of Change
of Supplier Readings and resolution of Disputed Change of Supplier Readings”)
7.
The new NHHDC should pass the D0086 so determined to the old NHHDC, new Supplier
and Distributor. Once received, the old NHHDC should pass the D0086 to the Old Supplier
and use the D0086 to calculate an AA using the profile coefficients received from the
SVAA/ISRA/ IARA for the SSD and pass it into Settlements (i.e. to the old DA).
8.
The new NHHDC should then calculate an EAC for the MRoCoS dated SSD using the
profile coefficients received from the SVAA/ISRA/ IARA for the SSD and pass it into
Settlements (i.e. to the new DA).
9.
As part of its routine processing, the new NHHDC creates D0010 flows for all readings
available which were received on or after SSD. Such readings should be validated, and
passed to the appropriate parties as D0010s with Reading Types , of ‘C’, ‘D’, ‘F’, ‘R’, or ‘S’
(but not ‘A’) as soon as possible.
They should be processed for Settlement in date order as normal, subject to the receipt of
Daily Profile Coefficients for their Reading Dates (i.e., after SSD+7).
Impact of not implementing WP:
Settlement Requirements as set out in BSCP502 and BSCP504 and MRA Requirements as set
out in Section 29 related to determining the most appropriate Meter Reading on CoS will not be
honoured.
Notes to WP 6:
1. Handling of reads that fail validation should be consistent with BSCP504
2. Due to the tight timescales involved and the need to keep new NHHDC to NS interaction to a
minimum (see Objective 3), the handling of potential CoS reads that fail validation is subject to
bilateral arrangements between the NHHDC and NS. In the absence of such bilateral
arrangements the new NHHDC should wait until the end of SSD+8 and deem the CoS reading.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 19 of 227
Working Practices Product Set (WPPS)
3. A COR passed to the new DC on a D71 may have a read date between SSD-5 and SSD+5.
Readings dated prior to SSD will not be processed for Settlement or passed back to the NS on
a D0010, but will be validated and may be used in the determination of the MRoCoS (reads
prior to SSD are outside the registration period of the new Supplier).
4. Where it is agreed that the MRoCoS provided on the D0086 should contain readings for both
Settlement and Non Settlement registers, the New NHHDC should populate readings for Non
Settlement Registers in accordance with WP104.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 20 of 227
Working Practices Product Set (WPPS)
WP 7. Checksum to confirm successful E2E transfer to Pool Developed Applications
WP no:
Status:
7
Implemented by
Industry
Implementation
Date:
27/03/2001
Title:
Use of Checksum for confirmation of successful end to end data
communication to Pool Developed Applications
Version:
3
Originator:
DST
WP type:
S
Originator Ref:
Pool CR337V2a
Date raised:
12/11/97
DST Doc. Ref:
Product Area:
UFDS; Common
Subsystem
Technical
Specification
(Logica ref.
101PZT)
Parties Affected:
Baseline
Products
Impacted:
None
Last Amended:
30/06/00
Change History
Approved at CCG 10 on 31/03/98 – see Design Note 5
Participants transmitting flows
to Pool Developed
Applications
V3 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
The BSC Auditor requires detection of corruption of data transmitted across the data network; he
has accepted that Checksum creation and validation is an appropriate method. In line with this
understanding, the Pool Developed Applications (PDAs) expect files to be accompanied by a
checksum which spans all preceding data in the file as set out in Common Subsystem Technical
Specification (CSTS) and will reject any file where the checksum accompanying the file does not
match that derivable from the data.
The point at which a checksum is applied is tightly restricted by the introduction of Test Flags to
flows sent to Pool developed applications introduced by CR337 v2a and UFDS 1.5. In practice,
unless the file has been written from the outset as a Pool Format File structured precisely as set
out the rules of Common Subsystem Technical Specification the checksum derived from that file,
the file will be rejected by the PDA. In consequence Participants have no option but to meet the
following Statement of Operation.
Statement of Operation:
The MDNS capability for converting UFF to PTFF flows cannot be used for flows to PDAs as
conversion leads to the checksum being incompatible with the data. The strict sequencing of
checksum generation within overall file creation process is to be followed to ensure that the
checksum does remain compatible with the data when received by the PDA.
On the Participant side:
Generate Flow Data  add UFDS Pool PFF header (CSTS Chapter 11), delimiters etc. 
Calculate Checksum  Convert PFF Header to PTFF Header (version 1.5 Table 3) and include
Test Data Flags  Transmit to PDA.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 21 of 227
Working Practices Product Set (WPPS)
Implications of Statement of Operation:
Failure to follow this operation will lead to a Pool Developed Application rejecting, with checksum
error, any file sent to it from a non Pool Developed Application.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 22 of 227
Working Practices Product Set (WPPS)
WP 9. Related Metering Points
WP no:
Status:
9
Implemented by
Industry
Title:
Related Metering Points
Version:
4
Originator:
WP type:
W
Originator Ref:
Date raised:
22/10/97
DST Doc. Ref:
Product Area:
NHH Meters
Parties Affected:
Baseline
Products
Impacted:
MRA, E2E
Last Amended:
Change History
Implementation
Date:
01/07/2000
NHH MOp DRG
Supplier, NHH MOp, NHHDC
09/12/99
Approved at CCG 10 on 31/03/98 – see Design Note 5
V3 with WP CR 36 approved at CCG 30 on 9/07/99 - see Design Note
26
V4 with WPPS CP 2 approved at MDB_00_01
Context:
Many Suppliers currently supply Metering Systems where there is one or more associated MPAN.
For example metering systems that require two SSCs to describe their consumption in settlements
such as Economy 9, Warmwise, Heatwise etc. As there can only be one SSC per MPAN at any
given time two MPANs are required for each of these Metering Systems.
Each MPAN has an SSC allocated to it. The SSCs each consist of one or more TPRs. Both the
MPANs relate to the same physical meter, and hence should always be supplied by one supplier.
These Metering Points are an example of Related Metering Points. For more guidance on
metering systems and Related Metering Points refer to the MRA.
This Working Practice details the procedures to be followed in dealing with Related Metering
Points in the Non Half Hourly market.
Working Practice:
Where the Supplier is maintaining one or more related MPANs they should utilise
whatever method they deem most appropriate to ensure that there is only one “Main”
MPAN for the metering point. This “Main” MPAN is always retained through the metering
point lifecycle with that Supplier, thus ensuring consistency with the MPAN for the
metering point.
Installation of Related Metering Points
1. All Agents (MOp, NHH DC and NHH DA) are appointed to all MPANs in the normal way – e.g.
one MPAN for the normal register and one for the switched register(s), or one for each meter
present at a site
2. The Supplier requests that the relevant metering is installed by sending D0142 for each
MPAN.
3. Having carried out the necessary work, the MOp sends MTDs in the normal way. A D0150
and D0149 is sent for each MPAN. (Switched heating load meters, where the physical
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 23 of 227
Working Practices Product Set (WPPS)
registers are mapped across two MPANs, is thought to be the only time that all physical
registers are not reported together).
Change to Metering System
Where the metering system is replaced or re-configured in such a way as to remove one or more
SSCs, the associated MPAN(s) becomes redundant. The Supplier should:

Identify the requirement for change of tariff / metering system, usually from Customer
considerations;

Determine the required new Standard Settlement Configuration(s) (SSC);

Determine the “Main” MPAN that it wishes to maintain – this should be the MPAN used for
normal operation as set out above;

Determine any other MPANs that are to remain.
The Supplier should request the change to SSC by sending D0142(s) for the MPAN(s) to be
retained to the NHH MOp with Group 267 as follows:
Group 267 for retained MPANs:
MPAN Core
Metering Point Address and Postcode
Retrieval Method
Requested Energisation Status
Standard Settlement Configuration Id
Additional Information
Remove Metering Point Meters
MPANs for Metering Points to be retained
Must be populated
‘N’ – Not known
‘E’ – Energised or ‘D’ – De-energised as
appropriate
New SSC for new Tariff
Text stating that this is a change to the
metering system configuration requiring a
change to the SSC and the number of
MPANs. Include the related MPAN(s) that
is(are) affected. In particular identify the
MPAN(s) that is (are) no longer required.
‘F’ – indicating that the metering should
remain
The Supplier should also provide another D0142(s) to the MOp instructing it to remove the
other MPAN(s) as follows:
Group 267 for removed MPAN(s)
MPAN Core
Metering Point Address and Postcode
Retrieval Method
Requested Energisation Status
Standard Settlement Configuration Id
Additional Information
Remove Metering Point Meters
Version :
5.4
Status :
Approved
MPAN for the Metering Point to be removed
Must be populated
‘N’ – Not known
‘D’ – De-energised - indicating that it is no
longer required
Null or Blank – indicating that there is no
associated SSC
Text stating that this is a change to metering
configuration requiring removal of an MPAN,
also include details of the other related
MPANs
‘T’ – True – indicating that effectively there is
to be no metering for this MPAN
Date :
01 Nov 2007
Page 24 of 227
Working Practices Product Set (WPPS)
The Supplier should attempt to send the D0142s in the same file/flow. In any case the
MOp should wait for all the relevant information before carrying out a Site Visit. It is the
circumstance of the receipt of all D0142s together that will ensure the MOp is aware of the
process to be followed and avoid misinterpretation over what is to be done with the
metering for the MPAN to be removed.
The MOP should carry out a Site Visit to either:
 Replace or re-configure the Economy 9 meter with a single tariff meter e.g. single rate
or Economy 7; or
 Remove the Meter associated with the MPAN to be removed.
Once the MOp has reconfigured the Metering Point against the main MPAN, they should
send to the Supplier, NHH DC and Distributor:
 D0150/D0149 for the main MPAN (and all other remaining related MPANs) containing
the new SSC(s) and new EFSD {SCON} / EFSD {MSMTD} and MTD / mapping details
appropriate to the new configuration. If in the example of the Economy 9 meter the
MOp chooses to use the existing Economy 9 meter it will need to report the Economy
9 specific register as a Non Settlement Register; and
 A D0150 only for each removed MPAN(s) with Group 08A populated, indicating the
discontinuation of the meter technical details for that MPAN, from the Date of Meter
Removal. (This also means that the Distributor will have information on the metering
point – MPAN, that they can, if they choose, cross reference with the request for
disconnection from the Supplier – see WP132).
On receipt of these flows, the Supplier can infer that the requested change to
configuration / metering system was successful and that the MPAN(s) is (are) now
redundant. The Supplier should then request the Distributor to remove the MPAN(s) from
MPAS, using an appropriately populated D0132 as detailed in WP132.
Impact of not implementing WP:
The procedures relevant to Related Metering Points (MPANs) will remain unclear and the
“Main” MPAN may not be retained through the metering point lifecycle with that Supplier.
Consistency with the MPAN(s) for the metering point may not be ensured.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 25 of 227
Working Practices Product Set (WPPS)

WP 16. MPAS - Differentiation between Supplier Full or Partial Refresh (D0204)
WP no:
16
Status:
Implemented by
Industry
Implementation
Date:
05/06/2002
Title:
MPAS - Differentiation between Supplier Full or Partial Refresh (D0204)
Version:
2
Originator:
MPAS Workshop
WP type:
S
Originator Ref:
44
Date raised:
4/12/97
DST Doc. Ref:
Product Area:
MPAS
Parties Affected:
Baseline
Products
Impacted:
DTC D0204 - Selective or Full Refresh of MPAS Details
J0723 – Instruction Type
MRA – Clauses 22 and 23
Last Amended:
05th June 2002
Change History
Approved at CCG 10 on 31/03/98 – see Design Note 5
Suppliers, MPAS
V2 with WPPS CP 51 agreed at MDB_02_52 on 25/04/02
Context:
Flow D0204 MPAS to Supplier is used for both Full and Partial Refresh. Within the file there is no
mandated way of differentiating between the two types. A Supplier needs a clear and simple
method for determining whether the Refresh received from MPAS is Full or Selective. If selective,
the Supplier needs to take account of the MPAS source as file layout depends on the particular
MPAS Service Provider source. The procedures and mode of communication for full and selective
refreshes are covered in the MRA (clauses 22 & 23).
Statement of Operation:
Whilst it is assumed that the Supplier who requests the refresh would know when they receive it
what type it is, the following structures are proposed to aid differentiation, utilising the existing
Instruction Type structure, as detailed below.
For Full Refresh, issue all MPANs within a single Instruction Type, in a dedicated file i.e.:
Instruction Type ‘SP84’
MPAN 1
MPAN 2
etc.
For Partial Refresh the MPAS systems generate the following:
1. EELC MPAS and St. Clement’s Services (SCS) MPRS (provided to the following participants:
LOND, SOUT, NEEB, NORW, EMEB, MIDE, HYDE, YELG, SWEB and SWAE) support one
MPAN per instruction per file i.e.:
Instruction Type ‘SP84’
MPAN 1
2. SEEB supports each MPAN under an individual Instruction, many instructions to a file –i.e.:
Instruction Type ‘SP84’
MPAN 1
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 26 of 227
Working Practices Product Set (WPPS)
Instruction Type ‘SP84’
MPAN 2
Instruction Type ‘SP84’
etc.
3. SPOW & MANW supports up to 20 MPANs within a single Instruction, in a dedicated file i.e.:
Instruction Type ‘SP84’
MPAN 1
MPAN 2
etc.
Note that this Working Practice does not require any amendment to the MDNS software.
Implications of Statement of Operation:
There is a risk of a Supplier deleting data for a full refresh and populating only with a partial
refresh.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 27 of 227
Working Practices Product Set (WPPS)
WP 20. Use of Checksum with UFF flows
WP no:
20
Status:
Implemented by
Industry
Implementation
Date:
Title:
Use of Checksum with User File Format (UFF) flows
Version:
3
Originator:
WP type:
W
Originator Ref:
Date raised:
15/1/98
DST Doc. Ref:
Product Area:
None
Parties Affected:
Baseline
Products
Impacted:
UFDS
Last Amended:
30/6/00
Change History
Approved at CCG 9 on 06/03/98 - see Design Note 3
27/03/2001
DST
Participants transmitting UFF
flows
V3 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
 the UFDS defines the use of checksum with MRA flows (i.e. in UFF) as optional;
 where a checksum is calculated using the current checksum algorithm, the checksum will no
longer be correct for a UFF flow if the MDNS translates the file between variable to fixed
formats.
In consequence, if a sender and receiver wish to use the checksum to validate a particular
instance of a flow they need to agree to use the same format.
Working Practice:
For UFF flows :
1. checksums should only be used with bilateral agreement between the two Participants and
with the agreement that both will structure the files in either fixed or variable format
2. otherwise, flows should be sent without checksums.
For MPAS - Supplier interface checksums should be ignored on input.
Impact of not implementing WP:
Without this Working Practice the receiver will reject UFF files as they will have incorrect
checksums.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 28 of 227
Working Practices Product Set (WPPS)
WP 21. Provision of Metering Point Changes to Agents
WP
no:
21
Status:
Implemented by
Industry
Implementation
Date:
29/08/2002
Title:
Provision of Metering Point Changes to Agents
Version:
3
Originator:
NHH MOp DRG, NHH DC DRG
WP type:
W
Originator Ref:
WA001/3.4.3
Date raised:
20/10/97
Related WPs:
28, 61, 87 and 107
Product Area:
Agent
Appointments
Parties Affected:
Supplier, DC, Distributor, Mop
Baseline
Products
Impacted:
DTC D0131 – Metering Point Address Details;
D0155 – Notification of new MOp or DC Appointment & Terms;
D0153 – Notification of Data Aggregator Appointment & Terms.
E2E’s - Appoint/De-appoint NHH MO, Appoint/De-appoint NHH DC,
Appoint/De-appoint HH MO, Appoint/De-appoint HH DC
Last Amended:
28/02/02
Change History
Approved at CCG 10 on 31/03/98 - see Design Note 5
V2 with WP CR 37 approved at CCG 30 on 9/07/99 - see Design Note
26
V3 with WPPS CP 49 approved at MDB_02_01 on 31/01/02
Context:
Where a Metering Point address is required for a new connection, or a change of details is
identified for an existing MPAN, there is no clear instruction as to how this information is provided
to Agents. Supplier notifications to Agents need to be precise and unambiguous.
Working Practice:
A Supplier should use a D0153 (Data Aggregator) or D0155 (DC or MOp) to notify agents of
changes in contractual arrangements, service references, service levels and reading schedules.
(Note that this does not preclude the need for a Supplier to negotiate contractual terms in advance
of providing these flows - see E2E p53, p55, p60, p61 & Working Practice 28).
When sending a D0155, Metering Point Address and Postcode (J1036-J1044 incl. & J0263)
should be sent in all cases. D0131 should be used to notify a change of Metering Point Address
for a given MPAN core.
Impact of not implementing WP:
There has been significant concerns regarding Participants ability to guarantee that the correct
MPAN is referenced when undertaking transactions between participants. It has been agreed that
using address information to check MPANs will significantly improve the chances that participants
will reference the correct customer when inter-operating. Clearly, the ability to ensure relevant
participants are referencing the same customer, as addressed by this WP will reduce industry
error rates and enhance customer perception. The use of D0131 to correct address information,
and D0153 and D0155 to confirm contractual arrangements will help to ensure Agents are able to
undertake their contractual obligations.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 29 of 227
Working Practices Product Set (WPPS)
WP 28. Usage of Service Reference and Service Level Reference
WP no:
28
Status:
Implemented by Industry
Title:
Version:
Usage of Service Reference and Service Level Reference
NHH MOPP/DC DRG
Originator:
1
WP type:
W
Originator Ref:
WA002/WA026
2.2.3/2.4.1
Date raised:
20/10/97
Related WPs:
107
Product Area:
Agent
Appointments
Parties Affected:
MOPs, Suppliers, DCs, DAs,
Baseline Products
Impacted:
DTC J0275 - Service Level Reference & J0274 - Service Reference;
Relevant flows - D0176, D0178, D0180, D0194, D0216, and specifically:
D0011 – Agreement of Contractual terms;
D0153 – Notification of Data Aggregator Appointment & Terms;
D0155 – Notification of New MOp or DC Appointment & Terms.
E2E NHH MOp A1034,A422,A423 - Diagram Appoint/De-appoint NHH
MO
DA (HH & NHH) A1008,A168,G701 Diagram Appoint/De-appoint DA
(NHH & HH); NHH DC A1032,A400,A401 Diagram Appoint/De-appoint
NHH DC
HH MOp A1130,A425,A426 Diagram Appoint/De-appoint HH MO HHDC
A1136, A447, A448 Diagram Appoint/De-appoint HH DC
Last Amended:
31/03/98
Change History:
Approved at CCG 10 on 31/03/98 - see Design Note 5
Context:
These data items are mandatory in all flows in which they appear but their use is unclear.
Working Practice:
Where they have been specified in Participants’ Commercial Agreements, and are used within the
DTC flows (D0153, D0155 & D0011) when appointing agents and agreeing contractual terms, the
fields are not to be used to negotiate contractual terms, and hence should not be amended. They
should be reproduced (on D0011) exactly as per the incoming flow (D0153, D0155).
Negotiation should occur outside the DTC, and the DTC flows should reflect the results of
negotiation. If the Service Level Reference & Service Reference are different on the incoming
flows (D0153, D0155) to those agreed by negotiation, the agent should reject the appointment
using a D0261 - Rejection of Agent Appointment, using Rejection of Agent Appointment Code
(J1016) of ‘N’ - No Contract.
Note: DTC CR 2982 which introduces new Rejection Codes has been approved since this WP
was agreed.
Impact of not implementing WP:
Allowing the Supplier and its Agents to negotiate contractual terms each time the Agent is
appointed to an MPAN is unduly complex, error prone and time consuming potentially requiring
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 30 of 227
Working Practices Product Set (WPPS)
process repetition. If negotiation was permitted, a new flow would be required to allow Suppliers to
accept counter proposals.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 31 of 227
Working Practices Product Set (WPPS)
WP 30. NHH Meter Readings following a Site Visit - Meter Operator and Distributor
WP no:
30
Status:
Implemented by
Industry
Implementation
Date:
27/03/2001
Title:
Reporting findings and providing Meter Readings in the NHH Market
following a Site Visit - Meter Operator and Distributor
Version:
2
Originator:
MOP DRG
WP type:
W
Originator Ref:
WA019, WA020
Date raised:
20/10/97
DST Ref:
WoPr MOP11
Parties Affected:
Suppliers, MOps, NHHDCs,
Distributors
Product Area:
Baseline Products
Impacted:
D0010 - Meter Readings;
D0002 - Fault Resolution Report or Request for Decision on Further
Action;
D0139 - Confirmation or Rejection of Energisation Change;
E2E - various, including De-energisation, NHH Meters: Process Meter
Readings
BSCP504 para 3.3.5.3
Related Working
Practices:
WP69
Last Amended:
30/06/00
Change History:
Approved at CCG 16 on 05/06/98 - see Design Note: 12
V3 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
The MOp and to a lesser extent the Distributor make visits to a Customer’s site for the purpose of
meter installation, change of functionality and removal, for energisation and de-energisation and
for disconnection. The choice of meter reading data flows provided by the Meter Operator and the
Distributor, on obtaining access to a customer’s premises or not and the data they contain, need
to be precisely defined.
Working Practice:
This Working Practice specifically refers only to the Non Half Hourly Market.
General - MOp and Distributor:
 SVCs will only be provided on D0010 when used to report exceptions; e.g. an SVC will be
provided when a meter which is expected to be energised is found to be de-energised.
 Meter Readings are only sent via D0010; D0139 is not used for this purpose (see Note 1).
Meter Operator:.
General
If the job required an installation, change of functionality or energisation, it is assumed that the
initial read supplied via a D0010 will have been obtained if the job is successful as the job cannot
be considered completed without a read.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 32 of 227
Working Practices Product Set (WPPS)
If a job fails:
 failed change of energisation status for credit meter (i.e. energisation/re/de-energisation) either the MPAN level J1253 in D0139 or an appropriate SVCC (J0024) set in D0221 will be
sent to the Supplier only as appropriate (see WP 69)
 failure of other jobs - D0002 will be used
 If no meter readings are obtained the NHHDC will not be notified
 If meter readings are obtained but the job failed the readings will be sent to the NHHDC using
D0010 with Reading Type = ‘S'.
If a job is successful but a meter reading is not obtained:
 where the job required replacement of a meter or change of functionality, the MOp sends
D0002 to advise the Supplier and the NHHDC that the final read has not been obtained for the
old meter (as could occur with meter ‘burn-out’) in addition to the D0010 sent with initial reading
for the new meter.
 where the job required de-energisation, the MPAN level SVC in D0139 (Group 261) is used to
indicate why the readings have not been obtained.
 where the job required removal of all meters, the MOp sends a D0002 to advise the Supplier
and the NHHDC that final readings were not obtained. Thereafter, NHHDC may calculate
appropriate deemed reads in line with relevant BSCPs and instruction from the Supplier.
Distributor:
 When a Distributor undertakes a (de-)energisation, whether successful or not, either the MPAN
level J1253 in D0139 or an appropriate SVCC (J0024) set in D0221 will be sent to the Supplier
only as appropriate (see WP 69).
 If the (de-)energisation fails and no meter readings are obtained then the NHHDC is not
notified.
 If meter readings are obtained but the job failed, the readings must be sent to the NHHDC
using D0010 with a Reading Type =’S’.
 If the job succeeds but no meter readings are obtained, the NHHDC will be notified outwith the
DTC (see Notes 2 & 3). Thereafter NHHDC may calculate appropriate deemed reads in line
with relevant BSCPs and instruction from the Supplier.
Impact of not implementing WP:
This Working Practice ensures that recipients of the relevant flows share the same understanding
regarding the use of these flows. Without this WP in place, Suppliers, Distributors and Meter
Operators as Supplier Agents may misinterpret or ignore the flows, and hence fail to meet their
obligations.
Notes:
1. In the Half Hourly Market, readings may be sent on D0139.
2. The DTC does not provide for D0002 to be sent by the Distributor to the NHHDC; this is in
contrast with the MOp which may provide a D0002.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 33 of 227
Working Practices Product Set (WPPS)
3. The failure to obtain a reading cannot be indicated as the DTC stands, by the omission of a
meter reading from the D0010 alone, as register readings are mandated if a date of reading is
to be provided in Group 030.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 34 of 227
Working Practices Product Set (WPPS)
WP 33. Providing Customer Details to the Distributor during Registration
WP
no:
33
Status:
Implemented by
Industry
Implementation
Date:
29/08/2002
Title:
Providing Customer Details to the Distributor during Registration
Version:
2
Originator:
JTCC
WP type:
W
Originator Ref:
76, 156, 186
Date raised:
26/1/98
Related WP:
21
Product Area:
MPAS
Parties Affected:
Suppliers, MPAS, Distributor
Baseline
Products
Impacted:
DTC – D0302 – Notification of Customer Details
Last Amended:
28/02/02
Change History:
Approved at CCG 9 on 06/03/98 – see Design Note 3
E2E - A160 – Supply Quote accepted (Register MPAN and Appoint
Agents (inc Change of Agent and generation of additional/new MPAN
Core(s))
V2 with WPPS CP 49 approved at MDB_02_01 on 31/01/02
Context:
The E2E show that:
On acceptance of a quote by a Customer, the New Supplier attempts Registration and,
independently of whether Registration is accepted or not, informs the Distributor of Customer
Details – E2E flow F2831.
Whereas the business practices of some Participants is that:
The New Supplier waits till the Registration is accepted and, where it is Change of Supplier, any
Objection resolved before informing the Distributor of Customer Details.
Working Practice:
Both practices, as portrayed by the E2E and as currently exercised by some Participants, are
acceptable, provided only in the latter case that data flows D0302 and (where relevant) D0225 are
transmitted to the Distributor within the Change of Supplier process.
Impact of not implementing WP:
Acceptable business practices within Competitive Supply are prevented.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 35 of 227
Working Practices Product Set (WPPS)
WP 34. Termination of New Supplier Agents during the Objection Process
WP no:
34
Status:
Implemented by
Industry
Implementation
Date:
29/05/2003
Title:
Termination of New Supplier Agents during the Objection process
Version:
4
Originator:
JTCC
WP type:
W
Originator Ref:
76, 209
Date raised:
06/02/98
Related WP:
100
Product Area:
MPAS
Parties Affected:
Suppliers, MPAS, Agents
Baseline
Products
Impacted:
DTC
D0151 – Termination of Appointment or Contract by Supplier
D0155 – Notification of New Meter Operator or Data Collector
Appointment and Terms
D0303 – Notification of Meter Operator, Supplier and Metering Assets
installed / removed by the MOP to the MAP
E2Es
A604 – Receive Notification of objection, cancel agents and update
records
A836 – Resolve Objections (Diagram E2E CoS Objection Process)
Last Amended:
03/03/03
Change History:
Approved at CCG 9 on 06/03/98 - see Design Note 3
Approved at CCG 31 on 13/8/99 – see Design Note 27
Approved at CCG 32 on 05/11/99 – see Design Note 28
V4 with WPPS CP 61 approved at MDB_03_03 on 27/03/03
Context:
The purpose of this Working Practice is to clarify the processes and sequences required to be
followed by Suppliers for the appointment and de-appointment of agents during a Change of
Supplier. In particular, the appointment (D0155) of agents by the New Supplier and any
subsequent termination /cancellation (D0151) on change of supplier failure and the deappointment/re-appointment of agents by the Old Supplier.
This Working Practice will also clarify the processes required to be followed by MOPs regarding
the D0303 flow (Notification of Meter Operator, Supplier and Metering Assets installed / removed
by the MOP to the MAP).
Also clarified are the effective dates of the agent appointments and de-appointments that should
be used following the objection process. These are given in the scenario table which follows the
Working Practice.
There are two variations in the understanding and responsibility of Suppliers regarding the
appointment/de-appointment of their agents following objection.
1. The E2E diagrams show that following acceptance of a Notice of Objection from the Old
Supplier, MPAS informs the New Supplier of the Objection, thereupon the New Supplier
cancels appointments with DC, MOp and DA without waiting until it knows whether or not the
Objection is sustained – E2E flows F2793, F2894, F2954 using D0151.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 36 of 227
Working Practices Product Set (WPPS)
2. The business practice of at least two Participants is that following notification of the Objection,
the New Supplier waits until it is clear that the Objection is sustained before cancelling
appointments for the MPAN with DC, MOp and DA.
Working Practice:
Both practices, as portrayed by the E2E and currently exercised by some Participants, are
acceptable, provided only that in the latter case data flow D0151 is transmitted to the three Agents
once any Objection is sustained.
The attached table clarifies both of these alternative approaches for both the case where the
objection is upheld and where the objection is removed. The table also specifies the obligations
on the Suppliers with regard to sending appointment and de-appointment flows and the effective
to date to be included in any termination flow.
Beneath the table are the rules for the MO when sending the D0303 to the MAP following receipt
of the appointment/de-appointment flows.
Impact of not implementing WP:
Acceptable business practices within Competitive Supply between the Supplier and its Agents are
prevented.
Scenario table follows:
Scenario
Supplier Approach
1
New Supplier appoints agents
wef SSD (D0155);
Old and New Supplier wait for
resolution of objection;
Objection is removed;
Old Supplier terminates agents
(D0151).
2
New Supplier appoints agents
wef SSD (D0155);
Old and New Suppliers wait for
resolution of objection;
Objection is upheld;
New Supplier terminates agents
(D0151).
3
New Supplier appoints agents
wef SSD (D0155);
On notification of objection New
Supplier cancels agents
(D0151);
Objection is removed;
New Supplier re-appoints
agents (D0155).
Old Supplier terminates agents
(D0151).
Version :
5.4
Status :
Approved
Supplier Obligation
As soon as is reasonably practicable following
objection removal/ resolution, the Old Supplier
should send a D0151 to the agent with an Effective
to Date {Agent} of the New Supplier’s SSD minus
one day, and a termination reason of ‘LC’,
regardless of the amount of time which has passed
between the New Supplier’s SSD and the objection
resolution date.
As soon as is reasonably practicable following the
upholding of the objection, the New Supplier should
send a D0151 with an Effective to Date {Agent} of
the New Supplier’s SSD minus one day, to cancel
the appointment, and a termination reason of ‘OB’.
Where an agent receives such notification, its
previous appointment (with the Old Supplier)
remains in effect because the Old Supplier has not
terminated the appointment.
The Effective From {Agents} dates supplied by the
New Supplier in the two D0155's (initial and then reappointment) should both be the New Supplier’s
SSD. The Effective to Date {Agent} date contained
within the New Supplier’s D0151 should be the New
Supplier’s SSD minus one calendar day and the
Termination reason should be ‘OB’. Note that the
Old Supplier is required to send a D0151 to
terminate agents upon removal of objection, with
Effective to Date {Agent} = the New Supplier’s SSD1 and a Termination Reason of ‘LC’.
Date :
01 Nov 2007
Page 37 of 227
Working Practices Product Set (WPPS)
4
New Supplier appoints agents
wef SSD (D0155);
On notification of objection New
Supplier cancels agents
(D0151);
Objection is upheld.
The Effective From {Agents} date supplied by the
New Supplier in the D0155 should be the New
Supplier’s SSD and the Effective To Date {Agent}
contained within the New Supplier’s D0151 should
be the New Supplier’s SSD minus one calendar day.
The Termination Reason included in the D0151
should be ‘OB’ Where an agent receives such
notification, its previous appointment (with the Old
Supplier) remains in effect because the Old Supplier
has not terminated the appointment.
Rules for populating the D0303:
On receipt of a D0155, (it may be necessary to wait for receipt of the D0150 to determine MAP id),
MO sends a D0303 with the Effective from Date {MOA} populated with the same date as that
contained in the D0155 from the Supplier.
On receipt of a D0151, MO sends a D0303 with the Effective to Date {MOA} populated with the
same date as that contained in the D0151 from the Supplier.
Notes:
1. The Supplier is responsible for the action of its agents. Any work undertaken by the agent
during a period of liability which is then retrospectively cancelled should be the subject of
contractual terms and conditions, agreed between the supplier and their agent in the
knowledge of the above obligations.
2. The “Effective To Settlement Date {REGI} for Old Supplier” (J0928) provided on the D0058 is
the New Supplier SSD minus one calendar day.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 38 of 227
Working Practices Product Set (WPPS)
WP 35. Prepayment Metering - Clarification of use of item J0582 in D0188
WP no:
35
Status:
Implemented by Industry
Title:
Prepayment Metering – Clarification of use of item J0582 in D0188
Version:
1
Originator:
LE/Seeboard
WP type:
W
Originator Ref:
DTC CR 2905
Date raised:
27/1/98
DST Ref:
Product Area:
PPM
Parties Affected:
Baseline
Products
Impacted:
D0188 - Key Transaction Details;
D0189 - Adjust Key Meter Debt/Recovery Rate at Specific Locations;
D0190 - Issue Customer Key;
Supplier, PPMIP
J0038 – Customer Reference Number;
J0582 - Key Meter Supplier/Customer Id;
E2E A1040 - Polling of Vendor Data, A124 - Supplier Processes the PPM
Readings and passes them on to NHHDC, Diagram - Prepayment Meter
Infrastructure Polling
Last Amended:
9/3/98
Change History
Approved at CCG 9 on 06/03/98 - see Design Note 3
Context:
Flow D0188 represents transaction data from a PPMIP to Suppliers. It is the Supplier’s only
means of obtaining meter reading and financial data from their customer without a visit to the
premises and will take place every time a customer charges a key. The Supplier, at pre-agreed
frequencies will pass meter reading data to the NHH DC for settlement purposes. There are
currently approx. 1.3 million key meter customers in the UK. Based on mean transaction
frequencies each 2T customer will generate, on average, between 40 and 50 D0188 flows every
year. Assuming a 5% churn this represents between 2.6 million and 3.2 million individual D0188
flows every year.
The DTC flow consists of 17 Data Items arranged in two Groups (386 Customer Payment Details
and 387 Meter Register Detail per Meter). One of these, J0582 Key Meter Supplier/Customer ID is
unique to this flow and consists of a number of separate items which are also Data Items within
the DTC in their own right. It also includes an item which, in its present state, cannot be populated.
J0582 (Key meter supplier / Customer ID), 20 characters is defined as:
Positions
EXACT Length
Name
1, 2
2
Key Meter Supplier ID (J1285)
3, 4
2
Distribution Business ID
5 – 17
13
Supplier Customer Reference No.
18, 19
2
Tariff Reference
20
1
Check digit
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 39 of 227
Working Practices Product Set (WPPS)
Working Practice:
The valid sets are:
Key Meter Supplier ID
As assigned by the Tariff Management
Forum
Distribution Business ID
As used within the current key meter
supplier system (e.g. Schlumberger)
Supplier Customer Reference
Number
As generated/used by the supplier
Tariff Reference
Space or ASCII character filled.
Check digit
Space or ASCII character filled.
The fields Tariff Reference and Check Digit must be set up as shown, but their values ignored in
processing. Note that tariff reference is not related to Tariff Setting’ (J0591), a 3 character field, or
‘Tariff Code’ (J0685).
Where the Supplier Customer Reference Number field in D0188 (13 digits) is copied to J0389 (20
digits) in flows D0190 and D0189, J0389 should be left justified and the field filled with trailing
blanks.
Impact of not implementing WP:
A PPMIP will be unable to construct the D0188 message and therefore cannot provide the
necessary information about Key Meter ownership and properties to its Supplier.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 40 of 227
Working Practices Product Set (WPPS)
WP 36. NHH DA requirement and MPAS usage of file and instruction number
WP no:
36
Status:
Implemented by Industry
Title:
NHH DA requirement and MPAS usage of file number and instruction
number
Version:
1
Originator:
MPAS Workshop
WP type:
S
Originator Ref:
11/12
Date raised:
10/02/98
DST Doc. Ref:
Product Area:
MPAS, NHHDA
Parties Affected:
Baseline Products
Impacted:
J0109 - Instruction Number;
Suppliers, MPAS, NHHDA,
NHHDC
J0330 - File Sequence Number;
on flows:
D0019, D0055, D0057, D0058, D0064-D0069, D0089-D0093, D0171,
D0172, D0203-D0205, D0209, D0213, D0217, D0259, D0260, D0271D0273.
Last Amended:
31/03/98
Change History:
Approved at CCG 10 on 31/03/98 - see Design Note 5
Context:
When sending flows from MPAS and NHHDC to Pool developed NHHDA systems the sender is
required to ensure that file number and instruction number are sequential and contiguous to each
recipient. It is unclear how these fields should be used on other inter role flows.
Statement of Operation:
MPAS operators provide file sequence numbering and instruction sequence numbering to each
individual Supplier, which they may utilise if they wish. Files will be sequenced with contiguous
increments, while instructions will be sequenced with increments (but may not be contiguous)
created at time of instruction generation. However these will be distributed across the individual
flow files.
MPAS does not check incoming file and instruction sequence numbers from Suppliers, however
provision by Suppliers of sequence numbering may assist in problem diagnosis.
NHHDC systems do not support file and instruction sequence numbering with roles other than
NHHDA.
Implications of Statement of Operation:
Significant extra processing would be required on behalf of the MPAS and NHHDC systems to
track and maintain sequential/contiguous file and instruction numbers for each supplier.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 41 of 227
Working Practices Product Set (WPPS)
WP 37. MPAS Input and Output File Processing
WP no:
37
Status:
Implemented by
Industry
Implementation
Date:
Title:
MPAS Input and Output File Processing
Version:
2
Originator:
MPAS Workshop
WP type:
S
Originator Ref:
5/9/13/14
Date raised:
10/2/98
DST Doc. Ref:
Product Area:
MPAS
Parties Affected:
Baseline Products
Impacted:
UFDS;
27/06/200
2
Suppliers, MPAS Operators
J0280 - File Creation Timestamp;
J1065 - File Completion Timestamp.
Last Amended:
24/05/2002
Change History
Approved at CCG 10 on 31/03/98 - see Design Note: 5
V2 with WPPS CP 55 agreed at MDB_02_06 on 27/06/02
Context:
MPAS operators process input and output files in batches either once or many times a day, but
not based on time of file creation. Participants should take this into account when scheduling their
file handling.
Statement of Operation:
Header and trailer time-stamp fields are set by MPAS at output file creation but are not used by
MPAS to determine the order of input processing. Instead, the order in which MPAS operators
process files available for each input batch is based on the time of receipt by the Service Provider,
rather than time of file creation.
Each MPAS processes any files available to the batch process at the end of the working day as
defined in the MRA, i.e. received by the Service Provider by 18:00. Consequential notifications
are transmitted as a batch at the end of processing.
SEEB1 processes any files available to the system during the working day as and when they
arrive. Consequential notifications are transmitted in batches at scheduled periods during the day.
Implications of Statement of Operation:
Some participants have assumed that time-stamps indicate that files will be processed in timestamp order. This is not the case.
Participants who interface with MPAS need to be aware of this Statement of Operation so that
they can schedule their MPAS interfaces accordingly.
1
Refer to MDD for a mapping of MPID to Company name
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 42 of 227
Working Practices Product Set (WPPS)
WP 38. Processing MPAS Changes with future effective dates
WP no:
38
Status:
Implemented by
Industry
Implementation
Date:
27/06/200
2
Title:
Processing MPAS Changes with future effective dates
Version:
3
Originator:
MPAS Workshop
WP type:
S
Originator Ref:
25
Date raised:
10/2/98
DST Doc. Ref:
Product Area:
MPAS
Parties Affected:
Baseline Products
Impacted:
D0055 – Registration of Supplier to Specified Metering Point;
D0205 - Update Registration Details;
E2E - A574 – Process CoS (Diagram – Registration on Change of
Supplier); A969 - Update MPAS Diagram – (Diagram - Updates to
Supplier held MPAD Items)
Last Amended:
24/05/2002
Change History:
Approved at CCG at 11 on 16/04/98 - see Design Note 6
Suppliers, MPAS Operators
V2 with WPPS CP 42 approved at MDB_01_10 on 25/10/01
V3 with WPPS CP 55 agreed at MDB_02_06 on 27/06/02
Context:
What number of changes to MPAS information (particularly appointments) can be made which are
effective at a future date, and how are they handled? A lot of issues have arisen with reference to
correcting future changes (especially where “future” includes the retrospective amendment time
window).
Statement of Operation:
Only one future appointment/meter point amendment is allowed by MPAS. When a change to a
registration appointment or attribute is made with an effective from date, which is determined by
the Supplier to be in error, each MPAS Service Provider will allow the following adjustments to be
made through standard flows.
1. EELC: any change to an appointment or attribute, within the time window allowed for change
(i.e. between the allowed retrospective time limit and the future), will remove ALL changes to
that appointment or attribute with the same or subsequent effective from date. This practice is
in line with MRA Clause 24.3 which permits a change with an effective date up to 13 months in
the past to remove any effective change to that item since that effective date.
2. MPRS, developed by SCS (St. Clements Services), provided to the following participants
(shown by their Market Participant Id 1) – LOND, SOUT, NEEB, NORW, EMEB, HYDE,
SWEB, SWAE and YELG: any change to an appointment or attribute must have an effective
from date equal to, or greater than, the latest effective from date for each data item and be
within the registration period. The retrospective change period should not exceed 14 months.
3. SEEB and MANW/SPOW: these systems follow the same approach as that for MPRS.
1
Refer to MDD for a mapping of MPID to Company name
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 43 of 227
Working Practices Product Set (WPPS)
Implications of Statement of Operation:
Suppliers need to be aware of how to resolve erroneous appointments/amendments for the
different MPAS Service Providers.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 44 of 227
Working Practices Product Set (WPPS)
WP 39. Amendments to MPAS during Objection Period
WP no:
39
Status:
Implemented by Industry
Title:
Amendments to MPAS during Objection Period
Version:
1
Originator:
ScottishPower/ Manweb
WP type:
S
Originator Ref:
MPAS/WoPr1
Date raised:
13/2/98
DST Ref:
MPAS Workshop 37
Product Area:
MPAS
Parties Affected:
Suppliers, MPAS
Baseline Products
Impacted:
D0089 - Notification from MPAS of Changed Metering Point Details
D0205 - Update Registration Details;
D0259 - Rejection of Scottish Allocation Schedule.
Last Amended:
31/03/98
Change History:
Approved at CCG 10 on 31/03/98 - see Design Note 5
Context:
During the MPAS differences workshops one of the differences identified was that the
ScottishPower/Manweb MPAS validation rules (as published to all Suppliers) mean that an Old
Supplier may not make amendments to MPAS whilst an objection is outstanding and a New
Supplier may not make more than one amendment to data prior to the objection window passing.
The frequency of such amendments in these situations is considered to be very low volume,
particularly due to the fact that, where an objection does take place, then any changes to metering
point data made by the New Supplier are backed out by MPAS and so the Old Supplier will have
the same metering point data held on MPAS as it did prior to the Change of Supplier taking place.
Statement of Operation:
If the situation does arise where there is a requirement to amend MPAN data then the Supplier
should contact the Scottish Power/ Manweb MPAS Operations who will ensure that the required
parties are kept informed and will then carry out the amendment once the objection window/period
has passed.
(Note that if a Supplier does send such an amendment via the MDNS to MPAS then this will be
rejected. The Supplier should then contact the Scottish Power/ Manweb MPAS Operations who
will manage the situation as above and there will be no charge for the rejection).
Implications of Statement of Operation:
Suppliers need to know how to interface with ScottishPower/Manweb’s MPAS system if they wish
to amend MPAN data during the objection window/period.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 45 of 227
Working Practices Product Set (WPPS)
WP 45. NHH Metering - Timing of when D0052 may be sent
WP no:
45
Status:
Implemented by Industry
Title:
NHH Metering - Timing of when D0052 may be sent
Version:
1
Originator:
WP type:
S
Originator Ref:
Date raised:
24/2/98
DST Ref:
Issue 65 & 66
Product Area:
NHH market
Parties Affected:
Supplier, NHHDC, MOp
Baseline Products
Impacted:
E2E - F3533, F3856, F3536, F3534, F3535, F3761, F4054, F3859
Last Amended:
07/05/98
Change History:
Approved at CCG 12 on 07/05/98 - see Design Note 8
DSC
DTC - D0052 Affirmation of Metering System Settlement Details
Context:
The DTC provides a flow definition for D0052 from the Supplier to the NHHDC to:
‘Establish the settlement details and EAC applied for a specified metering point and
unmetered supply. Used for new metering points, change in settlement details or change
in Profile Class’.
D0052 also provides the ‘Effective from Settlement Dates’ from which the changes in settlement
details are to be taken account of by the NHHDC and communicated to the NHHDA as supporting
information for the EAC calculation. It is essential that these Effective from Settlement Dates are
correct and the same in both MPAS and NHH DC systems as they are compared within NHHDA
using the data provided in flows D0019 and D0209. If they do not match precisely the NHHDA
system will report the mismatches as errors and will ignore the associated values of EAC and AA.
In situations where the Supplier instructs the MOp via D0142 in such a way that the SSC of the
metering system is changed, the Effective from Settlement Dates need to be aligned to the actual
date that the MOp was able to complete the work. This date may be different from the
appointment date in D0142 and in consequence from a specific Supplier desired Settlement date.
Statement of Operation:
The Supplier has two choices for informing the NHHDC of new connections and changes to a
metering system which affect the system’s SSC.
1. It can choose to wait until the MOp has completed the meter work and the MOp has indicated
this by providing a D0149 and D0150 to the Supplier and NHHDC before sending D0052.
When the Supplier is satisfied with the work done, it will by D+8 send a D0052 to the NHHDC
with SSC and Effective from Settlement Dates consistent with the date that the MOp actually
completed the work and a D0205 to the appropriate MPAS.
2. It can choose to send the D0052 and corresponding D0205 at the same time as sending the
D0142. If the MOp is unable for any reason to carry out the work on the Appointment day or
should the Supplier not have provided an Appointment Date then the Supplier will have to
correct any inconsistency between its intended date and the date that the MOp actually
completed the work as indicated in the MOp’s D0149 and D0150. This may include the
Supplier resending the D0052 and D0205. Details of the process to be followed by the NHHDC
to obtain a coherent set of Effective From Settlement Dates between the Supplier, MOp and
the NHHDC is provided in the accompanying flow diagram. It is necessary for the Supplier to
resolve with the NHHDC a mismatch of dates when these occur. The D+ days are indicative of
the shortest time that may be achievable - they could be relaxed by a number of days without
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 46 of 227
Working Practices Product Set (WPPS)
materially affecting the process.
In either choice, the Supplier shall ensure that there is no inconsistency between its desired SSC
for the metering system and that which the MOp set up as indicated in the D0149 and D0150.
Receive
D0052
from Supplier
Matching Details
available
Receive
D0150 / D0149
from MOp
No
Wait until
Date Match or
number of days
No
Matching Details
available
Wait until D+4
Yes
Yes
Do
Details
match
Yes
Save &
Process
Yes
Await Response for
resolution from
Supplier
No
D+5
Send D0170 to
Supplier with detail
in Additional
Information item
No
Has
mis-match
been reported to
Supplier by
MOp
Suggested
fastest
achievable
D+7
D+8
Version :
5.4
Status :
Approved
Supplier
communicates
instructions on
resolution
Apply Resolution
& Process
Diagram
NHHDC process
for resolving
EFSDs between
D0052 and D0150/
D0149 for WP45
Option 2
Date :
01 Nov 2007
Page 47 of 227
Working Practices Product Set (WPPS)
WP 52. Bulk Tariff Changes - Token Meters
WP no:
52
Status:
Implemented by Industry
Title:
Bulk Tariff Changes – Token Meters
Version:
1
Originator:
Type:
S
Originator Ref:
Date raised:
23/03/98
DST Ref:
PP Issue 15 (98/159)
Product Area:
Prepayment
Parties Affected:
Supplier, MOp, NHHDC
Baseline Products
Impacted:
E2E - A1054 (Diagram – Operate PPMs including the recharging of
smartcards/key and the sale of tokens)
A115 (Diagram – NHH Meters: Process Meter Readings)
Last Amended:
20/04/98
Change History:
Approved at CCG 12 on 07/05/98 - see Design Note 8
DSC
Context:
There is a requirement from time to time for the MOp to carry out bulk changes on token meters in
tariff and price per unit.
Currently this is not fully modelled in the E2E nor is it intended to be. The work is required to be
carried out by the MOp or the NHHDC acting as the MOp’s surrogate. However it is expected that
completion of the work for each meter may be signalled using DTC flows. There are two possible
approaches:
1. The MOp notifies the Supplier by invoking A1054 on p. 41 to change debt/recovery rate and
tariff setting on token meters on a per MPAN basis and signals completion to the Supplier via
flow F3033.
2. The NHHDC as surrogate MOp by invoking A115 on p. 36 and signalling completion of each
change in debt/recovery rate and tariff setting to the Supplier via F2662 using D0010 with SVC
set to 24 (Token Meter Reset).
Statement of Operation:
A Supplier and its MOp agree bilaterally in a localised MOp standard agreement:
1. The scope of any bulk tariff change
2. How the Supplier identifies the tariff / price changes and the MPANs affected to the MOp
3. What degree of confirmation the MOp, either directly or through the NHHDC acting as
surrogate MOp, is to provide the Supplier. This may vary from individual reporting on change to
each MPAN as set out in the two approaches above or as a simple overall completion summary
of the MPANs changed.
The actual choice of flows and their sequencing is outwith the End-to-End Diagrams.
Implications of Statement of Operation:
The purpose of the Statement of Operation is to make it clear that bulk tariff and other changes
are the Supplier’s responsibility to agree to with its MOp albeit within the Supplier/MOp Standard
Agreement framework.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 48 of 227
Working Practices Product Set (WPPS)
WP 53. Change of NHH Metering Type (Credit and Prepayment Meters)
WP no:
53
Status:
Implemented by Industry
Title:
Change of NHH Metering Type (Credit and Prepayment Meters)
Version:
1
Originator:
WP type:
W
Originator Ref:
Date raised:
23/03/98
DST Ref:
PP Issue 1 (98/159)
Product Area:
NHH operations
Parties Affected:
Supplier, MOp
Baseline Products
Impacted:
D0142, D0194, D0200, D0216
Last Amended:
02/04/98
Change History:
Approved at CCG 11 on 16/04/98 - see Design Note 6
DSC
Context:
It is currently unclear how flows D0142, D0194, D0200 and D0216 should be used in conjunction
with Meter Installation and Change, particularly when a change of type from credit to prepayment
or vice versa is requested by the Supplier of the MOp.
Working Practice:
The following practice is proposed:
Installation and replacement of credit meter
Use D0142
Installation and replacement of prepayment
meter
Use D0194, D0200 or D0216
Replace credit meter by prepayment meter
Use D0194, D0200 or D0216
Replace prepayment meter by credit meter
Use D0142
Remove all meters, credit or prepayment
Use D0142
It is assumed that there is no need to install multiple prepayment meters to meet any prepayment
meter requirement at the same MPAN with one exception. This exception is where a token meter
requirement is met by the addition of a token acceptor to a credit meter. Whilst the decision as to
whether to use a token acceptor in conjunction with a credit meter is determined by the MOp in its
contract with the Supplier, it is assumed that a request for replacement of a credit meter plus
token acceptor by a credit meter will result in the MOp removing the token acceptor. This request
will be initiated by use of D0142.
Note: the WP does not cater for replacement of one type of prepayment meter by another. This
can be achieved by removing the current prepayment meter before installing the new type.
Impact of not implementing WP:
There will be no consistent treatment between MOps on receipt of any one of these data flows and
hence inconsistent meter installation.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 49 of 227
Working Practices Product Set (WPPS)
WP 55. Use of Tariff Code for notifying the MOp of Token Meter and Smartcard
setup
WP no:
55
Status:
Implemented by Industry
Title:
Use of Tariff Code for notifying the MOp of Token Meter and
Smartcard setup
Version:
1
Originator:
WP type:
W
Originator Ref:
Date raised:
23/3/98
DST Ref:
PP Issue 5 (98/159)
Product Area:
Prepayment Token and
Smartcard Meters
Parties Affected:
Supplier, MOp, PPMIP
Baseline Products
Impacted:
D0197, D0200, D0216 etc.
Last Amended:
02/04/98
Change History:
Approved at CCG 11 on 16/04/98 - see Design Note 6
DSC
J0685
Context:
It is necessary for the Supplier to inform the MOp or PPMIP of the SSC and hence TPRs to be
able to choose the appropriate meter, time switching settings and prices to set up on the
prepayment meter on installation or replacement or change of tariff. The method for informing the
MOp or PPMIP is by using a Tariff Code, J0685. The actual values for the code are defined
between a Supplier and its MOp bilaterally but the format of the code is required to be
standardised across the industry.
Working Practice:
The Associated Document ‘originally developed by ScottishPower defines for Token Meters the
table structure for Tariff Code (alias Tariff Scheme) and its corresponding data items. A similar
schema document is available for Smartcard Meters. The structure allows for a Tariff Code to
identify corresponding values of SSC, and any of Debt Recovery Rates, Standing Charge, Rental
and Supplier Global Setting.
Impact of not implementing WP:
Other approaches would be required for the Supplier to inform the MOp or PPMIP of SSC, TPRs
and prices etc. This approach was deemed the most efficacious by the Prepayment DRG.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 50 of 227
Working Practices Product Set (WPPS)
Associated Document for WP 55. Use of PPM Tariff and Configuration Data
1
Introduction
This document, (originally DST 98/153 and based on an earlier paper developed by
ScottishPower), describes the proposed Industry standard method of managing prepayment tariff
and configuration data for Token prepayment meters. This document refers only to Token
prepayment meters but the principles can be applied to both Smartcard and Key meters.
Prepayment meters are more complex than credit meters because they contain tariff information
and several programmable operating variations. Currently the Data Transfer Catalogue (DTC)
does not support this additional functionality and guidelines do not exist to explain the use of
prepayment meters. This document is intended to address these problems by proposing a
storage structure and referencing mechanism for the necessary data. This document assumes
that as few changes as is practicable will be made to the DTC.
2
Summary
Two sets of data are required to install a prepayment meter:

Tariff and pricing information

Meter Configuration Data
The only method currently available for referencing this data is using the Service Reference and
Service Level Reference, which appear in the prepayment meter flows in the DTC. These
contract references are more commonly associated with the provision of a service to an agreed
level. This is a significant abstraction from what is actually required in these flows i.e. the tariff
and configuration of a prepayment meter. It is therefore proposed that these are replaced with a
simple reference to a table of Tariff Codes and configurations that have been previously agreed
between the MOp and their Supplier.
When the tariff rate changes the Supplier and the MOp will agree a new table of Tariff Codes. In
this way, tariff changes are reflected in the new agreed Tariff Code tables. The MOp now knows
the new tariff for all meters so there is no need for the Supplier to send a tariff change flow for
each prepayment meter. Each Tariff Code will be given a unique key so that it can be referenced
in the DTC flows with DTC data item J0685 Tariff Code.
There are many permutations for configuring prepayment meters. The number of options
available will be reduced to a few agreed configurations that the Supplier may choose. There are
currently no DTC items for selecting configuration options. This document describes a method of
linking this to a Tariff Code.
2.1
Detailed Description
The data required by prepayment meters can be divided up into two areas configuration and tariff.
The configuration data will comprise of a choice of meter operation modes and their default
settings. The tariff information comprises of the unit rates that are set and the time patterns at
which they are operational.
2.2
Tariff Codes
Standard Settlement Configurations (SSC) are required on every prepayment meter. The SSC
specifies the time patterns that registers record consumption. It will therefore be necessary to
choose an SSC and then choose unit rates to apply to the settlement registers that the SSC
defines. The DTC does not contain SSCs in prepayment flows so they will be linked to the meter
tariffs and will form the basis of the Tariff Code table. E.g.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 51 of 227
Working Practices Product Set (WPPS)
Tariff
Code
SSC
0001
0393
0002
0070
0003
0092
In addition, the tariff table will contain charging information for each settlement register in a
prepayment meter. A number of charging schemes may be agreed between the Supplier and the
MO. The table below shows a list of example Tariff Codes.
Tariff
Code
SSC
Rate
A
Rate B
Rate C
0001
0393
0.055
-
-
0002
0070
0.011
0.022
-
0003
0092
0.023
0.012
0.024
:
:
:
:
:
Some Suppliers may vary their Rental and Standing Charges and will include these in their tariff
tables. e.g.
Tariff
Code
Standing
SSC
Rate A
Rate
B
Rate C
charge
Rental
0001
0393
0.055
-
-
£2
£5
0002
0393
0.011
-
-
£3
£5
0003
0070
0.011
0.022
-
£3
£5
0004
0070
0.010
0.020
-
£2
£4
0005
0005
0.023
0.012
0.024
£4
£5
0006
0005
0.023
0.012
0.024
£4
£6
:
:
:
:
:
:
:
The Tariff Codes in the rows of the table will be selected by the Supplier using the DTC Data Item
J0685 Tariff Code.
The tariff table will be maintained by the MO and the Supplier and updated when tariff rates
change. All meters will be associated with a Tariff Code and will be reset if the Tariff Code
changes. When stored in a database the tariff table will be normalised so that maintenance is
simplified and tariff information is localised.
2.3
Supplier Global Data
The DTC contains only a few of the programmable configuration options available in most
prepayment meters. The configuration will have to be linked to the Tariff Codes, fortunately
settings of prepayment meters tend to be the same for all customers for any given Supplier.
It is proposed that the tariff table is repeated for each configuration option that a Supplier requires.
A settings table should be created for each set-up that a Supplier wants so that it can be
referenced from the tariff table.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 52 of 227
Working Practices Product Set (WPPS)
For example:
Supplier Global Settings 0001
Required
Value
Economy Rate
No
£2
Display Cycle Option
Yes
-
Low credit buzzer
Yes
£3
Set real time clocks
No
-
Display Advance
Yes
-
Wide Tokens
Yes
-
£5 Pound Tokens
Yes
-
Pound Sign
No
-
Emergency Credit
Yes
£15
Initial Credit
No
£0
Note. The exact contents and options of the Supplier Global Setting table are unimportant and
can be agreed by the MOp and Supplier during appointment.
2.4
Tariff Table
An example Tariff Table is shown below:
Tariff
Code
Standing
Supplier
Global
Setting
SSC
Rate A
Rate B
Rate C
charge
Rental
0001
0393
0.055
-
-
£2
£5
0001
0002
0393
0.011
-
-
£3
£5
0001
0003
0070
0.011
0.022
-
£3
£5
0001
0004
0070
0.010
0.020
-
£2
£4
0001
0005
0005
0.023
0.012
0.024
£4
£5
0001
0006
0005
0.023
0.012
0.024
£4
£6
0001
0501
0393
0.055
-
-
£2
£5
0002
0502
0393
0.011
-
-
£3
£5
0002
0503
0070
0.011
0.022
-
£3
£5
0002
0504
0070
0.010
0.020
-
£2
£4
0002
0505
0005
0.023
0.012
0.024
£4
£5
0002
0506
0005
0.023
0.012
0.024
£4
£6
0002
:
:
:
:
:
:
:
:
The linking of Supplier settings to the tariff table complicates tariff maintenance and increases the
size of the Tariff table significantly. It is the only option available that imposes minimum change to
the DTC. In practice, this should not be an issue because it is assumed that Suppliers will not
require many different settings. The Tariff Code in the DTC is 4 digits which will allow 9999
different Tariff Codes. As shown on the table above, ranges of schemes may be set aside to
allow for expansion of the number of tariffs. For example 1-500 for Supplier Global Setting 0001,
501-100 for Supplier Global Setting 0002.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 53 of 227
Working Practices Product Set (WPPS)
WP 56. PAN Number Format (Used for Token Meters)
WP no:
56
Status:
Implemented by
Industry
Implementation
Date:
29/11/2001
Title:
PAN Number format (used for Token Meters)
Version:
3
Originator:
WP type:
W
Originator Ref:
Date raised:
18/03/98
DST Ref:
Issues 71 and 175, CR2918
Product Area:
PPMIP
Parties Affected:
PPMIP/Supplier/Vendors
Baseline Products:
J0525 - PAN Number used in D0173, D0174
Last Amended:
25/10/01
Change History:
V1 approved at CCG12 on 07/05/98 - see Design Note 8
SWALEC
V2 with WP CR5, approved at CCG 22 on 11/09/98 - see Design Note
17
V3 with WPPS CP 45 approved at MDB_01_10 on 25/10/01
Context:
The PAN number (J0525) is held on the Customer’s ID Card and is used in the purchase of
tokens from Token Meter Vendors such as Post Office Counters Ltd. (POCL), De la Rue, Pay
Point. It identifies the Customer and supports the distribution of information related to token
purchase transactions.
PAN is defined in the DTC as a 19 character string and is made up of a number of fields which
identify:
1. the Customer - this is done through Customer Account Number
2. the Customer’s Supplier - this is done through an IIN - a unique number issued by APACS
3. the PPMIP through whom any Payment Transaction will be routed between the Vendor and the
Supplier. The PPMIP is the one whose Authorised Area the Customer’s Metering Point is in.
The string also includes a check digit whose purpose is to ensure that errors incurred when
reading the string from an ID Card by a Vendor Payment Machine are detected. The need for this
check digit was confirmed at a prepayment business group chaired by OFFER 14 July 1998 and
referenced in OFFER paper, SUPPLY/98/47.
The information including PAN to be written to the Customer ID Card is provided by the Supplier to
the Customer either directly or through the services of the PPMIP using flow D0174. In these
cases the check digit is required. When the PAN is read by the Vendor it is included in flow
D0173 from the PPMIP to the Supplier but the check digit has little value and may be omitted (in
line with the original specification of PAN in the DTC where the check digit was optional).
Note that:
 the structure of PAN has been chosen to be compatible with the pre-competitive
Supply market;
 a customer remaining with its original Supplier can continue to use its existing card
which can be handled by existing Vendors working with the in-area Supplier. Only
when a customer changes to a new Supplier is it required to be issued with a new
card;
 the Supplier ID is an identifier from pre-competition business practice (i.e. the Agent
ID) and is not the Market Participant ID in a Supplier role in the 1998 context.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 54 of 227
Working Practices Product Set (WPPS)
Working Practice:
The PAN Number (J0525) when used in flows D0174 and D0173 and when held on a Customer’s
ID Token Meter ID Card are to be populated as follows:
Character
positions
Use
1 to 6
Supplier ID (IIN allocated by APACS)
7,8
Agent ID (the PPMIP) identified by an ID agreed across the Electricity
Industry and listed in Annex B of OFFER letter SUPPLY/98/47 (DST
ref.98/471) (Annex B, Distribution No. column highlighted below)
9 to18
Customer Account Number
19
Check digit (D0174 only)
The Check Digit:
 when provided needs to be calculated according to the ISO 7812 (luhn) algorithm,
described in Annex A of OFFER letter SUPPLY/98/47 (DST ref. 98/471), dated
15/7/98 (Annex A highlighted below);
 is required to be written by the Supplier to the Customer ID Card; the card will be
rejected by current known Vendor Payment Machines if omitted or incorrect;
 is required to be sent by the Supplier to the PPMIP as part of the PAN number in
flow D0174; but
 may be omitted in flow D0173 from the PPMIP to the Supplier. If omitted the digit
needs to be null or space according to user file format.
Notes:
1. The structure of the new PAN is compatible with existing numbering systems thereby avoiding
the need to replace Customers’ ID cards until a Customer changes to a another Supplier for the
first time.
2. Suppliers choosing not to make use of the in-area PPMIP should be aware that digits 7 and 8
of the PAN may contain an Agent ID.
Impact of not implementing WP:
Suppliers will not receive the correct cash payments made by their customers nor will the PPMIPs
be correctly charged for Token transactions. Customers cards may be rejected by Vendors’
machines and they will therefore be unable to purchase tokens for their meters.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 55 of 227
Working Practices Product Set (WPPS)
Annex A of OFFER letter SUPPLY/98/47 (DST ref. 98/471)
EEB (DEREGULATION SERVICES)
Luhn formula for computing modulus 10 “double-add-double” check digit
The following steps are involved in this calculation.
Step 1
Double the value of alternative digits beginning with the first right hand
digit (low order).
Step 2
Add the individual digits comprising the products obtained in step 1 to
each of the unaffected digits in the original number.
Step 3
Subtract the total obtained in step 2 from the next higher number ending
in 0 (this is equivalent to calculation the “tens complement” of the low
order digit (unit digit) of the total). If the total obtained in step 2 is a
number ending in zero (30, 40 etc.), the luhn check digit is 0.
Example
PAN without luhn check digit 872560021439746445
8
7
2
x2
8
14
5
6
x2
2
10
0
0
x2
6
0
2
1
x2
0
4
4
3
x2
1
8
9
7
x2
3
18
4
6
x2
7
8
4
4
x2
6
8
5
x2
4
10
8+1+4+2+1+0+6+0+0+4+1+8+3+1+8+7+8+6+8+4+1+0=81
90-81=9
PAN with luhn check digit is 8725600214397464459
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 56 of 227
Working Practices Product Set (WPPS)
Annex B of OFFER letter SUPPLY/98/47 (DST ref. 98/471)
PES
CODE
Distribution No.
Eastern
EE
10
East Midlands
EME
11
London
12
Manweb
MAN
13
Midlands
MEB
14
Northern
NE
15
Norweb
NOR
16
Seeboard
SEE
19
Southern
20
SWALEC
SWA
21
SWEB
SWE
22
Yorkshire
YEG
23
ScottishPower
SP
18
Hydro-Electric
SHE
17
London and Southern have not requested alphabetic code as they do not use token meter
technology.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 57 of 227
Working Practices Product Set (WPPS)
WP 57. Error Handling - Notification
WP no:
57
Status:
Implemented by
Industry
Implementation
Date:
27/03/2001
Title:
Error Handling - Notification.
Version:
2
Originator:
WP type:
W
Originator Ref:
Date raised:
30 March 1998
DST Ref:
Issue 52
Product Area:
DTC flows
Parties Affected:
Participants receiving flows
Baseline
Products
Impacted:
DTC flows
Last Amended:
30/06/00
Change History:
Approved at CCG 12 on 07/05/98 - see Design Note 8
DST
V2 with WPPS CP 24 at MDB_00_06 on 30/06/00
Context:
This WP covers flows between all Participants where the Recipient has received data files or flows
within files containing errors.
Working Practice:
Once a Recipient (R) is aware that a file or an individual flow is unacceptable to R, R should
contact the Originator (O) outwith the DTC process and provide details of:
1. the User File ‘file identifier’ of the file that is unacceptable, including application specific
information such as file sequence number or instruction number wherever possible to aid O,
and time/date of receipt
2. the reason(s) the file is unacceptable (and whether or not validation stopped on 1st error found)
including where appropriate: Group Id, group instance number, flow instance number, J
numbers, complete User File header information (included in cases of corruption of file id
where O can still be identified)
3. the action(s) R has taken if any
4. the action(s) R requests O to take. (The options include whole file re-transmission, retransmission of corrected flows and method of re-transmission of corrected flows.)
This manual procedure should be used unless there is a more appropriate method in the DTC
setting out established flows for the reporting of errors - one example is the interoperation of
MPAS and Suppliers, e.g. for the following flow pairs: D0055/D0057, D0064/D0066,
D0068/D0069, D0205/D0203, D0271/D0272.
R & O to maintain log of error handling events for later review, consistent with best practice and at
least as comprehensive as their logging of other data transfer events.
Manual Flows which are in error should be subject to the same structured processes.
The implementation of this WP by both O and R should be consistent with national and local
agreements.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 58 of 227
Working Practices Product Set (WPPS)
Impact of not implementing WP:
Without this Working Practice, the Originator of a file that is unacceptable to its Recipient will not
have enough information to analyse and correct the problem.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 59 of 227
Working Practices Product Set (WPPS)
WP 58. Error Handling - Whole File Retransmission
WP no:
58
Status:
Implemented by Industry
Title:
Error Handling - Whole File Retransmission.
Version:
1
Originator:
DST
WP type:
W
Originator Ref:
DST Issue 52
Date raised:
30 March 1998
Related WPs:
57, 59
Product Area:
DTC flows
Parties Affected:
Participants transmitting
flows between all
Participants
Baseline Products
Impacted:
DTC flows
Last Amended:
07/05/98
Change History:
Approved at CCG 12 on 07/05/98 - see Design Note: 8
Context:
This WP cross refers to WP 57 and assumes that the Originator has received notification that the
Recipient has rejected the whole file, eg has received a data file containing data and/or structural
errors. The file may have failed a checksum validation, or some data validation causing whole file
rejection.
Working Practice:
As soon as a Recipient (R) has advised - in line with WP 57 - an Originator (O) that O’s file is in
error or is unacceptable and R has requested the re-transmission of a corrected file, O shall:
1. Determine what if any data or structure needs to be changed
2. Advise R manually of the ID of the re-transmission if changed as the same file ID may be
appropriate if the file has not been used at all by R, and
3. Liaise with R to re-transmit the appropriately corrected file(s).
The default medium for re-transmission will be the same as the original transmission unless
mutually agreed between O and R.
R & O to maintain log of error handling events for later review, consistent with best practice and at
least as comprehensive as their logging of other data transfer events.
Manual Flows which are in error should be subject to the same structured processes.
The implementation of this WP by both O and R should be consistent with national and local
agreements.
Impact of not implementing WP:
Without this Working Practice an Originator who has sent a data file containing data or structural
errors may not be able to meet a Recipient’s legitimate requirements for re-transmission of
correct(ed) file(s).
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 60 of 227
Working Practices Product Set (WPPS)
WP 59. Error Handling - Correction of Errors
WP no:
59
Status:
Implemented by
Industry
Implementation
Date:
28/02/2002
Title:
Error Handling - Correction of Errors.
Version:
4
Originator:
DST
WP type:
W
Originator Ref:
Issue 52
Date raised:
01 April 1998
Related WPs:
57, 58
Product Area:
DTC flows
Parties Affected:
All Participants
Baseline Products
Impacted:
DTC flows
Last Amended:
28/02/02
Change History:
V1 approved at CCG 12 on 07/05/98 – see Design Note 8.
V2 with WP CR 2 to update the Associated Document (no change to
WP 59 itself) approved at CCG 18 on 10/07/98 - see Design Note 13.
V3 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
V4 with WPPS CP 48 accepted at MDB_02_01 on 31/01/02
Context:
This WP covers the correction of flows between Participants where the Originator (O) has been
informed that a file already sent by it to a Recipient (R) is in R’s opinion in error or unacceptable.
Working Practice:
When correcting errors found in flows, the Originator (O) must be prepared to use reasonable
endeavours to provide corrections in a way acceptable to the Recipient (R).
This may include: either whole file re-transmission; or re-transmission of corrected flows, using
either manual (e.g. fax, e-mail, diskette); or electronic re-transmission of corrected files/flows.
An exception to this is in relation to the data flows for which there is agreement between all
Participants to a single correction method. These are as set out in Data Flows For Specific Error
Handling, V 2.0 (attached).
Another exception is where O provides R, in advance, with auditable authority to make specific
data changes to resolve the problem and R subsequently makes the data changes.
Manual notifications for retransmissions should reference notifications for original transmissions
(and if a problem still exists, notification of this new problem will be raised as before).
If O on inspection remains convinced of the validity of its flows, then O shall advise R.
R & O to maintain a log of error handling events for later review, consistent with best practice and
at least as comprehensive as their logging of other data transfer events.
Manual Flows which are in error should be subject to the same structured processes.
The implementation of this WP by both O and R should be consistent with national and local
agreements.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 61 of 227
Working Practices Product Set (WPPS)
Impact of not implementing WP:
Without this Working Practice an Originator who has sent a data file that is unacceptable to its
Recipient may not be able to meet a Recipient’s legitimate requirements for retransmission of the
correct data.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 62 of 227
Working Practices Product Set (WPPS)
Associated Document for WP 59. Data Flows for Specific Error Handling
1. Introduction
The purpose of this paper is to identify the DTC data flows for which special treatment is required
in relation to error handling. The paper also defines the special treatment required in each case,
in terms of retransmission of the complete original file or retransmission of corrected next
instructions only.
Errors found in any flow where Error Handling is defined in BSCP’s, PSL’s or the MRA will be
handled according to these procedures. Errors not specifically covered by the BSCP’s, PSL’s or
the MRA will be subject to this Working Practice.
The reason for identifying specific data flows for special treatment is to reduce the potential
overhead for Participants of having to make provision in their error handling processes for both
types of retransmission, “whole file” and “corrected instructions”.
2. Data Flows for Special Treatment
The following table lists the data flows for which there is a single correction method for instruction
data errors. Resolution of file level errors, as opposed to instruction data errors, would normally
involve file retransmission as defined in WP58 Error Handling - Whole File Retransmission.
In the table below, “Whole file” means that the Originator should resend the complete original file
containing corrections. “Corrected instructions” means that the Originator should send corrected
instructions only, although the corrections could be sent with other additional instructions.
The Reason column indicates why the flow has been identified for special treatment. Flows have
been selected because they are associated with systems in which there is a high degree of
commonality between Participants. This is because they relate to new business processes
generally, but not exclusively, supported by newer consortium-developed systems rather than by
older legacy systems.
Table of Data Flows for Special Treatment
Flow
Name
Originator
Resends
Reason
D0018
Daily Profile Data Report
Whole file
Receiving Settlement output
(e.g. ECMS, SPS)
D0019
Metering System EAC/AA Data
Corrected
instructions
Receiving Settlement data or
output (e.g. ECMS, SPS)
D0023
Failed Instructions
Whole file
Includes NHHDA common
system output
D0028
Standing Profile Data Report
Whole file
Receiving Settlement output
(e.g. ECMS, SPS)
D0029
Standard Settlement Configuration
Report
Whole file
Receiving Settlement output
(e.g. ECMS, SPS)
D0030
Non Half Hourly DUoS Report
Whole file
Receiving Settlement output
(e.g. ECMS, SPS)
D0036
Validated Half Hourly Advances for
Inclusion in Aggregated Supplier Matrix
Whole file
Receiving Settlement data or
output (e.g. ECMS, SPS)
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 63 of 227
Working Practices Product Set (WPPS)
Flow
Name
Originator
Resends
Reason
D0039
Daily Profile Coefficient Extract
Whole file
Receiving Settlement systems
output
D0040
Aggregated Half Hour Data File
Whole file
Receiving Settlement data or
output (e.g. ECMS, SPS)
D0041
Supplier Purchase Matrix Data File
Whole file
NHHDA common system output
D0043
Supplier Deemed Take Report
Whole file
Receiving Settlement output
(e.g. ECMS, SPS)
D0055
Registration of Supplier to specified
Metering Point
Corrected
instructions
MPAS systems related. O
notified via D0057
D0064
Notification of an Objection to Change
of Supplier Made By the Old Supplier
Corrected
instructions
MPAS systems related. O
notified via D0066.
D0068
Removal of Registration Objection
Corrected
instructions
MPAS systems related. O
notified via D0069.
D0079
Supplier Purchase Report
Whole file
Receiving Settlement output
(e.g. ECMS, SPS)
D0081
Supplier Half Hourly Demand Report
Whole file
Receiving Settlement output
(e.g. ECMS, SPS)
D0082
Supplier – Supplier Purchase Matrix
Report
Whole file
Receiving Settlement output
(e.g. ECMS, SPS)
D0083
TUoS Report
Whole file
Receiving Settlement output
D0095
Non Half Hourly Data Aggregation
Exception Report
Whole file
NHHDA common system output
D0204
Selective or Full Refresh of MPAS
Details
Corrected
instructions
MPAS systems related. Option
for subsequent selective refresh
D0205
Update Registration Details
Corrected
instructions
MPAS systems related. O
notified via D0203
D0209
Instructions to Non Half Hourly or Half
Hourly Data Aggregator
Corrected
instructions
MPAS systems related.
D0227
Pool Market Domain Data File
Whole file
MDD system related
D0242
Supercustomer DUoS Daily Statement
Whole file
Consortium developed DUoS
system. Similar processing by
recipient (e.g. ECMS, SPS)
D0265
Line Loss Factor Data File
Whole file
Consortium developed
Distributor system.
D0266
Supplier Settlement Header Report
Whole file
Receiving Settlement output
(e.g. ECMS, SPS)
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 64 of 227
Working Practices Product Set (WPPS)
Flow
Name
Originator
Resends
Reason
D0269
Market Domain Data Complete Set
Whole file
MDD system related
D0270
Market Domain Data Incremental Set
Corrected
instructions
MDD system related
D0271
Request Contact Notice
Corrected
instructions
MPAS systems. O notified via
D0272
In addition to the data flows in the above table, the general rule for resending any report flow is to
resend the whole file.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 65 of 227
Working Practices Product Set (WPPS)
WP 60. Bulk Tariff Changes - Smartcard and Key Meters
WP no:
60
Status:
Implemented by Industry
Title:
Bulk Tariff Changes - Smartcard and Key Meters
Version:
1
Originator:
Type:
S
Originator Ref:
Date raised:
07/04/98
DST Ref:
PP Issue 15 (98/159)
Product Area:
Prepayment
Parties Affected:
Supplier, PPMIP
Baseline Products
Impacted:
E2E - Operate PPMs including the recharging of smartcards/key and
the sale of tokens and Prepayment Meter Infrastructure Polling
Last Amended:
07/05/98
Change History:
Approved at CCG 12 on 07/05/98 – see Design Note 8
DSC
Context:
There is a requirement from time to time for the PPMIP to carry out bulk changes of tariff and
price per unit for Smartcard and Key holders on behalf of the Supplier.
Currently this process is only partially modelled in the E2E. It appears from the E2E Diagram
Operate PPMs including the recharging of smartcards/key and the sale of tokens that a Supplier
could request the PPMIP to undertake a global change of tariffs using process A1051 or could
invoke the same process for individual MPANs using flow F2091/F920 (D0189 for Key Meters and
D0197 for Smartcard Meters) from A124 diagram Prepayment Meter Infrastructure Polling.
However the use of this process, A1051, for bulk change would be very heavy as MPANs are
individually addressed and changed and the new statuses are returned in flow instances F3054
(D0188 for Key Meters) and F3058 (D0199 for Smartcard Meters).
Statement of Operation:
A Supplier and its PPMIP agree bilaterally outside scope of the End to End Diagrams:
1. The scope of any bulk tariff / price per unit change;
2. How the Supplier identifies to the PPMIP the tariff / price changes and the MPANs/ meters
affected;
3. What degree of confirmation the PPMIP is to provide the Supplier; this may vary from individual
reporting on change to each MPAN / meter to a simple overall summary of all MPANs / meters
on completion.
The Statement of Operation is consistent with the Standard Agreements on use of Smartcard and
Key Meters.
It is expected that there will be an equivalent back-to-back agreement between the PPMIP and the
Vendors it works with.
Implications of Statement of Operation:
The purpose of the Statement of Operation is to make it clear that bulk tariff and price changes
are the Supplier’s responsibility to agree to with its PPMIP.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 66 of 227
Working Practices Product Set (WPPS)
WP 61. Content of D0148 between a Supplier and its Agents
WP no:
61
Status:
Implemented by
Industry
Implementation
Date:
10/05/2001
Title:
Data content of D0148 between a Supplier and its Agents in the NHH
and HH Markets
Version:
5
Originator:
British Gas
WP type:
W
Related WPs
21, 66, 77 and 116
Date raised:
6/5/98
Ref:
Issue 99: 98/275 WP 40
Product Area:
NHH and HH
Markets
Parties Affected:
Suppliers, MOps,DCs
Baseline
Products
Impacted:
D0148 - Notification of Change to Other Parties
Last Amended:
30/11/00
Change History:
V1 Approved at CCG 16 on 05/06/98 – see Design Note 12
V2 Approved at CCG 30 on 09/07/99 – see Design Note 26
V3 agreed at MDB_00_03
V4 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
V5 with WPPS CP 35 accepted at MDB_00_11 on 30/11/00
Context:
A Supplier will be required to notify its DC and MOp Agents using D0148 of any change to the
other of its Agents for the metering point for the three functional processes: New Connection,
Change of Supplier and Change of Agents.
It is unclear from the Supplier’s viewpoint what information the Agent has or can derive from data
within the flow and what data it explicitly needs to be informed about. This lack of clarity may result
in flows being rejected as the Supplier and Agent may have different views on what each is
expecting to send and receive in the flow in the three functional processes.
From the agent’s perspective, the receipt of the D0148 should trigger them to take appropriate
further action, as the content of the D0148 indicates the context in which it is being sent and
therefore the action required to be taken on receipt.
Therefore the purpose of this Working Practice is to define the required data items in each of the
three different uses of the flow: New Connection, Change of Supplier and Change of Agents and
to indicate what further action the agent should take. This WP should be reviewed in conjunction
with the D0148 notes held under DTC Annex C.
This WP is written to support Agent Competition in both the NHH and HH markets.
Working Practice:
Flow D0148 is used for the identification of other Agents with which an Agent will need to
communicate. It is not used in the transmission of information to an Agent concerning its own
appointment.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 67 of 227
Working Practices Product Set (WPPS)
A D0148 must be sent by the Supplier on all Meter Operator, Data Collector and Data Aggregator
appointments (as defined in this WP and DTC Annex C). This ensures that, for the recipient, there
is no confusion over the context, and therefore intention, of the flow and the agent’s subsequent
obligations.
The content of this flow will depend on which Agents have changed, and which Agent is the
recipient of the information. Where an existing Agent is informed about the appointment of a new
agent they should already know the identity of the old Agent, and can derive the termination date
from the appointment date of the new Agent, these items are therefore not sent/required. For
example, in the case of the Supplier changing its Data Collector only, the MOp is not sent the Old
Data Collector termination details and Effective to Date. The D0148 should be used to update and
supersede only that information which the agent needs to know and is currently unaware of.
The new appointee receiving the flow may not need an accurate original appointment date for an
existing Agent. This is only the case for an existing Data Collector Appointment sent to the new
MOp and the existing Meter Operator Appointment sent to the new Data Collector. The date of the
existing appointment sent should be the same or earlier than the new appointee’s appointment
date. Wherever possible the Supplier should send the actual appointment date. If not sending the
correct appointment date results in the MOp or DC not being able to perform their duties
accurately then this shall be the responsibility of the Supplier and therefore it is recommended that
correct information is sent in all circumstances.
Where several Agents are changed, the date of change may vary between the Agents. This may
cause multiple occurrences of certain data items in order to provide the Agent being informed by
D0148 of the information it requires. The examples assume that where more than one agent has
changed within a particular scenario, the Effective from Dates of the new agent appointments are
on the same day. If more than one agent is changed, but the effective from dates of those
appointments are different, then the scenarios for changing each agent separately should be
followed in order of their appointment dates.
If the Non Half Hourly DA has been changed during the period that the Supplier has held the
registration, it would be necessary to send multiple occurrences of Groups 277 and 278 to the
NHH DC to cover the DA history, in line with BSC Party Service Line 120 (NHH). There is no
requirement to pass DA history to a Half Hourly Data Collector.
The effective from dates for the Data Aggregator appointments need to be accurate as this
determines where the Data Collector sends consumption information for Settlement Days.
In cases where an Agent is changed, the Supplier should ensure that the Effective to and
Effective from Dates sent for those Agents are contiguous.
The examples shown in DTC Annex C detail the data which needs to be sent; this information is
also summarised in the table attached to this Working Practice. The Supplier must not send more
data than that documented in the examples because the Agent will not be able to determine in
what context they are receiving the flow and their resultant next action. The only exception to this
is that whereas the examples assume that a Supplier will not send its Half Hourly Data Collector
the DA history, it may choose to do so. The examples provide guidance on how the flow should
be populated in this instance. Should the Agent require more data than this, e.g. to save deriving
Effective to Dates, this would need to be subject to bilateral agreement.
It is recommended that the Supplier sends all required information in the D0148 in a single
occurrence of the flow. However, where the situation permits and where a Supplier judges that it
needs to send incremental versions, it must do so in a way that the context of the flow is not
ambiguous to the recipient and any follow-on action that should be taken is clear.
For each of the business events that will trigger a D0148, Annex C of the DTC shows how the
D0148 should be populated for a single occurrence of the flow and also, where appropriate, how
the flow should be populated if sent in incremental versions. Consequently, whenever a D0148 is
sent it must conform to the examples shown in Annex C of the DTC.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 68 of 227
Working Practices Product Set (WPPS)
From the perspective of the recipient Agent, the content of the D0148 should be used as a trigger
for further action, as detailed:
1.
Where the content of the D0148 indicates that this is a Change of Supplier event– i.e. the
Effective from Settlement Date {REGI} of the New Supplier matches the Effective from
Dates of the Agents and information relating to the Old Agents is present:

The New Agent should request information from the Old Agent as defined in the E2E’s
NHH ONLY Appoint Agents to the metering point and HH ONLY Appoint Agents to the
metering point.
Where the change of supplier is coincident with a change of measurement class
(NHH to HH), the usage of D0148 is defined by WP 116.
2.
Where the content of the D0148 indicates a New Connection no action is required other than
to record who the associated agents are – i.e. there is no information relating to Old Agents
in the D0148.
3.
Where the content of the D0148 indicates a change of agent – i.e. The Effective from
Settlement Date {REGI} of the Supplier is earlier than the Effective from Dates of the
Agents:

Where the DC has changed, the incumbent MOp should send meter technical details to
the New DC, E2Es Appoint/De-appoint NHH DC or Appoint/De-appoint HH DC

Where the MOp has changed, there is no requirement on the incumbent DC to take
any further action other than to record who the associated agents are, E2E’s
Appoint/De-appoint NHH MO or Appoint/De-appoint HH MO

Where the DA has changed, the incumbent DC should send settlement information as
defined in BSCPs 502 and 504 to the appropriate DA’s,E2E’s HH Meters: Process
Meter Readings and NHH Meters: Process Meter Readings.
On a change of agent within measurement class, the incumbent Supplier will request that
the old agent transfer the relevant metering point history to the new, E2E’s Appoint/Deappoint NHH MO, Appoint/De-appoint NHH DC, Appoint/De-appoint HH MO, Appoint/Deappoint HH DC. Therefore, the New Agent need take no action other than to wait on this
information. However, where the information has not arrived with the New Agent by 10
WD after receipt of the D0148, the New NHHDC should take the appropriate course of
action as dictated by the agreement with the Supplier.
Where there is a change of agent due to a change of measurement class (NHH to HH),
the usage of D0148 is defined by WP 66.
It should be noted that Old Agents do not receive a D0148 to inform them of the identity of
the New Agents for sending on metering point history. The Ids of the New Agents are
provided in the D0170, as per WP 77.
Where the Agent cannot process the D0148 (where it conforms to this WP), or believes
that the information contained therein is incorrect, then they should contact their Supplier
outwith the DTC to resolve the problem.
Impact of not implementing WP:
Without this WP, a Supplier and its Agents’ views of what should be sent by the Supplier and
received by its Agents using D0148 may differ. This could result in unacceptable flow rejection.
This, in turn, would impact on the New Connection, Change of Supplier and Change of Agent
functional processes as there are other time critical activities which have to be completed by
Agents after receiving the information in D0148.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 69 of 227
Working Practices Product Set (WPPS)
In order to unambiguously define the required data exchange in the three different circumstances,
an alternative to the WP would be to have three separate DTC flows defined. Following the
examples in DTC Annex C and this WP avoids this need.
Associated Document: D0148 in Annex C of the DTC
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 70 of 227
Working Practices Product Set (WPPS)
Attachment to Working Practice 61
The following table summarises the rules to be applied to the population of D0148 in each scenario. This should be read in conjunction with DTC Annex C. This
table only covers cases where the information is sent in a single instance of D0148. If multiple instances are sent, refer to Annex C of the DTC.
Scenario
Sent to
Data Groups
271
Data Collector
272
1. Change of MOp
1.1 New MOp
E
274
273
EFD
3. Change of DA
2.1 Incumbent MOp
N
2.2 New DC
O
275
O
1.2 Incumbent DC
2. Change of DC
Meter Operator
276
5. Change of MOp and DA
9. New Connection
Version :
5.4
Status :
Approved
279
N
EFD
CoDC-1
E
EFD
*O/E
*EFD
*CoDA-1
N
EFD
*O/E
*EFD
3.1 Incumbent Mop**
4.1 New MOp
N
4.2 New DC
O
5.1 New MOp
E
6.1 Incumbent MOp
N
6.2 New DC
O
7. Change of MOp, DC & DA 7.1 New MOp
8. Change of Supplier
278
EFD
EFD
O
CoDC-1
EFD
N
7.2 New DC
O
8.1 New MOp
N
8.2 New DC
O
9.1 New MOp
N
N
CoMOp-1
EFD
O
5.2 Incumbent DC
6. Change of DC and DA
Data Aggregator
CoMOp-1
3.2 Incumbent DC
4. Change of MOp and DC
277
*CoDA-1
CoMOp-1
N
EFD
N
EFD
E
EFD
*O/N
*EFD
*CoDA-1
*O/N
*EFD
*CoDA-1
N
SSD
EFD
CoDC-1
EFD
O
CoDC-1
SSD
N
CoMOp-1
EFD
O
SSD-1
N
SSD-1
SSD
SSD
Date :
01 Nov 2007
Page 71 of 227
Working Practices Product Set (WPPS)
9.2 New DC
10. CoMC NHH to HH
10.1 New MOp
10.2 New DC
N
N
CoMC
SSD
O
N
N
SSD
N
CoMC
CoMC-1
CoMC
Notes:
* For NHH MPANs, these details are repeated for each DA during the current Supplier’s registration. In NHH Market only
** No D0148 sent
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 72 of 227
Working Practices Product Set (WPPS)
WP 63. Use of Profile Class and SSC for HH Meters in MPAS flows
WP no:
63
Status:
Implemented by
Industry
Implementation
Date:
27/06/2002
Title:
Use of Profile Class and SSC for HH Meters in MPAS flows
Version:
4
Originator:
WP type:
S
Originator Ref:
Date raised:
24 April 1998
DST Doc. Ref:
Issue 85, PRs 1720, 1721
Product Area:
MPAS
Parties Affected:
Suppliers, MPAS
Baseline Products
Impacted:
D0055 - Register Supplier;
Related WP:
19, 66, 116
Last Amended:
24/05/2002
Change History:
Approved at CCG 20 on 04/08/98 – see Design Note 15
K Moss SEEBOARD
D0205 - Update Registration Details
V2 with WP CR 48 approved at CCG 30 on 9/07/99 - see Design
Note 26
V3 with WPPS CP 41 approved at MDB_01_10 on 25/10/01
V4 with WPPS CP 55 agreed at MDB_02_06 on 27/06/02
Context:
Clarification of the Profile Class and SSC requirements is needed for:
1. Initial registration for a new HH metering point;
2. Ongoing data changes for a HH metering point; and
3. A change of metering point from NHH to HH within a Suppliers registration.
4. A change of metering point from NHH to HH coincident with a change of Supplier.
In the context of a HH metering point, Profile Class and SSC are processed by the four MPAS
Service Providers differently as shown below:
1. SPOW/MANW 1 for both Profile Class and SSC
 Will only accept Profile Class / SSC and change Effective From Date both set to either
null or blank.
2. MPRS (developed by St. Clement’s Services and provided to LOND, SOUT, NEEB, NORW,
EMEB, MIDE, HYDE, SWEB SWAE and YELG and EELC for both Profile Class and SSC
 Will accept a null or blank Profile Class / SSC with or without a non-null or non-blank
change Effective From Date
3. SEEB for Profile Class
 Will accept a null or blank Profile Class with or without a non-null or non-blank change
Effective From Date
4. SEEB for SSC
 Will only accept a null or blank SSC with a null or blank change Effective From Date.
1
Refer to MDD for a mapping of MPID to Company name
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 73 of 227
Working Practices Product Set (WPPS)
In contrast certain Supplier registration systems, notably those using the CARE system will
provide an Effective From Date for all changes of Profile Class and SSC whether or not these
data items become null following the change.
MRA clause 24.3. states that any change to MPAD data needs to be accompanied by an Effective
From Date. This could be interpreted as when moving from the NHH Market to the HH Market:
 Effective From Dates (J308 and J300) are required for Profile Class and for SSC
even though the data items themselves become null or
 an Effective From Date for Measurement Class or other data item signifying the HH
Market would suffice to determine a change of Profile Class or SSC.
It is clear that there is incompatibility between some of the MPAS Service Providers and some of
the Supplier Registration systems and arguably either may be an acceptable interpretation of the
MRA
Working Practice:
Notification of a change of type from NHH to HH (within a registration) is achieved by a Supplier
providing D0205 to MPAS with the relevant data-items (i.e. DA & type, DC & type, MO & type,
Measurement Class) set to their new HH values. Similarly, initial registration for a metering point
identifies that it is a HH metering point through the appropriate setting of the same data items.
1. Any D0055 for initial registration of a new HH metering point should have SSC and Profile
Class set to blank or null.
2. Any D0205 for an ongoing data change to a metering point in the HH market should have
SSC, Profile Class and their Effective from Settlement Dates set to blank or null except when
initiating a CoMC to the NHH market when both need to contain appropriate values.
3. Any D0205 which initiates a CoMC of a metering point from the NHH to HH market (WP66)
should have SSC, Profile Class set to blank or null and:
 either their Effective from Settlement Dates set either to null or blank; or
 set to the date of the change.
4. Any D0055 for a change of Supplier registration coincident with change of measurement class
(NHH to HH – WP 116) with the measurement class set to HH should have SSC and Profile Class
set to blank or null. It should be noted that other data (such as Agent Id and Types) may be
required in accordance with MPAS Validation Procedures.
Where the New Supplier submits a minimal D0055 on a CoMC coincident with CoS, as D0205 in
accordance with that detailed at (3) should be sent to update the measurement class from NHH to
HH (WP116) as determined by ‘Supplier Registration’ software in use by the Supplier.
Where the MPAS receiving software rejects the D0205 in the second case, it will reply with a
D0203 (Rejection Reason Code set appropriately). It will be the responsibility of the Supplier to
instruct the Distribution Business, through its MPAS Operator, to set the correct values of the data
items in the relevant MPAS.
Impact of not implementing the Working Practice:
Unless the approach described above is followed, it will not be possible to establish Profile Class
and SSC correctly for a Metering Point in the HH Market.
Notes to WP 63:
1. ‘Blank’ should be interpreted as the required number of space characters when sending the
optional data item in fixed format messages.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 74 of 227
Working Practices Product Set (WPPS)
2. ‘Null’ should be interpreted, in variable length message format, as a terminating delimiter
without any preceding characters.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 75 of 227
Working Practices Product Set (WPPS)
WP 66. Change of Measurement Class - NHH to HH
WP no:
66
Status:
Implemented by
Industry
Implementation
Date:
29/08/2002
Title:
Change of Measurement Class - NHH to HH not coincident with
CoS
Version:
4
Originator:
WP type:
W
Originator Ref:
Related WP(s)
63
Issue No:
Date raised:
18/05/98
DST Doc Ref:
Product Area:
All
Parties
Affected:
Baseline
Products
Impacted:
End to End Diagrams Install, Replace, Energise, Remove, and Sale
of a HH Meter, Change of Measurement Class, Change of
Measurement Class: NHH to HH, Same Supplier, Change of
Measurement Class: NHH to HH, Coincident with CoS
BSCP502 Sections 2.3 and 3.3
Last Amended:
28/02/02
Change History
Approved at CCG 24 on 6/11/98 - see Design Note 20
103
Supplier, MPAS, old and new
DCs, MOps, DAs
V2 with WPPS CP 5 accepted at MDB_00_02 on 24/02/00
V3 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
V4 with WPPS CP 49 approved at MDB_02_01 on 31/01/02
Context:
Change of Measurement Class (CoMC) from NHH to HH and from HH to NHH markets were both
out ruled out of scope for Initial Market Opening. However, CoMC from the NHH to HH market is
considered to have material importance from the time that the market is fully open and a defined
and practical set of procedures to carry out this function in a consistent way is considered to be
valuable.
The End to End diagrams defined the expected process at market opening. However, the position
has changed since the market opened. At CCG 22 it was agreed that a Working Practice was
necessary but it should provide only a guideline as to how the Supplier and HH MOp should interoperate, leaving the detail and, in particular, the method of and medium for passing information
between the two parties largely open. The CCG did stipulate however that inter-operation with the
NHH MOp should be prescriptive.
The rationale of this formulation of the CoMC practice is that the effective date of the CoMC is the
date when the HH MOp transfers power from the NHH meter to HH meter, and this date is used
by the Supplier to retrospectively de-appoint and appoint its NHH and HH agents. To achieve
orderly implementation of the CoMC, the Supplier will make all agents aware of the impending
CoMC and its prospective date at the outset of the procedure. The role and scope of the HH MOp
has been of major concern in considering acceptable procedures so far. It is noted that unlike the
DA and DC roles, there is no BSC Procedure to define its inter-operation with other parties, only
a Party Service Line. The Working Practice as presented here is based on the following business
premises:
1. There will be a change of MOp at CoMC and the HH MOp is qualified to work not only in the
HH Market but also in the NHH market of the Distribution Area concerned;
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 76 of 227
Working Practices Product Set (WPPS)
2. There is agreement between the HH MOp and the NHH MOp that the HH MOp can act on the
NHH MOp’s behalf in reading and removing the NHH meter; the potential for such agreement
is underwritten by the MOp Party Service Line.
If the HH MOp and the NHH MOp are the same agent then the practice between HH MOp and
NHH MOp becomes an internal matter for the MOp. The need for following the Practice is
significantly simplified if the Supplier is the same organisation as the two MOps. If the new MOp
is not qualified to work in the NHH market in the Distribution Area then the Supplier will be obliged
to contract the NHH MOp to work alongside of the HH MOp to read and remove the NHH meter
whilst the latter installs the HH meter.
The same Practice can be used if the Supplier has sufficient confidence that its HH MOp will
install the metering system on the date planned; however, in this case the Supplier may choose to
notify MPAS of the appointment date of its agents in advance, being the Date of Change of
Measurement Class.
The Working Practice can be read in conjunction with E2EChange of Measurement Class;
although, for the reasons given above, the Practice is less prescriptive.
A more radical procedure of disconnecting the old NHH meter and connecting a new HH meter
was considered but not pursued as this requires creating a new MPAN Core.
Working Practice:
The Working Practice is restricted to Change of Measurement Class (CoMC) with no coincident
Change of Supplier event. It is based on the assumption that the new HH MOp is also qualified to
operate in the NHH market in the Authorised Area.
The inter-operation between parties to the CoMC is complex and the flows involved need to follow
a defined sequence. To aid comprehension, a flow chart is attached to support the Practice
and the reference numbers used in the text below corresponds to the numbering of the
processes in the flow chart.
It is assumed that the Supplier has already set up contracts with HH Agents willing to operate in
the Authorised Area of the Metering Point in question.
1. The Supplier recognises a need to change the market regime of the Metering Point from NHH
to HH. This can result from a customer request or because the maximum power taken at the
Metering Point is deemed to be rated as 100kW or greater.
2. The Supplier communicates to its HH agents that a CoMC is required for the Metering Point
and liaises with them on details of the metering required and the prospective date of installation.
This communication itself is not contractually binding at this stage.
3. The Supplier can choose to appoint the HH MOp to the metering point by bilateral agreement or
electronically via a D0155 flow (as required by some Participants’ HH MOp using Wheatley
System at this point) and, in this case:
8. The HH MOp will acknowledge the D0155 flow with a D0011 flow.
3. (continued) Where the Supplier and HH MOp have confidence that the prospective installation
date can be met, the Supplier can choose to forward the installation date as the HH Agent date for
all three agents to MPAS using D0205 (contents of the D0205 should be consistent with WP63).
4. The Supplier will pass to the HH MOp:
 Meter Serial Numbers of the NHH Meters to be removed;

The functional requirements of the HH Metering System to be installed (see note 1);
The method and medium for providing these information is to be agreed bilaterally and may
include the use of Flow D0142 electronically.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 77 of 227
Working Practices Product Set (WPPS)
9. Where required, the HH MOp requests site technical details from the Distributor using the
transmission method specified in the Distributor’s DUoS agreement.
10. The HH MOp notes all readings on the NHH meters and passes these readings to the NHH
MOp by a method and medium to be agreed bilaterally. Note the HH Mop cannot identify DTN
meter register Ids on site but is able to record the meter Ids together with any of the NHH
metering system’s mechanical registers and with any labels and/or their position on the meter
and/or their purpose or, in the case of electronic registers will scroll through the whole display
noting all the displays in the sequence that they appear. It will then disconnect the meters.
15. Once disconnected, the HH MOp negotiates with the NHH MOp for their return or disposal.
11. The HH MOp installs the HH metering system and configures it in line with the Supplier’s
requirements as set out in 4. The HH MOp informs the Supplier by a bilaterally agreed method of
successful installation and the date completed.
5. The Supplier formally appoints, via flows D0155 and D0153, the HH MOp, the HH DC and the
HH DA to the Metering Point if not appointed earlier at 3. The day of the installation of the HH
meter will be taken as the Effective From Date ‘D’. On reception of D0011 from all three agents,
the Supplier will pass Customer Identification to the agents via D0302 and informs each of them of
the other agents via flow D0148.
6. The Supplier retrospectively terminates the NHH agents for the metering point with Effective
To Date ‘D-1’ (Calendar Day ‘D’ -1). The Supplier completes the ‘Termination Reason Code’ on
the D0151 to the NHH MOp and NHH DC with the value ‘MC’ (Change of Measurement Class non
coincident with CoS) (see note 2).
7. The Supplier updates MPAS with the new agent IDs and the new measurement class via a
D0205 with Effective From Date of ‘D’. For the avoidance of doubt, Effective From Settlement
Date {REGI} needs to remain as the SSD of the NHH Metering System.
See Working Practice 63 for a fuller description of data item settings on CoMC, and, in particular,
the handling of SSC and Profile Class.
12. The HH MOp on receiving the D0148 from the Supplier informs the HH DC, the Supplier and
the Distributor of the Meter Technical Details (MTD) for the installed HH metering system using
flow D0268. The Distributor then updates MPAS with any changes to Distributor responsible
MPAD items (for example - Line Loss Factor).
13. The HH MOp informs the HH DC of the initial read (D0010) of the HH metering system.
14. The HH MOp initiates proving the HH metering system in the normal manner and informs the
Supplier, Distributor and HH DC of the result.
16. The NHH MOp promptly informs (see note 3) the Supplier, the Distributor and the NHH DC of
the removal of the NHH metering system using flow D0150.
17. The NHH MOp promptly informs the NHH DC of the Final meter readings using a D0010. The
NHH MOp is responsible for interpreting the meter readings taken by the HH MOp and relating
them to meter register IDs for transmission via D0010 to the NHH DC.
18. The NHH DC processes the Final reading and submits it to the Supplier. Note the NHH DC
system would normally expect a corresponding Initial reading. However, in this situation, the next
event for the NHH DC is the receipt of the Termination of Appointment (D0151) from the Supplier.
Impact of not implementing WP:
Without a commonly agreed procedure for Change of Measurement Class, Suppliers will derive
their own procedures with their agents on a bilateral basis. This is not only wasteful but is error
prone and markedly so in an area which is complex commercially and critical for Settlements.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 78 of 227
Working Practices Product Set (WPPS)
Notes:
1. There will be cases where the NHH Meter may be re-programmed to meet the HH metering
requirements; however in the majority of these cases it is expected that there will be no
change in MOp and therefore the practice followed in such an instance can be simplified - see
Context.
2. If the Change of Measurement Class fails and the Supplier has already appointed HH agents,
these agents appointments will be terminated with a Termination Reason Code of ‘FC’ (Failed
Change of Measurement Class).
3. Party Service Line 110 section 1.3.2.1 states that “the Meter Operator shall prepare and
maintain plans that will enable its Associate Supplier’s obligations under the BSC to continue
to be met notwithstanding the expiry or termination of the Meter Operator’s appointment as the
Meter Operator”.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 79 of 227
Working Practices Product Set (WPPS)
CoMC
as revised by Expert Group
DST 98/584
NB:
1. Procedure assumes that Supplier has:
- already established agent contracts with HH Agents
and NHHMOp
- established that NHHMOp will work with HHMOp as
required by MOp Party Service Line
Supplier needs to change
the Measurement Class of
Metering system to HH
market
1
2. HHMOp has permission to operate on NHH meters in
Distribution Area
2
Supplier liaises with HH
Agents on requirement for
CoMC and its prospective
date
3
Supplier initiates an HH MOp
appointment using D0155 if
required by HHMOp system
MOp formally acknowledges
appointment using D0011 if
required by HHMOp system
8
4
Supplier requests HHMOp to
carry out CoMC of Metering
Point and provides
relevant details of NHH
meters to be removed and
metering functionality of
required HH system using
D0142 and / or other means
If required HHMOp requests
Site Technical Details from
Distributor in accordance with
DUoS Agreement
9
3. Dashed procedures are optional but may need to be
invoked when using certain MOp systems
10
HHMOp reads NHH meters
and passes readings to
NHHMOp outside DTN and
removes meters if required
HH MOp installs HH Meter
on Day D and informs
Supplier outside DTN
Supplier appoints HH Agents
as of Effective Date D using
D0155, D0153;
1. awaits D0011from agents
2. informs agents of the other
agents using D0148 and of
Customer details using
D0xxx
HHMOp informs Supplier,
Distributor and HHDC of
MTD of HH Metering System
using D0268
6
Supplier terminates all NHH
Agent appointments with
Effective Date D-1 using
D0151
HHMOp informs HHDC of
Initial Read using D0010
7
Supplier updates MPAS of
CoMC details using D0205
HHMOp Initiates proving of
HH Metering System and
inform Supplier, Distributor
and HHDC of outcome
5
Version :
5.4
Status :
Approved
11
12
13
14
HHMOp negotiates with
NHHMOp for the disposal of
NHH meters
15
NHHMOp informs Supplier,
Distributor and NHHDC of
de-installation of NHH
metering system using
D0150
16
NHHMOp informs NHHDC of
Final Readings using D0010
17
NHHDC passes Final
Readings to Supplier
18
Date :
01 Nov 2007
Page 80 of 227
Working Practices Product Set (WPPS)
WP 69. Use of D0221, D0139 or D0179 to Supplier re failure to energise a Meter
WP no:
69
Title:
Version:
Type:
Date raised:
Product Area:
Baseline
Products
Impacted:
Related WP:
Last Amended:
Change History:
Status:
Implemented
Implementation 01/01/2001
by Industry
Date:
Use of D0221, D0139 and D0179 to signal to Supplier a failure to
change the energisation status of a Metering Point
Originator:
Southern, SWEB
6
W
20/05/98
Originator Ref:
DST Ref:
Issue 106
Parties
MO, Supplier, Distributor
Affected:
DTC Flows D0221, D0139, D0179, D0180
DTC Data Items J1253, J0691, J0174, J0014
30
31 August 2000
V1 approved at CCG 16 on 12/06/98 - see Design Note 12
V2 with WP CR 10 approved at CCG 21 on 21/08/98 - see Design
Note 16
V3 with WP CR 40 approved at CCG 30 on 09/07/99 - see Design
Note 26
V4 with WP CR 28 approved at CCG 31 on 13/08/99 - see Design
Note 27
V5 with WP CR 24 approved at MDB_00_06 on 30/06/00
V6 with WP CP 26 approved at MDB_00_11 on 30/11/00
Context:
DTC flow D0139 can be used to notify that a requested change to energisation status (either deenergisation or energisation) has failed; flow D0221 can be used to notify a failure to energise a
metering system. There is therefore some confusion regarding which of these flows should be
used in the specific instance of a failure to energise a metering system.
AP/BSCP504 mandates the use of D0139 to report a failure to change the energisation status of a
metering point. Some MOs as participants are also using D0221 as this indicates a failure
through its title, whilst others are solely using the D0139 even though they need to rely on J1253
(Failure to Energise, De-energise or Disconnect Reason Code) to signal failure. Some software
which is used by a number of MOs uses D0221 although some do not use it exclusively.
For prepayment meters, D0179 may also be used to signify a failure to energise a meter as this
flow may be populated with a Failure Reason Code (J0691).
This Statement of Operation aims to set out all possible responses to a failure to energise a
meter.
Working Practice:
The MO and Distributor should always respond to the Supplier with a D0139 with an appropriate
value of J1253 where there is a failure to de-energise. The Date of Action (J0014) should be the
date of the attempt to change.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 81 of 227
Working Practices Product Set (WPPS)
1. MO fails to Energise a Credit Meter
Suppliers should be able to accept either flows D0221 or D0139 as a failure response to energise
a Credit Metering System using a D0134. The MO must send a D0139 and may also send a
D0221:
a) the D0139, should have J1253, Failure to Energise, De-EnergiseDisconnect Reason Code,
populated with an appropriate value. The Date of Action (J0014) should be the date of the
attempt to change.
b) the D0221 should have an appropriate Site Visit Check Code (J0024). The Appointment Date
(J0174) should be the date of the attempt to change.
A Meter Operator must adopt option (a), but may also adopt alternative (b).
2. MO fails to Energise a Prepayment Meter
Suppliers should be able to accept either flows D0221 or D0139 or D0179 as a failure response to
a request to energise a Prepayment Metering System using a D0134 or D0180. (Use of D0134 to
request energisation of a prepayment meter is mandated by the BSC Procedures; additional use
of D0180 is by bilateral agreement between the Supplier and the MO). A MO must send the
D0139 and may also send a D0221 or D0179:
a) the D0139 should have J1253, Failure to Energise, De-Energise or Disconnect Reason Code,
populated with an appropriate value. The Date of Action (J0014) should be the date of the
attempt to change.
b) the D0221 should have an appropriate Site Visit Check Code (J0024). The Appointment Date
(J0174) should be the date of the attempt to change.
c) the D0179 should have an appropriate value for J0691, Failure Reason Code and the Date of
Action (J0014) should be the date of the attempted change. (The D0179 should not be sent
to the Data Collector)
3. Distributor fails to Energise a Credit Meter
Where a Distributor has been unable to energise a credit meter, it must report this to the Supplier
using D0139 (there are no flow instances of D0221 from the Distributor). J1253, Failure to
Energise, De-Energise or Disconnect Reason Code, should be populated with an appropriate
value. The Date of Action (J0014) should be the date of the attempt to change.
4. Distributor fails to Energise a Prepayment Meter
Where a Distributor has been unable to energise a prepayment meter, it must report this to the
Supplier using D0139. It may also send a D0179:
a) the D0139, should have J1253, Failure to Energise, De-Energise orDisconnect Reason Code,
with an appropriate value. The Date of Action (J0014) should be the date of the attempt to
change.
b) the D0179 should have an appropriate value for J0691, Failure Reason Code and the Date of
Action (J0014) should be the date of the attempted change.
The choice in any particular Supplier / Agent relationship needs to be agreed bilaterally.
Implications of Statement of Operation:
If Supplier systems are designed in a way that ignores any of the above possible mechanisms
for reporting a failure to energise, Suppliers may not be able to process notifications of failed
energisations. This may delay when these metering systems are eventually energised.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 82 of 227
Working Practices Product Set (WPPS)
WP 71. Need to ensure MOp has details of a change to Keys or Smartcard Meter
SSC
WP no:
71
Status:
Implemented by
Industry
Implementation
Date:
01/04/2000
Title:
Need to ensure that the MOp has details of a change to a Key or
Smartcard Meter SSC
Version:
3
Originator:
WP type:
W
Originator Ref:
Date raised:
08/05/98
DST Ref:
Issue 125
Product Area:
Prepayment
Parties Affected:
Suppliers, Mops, PPMIPs
Baseline Products
Impacted:
DTC flows D0190
D0183
D0197
Last Amended:
09/07/99
Change History:
V1 approved at CCG 16 on 12/06/98 - see Design Note 12
David Leck: LE
Issue Customer Key
Issue New Customer Smart Card
Smart Card Commands to Remote Terminals
V2 with WP CR 7 approved at CCG 21 on 21/08/98 – see Design
Note 16
V3 with WP CR 41 approved at CCG 30 on 09/07/99 - see Design
Note 26
Context:
It is possible for a Supplier to instruct the PPMIP to issue a Key with a Tariff Setting (J0591) or a
new Smartcard or Tariff Code (J0685) which will change the SSC associated with the meter
system. It was identified that the date of such a change would not be known to the MOp who
would not know to instruct the NHHDC with a D0150 and D0149. Two options were proposed for
its resolution (a) being to inform the MOp once the date of the change of configuration is known
and (b) to disallow such a means of changing SSC without a MOp site visit.
Option (a) could be engineered in a number of ways; however all would require significant change
to Supplier / MOp systems. The DST therefore agreed that option (b) be adopted even though this
could restrict a Supplier’s scope of action and would require a MOp visit.
Subsequent to the acceptance of Version 1 of this WP by Industry, MEB reported that it and other
Smartcard operators had already engineered a mechanism for informing the MOp on what date
the Customer had inserted the Smartcard to initiate the change. MEB therefore sought a change
to this WP to allow its approach to be an acceptable alternative to requiring a MOp visit to change
an SSC of a Smartcard meter.
It was agreed at CCG 21 that the actual MEB solution, whilst an acceptable standard way forward,
should not constrain other technical solutions to avoid a MOp visit and these could be agreed
bilaterally between the Supplier and its Agents. Technical solutions for Key Meters could be such
cases.
Working Practice:
It is essential that the MOp is informed of changes to the SSC of a Key or Smartcard meter and
the dates of such changes from what ever source they occur. Flows D0190 for Key Meter or
D0183 or D0197 for Smartcard Meter allow the Supplier to instruct the PPMIP to update meter
technical details including SSC of a Key or Smartcard Meter using the key or card. However the
update of the meter details takes place at the happenstance of the Customer and therefore is not
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 83 of 227
Working Practices Product Set (WPPS)
directly known by the Supplier or the MOp. In consequence, where the Supplier wishes to change
the SSC of a key or Smartcard meter, the Supplier may choose either of the following two
approaches (but not both):
1. request a MOp site visit to change a MPAN Standard Settlement Configuration (SSC) or;
2. implement the necessary Supplier software which will instruct the MOp to update its records in
line with the change already made by Key or Smartcard insertion but will exclude the need for
a MOp visit. In this approach the standard sequence of flows to be implemented is:

the Supplier receives a D0188 for a Key meter or a D187 for a Smartcard Meter from its
PPMIP detailing the meter changes made;

if these changes include a change to the SSC then the Supplier sends a D0005 to the MOp
which will include J0007, Requested Action Code, set to 7 (Transfer meter technical and
commissioning details and meter reading history to new Data Collector); it is recognised that in
this case the Data Collector is not ‘new’ but MEB consider that this is the most appropriate
value in the set. The Supplier may choose to augment the flow by suitable wording in J0012
or J0173;

the MOp updates its database and sends a D149/D150 to NHHDC (and Supplier) (this
requires the MOp to have implemented this mode of operation).
This standard sequence does not preclude an individual Supplier and its Agent entering into a
bilateral agreement to adopt a different technical solution if this is advantageous to both
parties, therefore the Supplier will determine with its agent which approach is to be applied.
Impact of not implementing WP:
The Supplier should not be required to introduce a relatively significant software change should it
wish to supply a customer with a Key or Smartcard Meter, unless it has already done so or intends
to do so.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 84 of 227
Working Practices Product Set (WPPS)
WP 73. Value of J0171 'Reading Type' taken on a Change to Energisation Status
WP no:
73
Status:
Implemented by
Industry
Implementation
Date:
01/04/2000
Title:
Value of J0171 'Reading Type' assigned to Meter Readings taken on
a Change to Energisation Status
Version:
3
Originator:
JTCC
WP type:
S
Originator Ref:
PRs 850, 960, 1162, 1170
Date raised:
26/02/98
DST Ref:
Issue 124, CR2476
Product Area:
NHH Market
Parties Affected:
NHH DC, MOp, Supplier
Baseline Products
Impacted:
E2E's
DTC flows D0010, D0139
Related Working
Practices:
WP30, WP74
Last Amended:
09/07/99
Change History:
V1.0 approved at CCG 16 on 12/06/98 - see Design Note 12
V2.0 with WP CR4 approved at CCG 19 on 24/07/98 - see Design
Note 14
V3 with WP CR 42 approved at CCG 30 on 09/07/99 - see Design
Note 26
Context:
The valid set of Reading Type (J0171) does not currently include a value for either deenergisation or re-energisation, either of which may be reported on a D0010. A consequence is
that Participants have taken existing values of the set to workaround the deficiency; the values
taken however are not same across the whole industry and a practice is needed to help
participants inter-operate. Reading Types on D0010 and D0139 flows from the MOp need to be
expressly defined to ensure inter-operation. The NHH DRG has publicised its decision that the
MOp should not include meter readings in the D0139 sent to the NHHDC and Supplier on
changes to energisation status in the NHH market (see also WP30), but should send them in a
D0010 in parallel. There therefore remains a need to flag D0010 with a Reading Type which will
allow recipients to associate the D0010 unambiguously with the D0139.
Statement of Operation:
When the MOp takes the reading on a change of energisation status, it will send a D0010 flow to
the NHHDC with Reading Type, J0171 where type is:

set to 'F' for final, or ‘S’ for Special or ‘Z’ for CoT on a de-energisation

set to 'I' for initial or ‘S’ for Special or ‘Z’ for CoT on a re-energisation.
Whilst the choice of values F / I or S or Z is to be decided between the Supplier and its Agent by
bilateral agreement, the Supplier is expected to be able to handle either combination.
Implications of Statement of Operation:
In the absence of an extended valid set for Reading Type, there needs to be an agreed
convention for the MOp to set a Reading Type which allows it to signal to Supplier and NHHDC,
that the meter readings arise from the MOp changing the energisation status of a metering
system.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 85 of 227
Working Practices Product Set (WPPS)
WP 74. Use of D0010 and J0171 on a Change to Metering System Configuration
WP no:
74
Status:
Implemented by
Industry
Implementation
Date:
01/10/2000
Title:
Number of D0010s and value of J0171 'Reading Type' assigned to
these flows on a Change to Metering System Configuration.
Version:
3
Originator:
JTCC
WP type:
W
Originator Ref:
PRs 850, 960, 1162, 1170
Date raised:
26/02/98
DST Ref:
Issue 124/229
Product Area:
NHH
Parties Affected:
NHH DC, MOp, Supplier
Baseline
Products
Impacted:
E2E's
Last Amended:
30/06/00
Change History:
Approved at CCG 28 on 16/04/99 – see Design Note 24
DTC flow D0010
V2 with WP CR 43 approved at CCG 30 on 09/07/99 - see Design
Note 26
V3 with WPPS CP 17 accepted at MDB_00_06 on 30/06/00
Context:
The valid set of Reading Type (J0171) is currently inadequate to describe the types of reading
that may be reported on a D0010. A consequence is that Participants have taken existing values
of the set to work around the deficiency in uses not specifically catered for. Two such uses are
Metering System re-configuration and meter replacement (ie no change of configuration) within a
multimeter MPAN. Reading Types on D0010 flows from the MOp need to be expressly defined
and the number of flow instances to be agreed to ensure interoperation. Two approaches are
currently in place;

send readings with reading type ‘F’ for all registers before the re-configuration/ replacement
and send another set of readings with reading type ‘I’ for all registers after the reconfiguration/replacement, or

send readings with reading type ‘F’ for all of the meter registers that are to be removed and a
set of readings with reading type ‘I’ for all the new meter registers. Additionally, send a set of
readings with reading type ‘S’ (Special) for all registers that have not been replaced.
The CCG 16 meeting considered metering system re-configurations and determined that having
two different approaches is not conducive to good business inter-operation. CCG recommended
that the whole Industry should move to the former approach as this is better in line with the Annex
C entry for the D0150 which specifies that the treatment of a Metering System as a whole rather
than as a set of discrete meters.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 86 of 227
Working Practices Product Set (WPPS)
Working Practice:
When the MOp changes the Metering System configuration in response to a D0142 from the
Supplier, or makes a meter replacement without a change in meter configuration it may achieve
this without replacing the Metering System as a whole as the MOp may choose to change or
replace individual meters and their settings. The MOp will send D0150 and D0149 flows to the
Supplier and NHHDC setting out the new configuration and register mappings in line with Annex
C. These flows will be accompanied by:

One D0010 to the NHHDC for all the registers in the old configuration, with Reading Type
flagged as 'F';

One D0010 to the NHHDC for all the registers in the new configuration, with Reading Type
flagged as 'I'.
Impact of not implementing this WP:
Without this Working Practice, Suppliers would need to handle two approaches for receiving
meter readings associated with meter replacement and/or the de-configuration and the
subsequent re-configuration of a Meter System. It is believed that this is not acceptable; one of
the approaches should be adopted.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 87 of 227
Working Practices Product Set (WPPS)
WP 75. Use of ‘Date and Time’ in D0010 for HH market
WP no:
75
Title:
Use of ‘Date and Time’ in D0010 for HH market
Version:
1
Originator:
DSC
WP type:
W
Originator Ref:
PRs 1087, 1509
DST Issue No:
126
Related WP(s)
Date raised:
4 June 1998
Product Area (s):
Status:
Implemented by Industry
DST Doc Ref:
Parties Affected:
HHDC, Suppliers,
Distributors
Baseline Products
Impacted:
DTC D0010 and J0016
Last Amended:
12/06/98
Change History:
Approved at CCG 16 on 12/06/98 - see Design Note 12
Context:
The majority of HH register readings are not an issue. The HHDC starts its collection cycle just
after midnight and most of the cumulative registers will have the actual Reading Date and Time
(J0016) sent on the D0010, usually between 010000 and 070000.
However, many metering systems have one meter register configured to record the Maximum
Demand. These meters can be reset at predetermined intervals (e.g. monthly) and the value
stored for later retrieval. This register reading has a date and time associated with it. Depending
on the type of meter and the data retrieval mechanism, the time recorded as midnight will be one
of 235959, 240000 or 000000.
The time of 240000 is not accepted by all participants as it is considered outside the valid set for
the domain time.
For example, in the HH market for MD readings taken when the meter is reset at midnight
between the 2nd Feb 98 and 3rd Feb 98, the Reading Date and Time (J0016) could be sent as
1998 02 03 000000. This is interpreted on receipt by different Suppliers and Distributors as
having taken place at either point A or point B. (i.e. this value is ambiguous).
A
B
2nd Feb 98
3rd Feb 98
4th Feb 98
An unambiguous representation of midnight is therefore required.
Working Practice:
When using the D0010 in the HH market, the Reading Date and Time (J0016) sent by HHDC to
Supplier and Distributor for readings taken at midnight should be set to YYYY MM DD 235959.
This corresponds to a moment before point A in the above diagram.
Impact of not implementing WP:
Unless this WP is implemented certain D0010s used in the HH market will be rejected by
recipients. Instead of the time 240000 an unambiguous alternative needs to be provided.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 88 of 227
Working Practices Product Set (WPPS)
WP 76. Distribution Business Allocation of NHH Meter Serial Nos. (J0004)
WP no:
76
Status:
Implemented by
Industry
Implementation
Date:
27/03/2001
Title:
Distribution Business Allocation of NHH Meter Serial Nos. (J0004)
Version:
7
Originator:
DSC
WP type:
S
Originator Ref:
DST Issues 118 & 172
Date raised:
08/06/98
DST Doc. Ref:
98.356
Product Area:
NHH
Parties Affected:
Suppliers, MOps, NHH DCs
Baseline
Products
Impacted:
None
Last Amended:
01/10/99
Change History:
V1 approved at CCG 18 on 10/07/98 - see Design Note 13
V2, with WP CR 9, approved at CCG 23 on 22/09/98 – see Design Note
18
V3, with WP CR 33, approved at CCG 29 on 21/05/99 – see Design
Note 25 (change to Associated Document only re SP/Manweb formats).
V4 with WP CR 27, approved at CCG 31 on 13/08/99 – see Design
Note 27
V5 with WP CR 49 and WP CR 52, approved at CCG 32 – see Design
Note 28
V6 with WPPS CP 28 accepted at MDB_00_06 on 30/06/00
V7 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
Processing steps involving the use of data item J0004, Meter Id (Serial Number), when
relating to NHH Metering Points, may involve Participants’ legacy systems. In such
systems, assumptions may be made about the format and uniqueness of the data item.
In the DTC, data item J0004 is specified as having format CHAR(10). But there are no
further specifications within the MRA Product Set which address the uniqueness or
internal format of the data item.
Engineering Recommendation M10/4, published by the Electricity Association in 1991,
provides a recommended standard format for meter serial numbers. However, it is not
included in the current MRA Product Set.
The Distribution Business’s exclusive contract for providing MOp services within their own
Authorised Areas implies that they will maintain ownership of meter serial numbers at
least until MOp competition is introduced. Hence, MOps will, at least initially, follow the
Distribution Business local practice for loading data item J0004.
Data Collectors may be faced with the situation when reading a meter, where the serial
number actually on the meter does not exactly match the contents of J0004 due to
formatting or truncation issues. The DC would need to take account of local practice
relating to meter serial numbering and to J0004 data entry in order to validate the
readings, as required by BSCP 504 4.2 1.
Problems may also arise in Suppliers’ billing systems, in which the meter serial number
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 89 of 227
Working Practices Product Set (WPPS)
may be used as a database key. Such systems may also make assumptions about the
format of the data item.
For MRA purposes, the data consistency between a meter’s serial number and the data
loaded into J0004 by the MOp is seen as an MOp’s internal process and not an interoperational issue. Hence it is outside the scope of Supplier Entry Testing. Similarly, a
DC’s validation of meter readings against J0004, and the Supplier’s use of J0004 in its
customer billing systems, are seen as internal processing for each Participant and are
hence also outside the scope of MRA testing.
Statement of Operation:
The purpose of this Statement of Operation is to provide a reference list of how
Distribution Businesses format J0004 for NHH Metering Points and what assumptions
should be made about uniqueness, so that Suppliers and NHH DCs can pre-empt any
processing problems they may have as outlined above.
In general, Participants should not assume that data item J0004 for NHH Metering Points
has any additional properties, such as uniqueness or standardised internal format, other
than any established locally between Participants.
When responding to a flow containing Distribution Business provided meter IDs, they
should be re-quoted, within the constraints of the appropriate flow.
All alphabetic characters used in J0004 are in upper case only.
Distribution Businesses have reported that they allocate data item J0004 for NHH
Metering Points as set out in the attached table, Table of Distribution Business Allocation
of NHH Meter Serial Nos. (J0004).
Implications of Statement of Operation:
DCs may fail to validate meter readings correctly due to meter serial number matching problems.
Suppliers may encounter unforeseen problems with their customer billing systems, possibly
resulting in invalid processing or systems failures.
Table follows
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 90 of 227
Working Practices Product Set (WPPS)
Associated Document for WP 76. Table of Usage of Meter Id (Serial Number) (J0004)
Participant
J0004 Allocation
Eastern Group
The following 10 character format is followed:
L YY P 12345(6), where
L = Manufacturer
YY = Year of delivery
P = Distribution Business identifier for Eastern Electricity
12345(6) = Manufacturer’s serial number.
The manufacturer’s serial number is screened to ensure uniqueness within the Distribution
Business Authorised Area.
EME
The following 10 character format has been followed for all meters delivered since 1968:
L YY P T 12345, where
L = Manufacturer identifier, with different codes used for certain metering devices such as
for timeswitching
YY = Year of delivery
P = Distribution Business identifier F for EME
T = Manufacturer’s meter type
12345 = Manufacturer’s serial number.
Meters delivered before 1968 have either “30”, “41”, “42”, “43”, “44” or “45” in the YY
position.
The J0004s will not be unique in all instances within the EME Authorised Area due to
some historical exceptions in the allocation of coding.
London
Electricity
The following 9 or 10 character formats are used:
LYYQ^12345
LYYQ12345
LYYQ123456
where:
^ represents a space
L = Manufacturer
YY = Year of delivery
Q = Either the Distribution Business identifier ‘A’ for London Electricity, or the identifier of a
third party Meter Operator that installed the meter.
12345 and 123456 = 5 and 6 digit Manufacturer’s serial numbers respectively.
All prepayment meters have meter ids of the format LYYQ^12345
There are known to be duplicate manufacturer’s serial numbers in existence.
Manweb
The following 9 character format is followed:
(existing
meters)
L XX P 12345, where
L = Manufacturer
XX = Year of manufacture
P = Purchaser (i.e. J for Manweb)
12345 = Manufacturer’s serial number.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 91 of 227
Working Practices Product Set (WPPS)
Participant
J0004 Allocation
MEB
The following 9 or 10 character format is followed:
L XX P 12345(6), where:
L = the meter manufacturer's Id code
XX = the year of manufacture
P = code ‘G’ for MEB
12345(6) is an alpha-numeric character string which is normally 5 characters in length but
can be 6 characters in some cases. Any alphabetic characters included would be in upper
case.
The J0004s are allocated to be unique.
This format applies in the majority of cases, but there are exceptions.
Northern
Electric
The following 10 character format is followed:
L XX P 12345 n, where:
L = manufacturer
XX = year of manufacture
P = Distribution Business identifier (L = Northern)
12345 = meter serial number
n = null
Norweb
The following 9 character format is generally followed, but there are some exceptions:
L YY P 12345, where
L = Manufacturer
YY = Year of delivery
P = Distribution Business identifier for Norweb
12345 = Manufacturer’s serial number.
The manufacturer’s serial number is screened to ensure uniqueness within the Authorised
Area.
Scottish Hydro
If 7 character the following format is followed:
WW 12345, where
WW = the purchase year which form digits 1 and 2 of the serial number stamped on the
meter
12345 = digits 3 to 7 of the serial number stamped on the meter itself
J0004s may not be unique at any data level within the Scottish Hydro Authorised Area.
OR
If 9 character the following format is followed (all the characters being included in the
meter serial number stamped on the meter itself):
L YY P 12345, where:
L = the meter manufacturer
YY = the purchase year
P = the purchaser. Scottish & Southern Energy plc is “C” or “R”
12345 = the meter serial number.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 92 of 227
Working Practices Product Set (WPPS)
Participant
J0004 Allocation
ScottishPower
The following 10 character format is followed:
(existing
meters)
P MM ZZ 12345, where:
P = Scottish Power
MM = Manufacturer and type
ZZ = Certification year
12345 = serial number
The following practice should be adopted for translating a 12 character meter id stamped
onto a physical meter to 10 character Meter Id (Serial Number) as per the definition in the
DTC:
Remove characters 4 and 5 (counted from the left hand end of the meter id) from the 12
character meter id to reduce it to a 10 character Meter Id (Serial Number). The resultant
J0004 remains unique within the Scottish Power Authorised Area.
ScottishPower/
Manweb
The following 10 character format is followed:
XxxxYnnnnn where
(new meters)
xxxx - four characters, no effective coding
Y – set to J or P for Manweb or ScottishPower respectively
nnnnn –five digit serial number
Seeboard
The following 8 character format is followed:
L YY 12345, where
L = Manufacturer
YY = Year of delivery
12345 = Manufacturer’s serial number.
For meters which existed before the Electricity Association recommendation was followed,
a range of formats exist. Hence it may be that not all J0004s are unique.
Southern
Electric
The following 9 character format is followed (all the characters being included in the meter
serial number stamped on the meter itself):
L YY P 12345, where:
L = the meter manufacturer
YY = the purchase year
P = the purchaser. Scottish & Southern Energy plc is “C” or “R”
12345 = the meter serial number.
OR
If 7 character the following format is followed:
WW 12345, where
WW = the purchase year which form digits 1 and 2 of the serial number stamped on the
meter
12345 = digits 3 to 7 of the serial number stamped on the meter itself
J0004s may not be unique at any data level within Southern Electric Authorised Area.
The manufacturer’s serial number is entered. This is a 7 or 8 digit number, with no
alphabetic characters.
SWALEC
Meter J0004s are checked to ensure uniqueness within MPAN only. J0004s may not be
unique within the SWALEC Authorised Area.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 93 of 227
Working Practices Product Set (WPPS)
Participant
J0004 Allocation
SWEB
The following 10 character format is followed for the majority:
L YY P 12345 B, where
L = Manufacturer
YY = Year of manufacture/certification
P = Distribution Business identifier ‘D’ for SWEB
12345 = Manufacturer’s serial number.
B = 1 blank character
There are also a significant number other formats, such as A12345.
A J0004 may not be unique, for example, due to truncation of the manufacturer’s serial
numbers.
For meters which existed before the Electricity Association recommendation was followed,
a range of formats exist.
Yorkshire
Electricity
The following 10 character format is followed:
MM XX P 12345, where:
MM = Manufacture make and type
XX = Year of manufacture
P = Distribution Business code (K for YE)
12345 = Manufacturer’s serial number
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 94 of 227
Working Practices Product Set (WPPS)
WP 77. Identification of New Agent on flow D0170
WP no:
77
Status:
Implemented by
Industry
Implementation
Date:
01/04/2000
Title:
Identification of New Agent on flow D0170
Version:
2
Originator:
JTCC
WP type:
W
Originator Ref:
PRs 1035c/1045c
Date raised:
23/04/98
DST Ref:
Issue 142
Product Area:
All
Parties Affected:
All
Baseline Products
Impacted:
DTC: flow D0170
Last Amended:
09/07/99
Change History:
Approved at CCG 18 on 10/07/98 - see Design Note 13
E2E’s NHH ONLY Appoint agents to the metering point (new supplier
- CoS), Appoint/De-appoint NHH MO, Appoint/De-appoint DA (NHH &
HH), Appoint/De-appoint NHH DC, HH ONLY Appoint Agents to the
metering point (new supplier – CoS), Appoint De-appoint HH MO,
Appoint/De-appoint HH DC
V2 with WP CR 44 approved at CCG 30 on 09/07/99 - see Design
Note 26
Context:
New Agent identity is labelled as ‘optional’ in flow D0170 sent to the Old Agent. In practice there
is a requirement for the data item to be mandated in the context in which it is sent. i.e. where
information is requested to be sent to the New MOp, then the identity of the New MOp should be
populated. Where information is requested to be sent to the New DC, then the identity of the New
DC should be populated.
This approach is supported in favour of the other considered option by determination of new
MOp/DC from the record header, as the above approach is required when the request comes
from the Supplier to the old MOp/DC during Change of Agent and is wholly in line with DTC
intentions.
Working Practice:
When a new agent or Supplier requests information from an old agent or Distributor using flow
D0170, it identifies the new agent in J0926 (New MOp) or J0927 (New DC) as appropriate.
Impact of not implementing WP:
The Old Agents/Distributor will not know the identity of the New Agents and will therefore be
unable to send meter system details to them; this would have major impact on agent support if not
corrected.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 95 of 227
Working Practices Product Set (WPPS)
WP 94. Token Meter Customer ID Card - Layout of Embossed Area
WP no:
94
Status:
Implemented by Industry
Title:
Token Meter Customer ID Card - Layout of Embossed Area
Version:
1
Originator:
WP type:
W
Originator Ref:
Date raised:
14 August 1998
DST Ref:
98/471 Issue 183
Product Area:
PPM
Parties Affected:
Suppliers; PPMIP
Baseline Products
Impacted:
DTC flow D0174, Issue Identity Card for Token Meter Customer
Data item J0536, Embossed Area Data
Related Working
Practices
WP56
Last Amended
10/11/98
Change History:
Approved at CCG24 on 06/11/98 – see Design Note 20
Kevin Woollard
Context:
A meeting chaired by OFFER on 15/07/98 of Token Meter Operators set out the required common
layout of the Embossed Area (Area 2) of the Customer Token Meter ID Cards. No specification
has yet been defined for DTC flow D0174 from Supplier to PPMIP but this needs to provide the
content for the Embossed Area as agreed at this meeting. It is therefore desirable to give the
layout agreed at this meeting a wider and formal standing to avoid possible incompatibility
between D0174 and the Embossed Area. Already Eastern has made use of Line 1 rather than it
being left blank.
Working Practice:
In line with the OFFER Memo ref: SUPPLY/98/47 (DST 98/471), the data item Embossed Area
Data (J0536) of 200 character maximum is to be allocated to a character string made up of 3
logical lines each of precisely 27 characters. The remainder of the string is either 119 spaces if
the flow containing the item is in fixed length format or is omitted if the flow is in variable format as
defined in the UFDS. There are 4 lines on the card but the Line 1 is to be skipped with the first line
of data provided in J0536 being assigned to Line 2 of the card. Thereafter:
Characters 1 to 27 and 28 to 54 of J0536, corresponding to Lines 2 and 3 of the card, may be
completed by the Supplier as it chooses.
Characters 55 to 81 of J0536 corresponding to Line 4 and to be standard across all cards as
follows:
PPMIP<space>AAA<space>99<space>P<spaces><Customer Ref No>
where:
 PPMIP is a 3 character literal ‘PPP’, is always to be present and is in character positions 55 to
57.
 AAA (Code) and 99 (Distribution Number) identify the specific Agent operating as PPMIP and
are defined in Annex B of the OFFER letter. Note that code AAA will need to be dropped once
the existing stock of cards has been used up. (It is unclear how the Supplier will get to know
this).
AAA is contained in character positions 59 to 61 and 99 in character positions 63 and 64.
 P is either the literal ‘P’ or is omitted dependent on the PPMIP (understood required by MEB
and YEB). If present it is in character position 66.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 96 of 227
Working Practices Product Set (WPPS)
 Customer Ref No is optional - if present is to be right justified with the last character being in
character position 81.
Impact of not implementing WP:
Suppliers need to emboss Customer ID Cards in line with the agreement at the OFFER meeting.
To do this, data item J0536 in flow D0174 needs to be in line with this agreement so that PPMIPs
may produce correctly embossed cards for Customers as required without need for specific
bilateral agreements with individual Suppliers.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 97 of 227
Working Practices Product Set (WPPS)
WP no:
Status:
99
Implemented by
Industry
Implementation
Date:
27/03/2001
Title:
Shutting down a Key Meter
Version:
3
Originator:
WP type:
W
Originator Ref:
Related WP(s)
WP 106
DST Issue No:
187
Date raised:
06/10/1998
DST Doc Ref:
(99/043); (99/086); (99/116)
99/154
Product Area (s):
PPM - Key
Meters
Parties Affected:
Supplier, MOp
D Leck/M Vickers
Baseline Products
Impacted:
Last Amended:
09/07/99
Change History:
Approved at CCG28 on 16/04/99 - see Design Note 24
V2 with WP CR 47 approved at CCG 30 on 09/07/99 – see Design Note 26
V3 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
Key Meters are designed to be put into a state of ‘Shutdown’. In this state the meter output is isolated from
the Distribution network and will not deliver electricity to the consumer however it will still be classified as
energised. Key meters may be truly de-energised by removal of the fuse.
Energisation and Shutdown status is notified to the Supplier on a D0179 from the MOp, with the appropriate
'Prepayment Meter Shutdown Status' (J1022) and 'Energisation Status' (J0080) set.
Provided the appropriate input is made by the MOp, shutting down a key meter powers up a coil in the meter
that physically moves a contractor in the meter that is then locked open. No current can flow to meter output.
On ‘livening up’ a second coil is powered and this unlatches the contractor and closes the circuit; current can
flow. In consequence a meter which is shut down is not de-energised within the definition of de-energisation
in the BSC, which is:
‘Means in relation to any Boundary Point or Systems Connection Point (or the Plant or Apparatus connected
to any System at such a point) the movement of any isolator, breaker or switch or the removal of any fuse
whereby no electricity can flow at such point to and from a System; and ‘de-energised’ shall be construed
accordingly’
The Boundary Point or Systems Connection Point relates to a connection to or between a distribution system
or the transmission system; therefore in order for a meter to be de-energised it must be isolated from the
Distributor. With shutdown the meter is only isolated from the customer, therefore it is not de-energised.
To put the meter into a normal operating state following shutdown the meter needs to be ‘livened up’. This
may be done by the MOp by instructing the meter using a PSU or by the Customer inserting a new key into
the meter - see WP106.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 98 of 227
Working Practices Product Set (WPPS)
Some Key Meter Operators choose not to shutdown their key meters as they consider the cost of getting a
MOp to do the work and potentially having to liven-up the meters later as being greater than the illegal
abstraction at risk.
The purpose of this Working Practice is to give new entrants a proper understanding of the options open to
them, particularly how they need and may choose to work with the Key Meter MOps regarding shutdown.
Working Practice:
Suppliers should be aware that two scenarios exist:
1. - Request Shutdown. Supplier populates ‘Prepayment Meter Shutdown Requested’ in the D0180 with T
for Shutdown Requested. Note that ‘Requested Energisation Status’ should be populated with E (as the
Energisation status will not be changing to de-energised).
- MOp Shuts down the meter (note that not all MOps support shutdown).
This will incur the cost of at least one MOp visit to Shutdown; with the subsequent option of 'livening up' by
MOp visit, or by Key insertion by the Customer (see WP 106).
2. - Request De-energisation. Supplier populates ‘Requested Energisation Status’ in the D0180 as D for
De-energise.
- MOp De-energises by removing the fuse.
This will incur the cost of two MOp visits, one to de-energise, one to re-energise.
Impact of not implementing the Working Practice:
Shutdown meters do not adhere to the BSC definition and so must not be classified as de-energised. There
are safety implications in classifying shutdown meters as de-energised, since if the meter is de-energised in
MPAS a distributor may be under the impression that the meter is not connected to the System and can be
worked upon with no danger.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 99 of 227
Working Practices Product Set (WPPS)
WP 100. Termination/Cancellation Dates on Agent Appointment
WP no:
100
Status:
Implemented by Industry
Title:
Termination/Cancellation Dates on Agent Appointment
Version:
2
Originator:
WP type:
W
Originator Ref:
Related WP(s)
WP34, WP66
DST Issue No:
Date raised:
15/10/98
DST Doc Ref:
Product Area (s):
NHH, HH
Parties Affected:
Baseline Products
Impacted:
D0151, D0153, D0155
Last Amended:
30/05/2002
Change History:
Approved at CCG25 on 20/11/98 – see Design Note 21
Simon Sanford
181, 214
Suppliers, Agents
V2 with WPPS CP52 agreed at MDB_02_06 on 27/06/2002
Context:
During testing and subsequent investigation of participant assumptions and expectations, it was
recognised that there exists significant variations in understanding on how to set and/or interpret
effective dates on Agent Termination/Cancellation.
To ensure Suppliers and their Agents have a common understanding of the dates on which they
are appointed, terminated or cancelled, a standard practice is required.
Most participants are consistent with regard to appointment and supply start dates.
In the context of this Working Practice, termination is deemed to mean the ending of an existing
contract for services; cancellation is deemed to mean the notification that an appointment is
deemed to have never existed (such as on a failed CoS).
This Working Practice only considers Agent cancellations where the Supplier cancels the
appointment prior to the first effective date of the appointment.
Working Practice:
When appointing an Agent using a D0155 or D0153 flow, the EFD{Agent} should be the date on
which the Agent is to take responsibility for the metering point. The appointment takes effect from
midnight at the beginning of the day specified in the EFD{Agent}. On CoS, this will normally be
SSD.
When terminating an Agent appointment using D0151, the ETD{Agent} should be the last
calendar day on which the Agent has responsibility for the metering point. The termination takes
effect at midnight at the end of the day specified in the ETD{Agent}. On CoS, this will normally be
SSD-1 calendar day.
When cancelling an Agent appointment with an EFD{Agent} in the future, again using D0151, the
ETD{Agent} should be the calendar day before the EFD{Agent} provided on the original
D0155/D0153. The Agent is to interpret a D0151 which contains an ETD{Agent} one calendar day
before the EFD{Agent} received on an earlier D0155 as a cancellation of appointment. (Note that
the ‘Termination Reason’ shall be ‘LC’ where the Supplier loses the supply contract, ‘CA’ where
the Supplier has appointed the Agent in error).
If an Agent acted as the Agent for the previous Supplier for the relevant metering point, the Agent
should treat the notification of cancellation, where ‘Termination Reason’ = ‘LC’, as a reinstatement
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 100 of 227
Working Practices Product Set (WPPS)
of its appointment with the previous Supplier, unless a D0151 has been received from the
previous Supplier. (Note that the previous Supplier must re-appoint an Agent if it has earlier
terminated the Agent. Such re-appointment (D0155) must ensure continuity of appointment to the
metering point, and hence should have an EFD{Agent} = (cancellation D0151) ETD{Agent}+1
(calendar) day) and an EFSD{REGI} = the original EFSD{REGI}).
This Working Practice does not apply to CoMC, which is the subject of Working Practices 66 and
116.
Impact of not implementing WP:
Suppliers and their Agents will not have a common understanding of the duration of their
appointments, and hence their contractual and licence obligations. Suppliers and Agents will
misunderstand communications between each other and may fail to undertake contractual actions
required of them.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 101 of 227
Working Practices Product Set (WPPS)
WP 102. Guideline for identifying any Meter Register in the HH Market
WP no:
102
Status:
Implemented by
Industry
Implementation
Date:
01/04/2000
Title:
Guideline for identifying any Meter Register in the HH Market
Version:
1
Originator:
WP type:
G
Originator Ref:
Related WP(s)
DST Issue No:
S Champion, PGen
131 and 190
Date raised:
23/11/98
DST Doc Ref:
Product Area (s):
Half Hourly
Market
Parties Affected:
Relevant Baseline
Products:
Usage of D0268, D0010
Last Amended:
24/02/99
Change History:
Approved at CCG 28 on 16/04/99 - see Design Note 24
Supplier, MOp, HHDC
Context:
Certain Suppliers wish to be able to receive readings from the meter registers associated with Half
Hourly Meters in order to have the identical values available to them as are available to their
customers. The readings they wish to be provided with include not only those available for the
‘defined set of registers’ (for which no specification needs to be provided in D0268) available from
Data Collectors such as UKDCS/Datum Solutions etc. (e.g. Cumulative reactive import (kVArh),
Maximum import in the Last Billing Period (kVA)), but any of those available from any type of HH
metering system installed.
A number of options have been considered as to how to identify these registers. They have
included:
1. A new DTC Flow;
2. An addition to D0268 based upon D0149 as used in the NHH Market;
3. Additions and modifications to the usage of the D149/D150 to allow these NHH flows to be
used in the HH marketplace. Some MOps will have difficulty supplying a NHH flow to be used
as an HH flow;
4. The use of an agreed set of Register Identifiers in flow D0010 with the Identifiers of the
Registers to be read being given in D0268 within Group 04A.
Analysis has shown that the first three solutions would be complex, expensive and timeconsuming to implement and that there is a preference for a low cost, low impact, and quickly
implementable solution for those Suppliers who wish to get access to register information. This is
achievable only through option 4, which originally stemmed from a proposal developed by the Half
Hourly Focus Group.
This option would allow the HHDC to map the registers found in the metering system to those
specified within the D0268 flow, without the need to include ‘Meter Register Type’ and ‘Time
Pattern Regimes’ in the flow.
Similarly, when a reading is received via D0010, it should be possible to interpret the ‘Meter
Register Id’ and map it directly onto the Supplier’s own code. However, there may be instances
when the Supplier will still need to refer to the TPRs to obtain the original mappings.
Whilst the approach is different from that provided by D0149 and D0150 in the NHH market
(options 2 and 3), for what in many case is the same meter asset, Distribution Business’s
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 102 of 227
Working Practices Product Set (WPPS)
canvassed are prepared to accept this situation. The approach is in line with MOp practice of
specifying all the registers available on the Metering System rather than just those required by the
Supplier.
This WP applies as a guideline only to Suppliers who contract with their MOps and HHDCs to
provide readings from all cumulative and maximum demand registers associated with a HH
metering System (and which are generally visible to the customer). It does not apply to Suppliers
who elect to be restricted to readings that can be provided through:

the standard HH metering channels; or

the limited set of registers that can be obtained using other register Id schemes adopted by
such organisations as UKDCS, Datum Systems and ScottishPower.
Working Practice Guideline:
When a MOp working in the Half Hourly Market wishes to identify the existence of such Meter
Registers to the Supplier and HHDC, it is recommended it makes use of the following Meter
Register naming scheme and practices for all available registers provided by the Metering
System. The guideline identifies:
 How Meter Registers are distinguished from registers providing Half Hourly values;
 The coding scheme to be used for the actual Meter Registers themselves;
 The completion of D0268 to provide the Register IDs to the Supplier and the HHDC;
 Incorporation of Register readings in flow D0010.
Distinguishing between IDs for Meter Registers and IDs for registers providing Half Hourly
Readings
 Alpha character Ids should be used to identify Meter Registers;
 Numeric character Ids should be used to identify standard HH channels.
Meter Register Coding Scheme
Four groups are proposed to cover cumulative / maximum value registers, and make use of the
first characters of A-X. The second character should be used to indicate the sequence of the
particular register within the designated category. It is assumed that Registers will embrace
readings captured to given time patterns e.g. STOD and therefore separate TPR designation of
each Id is not required.
Current Unit Registers:
First character:
2nd character:
A
B
C
D
kWhI
kWhE
kVArhI
kVArhE
E
F
kVAhI
kVAhE
A-Y 25 possible programmed registers
Z
cumulative register
Billing (i.e. month-end stored) Unit Registers:
First character:
G
H
I
J
K
L
Version :
5.4
Status :
Approved
kWhI
kWhE
kVArhI
kVArhE
kVAhI
kVAhE
Date :
01 Nov 2007
Page 103 of 227
Working Practices Product Set (WPPS)
2nd character:
A-Y 25 possible programmed registers
Z
cumulative register
Current Maximum Demand Registers:
First character:
M
N
O
P
Q
R
kW I
kW E
kVArI
kVArE
kVAI
kVAE
2nd character:
A-Y 25 possible programmed registers
Z
cumulative register
Billing (i.e. month-end stored) Maximum Demand Registers:
First character:
S
T
U
V
W
X
kW I
kW E
kVArI
kVArE
kVAI
kVAE
2nd character:
A-Y 25 possible programmed registers
Z
cumulative register
Group 04A set up in conjunction with Register usage
The MOp should specify all Meter Registers within the existing D0268 structure as additional
groups of Group 04A. Group 04A requirements are for a set of data items including Meter
Register Id that need to be set up correctly when used for Register specification. Those data
items in the set which are mandated should be set as follows.
 Meter Register Id - as set out above
 Outstation Id, Channel Number, Pulse Multiplier set to default values - values yet to be agreed
 Meter Register Multiplier and Number of Register Digits to be set up in line with the registers to
be reported
 Measurement Quantity Id to a value that is consistent with the first character of the Meter
Register Id.
Incorporation of Register Id and readings in D0010
Meter Readings from all the registers specified within the D0268 should be passed to the Supplier
by the HHDC and where required from the MOp to the HHDC using D0010. Group 030 should be
completed as per NHH readings with:
 Meter Register Id as above;
 Reading Date and Time as corresponding to the Register group as above;
 Meter reading for the register.
Set up of MV90 or other electronic reading devices
Where the HHDC uses a MV90 or similar reading device, the guideline recommends the HHDC to
set up, for each meter type, a cross-reference table between the data stream provided by the
reading device and the Register IDs specified above. This may be done as a one-off exercise.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 104 of 227
Working Practices Product Set (WPPS)
Impact of not implementing the Working Practice Guideline:
Without the guideline, the details supplied by those suppliers who choose to make all the
information visible will not be consistent - leading to greater cost and development effort for all
parties concerned. Other Suppliers and their agents who do not wish to utilise this guideline
remain unaffected.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 105 of 227
Working Practices Product Set (WPPS)
WP 104. Population of D0086 for Non Settlement Registers
WP no:
104
Status:
Implemented
by Industry
Implementation
Date:
27/03/2001
Title:
Population of D0086 for Non Settlement Registers
Version:
2
Originator:
Eastern
WP type:
G
Originator Ref:
Issue 215, 2 & 3.
Related WP(s)
WP 6, 64
DST Issue No:
6/232
Date raised:
10/11/1998
DST Doc Ref:
(98/744) (99/090), (99/126),
99/136
Product Area (s):
NHH DC
Parties
Affected:
NHH DC / Supplier
Baseline Products
Impacted:
BSCP 504 2.2.6; E2E's NHH Meters: Obtain Readings, New
NHH DC Obtain and Generate Change of Supplier meter
reading, Meter Reading on Change of Supplier Dispute; DTC D0086 and WP 6
Last Amended:
30/06/00
Change History:
V1 approved at CCG 32 on 05/11/99
V2 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
During operational processing of change of supplier (CoS) processes, the D0086 - Notification of
Change of Supplier Readings - has not always included readings for non-settlement registers
included at the metering point. Settlement obligations do not mandate the inclusion of nonsettlement registers in the MRoCoS. The submission of the MRoCoS to initial reconciliation must
not be delayed by the absence of the non-settlement register readings.
However, Old Suppliers cannot bill the Customer correctly without readings from some nonsettlement registers in addition to the settlement registers. Therefore when instructed to do so by
the New Supplier the New NHHDC should make every attempt to provide a set of actual readings
for all registers within settlement timescales. Failing this, the New NHHDC is required to estimate
readings for settlement registers using the defined deeming process set out by the Elexon in
BSCP504.
The required handling of non-settlement registers varies according to the register types and
measurement quantities. Note: the Meter Register Type for all month end registers whether they
are also cumulative or maximum demand are covered under section 3 (e.g. the Meter Register
Type for month end cumulative reactive registers is listed under month end registers):
1. For cumulative reactive registers (Meter Register Type = C) the Old Supplier’s closing reading
and the New Supplier’s opening read need to agree.
2. For maximum demand registers (Meter Register Type = M) the Old Supplier needs all readings
but these are of no use to the New Supplier as maximum demand registers are not cumulative.
Maximum demand registers should ideally be reset. If they are not reset the New Supplier will
receive a maximum demand reading following the next routine read that may have been recorded
during the period when the customer was supplied by the Old Supplier.
3. For month end registers (Meter Register Type = 2, 3 or 4) readings are not important as they
are not used as CoS readings. Suppliers will close and open their customer’s account on the
instantaneous readings even if they used/intend to use the month end registers for routine billing.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 106 of 227
Working Practices Product Set (WPPS)
As the reads are not used on CoS it is unimportant whether or not they are re-dated. However it is
logically incorrect to re-date them.
4. For cumulative maximum demand registers (Meter Register Type 1) readings are not used as
CoS readings as their primary purpose is as a check to maximum demand readings
This working practice describes the handling of non-settlement registers on CoS.
Note: This WP should be read in conjunction with WP6, WP64 and BSCP504.
Note: The new NHH DC should estimate CoS readings for Non Settlement registers in
accordance with any agreement they have with their Supplier.
Working Practice:
Readings for Settlement Registers should be handled in accordance with WP 6 and BSCP 504.
The New NHHDC should populate readings for non-settlement registers in D0086 as follows:
 All readings provided in flow D0086, except month end register readings, must be re-dated to
SSD. Month end registers should not be re-dated. The Reading Types for both settlement and
non-settlement registers should be populated in accordance with the procedures described in
WP6 and BSCP504.
Actual Readings are available
 Where actual readings are available they are to be used by the New NHHDC to populate the
D0086
Actual Readings for Non Settlement Registers are not available


Where values for settlement registers are available or can be deemed any estimating of nonsettlement registers must not be allowed to delay the CoS process for settlement purposes.
Where a partial read has occurred and readings are only available for settlement registers the
Supplier and Old NHHDC should be notified of any estimated readings for non-settlement
registers outwith the DTC. (This is necessary because a single D0086 cannot be used to
convey multiple readings with different reading types).
 Where it has been agreed between the New NHHDC and the Supplier that the New NHHDC
will estimate non-settlement registers and where the Old NHHDC has provided historical data
enabling the New NHHDC to do so, the New NHHDC should estimate readings for cumulative
non-settlement registers (Meter Register Type C). Estimated readings should have a reading
type of 'D.’ Care should be taken when estimating total registers that are the sum of deemed
settlement registers as the estimated total should ideally equal the sum of the deemed
registers
 The NHHDC should not estimate readings for maximum demand registers (Meter Register
Type M).
 The NHHDC should not estimate readings for month end registers (Meter Register Types 2 or
3).
 The NHHDC should not estimate readings for cumulative maximum demand registers (Meter
Register Types 1 or 4).
Suppliers Responsibilities
The suppliers should act as follows:

Where the Old Supplier is not satisfied with the readings on the D0086 and wishes to dispute
the MRoCoS, then Clause 29.3 of the MRA becomes relevant. However, the process
described in this Clause cannot be used for disputing readings from non settlement registers –
in such circumstances, a process similar to that described in Clause 29.3 could be used.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 107 of 227
Working Practices Product Set (WPPS)

Where estimated cumulative readings are provided for non-settlement registers by the New
NHHDC they are to be used for billing by both Suppliers where applicable. If either supplier
wishes to use any other estimated cumulative readings they may do so as long as there is no
risk of the customer being billed for the same consumption by both Suppliers. Specifically, if
the Old Supplier wishes to terminate an account using a higher cumulative reading than has
been estimated by the New NHHDC they must resolve the discrepancy with the New Supplier
in line with WP64. Where values for settlement registers are available or can be deemed the
New NHHDC must proceed with the CoS process for settlement purposes.

Where there is no agreement between the New Supplier and the New NNHDC to estimate
cumulative non-settlement registers, it is assumed that the New Supplier will not bill any
cumulative non-settlement registers (e.g. reactive power) when producing the customer’s first
routine bill after the CoS. In these circumstances the Old Supplier will estimate for their
termination bill using the historic data available to them.
Impact on Distributors

Where no readings are provided for maximum demand registers on the D0086 flow, a
Distributor will be expected to estimate these readings in line with its historical data and to bill
the Old Supplier accordingly

Where the Old Supplier is not satisfied with the estimate and wishes to dispute the reading its
UoS agreement with the Distributor becomes relevant.
Impact of not implementing WP:
The Old Supplier will not have available that information needed to bill the customer and close that
customer’s account.
Settlement timetables may be impacted if the NHHDC waits on non-settlement readings for
generation of the D0086.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 108 of 227
Working Practices Product Set (WPPS)
WP 106. Knowing the date for Livening up a Key Meter after Shutdown
WP no:
106
Status:
Implemented by
Industry
Implementation
Date:
01/04/2000
Title:
Knowing the date of Livening Up a Key Meter after Shutdown
Version:
1
Originator:
WP type:
W
Originator Ref:
Related WP(s)
WP71, WP99
DST Issue No:
187
Date raised:
28/01/99
DST Doc Ref:
99/087
Product Area (s):
PPM - Key
Meters
Parties Affected:
Supplier, MOp
Baseline Products
Impacted:
None
Last Amended:
09/02/99
Change History:
Version 1.0 approved at CCG 28 on 16/04/99 – see Design Note
24
David Leck (LE)
Context:
A Key PPM may be de-energised in a number of ways, as detailed in WP 99. However, this WP
applies specifically where the Key PPM was de-energised by putting the Key meter into a
Shutdown state.
A Supplier may initiate the issue of a new key to the Customer. The customer is then able to insert
the key and liven up the meter on an unspecified date.
The Supplier will eventually get to know the exact date the livening up occurred via the PPMIP on
a D0188 but there are no procedures/systems within the existing baseline by which the MOp and
the NHHDC are informed.
However it is essential that the MOp and therefore NHHDC and Distributor are informed of the
date the livening up occurred. Specifically the NHH DC, as they have an obligation to provide
details of the change to energisation status to the NHH DA in D0019 - Group IES: Effective from
Settlement Date (J1096) and Energisation Status Id (J1099).
Working Practice:
1. The preferred method is for the Supplier to request the MOp to carry out a site visit to liven up
the metering system directly. The Supplier can instruct the MOp to liven up the meter.
However this incurs the cost of a MOp visit. (The process and flows sent are therefore the
same as that for a MOp re-energisation by site visit); or
2. The Supplier may enter into a bilateral agreement with its MOp to allow the Supplier to instruct
the Mop to update its records in line with the livening up date received by the Supplier from its
PPMIP and without the need for a MOp visit. Supplier and MOp applications can therefore be
augmented to allow the date collected on the D0188 from the PPMIP to be passed to the MOp
and thence on to the NHH DC and Distributor. In this approach, a valid sequence of flows to
be implemented would be:
 The Supplier receives a D0188 for a Key meter from its PPMIP from which the Supplier can
deduce the date of key insertion and hence the date of livening up.
 The Supplier sends a D0005 to the MOp which will include J0007, Requested Action Code,
set to 11 (PP Register readings and settings). The Supplier may choose to augment the flow
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 109 of 227
Working Practices Product Set (WPPS)
by suitable wording in J0012 or J0173. The date of the livening up of the meter should be
included in the 'Date Action Required By' (J0028) field.
 The MOp updates its database and sends a D0139 to NHH DC and Distributor confirming
the change of energisation status to energised with the 'Date of Action' (J0014) set to the
date provided by the Supplier on the D0005. The MOp should also confirm the change to
energisation status to the Supplier using a D0179 (ensuring that the information on this is
consistent with that on the D0139's).
 The Supplier informs MPAS that the meter is energised on the date specified using a
D0205.
Impact of Not Implementing WP:
The Shutdown of a Key Meter by three of the current Key Meter MOps acting under the
instructions of their Suppliers is not an infrequent event and an effective solution needs to be
found as to when the meter is livened up if the MOp, NHHDC and Distributor are to be properly
informed and allowing consistent inter-operation between them and their Supplier. Further the
NHHDA needs to receive a consistent re-energisation date from the NHHDC and MPAS on flows
D0019 and D0205 respectively if it is not to generate spurious error messages on DA Validation
processing.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 110 of 227
Working Practices Product Set (WPPS)
WP 107. Changes to Existing Agent Appointment Details
WP no:
107
Status:
Implemented by
Industry
Implementation
Date:
01/04/2000
Title:
Changes to Existing Agent Appointment Details
Version:
2
Originator:
ScottishPower
WP type:
W
Originator Ref:
N/A
Related WPs:
WP 21, 28,
100
DST Issue No:
221
Date raised:
09/02/1999
DST Doc Ref:
(99/027), 99/084
Product Area (s):
DC and MOp
Parties Affected:
DC, MOp and Supplier
Baseline Products
Impacted:
DTC D0011, D0012, D0153, D0155 and D0261.
Last Amended:
24/02/1999
Change History
Version 1 approved at CCG 29 on 21/05/99 - see Design Note 25
E2E's Appoint/De-appoint NHH MO, Appoint/De-appoint DA (NHH
& HH), Appoint/De-appoint NHH DC, Appoint/De-appoint HH MO,
Appoint/De-appoint HH DC.
Version 2 accepted at MEC_00_03 on 28/03/00
Context:
There is a recognised requirement for a Supplier to be able to change the appointment details for
their agents during an appointment term. The details that may change are:
 Contract Reference (J0048)
 Service Reference (J0274)
 Service Level Reference (J0275)
 Regular Reading Cycle (DC only) (J0277).
This effectively constitutes a new appointment for the same Supplier and MPAN and therefore
both Suppliers and agents should utilise a common process.
This WP does not currently scope bulk changes, but applies to small scale 'one off's'.
Working Practice:
Where a Supplier wishes to change the details of their agent appointment during the agent's
appointment term, then the following procedure should be followed:
The Supplier should send a D0155 / D0153 with the relevant data items updated (see above),
ensuring that all necessary values are provided and correct (taking note of WP 21).
The Effective from Date {MOA}/{DCA}/ Effective from Settlement Date {DAA} (J0210, J0219 and
J0334 respectively) should be populated with the date that the supplier wishes the changed
appointment details to become effective from (see WP 100). The Effective from Settlement Date
{REGI} (J0049) should be populated with the SSD of the supplier (this should not have changed
from the original appointment flow).
On receipt of the updated appointment details, the agent should either:
 Confirm the details to the Supplier via a D0011 and (in the case of the DC where Regular
Reading Cycle is changed D0012) where the updated details are accepted/supported by the
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 111 of 227
Working Practices Product Set (WPPS)
agent (the values on the D0011/D0012 should match those provided on the D0155). Therefore
the D0155 received supersedes the existing appointment and the agent should update their
details accordingly, or
 Reject the changed details to the Supplier via a D0261 where the updated details are not
accepted/supported by the agent, using appropriate valid set values. In this scenario the agent
will continue to work to the existing appointment details until an 'acceptable' D0155 is received
and processed.
Impact of not implementing WP:
Inconsistent processing which may lead to agents not being appointed to a metering point with the
Supplier therefore not conforming to Settlement/MRA obligations. 'Over processing' may lead to
unnecessary costs in provision of the required functionality, therefore streamlining the process
should be encouraged.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 112 of 227
Working Practices Product Set (WPPS)
WP 108. Validation of Standing Data in MPAS Systems
WP no:
108
Status:
Implemented by
Industry
Implementation
Date:
Title:
Validation of Standing Data in MPAS Systems
Version:
3
Originator:
T Marquand (EE)
WP type:
W
Originator Ref:
E3, DST 76
DST Issue No:
246
Related WP(s)
29/11/2001
Date raised:
09/02/1999
DST Doc Ref:
(99/082), 99/135
Product Area (s):
MPAS
Parties Affected:
MPAS, Supplier
Baseline
Products
Impacted:
MRA Clause 15 and 24.
Last Amended:
20/09/01
Change History:
Version 1.0 approved at CCG 28 on 16/04/99 - see Design Note 24
V2 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
V3 with WPPS CP 42 accepted at MDB_01_10 on 25/10/01
Context:
Most MPAS operators:
 maintain tables of standing data including data received via the MDD Agent.
 validate Supplier registrations (via flow D0055) against such standing data and
reject these registrations if the data as present for the affected Metering Point is
invalid. This validation includes checking existing MPAS data if this is to be used
following the registration by default.
However no MPAS system automatically updates individual Metering Points affected by changes
in standing data nor is it possible for them to do so.
Note: there is a minimum set of data that needs to be present for a registration to be acceptable.
This is defined in MRA Clause 15.6 and in Distribution Business Validation Procedures.
As a consequence of this practice, if a new Supplier attempts to register itself as Supplier to a
Metering Point, but does not provide all standing data e.g. MTC but relies on the data provided by
the previous Supplier and this is now obsolete or deleted, then the registration will be rejected.
This situation has occurred in practice:
 an MTC has been withdrawn by the Distribution Business but the incumbent
Supplier has not updated the Metering Points referring to this MTC in the related
MPAS
 a New Supplier who has attempted to take over the Metering Point containing the
withdrawn MTC has had its registration rejected.
This situation is considered unsatisfactory to a New Supplier.
The obligation as set out in the BSC and MRA (Clause 24.5) is on the incumbent Supplier to
maintain standing data for each Metering Point it supplies in line with that published by the MDD
Agent.
The standing data is published as and when required by the MDD Agent.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 113 of 227
Working Practices Product Set (WPPS)
On receiving a new edition of the published data the incumbent Supplier should identify changes
in the published data and update accordingly any Metering Points referring to the changed data
using D0205.
However, it is recognised that a "work-around" may be needed to assist a New Supplier if the
incumbent Supplier has not discharged his responsibility.
It should be noted that no such validation is carried out against the standing data of data items:
 held against the Metering Point when the Supplier updates the other data items in
MPAS using a flow D0205. Only the data provided on the D0205 is validated
against standing data. Therefore inconsistent data could remain undetected in
MPAD for a Metering Point in this way;
 provided to Suppliers as part of full and partial refreshes - therefore inconsistent
MPAD data could be passed back to the Supplier in this way.
Working Practice:
For most MPAS Operators where standing data held against a Metering Point has become invalid
in this way and a New Supplier attempts a registration, the New Supplier will receive a D0057 with
Rejection Reason Code(s) indicating the data which is invalid.
The New Supplier should then determine the appropriate value of the missing data item (or make
an informed guess) by questioning the Customer, and include it in a revised D0055. The New
Supplier will be notified of the actual (invalid) value for the data item by a D0260 sent on
acceptance of the D0055. If this indicates that the data value quoted on the D0055 was incorrect,
the Supplier can amend the value by sending a D0205 with an effective date of SSD.
Note: The ScottishPower/Manweb MPAS will accept the registration.
Impact of not implementing WP:
The New Supplier will not be able to register successfully for a metering point, through no fault of
their own.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 114 of 227
Working Practices Product Set (WPPS)
WP 109. Use of D0012 in conjunction with Smartcard and Key Meters
WP no:
109
Status:
Implemented by
Industry
Implementation
Date:
27/03/2001
Title:
Use of D0012 in conjunction with Smartcard and Key Meters
Version:
2
Originator:
Matthew Cole; MEB
WP type:
W
Originator Ref:
N/A
Related WP(s)
WP 107
Issue No:
228
Date raised:
09/02/99
Doc Ref:
4/012
Product Area (s):
PPM, NHH DC
Parties Affected:
NHH DC & Supplier
Baseline
Products
Impacted:
DTC - D0155 and D0012
E2E Diagram Appoint/De-appoint NHH DC, A1032, F2925, A400 and
F2877.
E2E Diagram NHH ONLY Appoint agents to the metering point (new
supplier CoS), A608, F2928, A420 and F3328.
Last Amended:
30/06/00
Change History:
Version 1.0 approved at CCG 30 on 09/07/99 – see Design Note 26
V2 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
D0012 (Confirmation of the inclusion of the Metering Point in the Reading Schedule) for credit
meters is used by the Data Collector to confirm to its Supplier that it has included the metering
point in its reading schedule at a frequency required by the Supplier. The DC may optionally
provide a Meter Reading Schedule Date being the date it intends to take meter reading from the
metering point (this is assumed to be the first of the set of scheduled dates).
Where the metering point is a Smartcard or Key metering system, readings from this metering are
routinely collected by the PPMIP as a by-product of the customer recharging its Smartcard or Key.
Therefore, the meter does not need to be included in the Data Collectors ‘walk order’ as it does
not need to be read. As a D0012 notifies the Supplier that the Data Collector has included the
metering point in their meter reading schedules, the question has arisen as to whether flow D0012
is a ‘courtesy’ flow when used in conjunction with an installed Smartcard or Key meter or has it a
more purposeful use.
Industry has been canvassed and it is clear from their responses that participants do make use of
the flow in a purposeful manner.
Suppliers and their Data Collectors treat D0012 as an expected response to D0155 for Smartcard
and Key meters in the same way as for credit or token meters; in this respect they make no
distinction.
As a consequence :
DCs use D0012 as one of the responses to the D0155 appointment flow (the other being the
D0011). The D0012 should contain the same ‘Regular Reading Cycle’ – J0277 as that provided by
the Supplier in the D0155. Some DCs will use Meter Reading Schedule Date to provide the
‘default’ date of the first readings it would have passed to the Suppliers if the meter was read
quarterly.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 115 of 227
Working Practices Product Set (WPPS)
However, it should be noted that BSCP504states that the Supplier is expected to pass PPM
readings obtained remotely to the NHH DC as follows:
“The meter reading will be sent to the NHHDC in accordance with a meter reading cycle but this
cycle must not exceed a three month period. If the MS is remote the meter reading cycle must not
exceed a three month period”.
Note that some DCs will maintain the Metering Point in their walk orders so that the point can be
reinstated for data collection should the meter be replaced by a credit or token meter. However, it
is recommended that where the Key or Smartcard Meter is replaced by a credit or token meter,
the Supplier should update the Data Collector appointment, using a D0155 (WP 107), to indicate
that the Data Collector is expected to include the meter in its walk orders.
Working Practice:

D0155 and D0012 should be used in the same way, by both the NHH DC and the Supplier,
whatever metering is installed at the metering point.
 Where a Key or Smartcard Meter is present, the Regular Reading Cycle value on D0155
should be set to ‘N’ (No read required) to indicate to the NHH DC that they are not required to
read the meter / include the meter in their walk order(s). The NHH DC should return the same
value for ‘Regular Reading Cycle’ as that provided by the Supplier in the D0155 – i.e. a value
of ‘N’, in the D0012 to the Supplier. Where the Regular Reading Cycle is populated with ‘N’,
the Supplier should ignore the ‘Meter Reading Schedule Date’ as it will not be relevant

The Supplier is responsible for complying with BSCP504 requirements for passing the
Smartcard/Key meter readings to the NHH DC at least quarterly. However, the Supplier should
note that the NHH DC will process readings received as and when they arrive, generating the
required D0010’s and D0019’s to the Supplier and Settlements. Therefore the Supplier can
determine their own schedule for passing readings to the NHH DC (in agreement with the
NHH DC, if appropriate).

Where the Smartcard / Key meter reverts to a credit meter, the Supplier should follow the
process described in WP 107 to update the NHH DC’s appointment to indicate to the NHH DC
that they are required to include the meter in their walk order / read the meter.
Impact of not implementing WP:
A consistent approach is required to ensure that all Supplier's and Data Collectors meet their
settlement obligations regarding readings from Smartcard and Key metering and to ensure that
both the Supplier and NHH DC have the same understanding of their appointments.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 116 of 227
Working Practices Product Set (WPPS)
WP 111. Old Supplier Changes to MPAD prior to CoS
WP no:
111
Status:
Implemented by
Industry
Implementation
Date:
Title:
Old Supplier Changes to MPAD Prior to CoS
Version:
3
Originator:
MOP
WP type:
W
Originator Ref:
Design BP 62
Related WP(s)
29/11/2001
Issue No:
Date raised:
01 March 1999
Doc Ref:
Product Area (s):
MRA
Parties Affected:
Baseline Products
Impacted:
DTC – D0205, D0209, D0089, D0259 and D0213
Last amended:
20/09/01
Change History:
Approved at CCG32 on 05/11/99
Supplier, MPAS, DA
V2 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
V3 with WPPS CP 42 accepted at MDB_01_10 on 25/10/01
Context:
Data Aggregation (DA) and MPAS software has been developed on the basis that: ‘An Old
Supplier cannot change a New Suppliers data’. This effectively means that a Supplier can only
update their MPAD effective during their registration. This is significant where there has been a
change of Supplier registration by a New Supplier and there is a period of time between the New
Suppliers registration and their actual Supply Start Date. MPAS holds two registrations
simultaneously– the Old (current) Supplier’s registration, effective to and including SSD-1
calendar day and the New (pending) Supplier’s registration, effective from and including SSD.
Where the Old (current) Supplier makes any changes to their MPAD in this period (using a D0205
into MPAS), MPAS updates the Old Suppliers registrations and instructs any affected Old DAs
only (D0209). The New Suppliers registration is not updated and neither is any affected New DA
informed. It is very likely that the New Supplier will be impacted by the change – i.e. if the Old
Supplier de-energises the metering point, then the New Supplier is potentially (as they have the
choice to reverse any such change on SSD, NOT before) taking over a de-energised meter on
SSD.
In recognition of this process, outside of an objection, MPAS sends a D0213 to any pending
Supplier on receipt of the Old Suppliers update, containing the information that the Old Supplier
has provided. Although this is not the case during the Objection Resolution Period, when the
objection is removed, the New Supplier receives a D0089 informing them of any changes the Old
Supplier made during this period.
Working Practice:
Where the New Supplier is informed of changes to the Metering Point made by the Old (current)
Supplier they should either:
1. Where the change(s) to the Metering Point will exist past the SSD of the New Supplier, the New
Supplier should update MPAS, using a D0205, with the change(s) to the Metering Point to ensure
that the information held by both MPAS and any affected New DA is consistent with the actual
metering point. Or,
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 117 of 227
Working Practices Product Set (WPPS)
2. Where the New Supplier does not wish to support the changes made by a previous Supplier
and does not intend the change(s) to exist past their SSD, the New Supplier should reverse the
change on SSD. Where this requires a change to the actual metering system the MOP should be
instructed to reverse the change on SSD. This will ensure that the information held by both MPAS
and any affected New DA is consistent with the actual metering point. Where the New Supplier
undertakes this course of action, they do not have to update MPAS, as the information held by
MPAS for the New Suppliers MPAD will reflect the original registration details provided by the New
Supplier (and / or defaulted by MPAS).
It should be noted for (2) that where the New Supplier is unable to make the change on SSD, then
they should update their registration on MPAS with the changes made by the Old Supplier until
they can make the change, therefore ensuring that they have met their obligations under the
MRA, Clause 24.5.
Impact of not implementing WP:
The New Supplier may not be able to meet MRA and BSC Obligations regarding ensuring the
correct information for the metering point is registered on MPAS at all times and that the correct
information is being submitted to settlement via the DA.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 118 of 227
Working Practices Product Set (WPPS)
WP 113. Positioning of Key Meter Serial Number in DTC Meter ID
WP no:
113
Status:
Implemented by
Industry
Implementation
Date:
01/04/2000
Title:
Positioning of Key Meter Serial Number in DTC Meter ID
Version:
1
Originator:
MOP
WP type:
W
Originator Ref:
Design BP 86
Related WP(s)
76
DST Issue No:
219
Date raised:
24/02/99
DST Doc Ref:
Product Area (s):
PPM
Parties Affected:
Retail Design
Products Impacted:
DTC Data item J0004 - Meter ID (Serial Number)
Last Amended:
24/0999
Change History:
Approved at CCG31 on 13/08/99 – see Design Note 27
MOps, PPMIPs, Suppliers
Context:
The expected format of J0004 (Meter Id (Serial Number)) in the NHH Market provided by each of
the Distribution Business is set out in Working Practice 76. Whilst there are significant differences
between formats in general, all provide 5 or 6 digits for the serial number within manufacturer.
J0004 is defined as logical format CHAR(10) meaning that it has a maximum of 10 characters left
justified.
Key Meters are allocated a six digit serial number. However, it is possible to hold on the Key itself
the least significant five digits only, i.e. the most significant digit of the Key meter six digit serial
number is discarded.
It is important that Key meter numbering within the DTC abides by the general formats provided
by each Distribution Business as a whole and that the number used for any Key meter is the same
for the Distribution Business MOp as it is for the PPMIP.
The material contained within this Working Practice is taken from Design Briefing Paper 86 which
is to be withdrawn as part of the rationalisation of the retail design.
Working Practice:
Distribution Businesses shall abide by the format for their Meter Id (Serial Number)s (J0004) as
published in WP 76 for all flows sent to Suppliers.
Specifically:
1.
Meter Id (Serial Number) in flows from MOp and PPMIP for the same metering system
shall be identical.
2.
Whether or not the number stamped on the Key meter is five or six digits, only the least
significant five digits will be used in J0004.
3.
For those Key Meter Operators that provide for a five digit serial number (Northern,
Seeboard, Southern, SWEB), the MOp shall transcribe the digits from the meter directly to
the five digits allocated to serial number in J0004 (for all except Seeboard the number
starts at digit 5; for Seeboard the number starts at digit 4 (ms digit being 1)). The PPMIP
shall transcribe (the five digits of) the meter serial no digits received from the Vendor (e.g.
POCL, PayPoint, Schlumberger) to these five digits in J0004.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 119 of 227
Working Practices Product Set (WPPS)
4.
(Eastern Group, LE), the MOp and PPMIP shall agree to which of the six digits of J0004
they will transcribe the five digits read from the meter:

If the agreement is to transcribe to the last five digits then the undefined most
significant digit of the serial number within J0004 shall be set to a published valid
character – Eastern use ‘0’, LE use embedded space;

Otherwise the least significant digit shall be set to null / space according to the
specific flow containing J0004 being variable or fixed format.
It is essential that:
1.
The MOp transcribes the five digits read from the meter to the agreed five digits of the meter
serial number in flows such as D0150.
2.
The PPMIP transcribes the meter serial number digits received from the Vendor (POCL,
PayPoint, Schlumberger) to the same agreed five digits in J0004 of D0188.
This procedure will ensure that the Supplier gets the same value of Meter Id (serial number) in
MOp flows such as D0150 and in PPMIP flows such as D0188.
Impact of not implementing WP:
Without this Working Practice, Key meter numbering within the DTC may not abide by the general
formats provided by each Distribution Business and number used for any Key meter may not be
the same for the Distribution Business’s MOp as it is for the PPMIP.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 120 of 227
Working Practices Product Set (WPPS)
WP 116. Change of Measurement Class from NHH to HH Coincident with CoS
WP no:
116
Status:
Implemented by
Industry
Implementation
Date:
29/08/2002
Title:
Change of Measurement Class from NHH to HH Coincident with
Change of Supplier
Version:
5
Originator:
Steve Watson
WP type:
W
Originator Ref:
98/143
Related WP(s)
WP 63, 66 and
131
OIF Issue No:
12
Date raised:
28 April 1999
Doc Ref:
3-020, 4-014
Product Area (s):
All
Parties Affected:
All
Baseline
Products
Impacted:
BSCP 504, BSCP 502
Last Amended:
28/02/02
Change History:
Version 1 approved at CCG 30 on 09/07/99 - see Design Note 26
E2E, DTC, MRA
Version 2 approved at CCG 32 on 05/11/99 – see Design Note 28
Version 3 with WPPS CP 4 accepted at MDB_00_05 on 25/05/00
Version 4 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Version 5 with WPPS CP 49 accepted at MDB_02_01 on 31/01/02
Context:
Currently, there is no comprehensive industry defined process for Change of Measurement Class
coincident with Change of Supplier. Therefore, there is a requirement to define the process to
ensure that the CoMC occurs within very tight timescales – aimed at achieving the CoMC on SSD.
It should be noted that once an SSD has been registered it cannot be changed (MRA Clause 24.5
and MAP04).
This Working Practice assumes that the process runs reasonably smoothly – i.e. the MOp can
change measurement class within the specified timescales and that the change of Supplier goes
ahead unopposed. (Note: It is assumed that the metering point is non-designated and therefore
the only valid reasons for objection are erroneous registration, where both the Old and New
Supplier have to agree before any objection is raised, or where the New Supplier has not
registered for all of the related MPANs).
This Working Practice details the steps required in approximate order and does not reflect that a
number of the steps could be carried out in parallel: This level of detail is provided in the End to
End Diagrams.
Working Practice:
All references to days are working days unless it is stated otherwise.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 121 of 227
Working Practices Product Set (WPPS)
New Supplier and Agent Process:
1. Before registration, the New Supplier should manually (and outwith the DTC) ensure that
the New HH Agents to be appointed will accept the appointment. The New Supplier should
also confirm the intended CoMC date with the HH MOp (and Customer). It is recommended
that the New Supplier use that date as their Effective from Settlement Date {REGI}.
2. The New Supplier can then register on MPAS, (as defined in MRA Clause 15) using a
D0055. It is recommended that the EFSD {REGI} be as far in advance as is possible
(preferably at SSD minus 28 calendar days). Before completion of the CoMC CoS, the
Supplier will need to update the registration details with the Change of Measurement Class
and the details of the new half hourly agents. This could be done on the D0055 sent at this
point or could be performed through a subsequent D0205. It should be noted that, since
the agents appointed by the old supplier will be non half hourly agents and the registration
of the new supplier will default to these if the details of the half hourly agents are not
provided, the Supplier cannot include the new measurement class on the D0055 unless the
details of the new HH agents are also provided. Similarly, any subsequent D0205 updating
the registration details must contain both the new measurement class and the details of the
half hourly agents.
WP 66 details the requirements regarding the registration and updating of registration on a
change to measurement class from NHH to HH.
3. Once the registration is accepted on MPAS and confirmed with a D0217 and the New
Supplier has received the Old Supplier’s metering point details on the D0260 (including the
Ids of the Old Agents) , the New Supplier can appoint their New HH MOp using a D0155.
The New HH MOp should receive their appointment and acknowledge acceptance via a
D0011.
At the same time as MPAS confirms the New Supplier’s registration, they will notify the Old
Supplier of the pending loss of supply – D0058. [For Old Supplier and Agents, see step 10.]
4. The New Supplier should then inform the New HH MOp of the identity of the associated
agents - New HH DC, Old NHH DC and Old NHH MOp, using D0148 (see Working Practice
40 for details on how this instance of D0148 should be populated) and provide Customer
details (Customer Name) using D0131.
In time to ensure receipt prior to the planned CoMC date, the New HH MOp should request
(using a D0170) the Site Technical details from the Distribution Business, who should
provide them on a D0215.
5. The New Supplier appoints their HH DC (via D0155) and HH DA (via D0153), and manually
informs them of the pending CoMC, thereby ensuring they are aware that the meter is to
become HH. The HH DA and HH DC should confirm their appointment on the D0011. The
appointment of the HH DC and HH DA can be done at any point in this process before the
change of metering. The appointments must be effective from the SSD of the New
Supplier, both in MPAS, and on Agents/Supplier systems.
6. The New Supplier can then update MPAS with their Agent details and the details of the
change of measurement class, if they have not done so already using a D0205. MPAS will
process the update and inform the HH DA of their appointment – D0209. The HH DA may
match this to their appointment details from the New Supplier.
7. The New Supplier should inform the New HH DC of the identity of the proposed associated
agents - New HH DA and New HH MOp, using D0148 (WP 40) and provide Customer
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 122 of 227
Working Practices Product Set (WPPS)
details (Customer Name) D0302. The New Supplier can, at this point, send the New HH
DC notification of the Settlement Details (MC/EAC/PC) for the Metering Point, using D0289.
However, the New Supplier may wish to wait until they have received the Meter Technical
Details (D0268) from the New HH MOp to ensure the sending of correct settlement
information to the New HH DC. It should be noted that where the Supplier chooses to send
settlement information at this point, any errors highlighted/uncovered by the receipt of the
meter technical details must be corrected with a resend of the D0289 by the Supplier.
The New HH DC will hold their appointment information pending receipt of Meter Technical
Details from the New HH MOp.
8. As far in advance as is possible, the New Supplier should instruct the New HH MOp to
change the measurement class of the metering point – D0142 to HH.
9. The New HH MOp should make appropriate arrangements for the change of measurement
class; which should include communication with the Old NHH MOp regarding meter removal
and / or transferral of relevant meter technical details (such as meter serial Id) if required.
The New HH MOp must ensure that the Old NHH MOp is aware of the pending CoMC, who
in turn must notify the old NHH DC either via fax, phone or email. The New HH MOp should
contact the New Supplier, manually outwith the DTC, to confirm the intended CoMC date,
therefore allowing the New Supplier to appoint their HH DC and HH DA, if they have not
done so already (See step 5).
Old Supplier and Agents:
10. On receipt of the notification of loss of supply from MPAS, the Old Supplier will determine
whether they are to object to the change of Supplier . This working practice assumes that
the Old Supplier does not object, as the likelihood of there being an objection is minimal.
11. The Old Supplier will then terminate their Agents – NHH MOp, NHH DA and NHH DC. The
Old Supplier should send a D0151 to each of the NHH DA, NHH DC and NHH MOp. The
Effective to Agent date should be SSD minus one and the ‘Termination Reason Code’
should be set as ‘LC’, as the Old Supplier must be assumed to be unaware of the pending
change of measurement class. As far as the Old Supplier hub is concerned, this is a
change of supplier.
12. On receipt of the appointment termination flows, both the Old NHH DC and Old NHH MOp
may not be aware that this is not a NHH to NHH change of Supplier. (However, the old NHH
MOp may have received the notification of the CoMC from the new HH MOp and the old
NHH DC may have received notification of the CoMC from the old NHH MOp, as indicated
in step 9.) In cases where the old agents are unaware of the CoMC/CoS on receipt of the
appointment termination flow, they will expect either, the new agent to contact them to
obtain the metering point history, or for the New Supplier to appoint them. This is not an
issue, as they will be informed of the CoMC/CoS later in the process.
13. On SSD, or within 4 WD of SSD, the HH MOp should change the meter from NHH to HH,
in accordance with any agreement with the Old NHH MOp (it should be noted that where
the HH MOp is to remove the NHH meter, they must be appropriately Qualified). The New
HH MOp should record all available readings from the removed/reconfigured meter. The HH
MOp then confirms the installation of the HH metering to the HHDC, Supplier and
Distributor on a D0268. Note: All effective from dates (Agents, Measurement Class etc)
should be set to the New Supplier’s SSD, regardless of the actual date of the CoMC
(providing the CoMC occurred within the time period specified above).
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 123 of 227
Working Practices Product Set (WPPS)
14. By end of day SSD +4 WD, the New HH MOp should have provided the Old NHH MOp with
the flow ‘Notification of Register Readings on Change of Measurement Class coincident
with Change of Supplier’, D0291 - and either:
 All readings displayed on the NHH meter together with the meter register description, or
 Notification that no read was obtained.
Details of how the D0291 should be populated in these circumstances is provided in
Working Practice 131.
15. By end of day SSD +5 WD, the Old NHH MOp should have mapped the final reading(s) to
the correct registers and redated it to SSD-1*. The mapped final reading for SSD-1 or
notification that no reading was obtained (referencing SSD-1) should be sent to the Old
NHH DC – D0010, containing notification of the CoMC/CoS . (The Old NHH MOp must
ensure that the Old NHH DC is aware of the CoMC and SSD-1).
Where the Old NHH meter was removed, the Old NHH MOp should send a D0150 with
Group 08A populated with the details of the removed meter (WP 50) to the Old NHH DC,
Distributor and Old Supplier .
Where a final reading was obtained, the D0010 from the Old NHH MOp should have a
reading date of SSD-1, a reading type of ‘F’, Site Visit Check Code(s) (J0024) of ‘10’ –
Change of Meter and Additional Information (J0012) indicating the change of measurement
class.
* SSD minus one is used here, as it has been defined as such in BSCP 504. However,
it should be recognised that this is a temporary workaround required where the
Agents cannot process a reading dated at SSD under these circumstances. It should
be noted that using a NHH meter removal / meter reading date of SSD-1 leaves a 24
hour settlement gap between the removal of the NHH meter and installation of the HH
meter / start of HH data collection (on SSD of the New Supplier). This contravenes the
PSL 120 obligation for dating the CoS reading at SSD. However, the intention is that
SSD will be used as the reading date once the Agent system(s) problem has been
addressed and resolved.
16. By end of day SSD +8 WD (when the final DPCs) are received, the Old NHH DC should
have processed the reading sent by the Old NHH MOp. Where no read was obtained, or
the read was invalid, then the Old NHH DC should deem the reading.
[The Old NHH DC could contact the Old Supplier manually and outwith the DTC to notify
them of the CoMC .]
By end of day SSD +8 WD, the Old NHH DC will generate and send a D0086 (as they are
generating the Change of Supplier Meter Reading) to the Old Supplier and the Distributor ,
populated as follows:
 Where a read was obtained and found to be valid – a reading date of SSD-1, a reading
type of ‘F’, Site Visit Check Code(s) (J0024) of ‘10’ – Change of Meter and Additional
Information (J0012) indicating the change of measurement class.
 Where no read was obtained - reading date of SSD-1, a reading type of ‘D’, Site Visit
Check Code(s) (J0024) of ‘10’ – Change of Meter and Additional Information (J0012)
indicating the change of measurement class. The Old NHH DC may choose to indicate
why no read was taken from the old metering.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 124 of 227
Working Practices Product Set (WPPS)
Where a read was obtained but found to be invalid – a D0010 should be sent (as per BSCP
504) containing the invalid data and Site Visit Check Code(s) (J0024) of ‘10’ – Change of
Meter and Additional Information (J0012) indicating the change of measurement class. A
final read should be deemed (generated and populated as indicated for the scenario where
no read was obtained). The Old NHH DC may also generate an associated D0010 for the
final meter reading as part of their background processing.
17. By end of day SSD +5 WD, the New HH MOp should have informed the New Supplier, the
Distributor and the New HH DC of the meter technical details of the new metering
configuration via D0268. In addition, the New HH MOp should have provided the start
reading(s) from the HH meter to the HH DC, with the start reading date and time. If the New
Supplier has not already done so, then they must send the HH DC notification of the
Settlement details (MC/EAC/PC) for the metering point, using D0289.
18. The HH DC will match these MTD and settlement information to their appointment details.
The HHDC will start collecting data from SSD - readings from midnight at SSD to the date
and time of the initial reading should be populated with zeroes (in line with BSCP 502). The
HH DC should then confirm the reading schedules to the Distributor - D0012 and should
confirm reading schedules and retrieval method to the New Supplier – D0012 and D0051.
19. On receipt of the MTD, the New Supplier should update MPAS – D0205 with any changes
to Supplier held MPAD.
20. MPAS will inform the Distributor of these changes and where this necessitates the
Distributor updating the Line Loss Factor for the metering point, the Distributor will update
MPAS with the changes and MPAS will notify the New Supplier on a D0171.
21. As soon as is possible, the HH DC and HH MOp should prove the HH Meter . The HH MOp
should inform the HH DC, New Supplier and Distributor of the confirmation of the proving
tests – D0214.
Impact of not implementing WP:
Change of Measurement Class could not occur coincident with CoS and therefore participants
would be unable to meet Ofgem requirements.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 125 of 227
Working Practices Product Set (WPPS)
WP 119. Change of Supplier with Shortened Registration
WP no:
119
Status:
Implemented by
Industry
Implementation
Date:
Title:
Change of Supplier with Shortened Registration
Version:
2
Originator:
AC EG
WP type:
G
Originator Ref:
AC EG 22
Issue No:
Agent Competition
Related WP(s)
27/03/2001
Date raised:
25 May 99
Doc Ref:
Product Area (s):
All
Parties Affected:
Baseline Products
Impacted:
DTC, E2E and BSCP 504, PSL 110 and 120
Last Amended:
30/06/00
Change History:
Version 1 approved at CCG 30 on 09/07/99 - see Design Note 26
All
MRA Clauses 15, 16 and 29
V2 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
For a change of Supplier registration, the New Supplier is able to register, where MPAS receives
the application for registration (D0055), ‘no later than the last Operational Working Day before the
Supply Start Date included in the Supplier’s application under Clause 15.5.1 and no more than 28
days in advance of that date;’ (MRA Clause 15.5.2). The design (E2E’s, BSCP501etc.) also
supports this timeframe for registration.
The New Supplier may choose to submit an SSD which is relatively immediate (or is forced to by
circumstances / the Customer, for example, on a CoT). However, as a result of commercial
constraints, in the form of service level agreements between Suppliers and Agents, there are a
detrimental implications on the Agents, and therefore Supplier, meeting their obligations.
Specifically in areas such as the transfer of Metering Point Historical information and the
generation of the change of Supplier meter reading, within the required timescales, especially
where the Agents change over the CoS.
In order to provide a solution to any problems posed by shortened timescales, the process
dependencies within a change of Supplier have been identified, in order to determine where the
‘bottlenecks’ or areas of concern lie. The following table defines the dependencies in the change
of Supplier process. Those dependencies which cannot be influenced by the agreement of service
levels between the New Supplier and its agents – i.e. those controlled by existing service levels
with the Old Agents, have been shaded:
Process Step:
Dependencies:
New Supplier confirms associated and old
agents to their New MOp and New DC
(D0148).
Dependent upon receipt of D0260 from
MPAS and D0011s from the New Agents
New MOp requests Old MOp for Metering
Point history (D0170)
Dependent upon receipt of D0148 from
the New Supplier
New DC requests Old DC for metering point
history (D0170)
Dependent upon receipt of D0148 from
the New Supplier
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 126 of 227
Working Practices Product Set (WPPS)
Process Step:
Dependencies:
Old MOp sends metering point technical
details history to the new MOp
Dependent upon receipt of D0170 from
the New MOp
Old DC sends metering point history to the
New DC
Dependent upon receipt of D0170 from
the New DC
New MOp sends metering point technical
details to the New DC and the New Supplier
Dependent upon receipt of information
(D0149 and D0150) from the Old MOp
New DC sends notification of inclusion of
reading schedules to the New Supplier and
the Distributor
Dependent upon receipt of information
(D0149/D0150) from the New MOp and
(D0010/D0152) from the Old DC
New Supplier sends a CoR to the New DC
(D0071)
Dependent upon receipt of information
(D0149/D0150) from the New MOp
New DC processes the reading as per WP 6
and BSCP504 and generates D0086 for
New Supplier, Old DC and Distributor.
Dependent upon receipt of information
(D0149/D0150) from the New MOp and
(D0010/D0152) from the Old DC, and
must occur BY SSD+8
The process can be represented by the associated schematic. The working days referenced
are:
 Either, the maximum allowed by the BSC and MRA requirements (where the BSC and MRA
specify timings),
 Or, represent the recommendations from Service level agreements.
Therefore the dependencies upon the receipt of information in the change of Supplier process,
for the fulfilment of certain obligations, were specified and used to determine a maximum and
minimum time frame for completing the process – i.e. finishing with the New NHH DC
generating the change of supplier reading at SSD +8.
It was determined that:

Where the maximum allowed time frames were utilised, that the New Supplier would have to
register between 11 and 9 working days prior to their SSD in order to have the change of
Supplier meter reading generated at SSD+8 by the New NHH DC.

Where the minimal time frames were applied, the New Supplier would have to register
between 5 and 3 working days prior to their SSD in order to have the change of Supplier
meter reading generated at SSD +8 by the New NHH DC.
This therefore appears to restrict Suppliers wishing to offer a shorter SSD, especially where the
Customer requires it.
It should be noted that the timings detailed are those that apply to the current Agent Service Level
Agreements, applicable to the Distribution Business monopoly. However, a Supplier can
determine their required response times for any new agents in their appropriate commercial
agreements and therefore specifically shorten timescales where required. However, in the
meantime, the problems come where the Supplier is changing away from the Distribution
Business, as they have no control over the timescales the Old Agents are working under.
Therefore, it can be seen that registration within such shortened timescales presents a New
Supplier with a commercial risk as regards the meeting of the change of Supplier obligations. This
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 127 of 227
Working Practices Product Set (WPPS)
Guideline Working Practice has been drafted to indicate to New Suppliers the areas over the
change of Supplier process that they can control by determining appropriate service levels with
their Agents, and those that are dependent upon service levels defined between the Old Supplier
and their Agents. It also attempts to define the most appropriate way to meet obligations, where
the New Supplier chooses to take the commercial risk of a shortened registration.
Working Practice
Where the New Supplier needs to register for an SSD within a short period of the submission of
their registration to MPAS (D0055), the following ‘shortcuts’ can be used to ensure that the New
Supplier and Agents have the information required to generate the Change of Supplier reading on
SSD +8. However, it is recommended that these steps be used only where there is real potential
for the timescales not to be met, as they are resource intensive and therefore not be encouraged
for every change of Supplier.
(1). The dependency upon the sending of the D0148 to the New MOp and New NHH DC, from the
New Supplier (on the receipt of the D0260 from MPAS after registration) is fixed. The New
Supplier cannot obtain this information any quicker than MPAS sends it and therefore, to counter
this, the New Supplier should endeavour to ensure the D0148’s are with the New Agents as soon
as is possible.
(2). The New Supplier should ensure (for example, via commercial agreements) that the New
Agents send the request for metering point information to the Old Agents as soon as is practicably
possible.
(3). The New Agents should confirm with the Old Agents the intended timeframes for the passing
of the information. BSCP504 and PSL120 detail the obligation on the Old Agent for the passing of
metering point history.
The New Agent may request (either via the ‘Date Action required by’ in the D0170, or outwith the
DTC) that the historical information be passed to them as soon as possible, this is acceptable only
where the Old Agent agrees to this. If not, then agreed service level timeframes apply.
(4). Where the New NHH DC has not received Meter Technical details in time to obtain an actual
read (if the New Supplier has requested one), the NHH DC should be able to determine the meter
to be read from the Customer’s address (however, this may be of limited value) and should be
able to make a site visit in accordance with the New Suppliers instructions. The meter can be
read and the readings interpreted and processed when the MTD and meter reading history
arrives.
(5). Where the New Supplier obtains a Customer own Read from their Customer, the New
Supplier should ensure that this read is with the New DC by SSD+7 (as defined in WP 6 and
BSCP 504). However, the D0071 requires metering information obtained from the Meter Technical
Details (D0150/D0149). However, if these have not yet arrived from the New MOp, the New
Supplier can either:
 Confirm with the New MOp whether this information has arrived from the Old MOp and if so,
can request the pertinent information for inclusion in the D0071, with the MTD following from
the New MOp. The New Supplier should also confirm with the New MOp that the MTD be sent
to the New NHH DC to ensure they are able to process the CoR. Or,
 Where the MTD are not yet with the New Mop, the New Supplier can send the information they
have the New NHH DC (ensuring that the New NHH DC is aware that the D0071, or
equivalent, is not populated correctly). The New NHH DC is then able to manually amend the
CoR in accordance with BSC requirements when the MTD and meter reading history arrives
with them.
(6). Where the New NHH DC has not received the meter reading history or the MTD by SSD+7,
then they may be able to agree the sending of these details from the Old Agents (via the New
MOp where necessary) to ensure their receipt with the New NHH DC in time to process the
change of Supplier meter reading.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 128 of 227
Working Practices Product Set (WPPS)
Impact of not implementing the Working Practice:
A Supplier will not be able to comply with OFGEM and MRA requirements for changes to Supplier
where they are required to utilise a ‘shortened’ registration, nor will they meet BSC requirements
re: settlements. Therefore inter-operation will fail.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 129 of 227
Working Practices Product Set (WPPS)
Schematic for Dependency Timings
The working days referenced are:
 Either, the maximum allowed by BSC and MRA requirements (where the BSC and MRA specify timings),
 Or, represent the recommendations from Party Service Level agreements.
+ 2WD
D0148
New
MOp
+ 5WD
D0170
Old
MOp
+ 5WD
D0149/
D0150
MPAS
D0055
D0260
+ 2WD
D0149/
D0150
+ 2WD
D0149/D0150
+ 2WD
New
Supplier
New
MOp
New
Supplier
New
Supplier
D0071
By SSD + 7
+ 2WD
D0148
New
DC
+ 5WD
D0170
Old + 5WD
DC
D0010/
D0152
New
Supplier
Version :
5.4
Status :
Approved
By SSD + 8
New
DC
D0086
By SSD to SSD + 2
D0072
Date :
01 Nov 2007
Page 130 of 227
Working Practices Product Set (WPPS)
WP 122. NHH New Connection Obligations
WP no:
122
Title:
Version:
WP type:
Related WP(s)
Date raised:
Product Area
(s):
Baseline
Products
Impacted:
Last Amended:
Change History:
Status:
Implemented by
Industry
NHH New Connection Obligations
Originator:
3
W
Originator Ref:
Issue No:
26 May 99
Doc Ref:
New
Parties Affected:
Connections
Implementation
Date:
29/05/2003
OIF
OIF NC EG
OIF
NHH MOp, Distributor and
Supplier
24/2/05
Version 1 approved at CCG 30 on 09/07/99 - see Design Note
26
V2 with WPPS CP 66 approved at MDB_03_04 on 24/04/03
Version 3 amended with CP0073 approved at MDB_04_11 on
25/11/04
Background
Version 1 of this Working Practice related to non Half Hourly Metering Points only, and it was
proposed that a review should be undertaken to provide a wider synopsis of the New Connections
process. MDB consequently convened a Working Group, the Supply Distribution Inter-operational
Group (SDIG), whose Terms of Reference included the review and re-issue of this Working
Practice. In addition, a New Connections Workshop was held to identify which key areas/issues of
the New Connections process participants required to be clarified and these have also been
incorporated into this Working Practice.
Context
It has been recognised that any breakdown in inter-operability between Distribution Businesses
and Suppliers, due to lack of visibility or consistency in processes, impacts the New Connection
process. To provide clarity for market participants, WP122v2 outlines the operational
responsibilities and highlights key areas of communication throughout the sequence of events to
establish and, ultimately, register a New Connection. In addition, it incorporates areas where a
customer is involved so that the customer’s expectation can be better managed, although it is
recognised that this Working Practice is not intended for use by customers.
Introduction
In order to establish early communication channels, this Working Practice acknowledges that a
customer may appoint a Supplier, and that Supplier may register the Skeleton Record, as far in
advance as is reasonably practicable. However, a number of outstanding operational issues were
highlighted which impact this principle. These include;
Customer’s awareness of the need to appoint a Supplier;
the sequencing of events for a New Connection;
misaligned Supply Start Date (EFD{Regi}) and meter installation date;
differing Validation rules applied by MPAS Service Providers;
instructions to Distribution Businesses for Metering Point energisation;
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 131 of 227
Working Practices Product Set (WPPS)
customer appointed MOps.
Therefore this Working Practice seeks to provide clarity on these issues, whilst recognising there
are diverse factors to be considered in the New Connections process and one solution/process
cannot be applied for all scenarios.
Scope and Purpose
This Working Practice is not intended for use in Emergency situations and therefore factors to be
considered for emergency connections/re-connections are excluded.
This Working Practice does not cover New Connections that are to be registered in CMRS.
Connections arranged through independent connections contractors are out of the scope of this
Working Practice, since the extent of activities they may undertake is determined by the
contestable restrictions established by Ofgem.
The purpose of this Working Practice is to provide an overview of, and to highlight the key areas
involved in, the New Connections process - from the application to a Distributor for a connection to
the network through to the Registration and Trading of the MPAN for that connection.
For clarity and ease of use, this Working Practice has been split into 3 sections
Section 1
New Connections Overview
high level diagram highlighting different
stages of the New Connection Process (refer
to associated table, at the end of this Working
Practice, for supporting information)
Section 2a
Registration Timeline
highlighting key steps dates throughout the
Registration Process for Suppliers
Section 2b
MPAS Validation and Supplier Clarifies MPAS Validation rules regarding
Updates regarding the Registration Supplier
updates
to
the
MPAN
Timeline
Supplementary data for ‘partial’ Registrations
and aligning EFD {Regi}(SSD) and Effective
From Dates for MPAD
Section 3-
Energisation.
Associated New Connections Overview
Supporting Information
Table
Distinguishes between network connection
and meter energisation for a New Connection
– Section 1 – Supporting Information
In addition, a Contact Matrix was established to provide dedicated contact details for all MRA
parties in relation to enquiries regarding specific Supplier/Distributor operational areas. These
details can be viewed on the MRA website, www.mrasco.com.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 132 of 227
Working Practices Product Set (WPPS)
1. New Connections Overview - a diagrammatical guideline for a new connection to demonstrate ‘best practice’
Please refer to the associated table at the end of this Working Practice for supporting information regarding each step.
Applicant
Applicant
Apply for New
Connection
Supplier
Applicant
Approve or
reject Quote
Appoint
Supplier
Supplier
Process
Supply
Contract
signed
contract
Register
Skeleton
Record
MPAN
Known
Receive
confirmation.
Appoint Agents
Arrange
Installatio n
Send
Details
MPAN
Unknown /
Required
Quote
Accepted
Distribution
Supply
Number
Notify
Applic ant of
MPAN
MPAS Online
MPAS Enquiry Service
Business
Process Meter
Technical Details
& Energisation
Status
Energisatio n Status &
MTD
D0217
Supply Number
Details
Distribution
Request for Meter
Installatio n / Energisatio n
Process
Request &
Confirm
Change in
Energisation
Status & MTD
D0055
Business
Administer Request
and Send Service
Quote / Connection
Agreement. Highlight
need to appoint a
Supplier
Supplier
Distribution Business
Instruct
Installation of
Meter and
Energisation. N.B
MOp should only
act on instruction
from the Supplier
Further
Info
Liaise with
Distributio n
Business
MO
Supplier
Supplier
Notify
Supple mentary
Data for Regi
(D0205)
Receive
Connection
Agreement
Notify
Supple mentary
Data for
Regi (D0205)
Notify
Supple mentary
Data for
Regi (D0205)
MPAS
Process
Registration
MPAS
Update MPAS w ith missing Supplementary Data
.
Until energisatio n
status received
MPAS
Generate
MPAN and
Skeleton
Record
Notify
MPAS
Create
Skeleton
Record
MPAS
Update
Reg
System
Include
in CD
Rom
Distribution Business
Schedule
Works
Install Cabling /
Jointing, CT / Cut Out
Monitor
incomplete
Registartions
(Untraded
MPANs)
Distribution Business
Independent Connection Contractors
Schedule
W ork
MPAS
cabling
installe d
Liven Service - Notify
Supplier of proposed
livening date
**** Developments undertaken by Independent Connection Contractors would be reliant on:
The independent contractor providing the standard letter(s) published by the Distribution Businesses, or
The end user understanding the New Connection process.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 133 of 227
Working Practices Product Set (WPPS)
2a. Registration Timeline
In order to promote early communication within the New Connection process, the Supplier should
register as early as possible. It has been recognised that it is not always possible or necessary for
the Effective From Date {Regi}, Meter Installation and Meter Energisation dates to be the same
and Suppliers are reminded of the option of registering a ‘Skeleton Record’ at the outset of their
appointment by a Customer, and then updating information to MPAS via the D0205.
The following timeline highlights prominent milestones throughout the Registration processes for a
New Connection. This timeline should be read in conjunction with the MPAS Validation rules
outlined in Section 2b.
Suppliers Registration Process for New Connections
Submit D0055 no more than 28 days
in advance of SSD
D0055
Registration of MPAN
Must contain a minimum of Supplier
ID, EFD{REGI} and MPAN Core.
Where ‘Energisation Status’ is not
populated on the D0055 for a NC, this
is a partial Registration
***Maximum period of time between EFD {REGI} and Energisation date
date is
not defined, other then the 14 month Final Reconciliation Run
During this period, MPAS classifies the Metering Point as ‘Untraded’
‘Untraded’
until a value is provided for the Energisation Status
Effective From Date {REGI}
(Supply Start Date- SSD)
‘The first inclusive
settlement date of a
Suppliers
registration to a
metering point’
Metering
Installed
Metering
Energised
D0205
Where the Registration (D0055) is incomplete,
the Supplier must update MPAS to complete the
Registration details (in accordance with MRA
24.8) and set Energisation Status
This timeline does not preclude Meter installation
and energisation on the same day, which could also be the same date as the Effective From Date {Regi} (SSD)
The following points should be noted in conjunction with the indicative timeline shown above:
 A Skeleton Record (refer to MRA for definition) for a Metering Point can be Registered in
advance of completion of connection work undertaken by the Distribution Business or
Independent Connections Contractor. However, Suppliers should be mindful of the MPAS
Validation rules under clause 24.13.5 of the MRA such that no updates can be made to
Metering Points in MPAS after 14 months in accordance with the Final Reconciliation Run
for Settlements.
 Effective From Date {REGI} establishes the point at which a Supplier assumes responsibility
for the Metering Point.
 The status of a Skeleton Record will remain ‘Untraded’ in MPAS until the Supplier updates
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 134 of 227
Working Practices Product Set (WPPS)
the Energisation status with a value (see section 2b for more details regarding this aspect),
which will consequently require all MPAD (as noted in Schedule 2 of the MRA) to be
present, failing which the notification of the Energisation Status to MPAS will be rejected.
 A Supplier is responsible for updating Trading data on a Metering Point as soon as possible,
but in any event within 5 Working Days of either a change becoming effective or being
notified of a change (MRA Clause 24.8) and he should meet this obligation as a priority. In
addition, Distribution Businesses monitor ‘Untraded’ Metering Points as recorded on their
MPAS Registration System and, where a Supplier receives such a report, they should
ensure that they review this report and undertake the appropriate action in a timely
manner.
 Differing MPAS procedures may result in a Supplier being required to align the Effective
From Dates (EFDs) for all Metering Points supplementary data under the Supplier’s
responsibility (see Schedule 2 of the MRA), with the EFD {Regi} (SSD). Further detail
regarding this issue is noted in Section 2(b).
2b.***MPAS Validation and Supplier Updates Regarding the Timeline in 2(a)
Where an incomplete D0055 (i.e where all the Metering Point Administration Data (MPAD) for
which a Supplier is responsible has not been included in the Registration flow) has been submitted
and accepted by MPAS, Suppliers can ‘drip-feed’ the missing Supplier data via the D0205 to
complete the ‘partial’ Registration1. Suppliers should be aware of the processing applied to ‘partial’
Registrations by the MPAS Registration Systems, as noted below.
St Clements Consortium
The MPAS Registration System developed and maintained by the St Clements Consortium
(provided to the following Service Providers, [referenced by their MPID] LOND, SOUT, NEEB,
YELG, NORW, EMEB, MIDE, HYDE, SEEB, EELC, IPNL, SWEB and SWAE) does not impose
any validation (other than ‘valid combinations’2 validations) on ‘partial’ Registrations. Thus, the
initial Registration for the Skeleton Record may provide values for only the Supplier Id and EFD
{Regi} (SSD). The MPAD can then be subsequently updated to MPAS (subject to valid
combination rules) until the Energisation status is updated from null to Energised or De-energised,
(which establishes the MPAN as ‘Traded’). At this time all the Trading data required from the
Supplier or Distribution Business (MPAD as defined in Schedule 2 of the MRA but excluding the
Change of Tenancy Indicator and Disconnection Date data items) must be present3. However,
there is no requirement in these MPAS systems for the supplementary Trading data to align with
Regi EFD. Thus the ‘Trading’ Status is separate from the EFD {Regi}, allowing differing Effective
From Dates (EFDs) for the EFD {Regi} (SSD) and supplementary data.
A Change of Supplier (CoS) will not be rejected by these MPAS systems even though all the
supplementary data related to the Registration has not yet been updated to MPAS. Where a CoS
has taken place in this circumstance, the old Supplier may still update MPAS with change/s with
EFDs for a period between a date equal to the Effective From Date {Regi} up to their Effective To
Date {Regi}. NOTE, this is the maximum period available for updates, and at no time can a
Supplier update/amend a data item for an earlier EFD than that already held on the MPAS
Registration System. Where a Supplier wishes to change the EFD {Regi} (other than through a
1
This is covered in Notes 6 and 7 of Schedule 3 of the MRA
2
Refer to the Validation procedures published (as required under MRA Clause 20.10) by the MPAS Service
Providers
3
It should be noted that, where the Energisation Status has a null value, it will not be possible to update MPAS with DA
details.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 135 of 227
Working Practices Product Set (WPPS)
CoS) or to insert a change to a data item for an EFD before that held on MPAS, such changes
shall be undertaken in accordance with MRA Clause 19 and the Retrospective Amendment
procedures (MAP04).
Independent MPAS Service Providers - MANW & SPOW
The validation requirements for the non-consortium MPAS Registration systems (as noted above
by their MPID) also allow Suppliers to initially Register a Skeleton Record. However, Suppliers
would then be required to align the EFDs for all supplementary data items with the EFD {Regi}
(SSD), regardless of actual installation / energisation dates.
In addition, where a ‘partial’ Registration is held for a New Connection by these MPAS systems;
o
SPOW and MANW will allow a CoS provided that the CoS (D0055) is fully populated. When
the old Supplier subsequently updates MPAS to complete the Registration details, the EFDs
will have to be aligned with their EFD {Regi}.
With the above in mind, Suppliers are reminded that this does not preclude the Energisation
status for the MPAN being notified to MPAS as De-energised with an EFD equal to EFD {Regi}
and a D0205 update can then be sent to MPAS when the meter is energised, with an Energisation
Status EFD equal to the actual energisation date eg:
Illustration :
(this is not intended as a timeline, and is indicative of effective dates for Registration only)
01/04/01
EFD {Regi}, either for a D0055 initial Registration for a Skeleton Record and the
Energisation Status can be updated later via a D0205 with the Energisation Status
populated as De-energised for the same EFD as EFD {Regi}; OR a complete D0055
may be sent, including the Energisation Status, with a value of De-energised’
The Registration now reflects a De-energised status with the same EFD as
EFD{Regi}
30/04/01
MOp (installs and) energises a meter on instruction from Supplier and confirms this
to the Supplier (D0139). The Supplier then notifies MPAS with a D0205 updating the
Energisation Status as Energised with an EFD of 30/04/01 MPAS accepts the
update.
The Registration record for that Metering Point will reflect De-energised for a period
from 01/04/01 (EFD {Regi}) up to 29/04/01, then Energised with effect from 30/04/01.
This will ensure that MPAS holds a contiguous and accurate record for the Metering Point and
satisfies the MPAS Validation requirements.
Populating the Energisation Status will require all Trading Data for the MPAN to be present in
MPAS. Therefore Suppliers may wish to consider what data they would utilise at the outset when
the technical details for the Metering Point may not yet be known. A specific combination of data
could be employed, which would provide a means of monitoring that the installation is not yet
complete, for instance, MTC 800 (no meter present)4 could be utilised, which would provide a
discrete identifier. This Working Practice does not attempt to prescribe what data should be used,
and Suppliers remain responsible for the accuracy and timely update of data items for which they
are responsible.
Additional Processing
4
MTC800 is not valid for all Distribution Businesses, refer to WP125 for further details regarding the use of MTC 800
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 136 of 227
Working Practices Product Set (WPPS)
The implementation of the ‘day+0’ change functionality in all MPAS Registration Systems enables
Suppliers to correct Metering Point Administration Data held in MPAS (for which they are
responsible, and subject to MAP04) for the same effective date as that already held in MPAS. This
will of course be subject to any update being a valid combination (where applicable) and meeting
any Validation Rules noted in the Service Provider’s published validation rules and BSC validation
rules as noted in Schedule 10 of the MRA. Whilst this will alleviate data errors in MPAS, when
undertaking such a change, Suppliers should have in mind their Supplier Hub performance
responsibilities for Settlements and the 14 month Settlements timetable.
3. Energisation Site and/or Meter
There is a distinction in operational responsibilities between energising a network connection and
energising a meter. Contractually, a Distribution Business will have the responsibility for ensuring
its network will be enabled to support the New Connection, and a Supplier will have the
responsibility for enabling the customer to receive energy.
New Connections presents a challenge for Market participants in meeting their specific obligations
and responsibilities, whilst attempting to manage the customer’s expectation. Hence, interoperability between Distribution Businesses and Suppliers is central to the success of this process
and therefore the following principles should be applied.
Site Connection to network
In meeting its obligations under a Connection Agreement, a Distribution Business should ensure
that, when completing the network connection, delivery of energy to any metering point/s is
disabled via an isolator/cut out. Where the identity of the customer’s Supplier is known,
acquainting that Supplier with proposed site connection schedules/dates will improve the New
Connections process for all participants. Where a Supplier has already registered the MPAN, the
Distribution Business may have received authorisation for the meter to be energised at the time
that the site connection is completed, in which case the process noted below under meter
energisation should be followed.
Where an Independent Connections Contractor has been engaged, there shall be adequate
assurance that the delivery of energy to a metering point shall not be enabled unless a Supplier
has registered responsibility for that metering point.
Meter energisation
A Supplier must authorise the energisation of a meter and it is assumed that, in order for a
Supplier to instruct energisation, all registration and settlement obligations have been met. This
includes situations where a customer has appointed the MOp, since the Supplier is deemed to be
responsible for that agent and the Supplier undertakes the Settlement liability for that Metering
Point.
The Supplier’s MOp would undertake energisation on instruction from the Supplier, however, in
certain circumstances, particularly in the HH market, a Distribution Business may receive a D0134
‘Request to Change Energisation Status’ from a Supplier to energise the ‘meter’ that is to say that
the receipt of a D0134 instructs the Distribution Business to energise a ‘site’ such that energy can
be delivered to the site/metering points and the meter/s can record consumption for Settlement
purposes. Where a D0134 instruction is received, a Distribution Business shall notify the Supplier
(and MOp) via a D0139 of the date of energisation, or of a failure to energise the meter.
Suppliers may choose to instruct a DB direct, or they may have a contractual arrangement such
that their MOp undertakes liaison with the DB to achieve energisation of a meter; this is likely to
be dependent on whether the Supplier’s MOp, or the MOp appointed by the Supplier on behalf of
the customer, is authorised to work on the DB’s network.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 137 of 227
Working Practices Product Set (WPPS)
Upon receiving confirmation of energisation, Suppliers shall ensure that their Registration details
are updated accordingly on the MPAS Registration System. If the Energisation Status has already
been Registered for the Metering Point these details – and any associated MPAD - shall be
updated to the correct values. This may include the use of the Day+0 facility in MPAS Registration
Systems to ensure that correct Settlement data is recorded for a Settlement Day.
Impact of not implementing the Working Practice:
It is a key principle of the competitive Electricity market that a Supplier should be responsible for
consumption of energy on a Metering Point at any given time, and that measurement of that
consumption should be accurate for Settlement purposes. Errors in the processes of updating
registration data and inaccurate consumption data impact on all Suppliers in their B&SC
participation and the consequences of these errors are borne by all Suppliers through the GSPG
Correction Factor. Therefore it is an essential objective that accurate information is reflected in
Registration and Settlement data.
If the requirements detailed in this Working Practice are not followed, key communication points
will be missed with operational consequences upon Distribution Businesses, Independent
Connections Contractors, Suppliers, MOps and Customers.
Metering points may be energised without a Supplier being appointed or Registered.
Where a Supplier has Registered the Metering Point, a failure to notify the change to the
Energisation Status will prevent a timely and accurate update to MPAS by the responsible
Supplier.
Inaccurate energisation records will have safety implications for operatives who attend the
premise, which is particularly relevant where the site is expected to be in a de-energised condition
and is actually live.
Unregistered Sites or an inaccurate Trading/Energisation status in MPAS impact on all Suppliers
within each GSP Group, as the demand will be attributed within GSP Group Correction Factors.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 138 of 227
Working Practices Product Set (WPPS)
Associated Table - New Connections Overview
The table below is intended to provide a guideline to those involved in a New Connection. It is intended as a high-level representation of the discrete steps
that need to be achieved, with indications of the consequences of a failure to complete these steps. It is not intended to be indicative of an order of events.
Following the principles included in the notes should assist in resolving or avoiding the majority of difficulties that may arise. For additional clarity, this table
should be read in conjunction with the New Connection Overview in Section 1 of this Working Practice.
It should be noted that this representation takes no account of the relationship between MOp and MAP.
Area of Work
Responsibility
Apply for New Connection
applicant
Associated Notes
The applicant who applies to the Distribution Business for the connection to their network may,
at this stage be a Developer/Builder or independent connections contractor, and is therefore
unlikely to be the end-user ‘Consumer’ at the Metering Point.
It should be noted that this application may also arise from a request for additional capacity for
an existing Metering Point where that capacity increase results in an additional (new) connection
to the Distribution network.
Administer Request and send Distribution Business
Service Quote / Connection
Agreement
Approve or Reject Quote
applicant
A Distribution Business will review the connection application in light of their network capacity
and security.
Distribution Businesses are required to provide an indication to the customer that they must
choose and contact a Supplier (Letter to include list of qualified Suppliers and/or the Ofgem /
energywatch website details where this information can be viewed.)
As stated previously, the applicant at this stage may not be the end-user.
It should be noted that the connection agreement relates to the connection point(s) to the
Distributor’s network as defined in the plans. Distributor’s have different terms and conditions for
these agreements, especially where specified availability is required for the connection.
Connection Agreement
Version :
5.4
Status :
Approved
Distribution
Business/applicant
Highlighting the New Connection requirements to the applicant at this time will improve the
process, especially the requirement to appoint a Supplier prior to energisation of the meter, and
that failure to have an appointed Supplier who has registered the Metering Point may adversely
affect the timely supply of electricity to the premise.
This reminder is also relevant to a connection provided for additional capacity at a site –
especially as it would be expected that a customer in this situation would already have a
preferred Supplier appointed for the existing connection/s.
Date :
01 Nov 2007
Page 139 of 227
Working Practices Product Set (WPPS)
Area of Work
Responsibility
Generate MPAN and Skeleton Distribution Business
Record
Notification of MPAN
Distribution Business
Associated Notes
Some Distribution Businesses create the MPAN for the new Metering Point and include this in
the Connection Agreement. However, some Distribution Businesses do not create an MPAN for
the new Metering Point until the network connection of that exit point has a final completion
date. This may be especially relevant where an Independent Connections Contractor is
undertaking the connection, since the Distributor may not have complete visibility of the
progress of the connection work.
As noted above, the MPAN may be included in the Connection Agreement, however, this
document may not be made available to the end-user. It would speed the Registration process if
the applicant was notified of the relevant MPAN as early as possible, and it would be advisable
for the MPAN to be included in all correspondence with the applicant. At this stage, the
requirement to appoint a Supplier to ensure that all Connection and Registration processes can
be completed satisfactorily should also be highlighted.
The Supply Number Enquiry Service for the relevant MPAS can be contacted for assistance in
locating the MPAN, or a Supplier may request a new MPAN (e.g. using a D0168), or locate a
contact from the Supplier/Distribution Matrix (www.mrasco.com) in order to obtain information
regarding the Metering Point.
Where the New Connection is to provide additional capacity for an existing premise, it would be
expected that the Customer already has a Supplier registered for the existing Metering Point(s).
In this case, a courtesy notification to the Supplier of the additional MPAN would be beneficial to
the process.
Notify Skeleton Record to MPAS Distribution
and create on MPAS system.
and MPAS
Version :
5.4
Status :
Approved
Business It is the responsibility of the Distribution Business to ensure that a Skeleton Record is created
on the MPAS Registration System within the timescales noted in MRA Clause 20. A definition of
a Skeleton Record is incorporated in the MRA (Part 1, Definitions).
Date :
01 Nov2007
Page 140 of 227
Working Practices Product Set (WPPS)
Area of Work
Responsibility
Associated Notes
Install Cabling / Cutout / CT / VT Distribution Business / A follow up letter to the Connection Agreement party regarding the requirement for a Supplier to
(as appropriate to the Connection Independent
be appointed should be initiated so that the Registration requirements can be commenced and
Agreement)
Connections Contractor the appropriate Supplier Agents can be appointed. The implications of insufficient timescales
for Suppliers to complete Registration, and the subsequent Energisation processes, should be
highlighted so that the customer has visibility of this dependency.
Independent Connections Contractors should be made aware that Energisation of the Metering
Point should not be permitted until a Supplier has registered responsibility for that Metering
Point and that their customer should be suitably informed of this to prevent undue delays. It is
strongly advised that Distribution Businesses obtain an undertaking to that effect from any
Independent Connections Contractor working on their Distribution System.
A Meter Operator might perform CT installation where they are authorised to work on the
Distribution Business’ assets. In any event, communicating the intended CT/VT installation date
to the Supplier, if appointed, will speed up the synchronisation of Energisation processes.
Please refer to Section 3 ‘Energisation’ for more detail.
Liven Service –
Distribution Business / Check Supplier appointed and notify Supplier of proposed ‘service-live’ date, if a Supplier has
yet to be appointed the Distribution Business should send a follow up letter to the Customer (or
If no Supplier has been appointed, Independent
isolate connection to site to ensure Connections Contractor applicant for connection) highlighting the requirement to appoint a Supplier so that energy can
be supplied to the premise..
no consumption can be delivered
until a Supplier has been appointed
and Registered to the Metering Point.
Connect to Network
A Distribution Business may have also received a D0134 instruction to energise the meter.
Where this is so, and the Distribution Business undertakes the meter energisation, this shall be
conveyed to the relevant participants via a D0139. Note, a failure to energise the meter should
also be conveyed via a D0139 (Refer to Section 3 ‘Energisation’ for more details).
Distribution Business
This is presently the sole responsibility of Distribution Businesses.
Ofgem are undertaking a full review of Competition in Connections and will be identifying a full
list of ‘contestable’ areas of work. This may impact Network connection activity as stated herein.
Register MPAN
Version :
5.4
Status :
Approved
Supplier
The Supplier can register the Skeleton Record at any time after the customer has appointed
that Supplier, providing the Skeleton Record has been notified to MPAS. (refer to sections 2a
[Registration Timeline] and 2b [MPAS Validation and Supplier Updates] in managing the
considerations noted therein) Suppliers should refrain from requesting agents to carry out work
until the metering point is in a Traded state. eg de-energised.
Date :
01 Nov2007
Page 141 of 227
Working Practices Product Set (WPPS)
Area of Work
Responsibility
Request Meter Installation
Supplier / Customer
Associated Notes
A MOp should only install a meter where appropriate instructions have been received from a
Supplier who has duly contracted with that MOp for that Metering Point.
The Customer may request the meter installation where they also have a contractual
relationship with the MOp. In this circumstance, a MOp shall ensure that they have the
appropriate contract with a Supplier for the Metering Point so that the Supplier can confirm the
instruction to install the meter. The Customer’s MOp should ensure that the Customer is aware
that a Supplier must be appointed and that the Supplier and MOp are required to comply with
Industry agreed procedures to issue and act upon the appropriate instructions for the installation
of a meter.
Install Metering Equipment
MOp
Distribution Businesses and Suppliers should be aware that this step can be completed by a
Customer appointed MOp. In all instances, a MOp must not install a meter without the authority
of the Supplier.
The installation of a meter should not, of itself, enable consumption of energy at a premise. The
appropriate Registration and Settlement conditions should be satisfied before a premise is
capable of receiving a supply of electricity, notwithstanding emergency situations.
This step does not preclude the energisation of the meter at the time of installation, providing
the MOp has received the appropriate instruction from the Supplier to energise the meter (see
below).
Request Energisation of meter5
Supplier
Only a Supplier shall instruct that a meter may be energised, notwithstanding emergency
situations.
If energisation is requested by the Customer, operatives must be aware that a Metering Point
may only be energised (i.e. enable the flow of energy to the premise/part of the premise) if a
Supplier has been appointed and requested energisation of that Metering Point, please see
notes under ‘Energise Meter’.
5
See section 3
Version :
5.4
Status :
Approved
Date :
01 Nov2007
Page 142 of 227
Working Practices Product Set (WPPS)
Area of Work
Responsibility
Energise Meter
MOp (and Distributor)
Associated Notes
Upon receipt of a Supplier’s instruction to so do, the meter can be energised and the duly
measured consumption of energy can commence to the premise.
Attention is drawn to the following extract from the Party Service Line for Meter Operators
PSL110 Ref ‘ The Meter Operator shall only energise a SVA Metering System if requested to do
so by its Associated Supplier.’
Confirmation of the Energisation status, including a failure to complete the energisation or a
rejection of the instruction to energise, shall be notified by a D0139 unless otherwise agreed
between the Supplier and MOp/Distributor.
In a New Connection scenario, the actual energisation date of a meter does not have to align
with the EFD {Regi} (SSD) of the Supplier. However, Section 2b of this Working Practice
documents the impact of this aspect in certain MPAS Registration systems.
Enable fuse in cutout /CT/VT- Distribution Business / The installation of a cutout/CT/VT should not of itself enable consumption of energy at a
thus energising the Metering MOp
premise (notwithstanding emergency situations). Under the New Connections process, the
Point.
appropriate Registration and Settlement conditions should be satisfied before a premise is
capable of receiving a supply of electricity.
This does not preclude the energisation of the meter at the time of installation of the
cutout/CT/VT, providing the appropriate instruction has been received from the Supplier.
Where energisation of the meter is carried out separately to meter installation, participants are
reminded of the requirement to update appropriate parties (e.g. with a D0139 unless otherwise
agreed between the participants, and the MPAS Registration details).
Some MOps may have authority to work on the Distribution Business’ assets, in which case they
may be able to undertake the cutout/CT work. VT energisation requires the attendance of the
Distribution Business.
Where MOps are not authorised to work on the Distributors assets, arrangements will need to
be in place to synchronise energisation events.
The Supplier must be informed when energisation has been completed.
Version :
5.4
Status :
Approved
Date :
01 Nov2007
Page 143 of 227
Working Practices Product Set (WPPS)
Area of Work
Notify MPAS
Status
Responsibility
of
Energisation Supplier
Associated Notes
Notifying the energisation status for a Skeleton Record or partial registration will require
completion of all other Trading data for that MPAN in MPAS (refer to Section 2a Registration
Timeline).
This may be a change of Energisation status where the MPAN has been registered as deenergised (refer to Section 2b MPAS Validation and Supplier Updates).
Version :
5.4
Status :
Approved
Date :
01 Nov2007
Page 144 of 227
Working Practices Product Set (WPPS)
WP 123. Transference of Non Settlement Historical Information
WP no:
123
Status:
Implemented by
Industry
Implementation
Date:
27/03/2001
Title:
Transference of Non Settlement Historical Information
Version:
3
Originator:
ACEG
WP type:
W
Originator Ref:
AC 07
Related WP(s)
WP 6, WP 104
OIF Issue No:
Date raised:
08/06/1999
Doc Ref:
4/019
Product Area (s):
NHH
Parties Affected:
NHH
Baseline Products
Impacted:
BSCP 504, PSL 110,120 and 140
DTC D0010, D0149, D0150 and D0152
E2E’s diagrams – NHH ONLY Appoint agents to the metering point (new
supplier CoS), Appoint/De-appoint NHH MO, and Appoint/De-appoint
NHH DC
Last amended:
30/06/00
Change History:
Version 1 approved at CCG 30 on 09/07/99 - see Design Note 26
V2 with WPPS CP 12 accepted at MDB_00_02
V3 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
In the NHH market, BSC Procedures and Party Service Lines detail the requirements and
obligations for the transference of metering point historical data on Change of Supplier and
Change of Agent. However, these obligations apply only to settlement information and therefore
there is no obligation on Agents to pass Non Settlement information. The E2Es specify only those
flows required to pass such information, not the content.
Therefore a requirement has been identified to define the obligations upon Agents with regards to
the passing of non settlement information. It is recognised that wherever possible, such
obligations should mirror those for settlement information, thus ensuring the lowest impact
solution.
Working Practice:
NHH Data Collector:
The responsibilities and obligations for the transfer of settlement information by an outgoing
NHHDC are stated in BSCP 504 and PSL 120. These responsibilities and obligations should also
be applied to non-settlement information. This therefore effectively means that all information for
the metering point should be transferred to the incoming (New) NHH DC to allow them to meet
their obligations to both the Supplier and to Settlements.
Specifically, the rules for determining the minimum content of historical information that the
outgoing NHHDC should pass to the new NHHDC for non-settlement registers, should be those
rules applicable to settlement registers as stated in BSCP504.
The transfer of information should be undertaken as described in the E2E’s Diagram NHH ONLY
Appoint agents to the metering point (new supplier CoS), Appoint/de-appoint NHH MO, and
Appoint/De-appoint NHH DC. The Data Collector should use D0152 and D0010, as described in
Version :
5.3
Status :
Approved
Date :
28 June 2007
Page 145 of 227
Working Practices Product Set (WPPS)
BSCP504 and the E2E’s. These should support both the settlement and non- settlement aspects
of the information being passed. Any information deemed to be required by the incoming (New)
NHH DC which is not supported by these flows should be passed to the new NHH DC either by
another applicable DTC flow, or outwith the DTC as appropriate.
NHH Meter Operator:
The responsibilities and obligations for the transfer of metering equipment technical details by an
outgoing NHHMOp are stated in BSCP504 and PSL110. These responsibilities and obligations
should also be applied to non-settlement information. This therefore effectively means that all
information for the metering point should be transferred to the incoming (New) NHH MOp to allow
them to meet their obligations to both the Supplier and to Settlements.
The transfer of information should be undertaken as described on page 46, page 53 and page 55
of the E2E’s (Change of Supplier, Change of NHH Data Collector and Change of NHH Meter
Operator respectively). The Meter Operator should use D0149 and D0150, as described in BSCP
504, PSL110 and the E2E’s. These should support both the settlement and non settlement
aspects of the information being passed. Any information deemed to be required by the incoming
(New) NHH MOp and/or incoming (New) Data Collector which is not supported by these flows
should be passed to the new NHH MOp/NHH DC either by another applicable DTC flow, or
outwith the DTC, as appropriate.
Impact of not implementing WP:
New Agents will not receive the information necessary to meet their obligations to their
Suppliers and this may have detrimental impact on service levels, such as billing, offered by the
Supplier to the Customer.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 146 of 227
Working Practices Product Set (WPPS)
WP 124. Allocation of PrePayment Meter Payments following CoS
WP no:
124
Status:
Implemented by
Industry
Implementation
Date:
Title:
Allocation of PrePayment Meter Payments following CoS
Version:
3
Originator:
Steve Watson
WP type:
G
Originator Ref:
Operational Issue
Related WP(s)
01/10/2002 to
28/02/2003*
OIF Issue No:
Date raised:
12/06/99
Doc Ref:
IDEG 4/015
Product Area (s):
All
Parties Affected:
All
Baseline Products
Impacted:
Last Amended:
05/09/02
Change History:
Version 1 approved with WPPS CP 1 at MDB_99_02 on 16/12/99
Version 2 approved with WPPS CP39 at MDB_01_08 on 30/08/01
Version 3 approved with WPPS CP56 at MDB_02_08 on 29/08/01
* The implementation date for Version 3 of WP 124 is 1st October 2002, with a phased
implementation approach, as it is recognised that a number of parties may not be able to
populate one or two of the fields on the schedule until system changes have taken place.
Therefore by 28th February 2003 all parties will have fully implemented the revised WP124.
Context:
Since the opening of Supply competition in the domestic market, considerable sums of
prepayment funds have been misdirected and sent to the wrong Supplier. The purpose of this
Working Practice is to offer a process that can be used to resolve any existing cases of
misdirected payments.
Whilst this Working Practice is intended to cover all such circumstances, it is acknowledged that
there may be exceptional situations not covered within this document and in such instances it is
expected that these would be resolved by appropriate bilateral agreements. However, since
bilateral agreements between Suppliers can be cumbersome and costly to maintain, Suppliers are
encouraged to adopt the process described in this Working Practice wherever possible.
Following a Change of Supplier, it is the Gaining Supplier’s responsibility to ensure that a new
prepayment device is issued to a Customer. However, the potential exists within the current
market arrangements for prepayment Customers to continue to use the prepayment device
(Card/Key/Smartcard) issued by the Old Supplier. Other than for devices that can be
reprogrammed off-site (for example, Smartcards) the only potential mechanism available to the
Gaining Supplier to ensure the Customer uses the new device issued with the Gaining Supplier
details rather than their old device issued by the Old Supplier, is to request a site visit. During the
site visit, readings can be taken and the prepayment meter reset and at the same time the Agent
can be instructed to recover or prevent the further use of the old device(s). However, it must be
recognised that a site visit often results in no access adding cost to the maintenance of the
prepayment Customer and alternative measures should be considered prior to requesting a site
visit.
The Gaining Supplier should take every opportunity to encourage the Customer to use the new
device. However, it is recognised that there will be occasions where the Customer will continue to
use the old device, despite all efforts being made by the Gaining Supplier. This continued nonuse of the correct device could result in misdirected payments being made for a considerable
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 147 of 227
Working Practices Product Set (WPPS)
period. Although this Working Practice was originally devised to handle the reallocation of
misdirected payments once the Customer has started to use the new device, the process also
needs to allow for those exceptional cases where the Customer has yet to use the new device
many months after it has been issued. However, claims should only be made in these
circumstances when the Gaining Supplier can demonstrate that reasonable endeavours have
been used to persuade the Customer to use the correct device. This situation is also addressed
in this Working Practice.
Working Practice:
The following principles should be considered when following the process described in this
Working Practice:
Principles:
1.
It is the Gaining Supplier’s responsibility to determine whether the Customer they are
gaining is a prepayment Customer or not. The Gaining Supplier’s Customer acquisition
and registration processes and procedures should support this principle.
2.
Payments for the purchase of meter Tokens or the charging of Keys or Smartcards belong
to the Supplier registered to the metering point at the time of the credit purchase. The
PPMIP should always allocate payments as per the vending details; they must not hold on
to any payment received.
3.
Payments received for meter Tokens or the charging of Keys or Smartcards on or after the
Supplier Start Date (SSD) of the Gaining Supplier shall not be used by the Old Supplier to
reduce outstanding debts.
4.
Suppliers should make any claims for misdirected payments on a regular basis and, where
possible, should notify the Suppliers receiving such claims, in advance, if they anticipate a
substantial increase in the volume of claims that will be made. A substantial increase is
one where the number of claims in a period is expected to increase by more than 50%
compared to the last period or if the total number of claims is to increase by more than
1000 in any given month (or 250 in any given week if claims are made on a weekly basis).
Where there is a substantial increase, the two Suppliers shall enter a bilateral agreement
for the handling of the excess.
5.
It is recommended that a Supplier endeavours to make a claim for any period of
misdirected payments within two months of:

The Customer commencing to use the correct device;

There being a change of meter technology following which, the old device is no
longer used;

The Gaining Supplier losing the Customer via a subsequent Change of Supplier
event:

There being a Change of Tenancy.
6.
Under normal circumstances the Supplier receiving a claim should not charge for passing
misallocated payments to the Supplier making the claim (the ‘initiating Supplier’).
However, where a subsequent claim is made for a site where there has already been a
successful claim covering part of the same registration period, it is acceptable for the
Supplier receiving the subsequent claim to charge for passing-on any further misallocated
payments.
7.
Suppliers should issue claims for misdirected payments on either a weekly or monthly
basis; the exact frequency should be as agreed between the initiator and recipient of such
claims. If the initiator of a claim determines that any particular claim is going to be issued
later than the agreed date for such claims, it is recommended that the initiating Supplier
notifies the Supplier receiving the claims of this fact.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 148 of 227
Working Practices Product Set (WPPS)
8.
If the initiating Supplier forecasts there to be a change in the frequency of issuing claims,
the initiating Supplier should provide the receiving Supplier with 20 Working Days’ notice of
the change.
9.
Claims for the reallocation of misdirected payments should be submitted using the
Schedules described in this Working Practice. However, it is recommended that claims
should not be made for misdirected payments covering less then 14 calendar days’ supply.
10.
Where the Gaining Supplier is able to demonstrate that reasonable endeavours have been
applied to encourage the Customer to use the new device but after a period of 12 months
(or some other period of time as mutually agreed between the Suppliers), the Customer
continues to use the old device then a claim may be submitted to the Old Supplier.
Schedules consisting of such claims should be separate from Schedules consisting of
claims where the Customer has started to use the new device and should also indicate the
types of actions that have been taken by the Gaining Supplier to encourage the use of the
new device. A minimum of 3 different approaches must have been taken during the last
12 months (or whatever period is agreed between the Suppliers) and at least one of those
should have been a site visit, in order for it to be deemed that reasonable endeavours have
taken place.
Possible methods that could be used by a Supplier are:

Phone call to the Customer to explain the need to use correct device.

Letter sent to the Customer to explain the need to use correct device.

Replacement device sent to the Customer

Visit to premises
11.
If a Supplier has no claims for a particular month (or week) then a zero claim should be
submitted for that period.
12.
Note: Claims for payments prior to 01 January 2001 should not be issued on a
separate schedule to those post 01 January 2001. (In version 2.0 of this Working
Practice claims prior to 01 January 2001 were treated differently.)
Procedures:
Detailed below are the procedures that are considered to be best practice when dealing with
prepayment meter customers.
1.
During a Change of Supplier, the Gaining Supplier’s customer acquisition and registration
processes and procedures should determine if the Customer is a prepayment Customer.
(At present, the meter timeswitch code or meter technical details, should indicate the type
of metering - prepayment or credit - installed at a premise, but meter timeswitch code
cannot be relied upon since it is recognised that in some cases the details held on MPAS
may be incorrect).
2.
When a prepayment meter Customer has been gained, the Gaining Supplier should
always clearly explain to the Customer the implications of using an old device. Sufficient
time in the registration process should be allowed by the Gaining Supplier to permit the
issue of a new prepayment device for use from SSD.
3.
The Old Supplier should record and retain all payments received from a Customer on or
after the SSD of the Gaining Supplier. The Old Supplier should not automatically refund
any payments received after SSD to the Customer but should instead allocate all related
payments to the Gaining Supplier once requested to do so and refer all enquiries to the
Gaining Supplier.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 149 of 227
Working Practices Product Set (WPPS)
4.
It is the Gaining Supplier’s responsibility to manage the income received from their
Customers and as such should be able to identify when no or insufficient payments have
been received from a prepayment meter Customer. When the Gaining Supplier believes
that payments are missing, that Supplier should contact the Customer and/or the Old
Supplier who may have a record of payments received. When contacted, the Old Supplier
should respond in a timely fashion (preferably by e-mail) to enable the Gaining Supplier to
validate monies held. If following a request from the Gaining Supplier the Old Supplier
confirms that no payments have been received since the Gaining Supplier’s SSD, the
Gaining Supplier should pursue the claim with the previous, previous Supplier. This is
discussed at step 18 below.
5.
Where payments have been received by the Old Supplier due to the Customer’s use of the
old device, the Gaining Supplier should remind the Customer of the need to use the correct
Key/Card/Smartcard, to ensure that payments are allocated correctly. Attempts should be
made by the Gaining Supplier to encourage the Customer to use the correct device and to
obtain the old device from the Customer. See Principle 11 for a list of methods the
Supplier could adopt to achieve this.
6.
When a Supplier issues a claim for the reallocation of misdirected payment(s), the Supplier
(the ‘initiating Supplier’) should issue such claims in the form of the Schedule attached to
Annex 1 of this Working Practice preferably in Excel compatible format. The initiating
Supplier should issue Schedules as soon as reasonably possible.
7.
The Supplier receiving a claim for the reallocation of misdirected payments (the ‘receiving
Supplier’) may reject any claims where the ‘Claim Request From Date’ or the ‘Claim
Request To Date’ is not included.
8.
The receiving Supplier must return the Schedule in the same format in which it was sent.
9.
Provided that the ‘Claim Request From Date’ of the claim period contained in the Schedule
is after the Supply End Date of the receiving Supplier’s registration, then the receiving
Supplier should process the Schedule. The initiating Supplier should ensure that the
Schedule only includes claims for periods for which that Supplier was registered for the
MPANs concerned.
10.
Once the Schedule has been processed and the receiving Supplier determines that
misdirected payments should be forwarded to the initiating Supplier, this transfer should be
completed in a “one-off” transaction that includes the completed Schedule. The Schedule
should be returned with the following additional information

Amount to be returned;

Any suitable comments.
If there is no payment to be returned or only part payment, the Previous Supplier ID field
should be completed where possible. (This information will enable the Gaining Supplier to
contact the previous, previous Supplier, as the Customer may be still using the device of
that Supplier.)
The Supplier receiving the money can then correctly allocate it to the appropriate
Customer accounts.
11.
The “one-off” claim of the misdirected payments should be initiated when there is
confidence that the Customer is correctly using the new device
12.
Where the Customer continues not to use the correct device for a period of 12 months
after the SSD of the Gaining Supplier or continues to use the old device beyond a date
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 150 of 227
Working Practices Product Set (WPPS)
agreed between the Suppliers, then the Gaining Supplier may make a claim for
misdirected payments. These claims for “non-users” should be submitted on a separate
Schedule to those claims being made for Customers where the correct device is now being
used. A claim for “non-users” should only be made if the initiating Supplier has made at
least 3 different attempts using 3 or more different methods, including at least one site visit
to encourage the Customer to use the correct device in the last 12 months (or during the
period agreed between the Suppliers). The methods used should be shown on the
Schedule – a list of possible methods is shown in Principle 10.
13.
The Schedule should be clearly marked to show that the schedule covers “non-users”.
Prior to the first non-user schedule being sent, the initiating Supplier should contact the
receiving supplier in order to negiotate the bilateral agreement for handling these
schedules. A further claim for continued “non-users” should not be submitted for a further
12 months or period agreed between Suppliers or until the Customer starts to use the
correct device.
14.
In exceptional circumstances if required, the Gaining Supplier can request an individual
breakdown of payments, subsequent to the return of the Schedule.
15.
The processed Schedule should be returned to a named contact within 30 working days of
receipt in cases where the Schedule does not include claims for “non-users”.
Please note from 1st January 2003 the processed Schedule should be returned to a
named contact within 25 working days of receipt in cases where the Schedule does
not include claims for “non-users”. From the 1st May 2003 the processed Schedule
should be returned to a named contact within 20 working days of receipt in cases
where the Schedule does not include claims for “non-users”.
The misdirected payments should be sent out within 10 working days of return of the
Schedule. When a Schedule includes claims for payments where the ‘Claim Request To
Date’ is more than twelve months prior to the date of the Schedule, then it may not be
possible to meet this 10-day timescale. In such cases the Suppliers should reach
agreement on the timescales for settling such claims.
16.
Where the Schedule relates to “non-users” these schedules should be returned within 40
working days subject to bilateral agreement.
17.
Where the number of claims in a period has increased by more than 50% compared to the
last period or if the total number of claims has increased by more than 1000 in any given
month (or pro rata if claims are made on a weekly basis) then it may not be possible to
meet these timescales. In such cases the initiating and receiving Suppliers should enter a
bilateral agreement for the handling of the excess.
18.
Where the Supplier who initiated the claim, receives a returned Schedule indicating that no
payment or only a partial payment has been made by the Customer, this may be due to
the payment being held by the Supplier registered immediately prior to the Supplier to
whom the claim was originally sent (the ‘previous, previous Supplier’). The returned
Schedule should include the ID of the previous, previous Supplier where possible and in
this circumstance, the initiating Supplier should issue a Schedule to that Supplier.
19.
The receiving Supplier should not make any charges for receiving, holding or transferring
payments to the initiating Supplier. However, this does not preclude charges being made
for subsequent transfers covering part of the same registration period.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 151 of 227
Working Practices Product Set (WPPS)
20.
Where any disputes arise between an initiating Supplier and a receiving Supplier regarding
the issue or return of payment claim Schedules, the following table summarises the
escalation procedure that should be followed:
Process
Timescale
Responsibility Level of
Contacts
Issue Schedule
Day of Issue
Operational Staff
Initial Follow Up
Day of Issue + 20 working
days (or 40 working days
for Schedules for “nonusers”)
Supervisor of Operational
Staff
Second Follow Up
Day of Issue + 25 working
days (or 45 working days
for Schedules for “nonusers”)
Senior manager of
Operational staff
Final Follow Up
Day of Issue + 30
working days (or 50
working days for
Schedules for “non-users”)
MRA Supplier Contract
Manager
Impact of not implementing WP:
Without a common solution or best practice process there is no agreed way for Suppliers to
reclaim monies due to them.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 152 of 227
Working Practices Product Set (WPPS)
Associated Document to WP 124 - Annex 1 to Working Practice 124
The annex contains:
 A Copy of the Spreadsheet
 A Copy of the list of scenarios
The following table shows the Reason Codes to be used in the attached spreadsheet:
Description
Reason
Code
01
No payments held for MPAN for period of Schedule
02
Wrong PPMIP/Supplier /Invalid SSD
03
Invalid MPAN
04
Total refunded to Customer
05
Partial refunded to Customer
06
Already settled same period in previous claim
07
Settled part of same period in previous claim
08
Settled to other Supplier-
09
Contact previous Supplier
10
Payments ceased at loss.
11
PAN missing (Token Only)
12
Meter serial number missing (Key Only)
13
Credit meter at time of loss
14
Erroneous transfer
15
Meter Serial is incorrect
16
Customer still supplied by us
17
Customer still using our device
Notes:

If reason code 01, 08 or 09 is used then the Supplier ID of the ‘other’ Supplier should
be provided.

Reason code 09 should be used when the Supplier receiving the Schedule has not
received any money.

Reason code 10 should be used in the instance when all the money for a particular
account has been received but there are no additional funds.

Reason Code 17 is an advisory note to the initiating Supplier indicating that the
Customer is still using the device of the old Supplier after the ‘Claim Request To
Date’ included in the Schedule.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 153 of 227
Working Practices Product Set (WPPS)
Spreadsheet for use in conjuction with WP 124.
Suppliers NAME and or logo
A
ID
B
MPAN
C
Property
No
D
Street
Road
Name
E
F
G
CLAIM REQUEST DATE
Post Code
FROM
TO
H
AMOUNT
I
J
REASON PREVIOUS
K
L
M
N
O
P
Meter
COMMENT LEB
PAN
CUSTOME Reading
CODES SUPPLIER
S
AMOUNT METER ID NUMBER R REF
Day
Q
R
Date
Meter
Reading
Night /Low
Column A is used for suppliers with DATABASES
Column B is a MPAN used by all suppliers
Column C Property No
Column D Street Road Name
Column E Post Code
Column F replaces SSD date
Column G replaces SED date or first use of device
Column H payments should be given in two decimal places and reconcile to total cheque
Column I reason code 1-17(see reason code list)
Column J previous suppliers
Column K comments field for additional info (NOT SPECIFIED UNDER CODES)
Column L Used By London only.Should be given as two decimal places and reconcile with the total payment made
Column M used by key suppliers
Column N required by Powergen only
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 154 of 227
Working Practices Product Set (WPPS)
Column O should not be released to other suppliers. (Used in order to process payments ONLY)
Column P meter reading single rate or day rate/low
Column Q date of meter reading for single rate/ low
Column R meter reading night rate/high
Column S date of meter reading night rate/high
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 155 of 227
Working Practices Product Set (WPPS)
A series of examples is provided with the intent to illustrate how to populate the schedule in the
particular circumstance.
Scenario One
The ‘Gaining Supplier’ has taken over responsibility for the MPAN but does not receive payments
after their supply start date.
SSD – SED = No Payments for period of owning site.
 Supplier A provided electricity to Customer.
 Supplier B gains Customer on the 25/04/2002, but loses customer on the 28/06/02 to
Supplier C
COLUMN NUMBER
COLUMN NAME
VALUE
A
ID
B
MPAN
11111111111
C
Property No
89
D
Street/Road Name
Sundorne Crescent
E
Post Code
SY1 4JG
F
Claim Request Date From
25/04/2002
G
Claim Request Date To
28/06/2002
H
Amount
15.00
I
Reason Codes
5
J
Previous Supplier
SPOW
K
Comments
Refunded 75.08
L
LEB Amount
M
Meter Id
K929 65279
N
Pan Number
63357412345678
O
Customer Reference
24517415321
P
Meter Reading Day
2587
Q
Date
26/06/2002
R
Meter Reading Night
S
Date
For Use of Supplier
Scenario Two
Similar to the Scenario One, however the Customer has started to use the device, the Gaining
Supplier nevertheless has not received money for the period of non-usage.
SSD - First Payment Date = Customer now using device since last payment date
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 156 of 227
Working Practices Product Set (WPPS)
Supplier A provided electricity to Customer.
Supplier B gains Customer: 25/04/02.
The Customer continues to use Supplier A device after CoS. On 20/06/02, Customer starts to use
Supplier B device. Payment from 25/04/02 to 20/06/02 needs to be transferred from Supplier A to
Supplier B.
COLUMN NUMBER
COLUMN NAME
VALUE
A
ID
B
MPAN
11111111111
C
Property No
89
D
Street/Road Name
Sundorne Crescent
E
Post Code
SY1 4JG
F
Claim Request Date From
25/04/2002
G
Claim Request Date To
20/06/2002
H
Amount
40
I
Reason Codes
5
J
Previous Supplier
SPOW
K
Comments
Refunded 75.08
L
LEB Amount
M
Meter Id
K929 65279
N
Pan Number
63357412345678
O
Customer Reference
24517415321
P
Meter Reading Day
3455
Q
Date
R
Meter Reading Night
S
Date
For Use of Supplier
Scenario Three
The Customer alternates between using two devices - one which is for the correct Supplier and
another that of a previous Supplier.
Start Payment Date – First Payment Date = Intermittent Usage between two devices
Supplier A provided electricity to Customer.
Supplier B gains Customer: 20/04/02.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 157 of 227
Working Practices Product Set (WPPS)
Customer commences using the new device (Supplier B device) on the 20/04/02 but then
alternates between Supplier A device and Supplier B device for the period 16/06/02 to 28/09/02.
Misdirected Payments need to be transferred from Supplier A to Supplier B. Method of
deterring/preventing the Customer from using the wrong device needs to be implemented.
COLUMN NUMBER
COLUMN NAME
VALUE
A
ID
B
MPAN
11111111111
C
Property No
89
D
Street/Road Name
Sundorne Crescent
E
Post Code
SY1 4JG
F
Claim Request Date From
16/06/2002
G
Claim Request Date To
28/09/2002
H
Amount
25.5
I
Reason Codes
J
Previous Supplier
K
Comments
L
LEB Amount
3434
M
Meter Id
K929 65279
N
Pan Number
63357412345678
O
Customer Reference
P
Meter Reading Day
Q
Date
R
Meter Reading Night
S
Date
SPOW
3688
9342
For Use of Supplier
Scenario Four
This relates to Change of Tenancy (CoT)
SSD Payment Date – Last Payment Date = Multiple COT
Supplier A provided electricity to Site.
Supplier B gains Site: 25/04/02.
Site is rented accommodation; COT takes place 27/07/02 but customer continues to use old
device. A further COT takes place on 28/09/02 and this customer starts to use correct device on
15/10/02 Payments need to be transferred from Supplier A to Supplier B. Response shows that
Supplier A does not hold any payment for the first customer, but does hold payments for the COT
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 158 of 227
Working Practices Product Set (WPPS)
customers. Method of deterring/preventing Customer from using the wrong device needs to be
implemented.
COLUMN
NUMBER
COLUMN
NAME
VALUE
VALUE
VALUE
A
ID
B
MPAN
11111111111
11111111111
11111111111
C
Property No
89
89
89
D
Street/Road
Name
Sundorne Cres
Sundorne Cres
Sundorne Cres
E
Post Code
SY1 4JG
SY1 4JG
SY1 4JG
F
Claim Request 25/04/2002
Date From
27/07/2002
28/09/2002
G
Claim Request 26/07/2002
Date To
27/09/2002
15/10/2002
H
Amount
15
5
I
Reason
Codes
1
J
Previous
Supplier
SPOW
K
Comments
L
LEB Amount
M
Meter Id
K929 65279
K929 65279
K929 65279
N
Pan Number
63357412345678 63357412345678 63357412345678
O
Customer
Reference
24517415321
P
Meter Reading
Day
Q
Date
R
Meter Reading
Night
S
Date
24517415321
24517415321
For Use of
Supplier
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 159 of 227
Working Practices Product Set (WPPS)
Scenario Five
The Customer uses the new Supplier device before the SSD. This claim is made by the old
Supplier to the new Supplier
Supplier A provided electricity to Site.
Supplier B gains Site: 20/04/02 but customer uses device 02/04//02.
The new device is sent to the Customer before the SSD and the Customer starts to use it.
Payments need to be transferred from Supplier B to Supplier A. Method of deterring/preventing
Customer from using the wrong device needs to be implemented.
COLUMN NUMBER
COLUMN NAME
VALUE
A
ID
B
MPAN
11111111111
C
Property No
89
D
Street/Road Name
Sundorne Crescent
E
Post Code
SY1 4JG
F
Claim Request Date From
02/04/2002
G
Claim Request Date To
20/04/2002
H
Amount
20
I
Reason Codes
J
Previous Supplier
K
Comments
L
LEB Amount
M
Meter Id
K929 65279
N
Pan Number
63357412345678
O
Customer Reference
24517415321
P
Meter Reading Day
3688
Q
Date
R
Meter Reading Night
S
Date
9342
For Use of Supplier
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 160 of 227
Working Practices Product Set (WPPS)
Scenario Six
This is the same as Scenario 1 or 2, but the old Supplier has partially refunded to the Customer
but has also passed payments to another Suppliers claim

Supplier A provided electricity to Site.

Supplier B gains Site: 25/04/02.
Customer starts to use device on 28/08/02
COLUMN NUMBER
COLUMN NAME
VALUE
A
ID
B
MPAN
11111111111
C
Property No
89
D
Street/Road Name
Sundorne Crescent
E
Post Code
SY1 4JG
F
Claim Request Date From
25/04/2002
G
Claim Request Date To
28/08/2002
H
Amount
0
I
Reason Codes
5,8
J
Previous Supplier
Settled £30 to BGAS
K
Comments
L
LEB Amount
M
Meter Id
K929 65279
N
Pan Number
63357412345678
O
Customer Reference
P
Meter Reading Day
Q
Date
R
Meter Reading Night
S
Date
3688
9342
For Use of Supplier
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 161 of 227
Working Practices Product Set (WPPS)
WP 125. MTC for No Meter Present
WP no:
125
Status:
Implemented by
Industry
Implementation
Date:
Title:
MTC for No Meter Present
Version:
2
Originator:
Steve Watson
WP type:
W
Originator Ref:
Operational Issue
Related WP(s)
29/05/2003
OIF Issue No:
Date raised:
09/06/1999
Doc Ref:
IDEG 4/016
Product Area (s):
All
Parties Affected:
All
Baseline Products
Impacted:
DTC – J0220
Last amended:
24/04/03
Change History:
Version 1 approved at CCG 31 on 13/08/99 - see Design Note 27
V2 with WPPS CP 67 approved at MDB_03_04 on 24/04/03
Context:
The Supply Number (MPAN) is a key element of the de-regulated electricity market arrangements.
It provides a unique reference number for each metering point and additional information to
enable Suppliers to operate effectively. The Meter Timeswitch Code (MTC) is a three digit code
which forms part of the Supply Number. There are two types of MTC: common codes, which have
a common definition within all Distribution Businesses and specific codes which are defined
independently for use with a specific Distribution Business.
The definition of a Metering Point is an exit point at which supply to or from a) is or is intended to be measured; or
b) was or was intended to be measured; or
c) is deemed to be measured in the case of Unmetered Supply.
It is generally accepted that the existence of a Metering Point implies that supply will be measured
as above. However, in certain situations for a) and b) above, there may be a need to record the
information in the registration data that no meter is currently fitted. For example a de-energised
metering point that has power supplied up to the point of the cut-out fuse, but which has no meter
on site as it has either not yet been installed or has been removed because the site is disused.
There is consequently a general concern that the absence of an installed meter needs to be
indicated in the registration data as
i)
an absence of any MTC, in the case of a New Metering Point, for example, is only
indicative of an absence of data related to the meter, whilst awaiting meter-specific
data delays completion of the registration details; and
ii)
an inability to update the MTC where it reflects Metering Equipment that has been
removed is not in keeping with the Suppliers responsibility under the MRA to maintain
registration data that accurately reflects the circumstances for the Metering Point
(Clause 28.1)
The ability to be able to identify where there is no meter present is beneficial because:
 Suppliers need to be aware of the configuration of the metering equipment (including the
absence of metering) at a customer’s premises in order to provide good service to the
customer from the outset in quoting well-founded tariffs or in timely awareness of
complications.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 162 of 227
Working Practices Product Set (WPPS)



From a safety perspective, both Suppliers and Distribution Businesses need to be able to
identify, with certainty, where there is no meter present.
It enables both Suppliers and Distribution Businesses to undertake monitoring of sites
registered as being without meters.
A consistent practice regarding the use of MTC800 for Metering Points other than Unmetered 1
Supplies would achieve data accuracy and enable clear identification of sites without meters.
Working Practice:
Use of MTC 800
Where no meter exists for a Metering Point this should be indicated using the common MTC code
of 800 defined in MDD as “temporary – no meter”. MTC 800 is one of a handful of MTCs
assigned an MTC Type Indicator of 'X' in MDD, meaning that they are anomalous codes, only to
be used under special circumstances. MTC Type X means that the MTC is not constrained to
Measurement Class HH or NHH, therefore MDD does not define the valid SSC or LLFC
combinations for such codes as they are valid with any LLFC/SSC values.
Thus, if the MTC is populated with a value of 800 this alone should be taken as an indication that
there is no meter present. The Profile Class and Standard Settlement Class can be populated with
any values, although the combination of PC/SSC must be valid as specified in MDD.
Assigning MTC 800 to Metering Points
It is intended that this MTC only be used for circumstances where either:
 the network connection has been completed up to the cut-out or CT/VT but is isolated, and
the Metering Point is awaiting meter installation;
 the meter has been removed but the network connection has not been disconnected;
 the Metering Point is a New Connection where supply to or from is intended to be measured
and a Supplier wishes to register and populate a Skeleton Record – please refer to WP122.
In these circumstances, it would be expected that the energisation status of the Metering Point
would be de-energised. However attention is drawn to the fact that there may be exceptional
circumstances where, for example, an isolator/fuse has been enabled (thus allowing energy to
flow) when there is no meter installed. This Working Practice is not intended for use in correcting
such situations
Note: At present, MTC800 is not supported by all Distribution Businesses. The latest version of
MDD will identify which MTCs are valid for which Distribution Businesses. Guidance for updating
this information can be found in BSCP509. Suppliers wishing to utilise this MTC where it is not
currently supported by the Distributor should liaise with that Distribution Business (appropriate
contact details can be found in the Contact Matrix held on the MRASCo website,
www.mrasco.co.uk.)
N.B. An operator visiting a site with such an MTC code should make no assumptions
regarding the safety or security of the metering point at that site.
1
MTC 800 is unsuitable for use with Unmetered Supplies since the description of this MTC is that the
absence of a meter is temporary, whereas Unmetered Supplies are permanently without a meter.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 163 of 227
Working Practices Product Set (WPPS)
Impact of not implementing WP:
A range of differing approaches across the industry may result in adverse safety/cost implications.
Utilising MTC 800 consistently to identify Metering Points which do not have meters will enable
easy identification of such situations for all Market Participants.
Suppliers will not meet their MRA responsibility to ensure that the data in MPAS for which they are
deemed responsible (which includes MTC) accurately reflects the circumstance related to the
Metering Point.
The CoS process may be impacted if sites without meters cannot be identified by Suppliers. This
could result in Suppliers waiting for Meter Readings on sites where no meters exist, and thereby
stalling the CoS process.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 164 of 227
Working Practices Product Set (WPPS)
WP 126. Supply Contract Cancellation Forms
WP no:
126
Status:
Implemented by
Industry
Implementation
Date:
01/04/2000
Title:
Supply Contract Cancellation Forms
Version:
1
Originator:
Pat Lawrence
WP type:
G
Originator Ref:
Operational Issue
Related WP(s)
OIF Issue No:
Date raised:
09/06/1999
Doc Ref:
4/017
Product Area
(s):
All
Parties Affected:
All
Baseline
Products
Impacted:
Last amended:
08/06/1999
Change History:
Version 1 approved at CCG 31 on 13/08/99 - see Design Note 27
Context:
If the Old Supplier believes that their contract to supply a designated premises will neither expire
nor be terminated by the New Suppliers Supply Start Date, the Old Supplier may object to the
registration (MRA Clause 16.1.1). Suppliers are currently passing third party cancellation forms to
other Suppliers on behalf of the Customer to aid the Change of Supplier process. Experience to
date has shown that a number of such forms, although being of reasonably common format, are
incomplete and ambiguous due to the quality of information that has been requested/received.
Several Suppliers use the same cancellation form for both gas and/or electricity supply contract
cancellations. Many of the forms which are sent do not clearly indicate which fuel contract is being
cancelled (or indeed if both are being cancelled).
The failure of Suppliers in the provision of key data items and the failure to clearly indicate which
contract is due for cancellation, may delay the cancellation process and lead to Customer
confusion. It will therefore assist all Suppliers to agree that a number of standard items will be
shown on all fuel cancellation forms, thus allowing ease of processing.
Note: This WP documents the contents of the Supply Contract Cancellation Form and is not
intended to define the processes to be followed.
Working Practice:
To facilitate processing a standard number of data items should be documented on each Supply
Contract Cancellation form.
It is recognised that Customers are not obliged to complete the data, and may not provide
the information, but the details should be requested in line with each individual company’s
policy.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 165 of 227
Working Practices Product Set (WPPS)
The following information should be requested on the fuel contract cancellation form:

Customer Name and Address;

Customer Telephone Number (optional);

Core Supply Number (or M number for Gas contracts);

Clear indication whether the contract to be cancelled is for Electricity or Gas , or both (dual
fuel). A cancellation instruction should be stated against each particular contract being
cancelled;

Customer Signature and Date Signed; and

New Supplier details (optional – to be used to facilitate contact between the Old and New
supplier if there are any queries) (e.g. headed paper)
Impact of not implementing WP:
Suppliers who receive notification of a contract cancellation may be unable to process the
cancellation if insufficient details are provided. The ‘Old Supplier’ can not inform the customer
or ‘New Supplier’ of the problems as these details may not be provided.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 166 of 227
Working Practices Product Set (WPPS)
WP 129. Usage of DTC flow D0290 “Instruction to Read Meter” (DP to DR)
WP no:
129
Title:
Usage of DTC flow D0290 “Instruction to Read Meter” (DP to DR)
Version:
1
Originator:
MRG EG
WP type:
W
Originator Ref:
DTC CR 3025
OIF Issue No:
N/A
Related WP(s)
Status:
Implemented by Industry
Date raised:
15/06/1999
Associated WPs:
Product Area (s):
NHH
Parties Affected:
Baseline Products
Impacted:
DTC flow D0290
Last amended:
1st October 1999
Change History:
Version 1 approved at CCG 31 on 16/09/99 - see Design Note 27
NHH DP / NHH DR
/Supplier
Context:
At the Metering Review Group (MRG) meeting on 23 March 1999 it was agreed that an Expert
Group would be set up to define the boundaries of the last resort NHH Data Retriever (DR) and
Data Processor (DP) resulting from the proposals to split the existing Data Collector Agency
Services from 1 April 2000.
Under this approach, the DP will provide the DR with all the information the DR requires to take a
reading for a specified MPAN. (This includes site, customer, meter details, and validation criteria
for the reading).
The DR will not be appointed using DTC flows (although a contractual arrangement will be
required – this is outside the scope of this WP), but will respond to a request to take a reading on
receipt of the D0290. Once the reading has been taken or missed, the DR provides the details to
the DP, and then is not required to retain any information relating to that reading.
The DP is responsible for maintaining the reading cycle details, informing the DR of the need to
take a site reading, and subsequently informing the Supplier of the results.
D0290 is used by the DP to inform the DR of all relevant details that are required to take a reading
for a specified MPAN.
This Working Practice is designed to inform the NHH DP how to complete the flow with the
required data by the NHHDR. It will also allow the NHH DR to correctly interpret the information he
receives.
Working Practice:
The groups and Data Items within the flow are structured similarly to existing DTC flow structures
and therefore should be populated in a manner consistent with these flows/items.
1. Metering Point address lines are shown as optional, however, the inclusion of the address
itself is mandatory. All the following Data Items in Group 86B “MPAN Cores”, should be
completed when known/applicable (this will allow the details to be confirmed and amended if
necessary by the DR on a D0222).
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 167 of 227
Working Practices Product Set (WPPS)
2a. Reading Window Details – This Group must be completed if no specific appointment has
been agreed – i.e. on routine visits when the DR has a window of +/- 5 working days (from the
Target Read Date) in which to obtain a reading. The Target Read Date is the date for which
all tolerance calculations will be generated. The regular reading cycle may be used by the DP
if he wishes to inform the DR when the next request to read (routine) may be issued. It can
not be guaranteed that the DR will receive a request as per the next reading cycle date, and
the DR must not assume this to be the case, however, the DR may wish to use this
information to schedule work. The Reason for Request field should be completed as per an
equivalent D0005 or D0072 flow received by the DP.
2b. Appointment Details – This Group should be completed if an appointment date has been
agreed by the Supplier (either with the DR direct or the Customer). Where a timeframe has
been agreed this should also be indicated. If the appointment is for a 2-hour time slot then the
Supplier must have agreed this with the DR (by Fax/Phone) prior to sending the flow. In this
instance the D0290 must be sent as confirmation of the request. The Reason for Request
field should be completed as per D0005 or D0072 flow received by the DP.
The above two groups are mutually exclusive. One and only should be completed for any one
MPAN.
3.
Expected Readings – The Expected Register Reading is the reading value which the DP has
estimated will be the reading on the meter at either the appointment date, or the target read
date. The DR should use this expected value, together with the tolerance information in order
to verify the meter reading obtained on site.
Impact of not implementing WP:
The flow may be completed inconsistently resulting in misinterpretation by the DR and DP.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 168 of 227
Working Practices Product Set (WPPS)
WP 131. Use of Notification of Register Readings on CoMC coincident with CoS
WP no:
131
Title:
Status:
Implemented by
Implementation 27/03/2001
Industry
Date:
Use of ‘Notification of Register Readings on Change of Measurement
Class coincident with change of Supplier’
Version:
WP type:
2
W
Originator:
Originator Ref:
SIR 1454
DTC CR 3007
Related WP(s)
Date raised:
WP 116
18 June 1999
OIF Issue No:
Doc Ref:
12
Product Area
(s):
Baseline
Products
Impacted:
Last amended:
CoMC
Parties Affected:
Change History:
Version 1 approved at CCG 32 on 05/11/99
5/003
HH MOp, NHH MOp
DTC D0291 (Notification of Register Readings on CoMC coincident
with CoS)
BSCP 504, BSCP 502, PSL 110 and PSL 120
30/06/00
V2 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
Working Practice 116 defines the process of Change of Measurement Class coincident with
change of Supplier (CoMC CoS). WP 116 (point 12) describes the requirement for the New HH
MOp to inform the Old NHH MOp of the CoMC CoS and of the final meter readings from the NHH
metering configuration, where obtained. The flow used to meet this requirement will be added to
the DTC as flow D0291, Notification of Register Readings on CoMC coincident with CoS.
The flow is defined such that the New HH MOp is able to:
 Describe meter registers and readings, thus enabling the Old NHH MOp to translate these into
mapped register readings suitable for the Old NHH DC.
 Notify that no reading(s) were obtained and the reason for the lack of reading(s).
 Inform the Old NHH MOp of the actual change of Supplier date, allowing them to re-date the
final NHH meter readings for the Old NHH DC.
 Notify the Old NHH MOp that the Old NHH meter has been removed or reconfigured.
 Notify the Old NHH MOp, in exceptional circumstances, that the CoMC has not occurred and
that there are therefore no readings available.
Therefore the following WP addresses the population of this flow for the circumstances described
overleaf.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 169 of 227
Working Practices Product Set (WPPS)
Working Practice:
1. HH MOp changes Measurement Class by SSD +4 and removes Old NHH Meter, final reading(s)
obtained:
Grou
Description
Item Name
p
Non Half Hourly Metering System
10C
MPAN Core
CoS and Coincident CoMC Indicator
Effective from Settlement Date
{REGI} for New Supplier
Metering Point Address Line 1
Metering Point Address Line 2
Metering Point Address Line 3
Metering Point Address Line 4
Metering Point Address Line 5
Metering Point Address Line 6
Metering Point Address Line 7
Metering Point Address Line 8
Metering Point Address Line 9
Metering Point Postcode
NHH Meter not present
11C
Site Visit Check Code
Additional Information
Non Half Hourly Meter details
12C
Meter Id (Serial Number)
Date of Meter Removal
Site Visit Check Code
Additional Information
Non Half Hourly Meter Registers
13C
These two data items are
Register Description
related, as the description
applies to the reading for
that register. Therefore
these should be repeated
Register Reading
to detail all registers and
their readings.
Reading Date and Time
Notes
Always required
Should be set to ‘T’ – True
Should be that of the New Supplier.
Although all the address items are
optional, the address itself is mandatory
and should be populated accordingly.
This group should not be populated, as
the HH MOp removed the NHH meter.
Meter Id of the removed NHH meter
Actual date that the HH MOp removed the
NHH meter
Any the HH MOp feels are relevant
Any information the HH MOp feels is
relevant, for example, what has been done
with the NHH meter.
Should be populated with enough
information for the receiving NHH MOp to
be able to identify the meter register and
map it to the register reading.
Reading from the register identified in the
description above.
Actual date and time the reading was
taken by the HH MOp
Notes: The Old NHH MOp should use the Effective from Settlement Date {REGI} for New Supplier
as the SSD. It is this date that will provide the Old NHH MOp with the date for redating the reading
to be sent to the Old NHH DC (WP 116).
The Old NHH MOp should interpret a populated ‘Date of Meter Removal’, plus the absence of
Group 11C as indication that the NHH meter was removed by the New HH MOp.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 170 of 227
Working Practices Product Set (WPPS)
2. HH MOp changes Measurement Class by SSD +4 and removes Old NHH Meter, final reading(s)
not obtained:
Grou
Description
Item Name
p
Non Half Hourly Metering System
10C
MPAN Core
CoS and Coincident CoMC Indicator
Effective from Settlement Date
{REGI} for New Supplier
Metering Point Address Line 1
Metering Point Address Line 2
Metering Point Address Line 3
Metering Point Address Line 4
Metering Point Address Line 5
Metering Point Address Line 6
Metering Point Address Line 7
Metering Point Address Line 8
Metering Point Address Line 9
Metering Point Postcode
NHH Meter not present
11C
Site Visit Check Code
Additional Information
Non Half Hourly Meter details
12C
Meter Id (Serial Number)
Date of Meter Removal
Site Visit Check Code
Additional Information
13C
Non Half Hourly Meter Registers
Register Description
Register Reading
Reading Date and Time
Notes
Always required
Should be set to ‘T’ – True
Should be that of the New Supplier.
Although all the address items are
optional, the address itself is mandatory
and should be populated accordingly.
This group should not be populated, as
the HH MOp removed the NHH meter.
Meter Id of the removed NHH meter
Actual date that the HH MOp removed the
NHH meter
Any the HH MOp feels are relevant, which
should indicate the reason that no read
was obtained.
Any information the HH MOp feels is
relevant, for example, what has been done
with the NHH meter and why (in more
detail) no final read was obtained.
This group will not be populated as no
final readings were obtained.
Notes: The Old NHH MOp should use the Effective from Settlement Date {REGI} for New Supplier
as the SSD. It is this date that will provide the Old NHH MOp with the appropriate date for passing
to the Old NHH DC (WP 116), with notification of no reading obtained, therefore allowing the Old
NHH DC to deem the MRoCoS.
The Old NHH MOp should interpret a populated ‘Date of Meter Removal’, plus the absence of
Group 11C as indication that the NHH meter was removed by the New HH MOp.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 171 of 227
Working Practices Product Set (WPPS)
3. HH MOp changes Measurement Class by SSD +4 and reconfigures Old NHH Meter (i.e. the
meter is not removed), final reading(s) obtained:
Grou
Description
Item Name
p
Non Half Hourly Metering System
10C
MPAN Core
CoS and Coincident CoMC Indicator
Effective from Settlement Date
{REGI} for New Supplier
Metering Point Address Line 1
Metering Point Address Line 2
Metering Point Address Line 3
Metering Point Address Line 4
Metering Point Address Line 5
Metering Point Address Line 6
Metering Point Address Line 7
Metering Point Address Line 8
Metering Point Address Line 9
Metering Point Postcode
NHH Meter not present
11C
Site Visit Check Code
Additional Information
Non Half Hourly Meter details
12C
Meter Id (Serial Number)
Date of Meter Removal
Site Visit Check Code
Additional Information
Non Half Hourly Meter Registers
13C
These two data items are
Register Description
related, as the description
applies to the reading for
that register. Therefore
these should be repeated
Register Reading
to detail all registers and
their readings.
Reading Date and Time
Notes
Always required
Should be set to ‘T’ – True
Should be that of the New Supplier.
Although all the address items are
optional, the address itself is mandatory
and should be populated accordingly.
This group should not be populated, as
the HH MOp reconfigured the NHH meter.
Meter Id of the reconfigured NHH meter
Should not be populated as meter was not
removed.
Any the HH MOp feels are relevant
Any information the HH MOp feels is
relevant, for example, that the NHH meter
has been reconfigured, not removed.
Should be populated with enough
information for the receiving NHH MOp to
be able to identify the meter register and
map it to the register reading.
Reading from the register identified in the
description above.
Actual date and time the reading was
taken by the HH MOp
Notes: The Old NHH MOp should use the Effective from Settlement Date {REGI} for New Supplier
as the SSD. It is this date that will provide the Old NHH MOp with the date for re-dating the reading
to be sent to the Old NHH DC (WP 116).
The Old NHH MOp should interpret the lack of the ‘Date of Meter Removal’, plus the absence of
information in Group 11C as indication that the NHH meter has been reconfigured to HH.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 172 of 227
Working Practices Product Set (WPPS)
4. HH MOp changes Measurement Class by SSD +4 and reconfigures Old NHH Meter (i.e. the
meter is not removed), final reading(s) not obtained:
Grou
Description
Item Name
p
Non Half Hourly Metering System
10C
MPAN Core
CoS and Coincident CoMC Indicator
Effective from Settlement Date
{REGI} for New Supplier
Metering Point Address Line 1
Metering Point Address Line 2
Metering Point Address Line 3
Metering Point Address Line 4
Metering Point Address Line 5
Metering Point Address Line 6
Metering Point Address Line 7
Metering Point Address Line 8
Metering Point Address Line 9
Metering Point Postcode
NHH Meter not present
11C
Site Visit Check Code
Additional Information
Non Half Hourly Meter details
12C
Meter Id (Serial Number)
Date of Meter Removal
Site Visit Check Code
Additional Information
13C
Non Half Hourly Meter Registers
Register Description
Register Reading
Reading Date and Time
Notes
Always required
Should be set to ‘T’ - True
Should be that of the New Supplier.
Although all the address items are
optional, the address itself is mandatory
and should be populated accordingly.
This group should not be populated, as
the HH MOp reconfigured the NHH meter.
Meter Id of the reconfigured NHH meter
Should not be populated as meter was not
removed.
Any the HH MOp feels are relevant
Any information the HH MOp feels is
relevant, for example, that the NHH meter
has been reconfigured, not removed and
the reason for there being no final
readings.
This group will not be populated as no
final readings were obtained.
Notes: The Old NHH MOp should use the Effective from Settlement Date {REGI} for New Supplier
as the SSD. It is this date that will provide the Old NHH MOp with the appropriate date for passing
to the Old NHH DC (WP 116), with notification of no reading obtained, therefore allowing the Old
NHH DC to deem the MRoCoS.
The Old NHH MOp should interpret the lack of the ‘Date of Meter Removal’, plus the absence of
information in Group 11C as indication that the NHH meter has been reconfigured to HH.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 173 of 227
Working Practices Product Set (WPPS)
5. HH MOp changes Measurement Class by SSD +4, the old NHH Meter is not present and
therefore the final reading(s) not obtained:
Grou
Description
Item Name
p
Non Half Hourly Metering System
10C
MPAN Core
CoS and Coincident CoMC Indicator
Effective from Settlement Date
{REGI} for New Supplier
Metering Point Address Line 1
Metering Point Address Line 2
Metering Point Address Line 3
Metering Point Address Line 4
Metering Point Address Line 5
Metering Point Address Line 6
Metering Point Address Line 7
Metering Point Address Line 8
Metering Point Address Line 9
Metering Point Postcode
NHH Meter not present
11C
Site Visit Check Code
Additional Information
12C
13C
Non Half Hourly Meter details
Meter Id (Serial Number)
Date of Meter Removal
Site Visit Check Code
Additional Information
Non Half Hourly Meter Registers
Register Description
Register Reading
Reading Date and Time
Notes
Always required
Should be set to ‘T’ - True
Should be that of the New Supplier.
Although all the address items are
optional, the address itself is mandatory
and should be populated accordingly.
Any the HH MOp feels are relevant
Any information the HH MOp feels is
relevant, for example, that the NHH meter
was not present and the date the HH MOp
went on site.
This group will not be populated as the
NHH meter was not present
This group will not be populated as no
final readings were obtained.
Notes: The Old NHH MOp should use the Effective from Settlement Date {REGI} for New Supplier
as the SSD. It is this date that will provide the Old NHH MOp with the appropriate date for passing
to the Old NHH DC (WP 116), with notification of no reading obtained, therefore allowing the Old
NHH DC to deem the MRoCoS.
The Old NHH MOp should interpret the absence of Group 12C and 13C, plus the populated Group
11C as indication that the NHH meter was not present when the HH MOp went on site to change
measurement class.
Impact of not implementing WP:
Both the HH and NHH MOp will have differing interpretations and therefore implementation of this
flow. As the D0291 is imparting important information for the Old Suppliers hub, which will impact
settlements, it is essential that all parties using the flow have a clear understanding of how to
populate and interpret it.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 174 of 227
Working Practices Product Set (WPPS)
WP 132. Logical vs Physical Disconnection and Notification to the Distributor
thereof
WP no:
132
Status:
Implemented by
Industry
Implementation
Date:
27/03/2001
Title:
Logical Versus Physical Disconnection and Notification to the Distributor
thereof
Version:
2
Originator:
OIF
WP type:
W
Originator Ref:
D0132
Related WP(s)
Issue No:
Date raised:
23 September
1999
Doc Ref:
Product Area (s):
NHH
Parties Affected:
Baseline Products
Impacted:
E2E Disconnection
Last amended:
30/06/00
Change History:
Version 1 approved at CCG 32 on 05/11/99
Distributor, Supplier, NHH MOp
DTC –D0132
V2 with WPPS CP 24 accepted at MDB_00_06 on 30/06/00
Context:
This Working Practice details the use of the D0132 for notifying the Distributor of a request for
disconnection of supply – specifically to ensure that the Supplier and Distributor are made aware
of their responsibilities regarding the physical and / or logical disconnection of the metering point.
The Supplier may request a disconnection of a metering point from the Distributor for a number of
reasons:
1. Metering point(s) that do not require current or future service, requiring physical disconnection
and removal of the MPAN(s).
2. Change to the metering system configuration requiring removal of one or more additional
MPANs e.g. Economy 9 to General Domestic tariff.
3. UMS Inventory change requiring removal of one or more UMS MPAN.
In all three cases the Supplier would send a D0132 to the Distributor in order to request the
removal of the main service cable (where appropriate) and request the removal of the MPAN by
sending a De-Registration notice to MPAS.
This WP describes how data items J1648 Disconnection Type, and Additional Information (J0012)
on the D0132 should be populated by the Supplier and interpreted by the Distributor so that
correct action is taken.
The process to be followed by the MOp and Supplier preceding a disconnection request of type 2
is detailed in WP9. The process to be followed by the UMSO to amend a UMS inventory is
detailed in BSCP 520.
The use of the D0132 should be considered to be equivalent to the “Disconnection Notice” as
defined in the DUoS Agreement.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 175 of 227
Working Practices Product Set (WPPS)
Working Practice:
Where there is a requirement for the disconnection of a metering point and/or removal of the
MPAN for any of the three reasons detailed in the Context, the Supplier should send a D0132 to
the Distributor. Where any request for disconnection is sent to the Distributor the Supplier must
first ensure that there is no reasonably foreseeable future use for the Metering Point.
The ‘Disconnection Type’ (J1648) should be populated with the required type:
P – Physical disconnection (main service cable to be severed via site visit);
A - Logical disconnection (redundancy of an additional MPAN); or
U – Logical disconnection (changes to the UMS Inventory).
This will enable the Distributor to undertake the required action with no potential for
misinterpretation.
Any information required under the DUoS Agreement that will enable the Distributor to undertake
their responsibilities, including the reason for the request; details of de-energisation works (where
appropriate); and an explanation of why there is no foreseeable future use for the Metering Point,
should be detailed in Additional Information (J0012).

Where the Disconnection Type is P – Physical disconnection, the Appointment Date (J0174)
should only be populated by the Supplier if it knows the date the disconnection is required, or
if they have agreed a date with the Distributor and/or Customer. The Distributor should
endeavour where appropriate to disconnect the mains cable on the date provided. Where no
Appointment Date is included the Distributor should act in accordance with any standard
agreement they have with the Supplier. Where any request for physical disconnection is sent
to the Distributor the Supplier must first ensure that the Metering Point has been de-energised,
and metering equipment removed where appropriate.

Where the Disconnection Type is A - Logical disconnection due to redundancy of an additional
MPAN the Appointment Date should be the date that any secondary MPAN was made
redundant. The Distributor should use this date as the date of disconnection of the MPAN.

Where the Disconnection Type is U - logical disconnection due to changes to UMS Inventory,
the Disconnection Date should be the date the UMS Inventory is changed.
In line with E2E Diagram Disconnection - The Distributor should confirm that the MPAN has been
disconnected by sending a D0125 to the Supplier.
The Distributor shall also notify MPAS of the disconnection and request that MPAS de-registers
the metering point. MPAS will then notify the Supplier (and any pending Supplier, where
appropriate) of the disconnection of the MPAN using a D0171.
The Supplier shall terminate their agents for the disconnected MPAN using a D0151. The
Termination Reason (J0279) is to be populated with ‘DE’ – Disconnection. The Effective to Date
{Agent} should either be the Date of Action (J0014) provided by the Distributor on the D0125, or
the Disconnection Date (J0473) provided to the Supplier on the D0171. The flow chosen is
dependent on where in the process the Supplier decides to terminate its agents; the two dates
should be the same.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 176 of 227
Working Practices Product Set (WPPS)
Impact of not implementing WP:
Where it is unclear as to what type of disconnection the Distributor will have to undertake on
receipt of the D0132 from the Supplier, the Distributor will have to maintain manual resource
intensive procedures for confirming the disconnection type required from Suppliers outwith the
DTC. Where these manual procedures fail, or are not implemented, the Distributors lack of
confirmation regarding the type of disconnection required could lead to misinterpretations of action
required and may even have safety implications where incorrect action is taken.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 177 of 227
Working Practices Product Set (WPPS)
WP 134. Completion of D0142 in HH and NHH Markets
WP no:
134
Status:
Implemented by
Industry
Title:
Completion of D0142 in HH and NHH Markets
Version:
1
Originator:
WP type:
W
Originator Ref:
Related WP(s)
WP53 WP132
Issue No:
Date raised:
26/04/99
Doc Ref:
Product Area (s):
DTC
Parties Affected:
Implementation
Date:
01/04/2000
ScottishPower / Manweb
ID 257
Supplier, Mop
Baseline Products
Impacted:
Last amended:
21/10/99
Change History:
Version 1 approved at CCG 32 on 05/11/99
Context:
D0142 as specified has generally been agreed to be deficient, however so far no one has
sponsored a change to improve it. Recently ScottishPower / Manweb has raised ID 257, the main
purpose of which was to specify how to use the flow within its current structure and DTC
specification. This WP is to formalise how D0142 should be completed in both HH and NHH
Markets without need for a DTC change.
Note that D0142 is only to be used for credit meters except where all meters are to be removed
from a Metering Point or where a Metering Point is to be changed from prepayment to credit
usage. Where prepayment meters are to be installed or re-configured then the appropriate
prepayment flow needs to be selected – see WP53.
There are essentially three different required metering system configurations to be signalled by
the Supplier where D0142 is appropriate:

Removal all Meters from the Metering Point – distinguished by Remove Metering Point Meters
(J1020) set to True

Install / reconfigure Half Hourly Meter – distinguished by J1020 set to False AND Standard
Settlement Configuration being Null

Install / reconfigure Non Half Hourly Meter– distinguished by J1020 set to False AND Standard
Settlement Configuration set to a valid SSC number
Considering the use of D0142 in the two markets:
Half Hourly Market
A major area of deficiency was identified as to the flow’s ability to specify HH metering
requirements. But at a meeting of HH operators under DST auspices, there was general
agreement that the data content and media required to be transferred from Supplier to MOp is
such that it is very likely, however complete the flow, there would always be a need for some
data transferred manually. The recommendation of that meeting was that D0142 should be left
unchanged and the sending of D0142 being used as a flag to the MOp. On receiving a D0142
the MOp would recognise that the Supplier has a need for meter installation / reconfiguration
and will contact the Supplier by telephone to determine its detailed requirements.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 178 of 227
Working Practices Product Set (WPPS)
Non Half Hourly Market
In contrast to the low volume highly specific half hourly metering requirements it is essential
that D0142 is made to work for the high volume generally simple requirements of the nonhalf hourly market.
Working Practice:
D0142 is to be used to install and reconfigure credit Metering Points in both the Half Hourly and
Non Half Hourly Markets; this includes the change of usage of a Metering Point from prepayment
to credit. Where prepayment meters are to be installed or reconfigured the appropriate
prepayment meter flows are to be used – their use is not subject to this WP. The one exception is
where all meters are to be removed from a metering point even if the Metering Point has been
used for prepayment: in this case this Working Practice applies.
Completion of D0142 in either Market:
The following rules should be adhered to in completing the data items within D0142 for a Metering
System in all the circumstances as set out above:
1. Metering Point Address is mandated within the definition of multi-line address. Postcode is
also to be treated as mandatory
2. Requested Energisation Status is mandatory;
Thereafter the rest of the flow is to be completed

first by determining whether All meters are to be removed and then

completed as appropriate for the Half Hourly or Non Half Hourly Market.
Thus:
Remove all meters
If all meters within a Metering System are to be removed then D0142 is to be completed as
follows
1. Remove Metering Point Meters (J1020) is set to True and SSC is set to Null
Else a Metering System is to be installed or reconfigured and
2. Remove Metering Point Meters is set to False
Completion of D0142 in the HH Market
1. Standard Settlement Configuration is left null
2. Retrieval Method (J0098) is mandated
3. Communications Method needs to be completed although it is optional in the DTC
4. J0012 (Additional Information) may be used to pass the information as for any other flow
However it is considered that this set of information will be insufficient for the MOp to install the
Metering system or reconfigure it and the MOp will contact the Supplier by telephone to determine
its complete requirements on receiving D0142
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 179 of 227
Working Practices Product Set (WPPS)
Completion of D0142 in the NHH Market
The following rules are to be adhered to:
1. Standard Settlement Configuration (J0076) is treated as mandatory
2. Metering System Non-Settlement Functionality Code (J1267) is used to define non settlement
requirements where required
Appointment Date (J0174) is to be treated as the installation / reconfiguration date and is to be
mandated where an appointment date has been agreed/determined. If it is blank the MOp should
act in accordance with any bi-lateral agreement with the Supplier. Other dates remain optional.
Of the other items in the flow:
 Additional Information (J0012) is optional and the Supplier can provide any additional
information it considers the MOp should be aware of
 Retrieval Method (J0098) is mandated and needs to be completed for adherence to the DTC
Communications Method is optional. Note that the data item is ‘null’ in the D0150 return flow.
Impact of not implementing WP:
Without some clear understanding by Suppliers of how they should complete D0142 there will
continue to be questions arising by the MOp on how the flow should be interpreted and
consequential concern as to what metering configuration the Supplier wishes it to install.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 180 of 227
Working Practices Product Set (WPPS)
WP 137. Passing of Historical Data using the D0010 and D0152
WP no:
Title:
Implemented by
Implementation
Industry
Date:
Passing of Historical Data using the D0010 and D0152
Version:
1
WP type:
S
Related WP(s)
None
Date raised:
09/08/2000
Parties Affected:
Old and New NHHDC
Baseline Products
Impacted:
D0010, D0152
Last amended:
27/10/2000
Change History:
V1 with WPPS CP 30 approved at MDB_00_10 on 27/10/00
137
Status:
21/11/2000
Context:
The BSC does not constrain Participants into a mandated method of packaging data in the
D0010/D0152; instead it allows a number of ways by which the same data may be packaged.
Although this provides flexibility for the sender it is important that the recipient must be able to
interpret, and subsequently process, the data correctly.
The BSC states that ‘Each Supplier shall ensure that there are appropriate arrangements in place
in compliance with the relevant Party Service Lines with each Supplier Agent for which it is
responsible to take over the functions of a Supplier Agent whose appointment has expired or been
terminated, including arrangements for the transfer of relevant data to such replacement agent.’
Statement of Operation:
The purpose of this Statement of Operation is to provide participants with the formats in which
each Participant NHHDC intend to populate the D0010/D0152.
Examples follow
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 181 of 227
Working Practices Product Set (WPPS)
Sending of the D0152 – Metering System EAC/AA Historical Data
1. 1 MPAN per D0152, 1 D0152 per MPAN
The following participants have indicated that they populate the D0152 in this manner:EELC
SWAE
SWEB
MIDE
ACCU
LOND
YELG
2 examples of populating the D0152 in this manner follow:D0152 FLOW1
301 MPAN1
302 AA/SETTLEMENT PERIOD1
303 AA/TPR1
303 AA/TPR2
302 AA/SETTLEMENT PERIOD2
303 AA/TPR1
303 AA/TPR2
304 EAC/SETTLEMENT DATE1
305 EAC/TPR1
305 EAC/TPR2
304 EAC/SETTLEMENT DATE2
305 EAC/TPR1
305 EAC/TPR2
306 SSC/SETTLEMENT DATE1
307 SUPPLIER/SETTLEMENT DATE1
308 PROFILE CLASS/SETTLEMENT DATE1
309 GSP GROUP/SETTLEMENT DATE1
310 MEASUREMENT CLASS/SETTLEMENT DATE1
311 ENERGISATION STATUS/SETTLEMENT DATE1
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 182 of 227
Working Practices Product Set (WPPS)
D0152 FLOW2
301 MPAN4
302 AA/SETTLEMENT PERIOD1
303 AA/TPR1
303 AA/TPR2
302 AA/SETTLEMENT PERIOD2
303 AA/TPR1
303 AA/TPR2
302 AA/SETTLEMENT PERIOD3
303 AA/TPR1
303 AA/TPR2
304 EAC/SETTLEMENT DATE1
305 EAC/TPR1
305 EAC/TPR2
304 EAC/SETTLEMENT DATE2
305 EAC/TPR1
305 EAC/TPR2
304 EAC/SETTLEMENT DATE3
305 EAC/TPR1
305 EAC/TPR2
306 SSC/SETTLEMENT DATE1
307 SUPPLIER/SETTLEMENT DATE1
308 PROFILE CLASS/SETTLEMENT DATE1
309 GSP GROUP/SETTLEMENT DATE1
310 MEASUREMENT CLASS/SETTLEMENT DATE1
311 ENERGISATION STATUS/SETTLEMENT DATE1
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 183 of 227
Working Practices Product Set (WPPS)
2. Multiple MPANs per D0152, 1 D0152 per MPAN
The following participants have indicated that they populate the D0152 in this manner:-
SPOW
EMEB
MANW
SEEB
NEEB
NORW
SOUT
HYDE
An example of populating the D0152 in this manner follow:D0152 FLOW1
301 MPAN1
302 AA/SETTLEMENT PERIOD1
303 AA/TPR1
303 AA/TPR2
302 AA/SETTLEMENT PERIOD2
303 AA/TPR1
303 AA/TPR2
304 EAC/SETTLEMENT DATE1
305 EAC/TPR1
305 EAC/TPR2
304 EAC/SETTLEMENT DATE2
305 EAC/TPR1
305 EAC/TPR2
306 SSC/SETTLEMENT DATE1
307 SUPPLIER/SETTLEMENT DATE1
308 PROFILE CLASS/SETTLEMENT DATE1
309 GSP GROUP/SETTLEMENT DATE1
310 MEASUREMENT CLASS/SETTLEMENT DATE1
311 ENERGISATION STATUS/SETTLEMENT DATE1
301 MPAN2
302 AA/SETTLEMENT PERIOD1
303 AA/TPR1
303 AA/TPR2
302 AA/SETTLEMENT PERIOD2
303 AA/TPR1
303 AA/TPR2
302 AA/SETTLEMENT PERIOD3
303 AA/TPR1
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 184 of 227
Working Practices Product Set (WPPS)
303 AA/TPR2
304 EAC/SETTLEMENT DATE1
305 EAC/TPR1
305 EAC/TPR2
304 EAC/SETTLEMENT DATE2
305 EAC/TPR1
305 EAC/TPR2
304 EAC/SETTLEMENT DATE3
305 EAC/TPR1
305 EAC/TPR2
306 SSC/SETTLEMENT DATE1
307 SUPPLIER/SETTLEMENT DATE1
308 PROFILE CLASS/SETTLEMENT DATE1
309 GSP GROUP/SETTLEMENT DATE1
310 MEASUREMENT CLASS/SETTLEMENT DATE1
311 ENERGISATION STATUS/SETTLEMENT DATE1
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 185 of 227
Working Practices Product Set (WPPS)
Sending of the D0010 – Meter Readings, for historical data
1. 1 MPAN per D0010, 1 D0010 per MPAN with repeating group 026 per flow instance
The following participants have indicated that they populate the D0010 in this manner:MIDE
SWAE
EELC
SWEB
ACCU
2 examples of populating the D0010 in this manner follow:D0010 FLOW1
026 MPAN1
028 METER1
030 REGISTER1/READING DATE1
030 REGISTER2/READING DATE1
028 METER2
030 REGISTER1/READING DATE1
026 MPAN1
028 METER1
030 REGISTER1/READING DATE2
030 REGISTER2/READING DATE2
028 METER2
030 REGISTER1/READING DATE2
D0010 FLOW2
026 MPAN2
028 METER1
030 REGISTER1/READING DATE1
026 MPAN2
028 METER1
030 REGISTER1/READING DATE2
026 MPAN2
028 METER1
030 REGISTER1/READING DATE3
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 186 of 227
Working Practices Product Set (WPPS)
2. Multiple MPANs per D0010, 1 D0010 per MPAN with single group 026 per flow instance
The following participants have indicated that they populate the D0010 in this manner:SOUT
HYDE
2 examples of populating the D0010 in this manner follow:D0010 FLOW1
026 MPAN1
028 METER1
030 REGISTER1/READING DATE1
030 REGISTER2/READING DATE1
028 METER2
030 REGISTER1/READING DATE1
028 METER1
030 REGISTER1/READING DATE2
030 REGISTER2/READING DATE2
028 METER2
030 REGISTER1/READING DATE2
026 MPAN2
028 METER1 (Reading type same for all reading dates)
030 REGISTER1/READING DATE1
030 REGISTER1/READING DATE2
030 REGISTER1/READING DATE3
026 MPAN3
028 METER1 (Reading Type ‘I’)
030 REGISTER1/READING DATE1
028 METER1 (reading Type ‘R’)
030 REGISTER1/READING DATE2
030 REGISTER1/READING DATE3
028 METER2 (Reading Type ‘S’)
030 REGISTER1/READING DATE4
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 187 of 227
Working Practices Product Set (WPPS)
3. Multiple MPANs per D0010, 1 D0010 per MPAN
The following participants have indicated that they populate the D0010 in this manner:SPOW
SEEB
MANW
YELG
LOND
NEEB
NORW – NFB System generated for non Mass Market Customers
An example of populating the D0010 in this manner follow:D0010 FLOW1
026 MPAN1
028 METER1
030 REGISTER1/READING DATE1
030 REGISTER2/READING DATE1
028 METER2
030 REGISTER1/READING DATE1
026 MPAN1
028 METER1
030 REGISTER1/READING DATE2
030 REGISTER2/READING DATE2
028 METER2
030 REGISTER1/READING DATE2
026 MPAN2
028 METER1
030 REGISTER1/READING DATE1
026 MPAN2
028 METER1
030 REGISTER1/READING DATE2
026 MPAN2
028 METER1
030 REGISTER1/READING DATE3
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 188 of 227
Working Practices Product Set (WPPS)
4. Multiple MPANs per D0010, 1 D0010 per MPAN where multi register meters have
separate groups 028 and 030
The following participant has indicated that they populate the D0010 in this manner:NORW – Customer 1 System generated for Mass Market Customers
An example of populating the D0010 in this manner follow:D0010 FLOW1
026 MPAN1
028 METER1
030 REGISTER1/READING DATE1
028 METER1
030 REGISTER2/READING DATE1
028 METER1
030 REGISTER1/READING DATE2
028 METER1
030 REGISTER2/READING DATE2
028 METER1
030 REGISTER1/READING DATE1
028 METER1
030 REGISTER1/READING DATE2
026 MPAN2
028 METER1
030 REGISTER1/READING DATE1
028 METER1
030 REGISTER1/READING DATE2
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 189 of 227
Working Practices Product Set (WPPS)
5. Multiple MPANs per D0010, Multiple D0010s per MPAN
The following participant has indicated that they populate the D0010 in this manner:EMEB
2 examples of populating the D0010 in this manner follow:D0010 FLOW1
026 MPAN1
028 METER1
030 REGISTER1/READING DATE1
030 REGISTER2/READING DATE1
028 METER2
030 REGISTER1/READING DATE1
026 MPAN2
028 METER1
030 REGISTER1/READING DATE1
026 MPAN3
028 METER1
030 REGISTER1/READING DATE1
030 REGISTER2/READING DATE1
028 METER2
030 REGISTER1/READING DATE1
026 MPAN4
028 METER1
030 REGISTER1/READING DATE1
D0010 FLOW2
026 MPAN2
028 METER1
030 REGISTER1/READING DATE4
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 190 of 227
Working Practices Product Set (WPPS)
WP 140. Conventions for the completion of Meter Register Id (J0010)
WP no:
Title:
Implemented by
Implementation 29/05/2003
Industry
Date:
Conventions for the completion of Meter Register Id (J0010)
Version:
1.1
WP type:
S
Related WP(s)
None
Date raised:
13/03/2000
Parties Affected:
NHHDC, MOP, Supplier, Distributor
Baseline Products
Impacted:
None
Last amended:
28/06/2007
Change History:
V1 with WPPS CP 60 approved at MDB_03_02 on 27/02/03
140
Status:
V1.1 with WPPS CP 84 approved at MDB_07_04 on 26/04/07
Context:
In the DTC, Data Item J0010 Meter Register Id is specified as CHAR (2). There are no further
specifications that address the internal format or conventions for populating this item. Meter
Register Id can therefore be populated with both alpha and numeric characters, and different
values can be used by other organisations to indicate the same thing.
Meter Register Id allows meter readings to be correctly allocated to the appropriate meter register.
With Agent Competition, it has been identified that NHHDC’s receive various combinations of
Meter Register Id configurations, and often have difficulty establishing the conventions used in
populating this field. This can in turn result in readings not being settled correctly.
Working Practice:
The purpose of this Working Practice is to provide a reference list of how agents populate J0010
for NHH Metering Points and what assumptions should be made about any conventions that are
used.
The Meter Operator is able to allocate any two character code for the Data Item, however, this
should only be done on Meter Installation or Meter Reconfiguration. The conventions used by the
MOP in the completion of Meter Register Id should be maintained wherever possible i.e. the
codes should not be changed on a change of MOP or retrospectively as the Supplier and NHHDC
will not be able to reconcile future readings with the New Register Ids.
MOP’s have reported that they complete data item J0010 as set out in the attached table, “Table
of Meter Register Id (J0010) Conventions”.
Impact of not implementing Working Practice:
DCs may fail to map the Meter Register Id with the physical registers which could result in
readings not entering settlements. Suppliers also may encounter billing problems.
Table follows
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 191 of 227
Working Practices Product Set (WPPS)
Associated Document to WP 140 – Table of Meter Register Id (J0010) Conventions
Participant
J0010 Conventions
Siemens
1 Rate Tariff
2 Rate Tariff
3 Rate Tariff
01 = All Day
01 = Low / Night
02 = Normal / Day
2 MPANs
01 = Low / Night
02 – Normal / Day
01 – Heating
(EELC)
R1 = Low / Night
R2 = Normal / Day
1 = Low / Night
2 = Normal / Day
L = Low
N = Normal
Key Prepayment:
01 = Normal / Day
02 = Low / Night
Other
or
01 = Low / Night
02 – Normal / Day
03 – Heating
1MPAN
01 = Low / Night
02 = Normal / Day
03 = Evening / Weekend
Wherever possible the two-digit J0010 Meter Register ID data item will be consistent with and
reflective of the identifiers or markings of the registers on the meters.
Siemens
(EELC)
New,
replacement
and reconfigured
meters (labels)
Where the two-digit J0010 Meter Register ID data item cannot represent the identifier of the
registers on the meters, a label will match the meter register identifier to the appropriate Meter
Register Id using the following convention.
EDF Customer
Field Services
EDF Energy within the London and SE area does not apply labels in any situation where the register
identification is obvious. Such circumstances are as follows:
Any meter with only one register, in such circumstances the register mapping is irrefutably
mapped.

Electromechanical and electronic meters with mechanical registers where the register
identifiers are clearly aligned to the data item J0010. EG L and N will be identified as such
in the D0149 data flow. Similarly rate 1 and rate 2 will be identified as 01 and 02 in the
D0149 data flow.
Register Type
Unrestricted Maximum Demand
Restricted Maximum Demand
Cumulative Unrestricted Maximum Demand
Cumulative Restricted Maximum Demand
(LOND &
SEEB)
Two-digit ‘Meter Register Id’ Reference
S1
S2
S3
S4
For more complex metering where the mapping is not so obvious EDF Energy within the London and
SE is intending to use the J0010 meter register identifiers identified in the table below. Many of the
meters in use do not have clear display identifiers and to overcome this situation labels displaying a
cross reference table will be applied advising the meter reader of which registers need to be
recorded.
Function
Rate 1 kWh
Rate 2 kWh
Rate 3 kWh
Rate 4 kWh
Rate 5 kWh
Rate 6 kWh
MD kW
kWh Total Units
kVArh
J0010 Meter Register Identifier
01
02
03
04
05
06
MD
TU
TR
It should be noted that no temporal relationship with TPR will be provided since it is assumed that
such mapping will be taken from the D0149 dataflow.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 192 of 227
Working Practices Product Set (WPPS)
Participant
J0010 Conventions
Metering
Services
(MIDE)
1 Rate Tariff
2 Rate Tariff
00 = All Day
01 = Low (Night)
03 = 1 Rate Meter
with integral MD /
kWh settlement
02 = Normal (Day)
04 = 1 Rate Meter
with integral MD / kW
Maximum Demand
(MD)
1R + kVA MD (old)
3 Rate Tariff
Other
4 Rate PPA
13=TOTAL
15=NIGHT
2R + kVA MD
21= DAY
Day kWh = 11
Night kWh = 21
23= DAY
MD kVA= 24
25= DAY
Day kWh = 0
MD kVA = 4
or
31=REACTIVE
Radio TeleMeter,
Register - Rate 1 =
Normal (or day),
33=MD
41=MD
1R + kVA MD (new)
Day kWh = 1
4 Rate PXA
Register -Rate 4 =
Low ( or night)
13= TOTAL
MD kVA=4
15= NIGHT
1R + kW MD
Smart Power Meter,
21= DAY
Day kWh= 11
Register - Rate 1 =
Normal (or day),
23= DAY
Register -
31=REACTIVE
MD kVA=12
1R + kVA MD (tariff
M) (old)
Day kWh= 3
25= DAY
33= MD
Rate 2 = Low (or
night)
41= MD
MD k VA= 4 or
1R + kVA MD (tariff
M) (new)
43= MD
CBA card/token
meters,
6 Rate PPM- Last Dial 1
Register - Rate 1 =
Normal (or
day),
15= NIGHT
Register - Rate 2 =
Low (or night)
25= DAY
13= TOTAL
Day kWh= 0
MD kVA=4
21= DAY
23= DAY
31= DAY
33= DAY
Other Token Meters,
35=REACTIVE
41= MD
Register - Rate 1 =
Normal (or day),
43= MD
51= MD
Register Rate 2 = Low (or
night)
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 193 of 227
Working Practices Product Set (WPPS)
Participant
J0010 Conventions
Northern
Electric
Distribution
Ltd/Yorkshire
Electric
Distribution
Ltd
1 Rate Tariff
2 Rate Tariff
3 Rate Tariff
A1 = Standard /
Unrestricted
A7 = Economy 7
(Heating on)
A8 = Economy 7
(Heating off)
B2 = Seasonal Time of
Day (Peak Period)
D7 = Budget Warmth
(Heating on)
A9 = Dynamic
(Heating on)
B1 = Dynamic
(Heating off)
(NEEB)
Other
B3 = Seasonal Time of
Day ((Day Period)
B4 = Seasonal Time of
Day (Night Period)
C8 = Economy 8
(Heating on)
B6 = Economy 8
(Heating off)
Credit Meters:
"00" (total)
Northern
Electric
Distribution
Ltd/Yorkshire
Electric
Distribution
Electric
Key Meters:
"H" (total)
Token Meters:
"t" (total)
(YELG)
For all new,
replacement or
reconfigured
meters fitted on
or after the 2nd
November 2006
for both our
NEEB and
YELG identifiers
D5 = Boiler Tariff
(Heating on)
D6 = Boiler Tariff
(Heating off)
"01" (low)
"02" (normal)
For where the meter
holds 4 or a 6 Rate
SToD the registers
are numbered
sequentially. For
example a 6 Rate
SToD meter (see
below) may have the
following registers,
the number to the
right of this shall be
the Reg Id held within
Mop.
"2" (low)
"1" (normal)
"2" (low)
"1" (normal)
Note: Where a Token
Acceptor is fitted the
meter shall be
recorded as Credit,
therefore the defaults
are "00" or"01/02"
Demand:
01 R01
07
Total:
02 R02
08
Max Demand:
03 R03 09
Reactive
04 R04
:
10
Cumulative Max
Demand:
05 R05 11
Reset Counter:
06 R06 12
United Utilities
01 = All Day
(NORW)
Version :
5.4
Status :
Approved
02 = Normal / Day
01 = Low / Night
02 = Weekday
03 = Low
04 = Weekend
Date :
01 Nov 2007
Page 194 of 227
Working Practices Product Set (WPPS)
Participant
J0010 Conventions
Scottish and
Southern
1 Rate Tariff
2 Rate Tariff
3 Rate Tariff
Other
"01" = Single Rate
2 rate "old type"
meter
"L " = Low Rate;
"N " = Normal Rate
or
"01" = Low Rate;
"02" = Normal Rate
"01","1 ",R1" = Weekday
"02","2 ","R2" =
Evening/Weekend
"03","3 ","R3" = Night
"HYDE"
For multi rate meters
with MD's,
the Register Id map
to the
sequence they are
displayed
on the Meter.
eg.
"02" = Day KWh
"03" = Night KWh
"04" = Total KVArh
"07" = Day KW
"08" = Night KW
(SOUT &
HYDE)
2 rate electronic
meter
"01","1 ","R1" = Day
"02","2 ",R2" = Night
or
"02" = Day
"03" = Night
"SOUT"
For multi rate meters
with MD's,
the first Register Id
maps to the
first MD or KWh
Register shown
in the display
sequence followed
by subsequent
Register Ids to
subsequent MD or
KWh Registers
that are displayed on
the Meter.
ie.
"01" = Maximum
Demand
"02" = Day KWh
"03" = Night KWh
Registers are numbered sequentially ‘01’, ‘02’, ’03’ etc until all the operational registers contained on
the meter are numbered.
Dataserve
(SPOW &
MANW)
IMServ Europe
(SEEB)
TO = Standard /
Unrestricted
OP = Off Peak /
Resticted
NT = Low / Night
WD = Weekday
DY = Normal / Day
EW = Evening / Weekend
NT = Low / Night
MD = Maximum
Demand
RD = Reactive
Demand
CT = Check Total
CD = Check Demand
HT = Warmwise
(Heating)
TR = Total Reactive
HI = Seasonal Time
of Day (Perk Period
Winter)
11 = Seasonal Time
of Day (Intermediate
Winter use)
12 = Seasonal Time
of Day (Summer and
all other times)
NT = Seasonal Time
of Day (Low/Night)
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 195 of 227
Working Practices Product Set (WPPS)
Participant
Western Power
Distribution
J0010 Conventions
1 Rate Tariff
2 Rate Tariff
3 Rate Tariff
Historically “01”
Historically,
"02" = low rate;
"01" = normal rate
R1 Day
Currently "S " or “R1”
(SWAE)
The following is
a general guide
only-meter
technical details
must be used to
determine the
true nature of
any register.
Current, very
recently
introduced,
convention is to
populate the
meter register
ID field with the
same register
ID that is
present on the
actual physical
meter.
Previously, a
register ID of 01
would indicate
normal, or
higher, rate and
a 02 would
typically
indicate low
rate.
Other
For multi rate meters
there may be "R3",
"R4" or "03 or "04"
etc.
R2 Evening
R3 Night
Currently,
2 rate "old type"
meter
"L " = low rate;
"N " = normal rate
For multi rate
registers there can
also be "05" or "06" or
"07" or "08" but there
is no consistent
mapping whereby
one register ID
always indicates a
particular register
type.
2 rate electronic
meter
"R1" = register 1;
"R2" = register 2
Historically, Maximum
Demand was “05”
(and “06” and “07” for
On/Off peak) and “02”
for kVArh.
Maximum Demand
can be any of
MD
D1
D2
Currently, Maximum
Demand can be any
of
D3
MD
D1 (On/Off MD – no
longer used in the
field)
D2
“”
D3
“”
KVArh register "KV”
(Normally, MD
only applies to 2
rate as shown)
N.B. - This were
the conventions
used by the
SWAE
NHHMOA up to
30th June 2007
prior to closure
of the business.
Following this
date the
convention
shown will be
applicable to
other
NHHMOAs who
have now been
appointed to
MPANs in
South Wales
where the meter
was installed
prior to 1st July
2007 and where
the previous
NHHMOA was
5.4
Version
SWAE. :
Approved
Status :
Date :
01 Nov 2007
Page 196 of 227
Working Practices Product Set (WPPS)
Participant
J0010 Conventions
Western Power
Distribution
(SWEB)
The following is
a general guide
only-meter
technical details
must be used to
determine the
true nature of
any register.
1 Rate Tariff
2 Rate Tariff
3 Rate Tariff
Other
Historically “01” (or
“02”, “03”, etc as
meters were
changed)
Historically
"01" = low rate;
"02" = normal rate
or
"03" = low rate;
"04" = normal rate
etc
Historically “01” “02” and
“03” (or “04”, “05” and
“06”)
Historically “01” “02”,
“03” and “04” (or “05”,
“06”, “07” and “06”)
Currently
R1 Day
R2 Evening
R3 Night
Currently
R1 Day
R2 Intermediate 1
R3 Intermediate 1
"R4" Night
.
Currently "S " or “R1”.
Separate Off peak
“RH”
Current
convention is to
populate the
meter register
ID field with the
same register
ID that is
present on the
actual physical
meter.
Currently 2 rate "old
type" meter "L " = low
rate;
"N " = normal rate
2 rate electronic
meter
"R1" = register 1;
"R2" = register 2
Previously, a
register ID of 01
would typically
indicate low rate
and an 02
would indicate
normal, or
higher, rate.
Where a meter
has register IDs
of 03 and 04, or
of 05 and 06
etc. then the
lower register ID
would typically
refer to the
lower rate and
the higher
register ID
would typically
refer to the
higher rate.
Maximum
demand register
"MD" and
KVArh register
"KV”, can apply
to any number
of rates
(Historically
“02”, etc used).
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 197 of 227
Working Practices Product Set (WPPS)
Participant
J0010 Conventions
1 Rate Tariff
2 Rate Tariff
Northern
Electric
Distribution
Ltd/Yorkshire
Electric
Distribution
Ltd
3 Rate Tariff
Other
01 = 0030 to 0730 (MonFri)
A range of Register
Ids is adopted.
02 = 1930 to 0030 (Mon –
Fri) and 0730 to 0030 (Sat
& Sun)
03 = 0730 to 1930 (Mon
to Fri)
(YELG)
Northern
Electric
Distribution
Ltd/Yorkshire
Electric
Distribution
Electric
Single Rate Meters;
sole kWh register
(both restricted and
unrestricted hours of
operation).
(YELG)
Please note;
mechanical single
rate meters do not
have a physical
register id (it is the
sole kWh register).
*See note below
about mechanical
and electronic
metering.
Credit Meters:
"00" (total)
"01" (low)
"02" (normal)
Meter Register Id =
01
Northern
Electric
Distribution
Ltd/Yorkshire
Electric
Distribution
Electric
Two rate meters
(economy 7 and
W/E).
Four Rate Meters
(W/E7)
Night Rate (Rate 1) =
01
Night Rate (Low
Rate) = 01
Evening/Weekend
(Rate 2) = 02
Day Rate (Normal
Rate) = 02
Weekday (Rate 3) =
03
Total (Rate 4) = 04
As with all registers,
the TPR describes
the specific hours of
operation.
For where the meter
holds 4 or a 6 Rate
SToD the registers
are numbered
sequentially. For
example a 6 Rate
SToD meter (see
below) may have the
following registers,
the number to the
right of this shall be
the Reg Id held within
Mop.
Key Meters:
"H" (total)
Token Meters:
"t" (total)
(YELG)
For all new,
replacement or
reconfigured
meters fitted on
or after the 2nd
November 2006
for both our
NEEB and
YELG identifiers
Note: Where a Token
Acceptor is fitted the
meter shall be
recorded as Credit,
therefore the defaults
are "00" or"01/02"
"2" (low)
"1" (normal)
"2" (low)
"1" (normal)
Demand:
01 R01
07
Total:
02 R02
08
Max Demand:
03 R03 09
Reactive
04 R04
:
10
Cumulative Max
Demand:
05 R05 11
Reset Counter:
06 R06 12
*It is important to appreciate that the actual or physical id (display) is determined according to
meter manufacturer and technology.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 198 of 227
Working Practices Product Set (WPPS)
For example 'mechanical' two rate meters show displays of 'Low' and ‘Normal’ but an electronic
two rate would typically show displays as 'Rate 1' and 'Rate 2' where Rate 1 is the night rate and
Rate 2 is the day rate. We therefore have to declare a common Register id and as you can see
from the above these are shown as the values '01' and '02' for both types.
The general convention is that the cheapest rate is displayed first working up to the most
expensive rate.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 199 of 227
Working Practices Product Set (WPPS)
WP 141. HH MTD – Clarification of use of specific data items in D0268.
WP no:
Version:
Implemented by
Implementation 28/08/2003
Industry
Date:
Half Hourly Meter Technical Details – Clarification of use of specific data
items in D0268.
3
WP type:
W
Related WP(s)
None
Date raised:
29/05/2003
Parties Affected:
HHMOP, HHDC, Supplier, Distributor
Baseline Products
Impacted:
DTC
Last amended:
23/2/06
Change History:
V1 with WPPS CP 68 approved at MDB_03_05 on 29/05/03
141
Title:
Status:
V2 with WPPS CP 69 approved at MDB_03_08 on 28/08/03
V3 with WPPS CP 77 approved at MDB 05_10 on 27/10/05
Context:
The D0268 flow contains information required by the HHDC to collect readings from the HH
metering systems. In order to ensure that the correct information is provided to the HHDC, the
various data items in the flow must be populated according to relevant rules. This Working
Practice aims to clarify the rules that the HH MOP must follow when filling out the values for
specific data items within the D0268 flow. This working practice combined with Annex C of the
Data Transfer Catalogue outlines how to appropriately populate all the relevant data items.
Working Practice:
The following section provides general guidance on the population of data items within the D0268
dataflow.
Code of Practice G Example (FERRARIS DISC METER):
An issue exists for a CoP G meter where the lag (RI) and lead (RE) channels on the outstation are
associated with the same physical meter register, which is a Ferraris disc. This would lead to both
outstation channels having the same Meter Register Id. The RI and RE channels should be
differentiated by using a different Meter register Id for each i.e 1I (for the RI channel), and 1E (for
the RE channel). For some areas in this instance the meter register is populated with ‘_E’ and ‘_I’
respectively to differentiate the same meter, different functions.
The following sections refer in greater detail to specific data items and associated relevant
values.
Outstation Passwords and PIN:
If the outstation requires a password (including default passwords) to allow interrogation and
timesetting, this shall be populated in the D0268.
The following table provides guidelines on the population of outstation passwords and PINs for the
various outstation types:
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 200 of 227
Working Practices Product Set (WPPS)
Outstation Type
PIN
Password
Level 1
Password
Level 2
Outstation
Id
C10
No
No
No
Yes
C11
No
No
No
Yes
C12
No
No
No
Yes
CEW
Yes
Yes
Yes
Yes
CLK
No
No
No
Yes
CMU with PSTN
Yes if multi
drop – typically
“LAN”
Yes
Yes
Yes
CMU with Paknet
Yes if multi
drop – typically
“NET LAN”
Yes
Yes
Yes
FAF
No
No
No
Yes
FCL
No
No
No
Yes
FCM
No
No
No
Yes
GE5
No
Yes
Yes
Yes
GOP
No
Yes
Yes
Yes
GP1
Yes
Yes
Yes
Yes
GP2
Yes
Yes
Yes
Yes
INP
Yes
Yes
Yes
Yes
KME
Yes
No
No
Yes
KMO
Yes
No
No
Yes
NGL
No
Yes
Yes
Yes
PRM with PSTN
Yes if multi
drop – typically
“LAN”
Yes
Yes
Yes
PRM with Paknet
Yes if multi
drop – typically
“NET LAN”
Yes
Yes
Yes
PXA
No
Yes
Yes
Yes
S4S
Yes if multi
drop
Yes
Yes
Yes
SPR
No
Yes
No
Yes
VIS
Yes
Yes
Yes
Yes
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 201 of 227
Working Practices Product Set (WPPS)
Reader Passwords for PXA and INDP meters shall be populated in the data item ‘Outstation Pin’
(J0464) only and the data item ‘Reader Password’ (J1258) shall be left blank.
ABB Vision Meter D0268 Population
Channel Numbers and Measurement Quantity Id:
Unlike the meter it supersedes, the ABB Vision has the potential for 14 profiling channels – the
PPM has 5. Reactive demand is recorded differently within the Vision meter, and is split into
its capacitive and inductive components. The 14 channels are as follows:
Channel Number (J0382)
Description
01
Import W
02
Export W
03
Q1 Inductive Import
04
Q2 Capacitive Export
05
Q3 Inductive Export
06
Q4 Capacitive Import
07
Total VA
08
Customer Defined 1
09
Customer Defined 2
10
Customer Defined 3
11
External Input 1
12
External Input 2
13
External Input 3
14
External Input 4
Reactive demand is recorded as above in channels 3 through 6:
 Total Import kVAr demand is vector sum of Q1 + Q2
 Total Export kVAr demand is vector sum of Q3 + Q4
Some MOPs utilise channel 8 as Q1 + Q2 (RI) and channel 9 as Q3 + Q4. In such circumstances
the D0268 would look something like:
01A|Mpanxxxxxxxxx|20000328|C|20000328|E|52|S/SHatch|11000/110|100/5|11000|3
02A|N502X03936|VIS|4|6|001|Abcd12|abcd34||PS|01999123456|1200|||
03A|N502X03936|ABB VISION HV (3 PHASE 3 WIRE)||
04A|01|N502X03936|1|1.000000|10.00|1.0000|AI|6|||
04A|02|N502X03936|2|1.000000|10.00|1.0000|UN|6|||
04A|03|N502X03936|8|1.000000|10.00|1.0000|RI|6|||
04A|04|N502X03936|9|1.000000|10.00|1.0000|RE|6|||
Impact of not implementing WP:
The impact of not implementing this Working Practice would be to continue facing the problems
caused by the current flow format. This Working Practice will ensure that less incorrect data is
inputted against D0268 data items, thus reducing the level of error and improving the efficiency of
using the flow. This will enable the HHDC to better perform their necessary tasks as they are
provided with correct data, and they are provided with workarounds to known deficiencies.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 202 of 227
Working Practices Product Set (WPPS)
Associated Document for WP 141 - Examples
1. Calmu with Paknet Communications
DTC flow format
File Type
DTC version
File Format
File Identifier
:
:
:
:
D0268
001
DTC
0000000001
**************************************************************
Flow Instance 1
01A
M
M
M
O
M
O
M
M
M
O
MPAN Cores
Range: 1 - 1
J0003 MPAN Core
: 1000000000001
J1254 Effective from Settlement Date {MSM : 19971001
J0418 Meter COP
: 5
J1686 Meter COP Issue Number
:
1
J1687 Complex Site Indicator
: F
J1025 Meter Equipment/Service Location
: In the Switchroom
J1255 System Voltage
: 415
J0427 Number of Phases
: 3
J1689 Event Indicator
: L
J0012 Additional Information
:
02A Outstation Details
Range: 1 - *
M J0428 Outstation Id
: 97X00001
M J0471 Outstation Type
: CMU
O J1691 Modem Type
:
M J0469 Outstation Number of Channels
: 4
M J1256 Outstation Number of Dials
: 6
O J0464 Outstation PIN
:
O J0470 Outstation Password Level 1
: 000000008259
O J1257 Outstation Password Level 2
:
O J1258 Reader Password
:
M J0386 Communications Method
: PK
O J1690 Dial In/ Dial Out Indicator
:
O J0385 Communications Address
:23533900123456
O J1260 Baud Rate
: 9600
O J1261 Sequence MPAN Core
:
O J1262 Sequence Outstation Id
:
03A Meter Details
Range: 1 - *
M J0004 Meter Id (Serial Number)
: 97X00001
O J0410 Manufacturers Make & Type
:
O J0501 Meter Current Rating
:
O J0455 VT Ratio
:
O J0454 CT Ratio
:
M J1684 Feeder Status
: A
M J1685 Feeder Status Effective From Date
: 19971001
M J1677 Meter Asset Provider
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 97X00001
M J0382 Channel Number
: 1
M J0432 Pulse Multiplier
: 5.000000
M J0475 Meter Register Multiplier
: 100.00
M J1688 Outstation Multiplier
: 100.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 2
M J0428 Outstation Id
: 97X00001
M J0382 Channel Number
: 2
M J0432 Pulse Multiplier
: 5.000000
M J0475 Meter Register Multiplier
: 100.00
M J1688 Outstation Multiplier
: 100.0000
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 203 of 227
Working Practices Product Set (WPPS)
M J0103 Measurement Quantity Id
: UN
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
: 97X00001
M J0382 Channel Number
: 3
M J0432 Pulse Multiplier
: 5.000000
M J0475 Meter Register Multiplier
: 100.00
M J1688 Outstation Multiplier
: 100.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 4
M J0428 Outstation Id
: 97X00001
M J0382 Channel Number
: 4
M J0432 Pulse Multiplier
: 5.000000
M J0475 Meter Register Multiplier
: 100.00
M J1688 Outstation Multiplier
: 100.0000
M J0103 Measurement Quantity Id
: RE
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
**************************************************************
File Type
: D0268
DTC version
: 001
Flows in File : 1
Groups in File : 7
File Ends.
**************************************************************
DTC UFF file
01A|1000000000001|19971001|5|1|F|In the Switchroom |415|3|L||
02A|97X00001|CMU||4|6||000000008259|||PK||23533900123456|9600|||
03A|97X00001|||||A|19971001|MPID|
04A|1|97X00001|1|5.000000|100.00|100.0000|AI|6|||
04A|2|97X00001|2|5.000000|100.00|100.0000|UN|6|||
04A|3|97X00001|3|5.000000|100.00|100.0000|RI|6|||
04A|4|97X00001|4|5.000000|100.00|100.0000|RE|6|||
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 204 of 227
Working Practices Product Set (WPPS)
2. GEC/ABB PPM Issue 2 With PSTN Communications
DTC flow format
File Type
DTC version
File Format
File Identifier
:
:
:
:
D0268
001
DTC
0000000001
**************************************************************
Flow Instance 1
01A
M
M
M
O
M
O
M
M
M
O
MPAN Cores
Range: 1 - 1
J0003 MPAN Core
: 1000000000002
J1254 Effective from Settlement Date {MSM : 19971001
J0418 Meter COP
: 5
J1686 Meter COP Issue Number
: 1
J1687 Complex Site Indicator
: F
J1025 Meter Equipment/Service Location
: Meter room
J1255 System Voltage
: 415
J0427 Number of Phases
: 3
J1689 Event Indicator
: L
J0012 Additional Information
:
02A Outstation Details
Range: 1 - *
M J0428 Outstation Id
: K97XX12345
M J0471 Outstation Type
: GP2
O J1691 Modem Type
:
M J0469 Outstation Number of Channels
: 4
M J1256 Outstation Number of Dials
: 6
O J0464 Outstation PIN
: 001
O J0470 Outstation Password Level 1
: ABC1234
O J1257 Outstation Password Level 2
: ABC5678
O J1258 Reader Password
:
M J0386 Communications Method
: PS
O J1690 Dial In/ Dial Out Indicator
:
O J0385 Communications Address
: 01234567890
O J1260 Baud Rate
: 1200
O J1261 Sequence MPAN Core
:
O J1262 Sequence Outstation Id
:
03A Meter Details
Range: 1 - *
M J0004 Meter Id (Serial Number)
: K97XX12345
O J0410 Manufacturers Make & Type
:
O J0501 Meter Current Rating
:
O J0455 VT Ratio
:
O J0454 CT Ratio
:
M J1684 Feeder Status
: A
M J1685 Feeder Status Effective From Date
: 19971001
M J1677 Meter Asset Provider
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
:K97XX12345
M J0382 Channel Number
: 1
M J0432 Pulse Multiplier
: 0.050000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 2
M J0428 Outstation Id
:K97XX12345
M J0382 Channel Number
: 2
M J0432 Pulse Multiplier
: 0.050000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: UN
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 205 of 227
Working Practices Product Set (WPPS)
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
:K97XX12345
M J0382 Channel Number
: 3
M J0432 Pulse Multiplier
: 0.050000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 4
M J0428 Outstation Id
:K97XX12345
M J0382 Channel Number
: 4
M J0432 Pulse Multiplier
: 0.050000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: RE
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
**************************************************************
File Type
: D0268
DTC version
: 001
Flows in File : 1
Groups in File : 7
File Ends.
**************************************************************
DTC UFF file
01A|1000000000002|19971001|5|1|F|Meter room |415|3|L||
02A|K97XX12345|GP2||4|6|001|ABC1234|ABC5678||PS||01234567890|1200|||
03A|K97XX12345|||||A|19971001|MPID|
04A|1|K97XX12345|1|0.050000|10.00|10.0000|AI|6|||
04A|2|K97XX12345|2|0.050000|10.00|10.0000|UN|6|||
04A|3|K97XX12345|3|0.050000|10.00|10.0000|RI|6|||
04A|4|K97XX12345|4|0.050000|10.00|10.0000|RE|6|||
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 206 of 227
Working Practices Product Set (WPPS)
3. CALMU Link With PSTN Communications
DTC flow format
File Type
: D0268
DTC version
: 001
File Format
: DTC
File Identifier : 0000000001
**************************************************************
Flow Instance 1
01A
M
M
M
O
O
M
M
M
O
MPAN Cores
Range: 1 - 1
J0003 MPAN Core
: 2300000000001
J1254 Effective from Settlement Date {MSM : 19980701
J0418 Meter COP
: 3
J1686 Meter COP Issue Number
:
J1025 Meter Equipment/Service Location
:
J1255 System Voltage
: 415
J0427 Number of Phases
: 3
J1689 Event Indicator
: L
J0012 Additional Information
:
02A Outstation Details
Range: 1 - *
M J0428 Outstation Id
: 92X00001
M J0471 Outstation Type
: CLK
O J1691 Modem Type
:
M J0469 Outstation Number of Channels
: 4
M J1256 Outstation Number of Dials
: 6
O J0464 Outstation PIN
:
O J0470 Outstation Password Level 1
:
O J1257 Outstation Password Level 2
:
O J1258 Reader Password
:
M J0386 Communications Method
: PS
O J1690 Dial In/ Dial Out Indicator
:
O J0385 Communications Address
: 01234567890
O J1260 Baud Rate
: 1200
O J1261 Sequence MPAN Core
:
O J1262 Sequence Outstation Id
:
02A Outstation Details
Range: 1 - *
M J0428 Outstation Id
: 92X00002
M J0471 Outstation Type
: CLK
O J1691 Modem Type
:
M J0469 Outstation Number of Channels
: 4
M J1256 Outstation Number of Dials
: 6
O J0464 Outstation PIN
:
O J0470 Outstation Password Level 1
:
O J1257 Outstation Password Level 2
:
O J1258 Reader Password
:
M J0386 Communications Method
: PS
O J1690 Dial In/ Dial Out Indicator
:
O J0385 Communications Address
: 01234567890
O J1260 Baud Rate
: 1200
O J1261 Sequence MPAN Core
:
O J1262 Sequence Outstation Id
: 92X00001
03A Meter Details
Range: 1 - *
M J0004 Meter Id (Serial Number)
: CP92X00001
O J0410 Manufacturers Make & Type
:
O J0501 Meter Current Rating
:
O J0455 VT Ratio
:
O J0454 CT Ratio
:
M J1684 Feeder Status
: A
M J1685 Feeder Status Effective From Date
: 19971001
M J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 92X00001
M J0382 Channel Number
: 1
M J0432 Pulse Multiplier
: 0.100000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 207 of 227
Working Practices Product Set (WPPS)
03A
M
O
O
O
O
M
M
M
O J0476 Associated Meter Id
:CP92X00002
O J0477 Associated Meter Register Id
: 1
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 2
M J0428 Outstation Id
: 92X00001
M J0382 Channel Number
: 2
M J0432 Pulse Multiplier
: 0.100000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:CP92X00002
O J0477 Associated Meter Register Id
: 2
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
: 92X00001
M J0382 Channel Number
: 3
M J0432 Pulse Multiplier
: 0.100000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: RE
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:CP92X00002
O J0477 Associated Meter Register Id
: 3
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 4
M J0428 Outstation Id
: 92X00001
M J0382 Channel Number
: 4
M J0432 Pulse Multiplier
: 0.100000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: UN
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:CP92X00002
O J0477 Associated Meter Register Id
: 4
Meter Details
Range: 1 - *
J0004 Meter Id (Serial Number)
: CP92X00002
J0410 Manufacturers Make & Type
:
J0501 Meter Current Rating
:
J0455 VT Ratio
:
J0454 CT Ratio
:
J1684 Feeder Status
: A
J1685 Feeder Status Effective From Date
: 19971001
J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 92X00002
M J0382 Channel Number
: 1
M J0432 Pulse Multiplier
: 0.100000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 2
M J0428 Outstation Id
: 92X00002
M J0382 Channel Number
: 2
M J0432 Pulse Multiplier
: 0.100000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
: 92X00002
M J0382 Channel Number
: 3
M J0432 Pulse Multiplier
: 0.100000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 208 of 227
Working Practices Product Set (WPPS)
M J0103 Measurement Quantity Id
: RE
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 4
M J0428 Outstation Id
: 92X00002
M J0382 Channel Number
: 4
M J0432 Pulse Multiplier
: 0.100000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 10.0000
M J0103 Measurement Quantity Id
: UN
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
**************************************************************
File Type
: D0268
DTC version
: 001
Flows in File : 1
Groups in File : 13
File Ends.
**************************************************************
DTC UFF flow
01A|2300000000001|19980701|3|||415|3|L||
02A|92X00001|CLK||4|6|||||PS||01234567890|1200|||
02A|92X00002|CLK||4|6|||||PS||01234567890|1200||92X00001|
03A|92X00001|||||A|19971001|MPID|
04A|1|92X00001|1|0.100000|10.00|10.0000|AI|6|CP92X00002|1|
04A|2|92X00001|2|0.100000|10.00|10.0000|RI|6|CP92X00002|2|
04A|3|92X00001|3|0.100000|10.00|10.0000|RE|6|CP92X00002|3|
04A|4|92X00001|4|0.100000|10.00|10.0000|UN|6|CP92X00002|4|
03A|CP92X00002|||||A|19971001|MPID|
04A|1|92X00002|1|0.100000|10.00|10.0000|AI|6|||
04A|2|92X00002|2|0.100000|10.00|10.0000|RI|6|||
04A|3|92X00002|3|0.100000|10.00|10.0000|RE|6|||
04A|4|92X00002|4|0.100000|10.00|10.0000|UN|6|||
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 209 of 227
Working Practices Product Set (WPPS)
4. FCL With PSTN Communications
DTC flow format
File Type
: D0268
DTC version
: 001
File Format
: DTC
File Identifier : 0000000001
**************************************************************
Flow Instance 1
01A
M
M
M
O
M
O
M
M
M
O
MPAN Cores
Range: 1 - 1
J0003 MPAN Core
: 1000000000004
J1254 Effective from Settlement Date {MSM : 19971001
J0418 Meter COP
: 3
J1686 Meter COP Issue Number
:
J1687 Complex Site Indicator
: F
J1025 Meter Equipment/Service Location
: Substation
J1255 System Voltage
: 11000
J0427 Number of Phases
: 3
J1689 Event Indicator
: L
J0012 Additional Information
:
02A Outstation Details
Range: 1 - *
M J0428 Outstation Id
: 99999
M J0471 Outstation Type
: FCL
O J1691 Modem Type
:
M J0469 Outstation Number of Channels
: 16
M J1256 Outstation Number of Dials
: 8
O J0464 Outstation PIN
:
O J0470 Outstation Password Level 1
:
O J1257 Outstation Password Level 2
:
O J1258 Reader Password
:
M J0386 Communications Method
: PS
O J1690 Dial In/ Dial Out Indicator
:
O J0385 Communications Address
: 01234567890
O J1260 Baud Rate
: 1200
O J1261 Sequence MPAN Core
:
O J1262 Sequence Outstation Id
:
03A Meter Details
Range: 1 - *
M J0004 Meter Id (Serial Number)
: P99X00001
O J0410 Manufacturers Make & Type
:
O J0501 Meter Current Rating
:
O J0455 VT Ratio
:
O J0454 CT Ratio
:
M J1684 Feeder Status
: A
M J1685 Feeder Status Effective From Date
: 19971001
M J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 1
M J0432 Pulse Multiplier
: 0.500000
M J0475 Meter Register Multiplier
: 100.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:P99X00002
O J0477 Associated Meter Register Id
: 1
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 3
M J0432 Pulse Multiplier
: 0.500000
M J0475 Meter Register Multiplier
: 100.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
03A Meter Details
Range: 1 - *
M J0004 Meter Id (Serial Number)
: P99X00002
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 210 of 227
Working Practices Product Set (WPPS)
O
O
O
O
M
M
M
03A
M
O
O
O
O
M
M
M
03A
M
O
O
O
O
M
M
M
J0410 Manufacturers Make & Type
:
J0501 Meter Current Rating
:
J0455 VT Ratio
:
J0454 CT Ratio
:
J1684 Feeder Status
: A
J1685 Feeder Status Effective From Date
: 19971001
J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 2
M J0432 Pulse Multiplier
: 0.500000
M J0475 Meter Register Multiplier
: 100.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 4
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 4
M J0432 Pulse Multiplier
: 0.500000
M J0475 Meter Register Multiplier
: 100.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: RE
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
Meter Details
Range: 1 - *
J0004 Meter Id (Serial Number)
: P99X00003
J0410 Manufacturers Make & Type
:
J0501 Meter Current Rating
:
J0455 VT Ratio
:
J0454 CT Ratio
:
J1684 Feeder Status
: A
J1685 Feeder Status Effective From Date
: 19971001
J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 5
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 200.00
M J1688 Outstation Multiplier
: 2000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:P99X00004
O J0477 Associated Meter Register Id
: 1
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 7
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 200.00
M J1688 Outstation Multiplier
: 2000.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
Meter Details
Range: 1 - *
J0004 Meter Id (Serial Number)
: P99X00004
J0410 Manufacturers Make & Type
:
J0501 Meter Current Rating
:
J0455 VT Ratio
:
J0454 CT Ratio
:
J1684 Feeder Status
: A
J1685 Feeder Status Effective From Date
: 19971001
J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 6
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 211 of 227
Working Practices Product Set (WPPS)
03A
M
O
O
O
O
M
M
M
03A
M
O
O
O
O
M
M
M
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 200.00
M J1688 Outstation Multiplier
: 2000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 4
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 8
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 200.00
M J1688 Outstation Multiplier
: 2000.0000
M J0103 Measurement Quantity Id
: RE
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
Meter Details
Range: 1 - *
J0004 Meter Id (Serial Number)
: P99X00005
J0410 Manufacturers Make & Type
:
J0501 Meter Current Rating
:
J0455 VT Ratio
:
J0454 CT Ratio
:
J1684 Feeder Status
: A
J1685 Feeder Status Effective From Date
: 19971001
J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 9
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:P99X00006
O J0477 Associated Meter Register Id
: 1
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 11
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
Meter Details
Range: 1 - *
J0004 Meter Id (Serial Number)
: P99X00006
J0410 Manufacturers Make & Type
:
J0501 Meter Current Rating
:
J0455 VT Ratio
:
J0454 CT Ratio
:
J1684 Feeder Status
: A
J1685 Feeder Status Effective From Date
: 19971001
J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 10
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 4
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 12
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 212 of 227
Working Practices Product Set (WPPS)
03A
M
O
O
O
O
M
M
M
03A
M
O
O
O
O
M
M
M
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: RE
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
Meter Details
Range: 1 - *
J0004 Meter Id (Serial Number)
: P99X00007
J0410 Manufacturers Make & Type
:
J0501 Meter Current Rating
:
J0455 VT Ratio
:
J0454 CT Ratio
:
J1684 Feeder Status
: A
J1685 Feeder Status Effective From Date
: 19971001
J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 13
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:P99X00008
O J0477 Associated Meter Register Id
: 1
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 15
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
Meter Details
Range: 1 - *
J0004 Meter Id (Serial Number)
: P99X00008
J0410 Manufacturers Make & Type
:
J0501 Meter Current Rating
:
J0455 VT Ratio
:
J0454 CT Ratio
:
J1684 Feeder Status
: A
J1685 Feeder Status Effective From Date
: 19971001
J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 14
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 4
M J0428 Outstation Id
: 99999
M J0382 Channel Number
: 16
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 10.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: RE
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
**************************************************************
File Type
: D0268
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 213 of 227
Working Practices Product Set (WPPS)
DTC version
: 001
Flows in File : 1
Groups in File : 26
File Ends.
**************************************************************
DTC UFF file
01A|1000000000004|19971001|3||F|Substation|11000|3|L||
02A|99999|FCL||16|8|||||PS||01234567890|1200|||
03A|P99X00001|||||A|19971001|MPID|
04A|1|99999|1|0.500000|100.00|1000.0000|AI|6|P99X00002|1|
04A|3|99999|3|0.500000|100.00|1000.0000|RI|6|||
03A|P99X00002|||||A|19971001|MPID|
04A|1|99999|2|1.000000|200.00|2000.0000|AI|6|||
04A|4|99999|4|1.000000|200.00|2000.0000|RE|6|||
03A|P99X00003|||||A|19971001|MPID|
04A|1|99999|5|1.000000|10.00|1000.0000|AI|6|P99X00004|1|
04A|3|99999|7|1.000000|10.00|1000.0000|RI|6|||
03A|P99X00004|||||A|19971001|MPID|
04A|1|99999|6|1.000000|10.00|1000.0000|AI|6|||
04A|4|99999|8|1.000000|10.00|1000.0000|RE|6|||
03A|P99X00005|||||A|19971001|MPID|
04A|1|99999|9|1.000000|10.00|1000.0000|AI|6|P99X00006|1|
04A|3|99999|11|1.000000|10.00|1000.0000|RI|6|||
03A|P99X00006|||||A|19971001|MPID|
04A|1|99999|10|1.000000|10.00|1000.0000|AI|6|||
04A|4|99999|12|1.000000|10.00|1000.0000|RE|6|||
03A|P99X00007|||||A|19971001|MPID|
04A|1|99999|13|1.000000|10.00|1000.0000|AI|6|P99X00008|1|
04A|3|99999|15|1.000000|10.00|1000.0000|RI|6|||
03A|P99X00008|||||A|19971001|MPID|
04A|1|99999|14|1.000000|10.00|1000.0000|AI|6|||
04A|4|99999|16|1.000000|10.00|1000.0000|RE|6|||
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 214 of 227
Working Practices Product Set (WPPS)
5. NGL With PSTN Communications
DTC flow format
File Type
: D0268
DTC version
: 001
File Format
: DTC
File Identifier : 0000000001
**************************************************************
Flow Instance 1
01A
M
M
M
O
M
O
M
M
M
O
MPAN Cores
Range: 1 - 1
J0003 MPAN Core
: 1000000000005
J1254 Effective from Settlement Date {MSM : 19980301
J0418 Meter COP
: 3
J1686 Meter COP Issue Number
:
J1687 Complex Site Indicator
: F
J1025 Meter Equipment/Service Location
:
J1255 System Voltage
: 415
J0427 Number of Phases
: 3
J1689 Event Indicator
: L
J0012 Additional Information
:
02A Outstation Details
Range: 1 - *
M J0428 Outstation Id
: 9999
M J0471 Outstation Type
: NGL
O J1691 Modem Type
:
M J0469 Outstation Number of Channels
: 4
M J1256 Outstation Number of Dials
: 6
O J0464 Outstation PIN
:
O J0470 Outstation Password Level 1
: PASS
O J1257 Outstation Password Level 2
:
O J1258 Reader Password
: PASS
M J0386 Communications Method
: PS
O J1690 Dial In/ Dial Out Indicator
:
O J0385 Communications Address
: 01234567890
O J1260 Baud Rate
: 1200
O J1261 Sequence MPAN Core
:
O J1262 Sequence Outstation Id
:
03A Meter Details
Range: 1 - *
M J0004 Meter Id (Serial Number)
: F90X00001
O J0410 Manufacturers Make & Type
:
O J0501 Meter Current Rating
:
O J0455 VT Ratio
:
O J0454 CT Ratio
:
M J1684 Feeder Status
: A
M J1685 Feeder Status Effective From Date
: 19971001
M J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
: 9999
M J0382 Channel Number
: 1
M J0432 Pulse Multiplier
: 3.000000
M J0475 Meter Register Multiplier
: 30.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:F90X00002
O J0477 Associated Meter Register Id
: 2
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
: 9999
M J0382 Channel Number
: 3
M J0432 Pulse Multiplier
: 3.000000
M J0475 Meter Register Multiplier
: 30.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
03A Meter Details
Range: 1 - *
M J0004 Meter Id (Serial Number)
: F90X00002
O J0410 Manufacturers Make & Type
:
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 215 of 227
Working Practices Product Set (WPPS)
O
O
O
M
M
M
J0501 Meter Current Rating
:
J0455 VT Ratio
:
J0454 CT Ratio
:
J1684 Feeder Status
: A
J1685 Feeder Status Effective From Date
: 19971001
J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 2
M J0428 Outstation Id
: 9999
M J0382 Channel Number
: 2
M J0432 Pulse Multiplier
: 3.000000
M J0475 Meter Register Multiplier
: 30.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 4
M J0428 Outstation Id
: 9999
M J0382 Channel Number
: 4
M J0432 Pulse Multiplier
: 3.000000
M J0475 Meter Register Multiplier
: 30.00
M J1688 Outstation Multiplier
: 1000.0000
M J0103 Measurement Quantity Id
: RE
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
**************************************************************
File Type
: D0268
DTC version
: 001
Flows in File : 1
Groups in File : 8
File Ends.
**************************************************************
DTC UFF file
01A|1000000000005|19980301|3||F||415|3|L||
02A|9999|NGL||4|6||PASS||PASS|PS||01234567890|1200|||
03A|F90X00001|||||A|19971001|MPID|
04A|1|9999|1|3.000000|30.00|1000.0000|AI|6|F90X00002|2|
04A|3|9999|3|3.000000|30.00|1000.0000|RI|6|||
03A|F90X00002|||||A|19971001|MPID|
04A|2|9999|2|3.000000|30.00|1000.0000|AI|6|||
04A|4|9999|4|3.000000|30.00|1000.0000|RE|6|||
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 216 of 227
Working Practices Product Set (WPPS)
6. Schlumberger PXAR With PSTN Communications
DTC flow format
File Type
: D0268
DTC version
: 001
File Format
: DTC
File Identifier : 0000000001
**************************************************************
Flow Instance 1
01A
M
M
M
O
M
O
M
M
M
O
MPAN Cores
Range: 1 - 1
J0003 MPAN Core
: 1000000000006
J1254 Effective from Settlement Date {MSM : 19970731
J0418 Meter COP
: 5
J1686 Meter COP Issue Number
: 1
J1687 Complex Site Indicator
: F
J1025 Meter Equipment/Service Location
:
J1255 System Voltage
: 415
J0427 Number of Phases
: 3
J1689 Event Indicator
: L
J0012 Additional Information
:
02A Outstation Details
Range: 1 - *
M J0428 Outstation Id
: S93X000001
M J0471 Outstation Type
: PXA
O J1691 Modem Type
:
M J0469 Outstation Number of Channels
: 3
M J1256 Outstation Number of Dials
: 6
O J0464 Outstation PIN
:
O J0470 Outstation Password Level 1
: 1234
O J1257 Outstation Password Level 2
:
O J1258 Reader Password
:
M J0386 Communications Method
: PS
O J0385 Communications Address
: 01234567890
O J1690 Dial In/ Dial Out Indicator
:
O J1260 Baud Rate
: 1200
O J1261 Sequence MPAN Core
:
O J1262 Sequence Outstation Id
:
03A Meter Details
Range: 1 - *
M J0004 Meter Id (Serial Number)
: S93X00001
O J0410 Manufacturers Make & Type
:
O J0501 Meter Current Rating
:
O J0455 VT Ratio
:
O J0454 CT Ratio
:
M J1684 Feeder Status
: A
M J1685 Feeder Status Effective From Date
: 19971001
M J1677 Meter Asset Provider Id
: MPID
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 1
M J0428 Outstation Id
:S93X000001
M J0382 Channel Number
: 1
M J0432 Pulse Multiplier
: 0.012000
M J0475 Meter Register Multiplier
: 1.00
M J1688 Outstation Multiplier
: 1.0000
M J0103 Measurement Quantity Id
: AI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 2
M J0428 Outstation Id
:S93X000001
M J0382 Channel Number
: 2
M J0432 Pulse Multiplier
: 0.012000
M J0475 Meter Register Multiplier
: 1.00
M J1688 Outstation Multiplier
: 1.0000
M J0103 Measurement Quantity Id
: RI
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
04A Meter Register Details
Range: 1 - *
M J0010 Meter Register Id
: 3
M J0428 Outstation Id
:S93X000001
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 217 of 227
Working Practices Product Set (WPPS)
M J0382 Channel Number
: 3
M J0432 Pulse Multiplier
: 1.000000
M J0475 Meter Register Multiplier
: 1.00
M J1688 Outstation Multiplier
: 1.0000
M J0103 Measurement Quantity Id
: AL2
M J0478 Number of Register Digits
: 6
O J0476 Associated Meter Id
:
O J0477 Associated Meter Register Id
:
**************************************************************
File Type
: D0268
DTC version
: 001
Flows in File : 1
Groups in File : 6
File Ends.
**************************************************************
DTC UFF flow
01A|1000000000006|19970731|5|1|F||415|3|L||
02A|S93X000001|PXA||3|6||1234|||PS|01234567890||1200|||
03A|S93X00001|||||A|19971001|MPID|
04A|1|S93X000001|1|0.012000|1.00|1.0000|AI|6|||
04A|2|S93X000001|2|0.012000|1.00|1.0000|RI|6|||
04A|3|S93X000001|3|1.000000|1.00|1.0000|AL2|6|||
2
AL is alarm - The PXAr/Indigo meter has a separate channel for alarms and this must be registered to
enable the HHDC to correctly collect data. (i.e. it is not a misprint, and not to be misinterpreted as AI)
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 218 of 227
Working Practices Product Set (WPPS)
WP 142. The Co-Operative Objections Process
WP no:
Status:
142
Implemented
by Industry
Title:
Co-Operative Objections Process
Version:
1.0
WP type:
W
Implementation
Date:
26/02/04
Related WP(s)
Date raised:
Nov 2003
Product Area (s):
All
Parties Affected:
Suppliers
Baseline Products
Impacted:
Last amended:
19/02/04 Dinesh Sharma
V1 with WPPS CP 71 approved at MDB on 27/11/03
Change History:
Context:
As a means of improving the overall customer experience, Suppliers have identified an
opportunity to reduce Erroneous Transfers (ETs) by utilising the Co-operative Objections process
between Suppliers.
MAP10 defines an Erroneous Transfer as that occurring when a customer has been transferred to
a Supplier without a valid contract being in place and the Application for Registration has been
processed in the relevant MPAS Registration System.
For Co-operative Objections, the status of the proposed transfer is a suspected Erroneous
Registration with the customer notifying the New Supplier that they believe that they have been
erroneously registered and the objection window is still open.
Working Practice:
Principles:
The Co-operative Objections Process will follow these principles:
 Each Co-operative Objection can only be raised by the Old Supplier with the approval of the
New Supplier;
 The Old Supplier should use reasonable endeavours to raise a Co-operative Objection
except where:

Key data has not been provided to enable the Old Supplier to trace the
customer’s record on their systems;

The objection window has closed; and

Related MPAN (where appropriate).
 To maximise benefits, the New Supplier should give priority to seeking co-operative
objections to those accounts closest to the end of the objection window;
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 219 of 227
Working Practices Product Set (WPPS)
 Where a Co-operative Objection is agreed and raised the New Supplier shall not resubmit
the registration unless the reason for the objection has been resolved;
 No caps or limitations on daily volumes;
 Non-domestic sites are out of the scope of these procedures;
 Where a co-operative objection has been raised to a customers transfer, the old supplier
should write to the customer confirming the action that has been taken, in accordance with
the requirements of section 16.7 of the MRA.
Contact Information:
Each Supplier should provide the following information for use during the operation of the CoOperative Objections Process:
 A designated contact with their telephone numbers for the purpose of co-ordination and
feedback;
 Ideally a single email address and a single point of contact should be nominated from each
Supplier to maximise the co-ordination of requests.
Procedures:
The Co-operative Objections Process will follow those processes outlined below and re-iterated by
the flowchart in Appendix 1. Examples of how Co-operative Objections could be presented for
inter-supplier communication purposes are contained in Appendix 2.
Request Co-operative Objection from New Supplier to Old Supplier
The New Supplier should make all reasonable endeavours to send a single spreadsheet (per
Supplier MPID) in an agreed format containing Co-operative Objection requests, prior to 12 noon
Monday to Friday. This will act as the trigger for agreement to be given for an objection to be
raised.
All files received by the Old Supplier by 12pm should be treated as received on that day and
processed on the same day. All files received after 12pm should be treated as received on the
following Working Day and processed by that day, unless otherwise agreed by both suppliers over
the phone.
On the same Working Day as the file is received (i.e. all files received up to 12pm on that working
day), the Old Supplier will process the file received and raise Co-operative Objections where
appropriate and by 1pm the following working day, send a response to the New Supplier
confirming whether or not an objection has been raised. Any failure to meet this timescale can
then be followed up by the New Supplier by telephone.
All Suppliers:
All Suppliers will use the standard spreadsheet templates for both requesting a co-operative
objection and responding to the request.
Impact of not implementing WP:
The effect of not implementing the WP is that customers are unable to derive the
benefit of a smooth and efficient resolution to Erroneous Transfers. The implication,
then, is that the level of customer satisfaction does not fulfil its potential.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 220 of 227
Working Practices Product Set (WPPS)
Appendix 1: Decision Making Chart
New
Supplier
Contact from
Customer to confirm
ET has occured
Is
contact within open
objection
window?
No
Follow ETCC
process
Yes
Resolve rejection
reason
Add customer
record to
spreasheet
No
Send spreadsheet
to Old Supplier
Await file
response
Has record been
accepted ?
Yes
Await objection
notification receipt
Send letter to
customer to
confirm that Coop was successful
Old
Supplier
Telephone
handshake
Old Supplier
receives file
Find file records
on system
Can
objection be
raised?
No
Mark record file as
'rejected'
Have
all records on file
been marked as
rejected or
accepted?
Yes
Yes
Send completed file
back to new supplier
Mark record file as
'accepted'
Raise objection
No
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 221 of 227
Working Practices Product Set (WPPS)
Appendix 2: Co-Operative Objections Industry Example - Electricity
Created
Title
Initial
01/01/2003 Dr
MANDATORY MANDATORY
Surname
Address1
Address2
Address3
Z
Who
13 Nowhere
Street
Feltham
London
OPTIONAL
MANDATORY
MANDATORY
MANDATORY
MANDATORY
Field
Notes
Created
Format is
xx/xx/xxxx
Title
Format is
x
Surname
Full Surname required
Address fields
Full Address required
Postcode
Full Postcode is required
MPAN
Must be 13 digits
Address4
OPTIONAL
Address5
Objection
Window
MPAN Number Cancellation_Reason Closure Date
Tw13 4XX
1800012345678
MANDATORY
MANDATORY
E
OPTIONAL
02/01/2003
MANDATORY
Accepted/
Rejected
Reason
No
Supplier does
not own site
MANDATORY
CONDITIONAL
Cancellation Reason As per MAP 10 reason codes
Objection window
end date
Accepted/ rejected
Must always be provided in
xx/xx/xxxx format to allow
prioritisation
Accepted = "yes"
"no"
rejected =
rejection reason can only be as
per following reasons:
Reason
· Key data has not been provided
to enable the new supplier to
trace the customer’s record on
their systems
· Supplier does not own the site
· The objection window has
closed
· Related MPAN
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 222 of 227
Working Practices Product Set (WPPS)
WP 143. Large Scale Disconnections Initiated by Local Authorities
WP no:
143
Status:
Implemented
by Industry
Implementation
Date:
Title:
Large Scale Disconnections Initiated by Local Authorities
Version:
1.0
WP type:
W
25/04/05
Related WP(s)
Date raised:
Oct 2004
Product Area (s):
All
Parties Affected:
Distribution
Suppliers. MOPs
Businesses,
Baseline Products
Impacted:
Last amended:
Change History:
25/04/05 Gary Morris
WPPS CP 74 version 1.1 approved at MDB on 31/3/05
Context:
As part of the Deputy Prime Minister’s Sustainable Communities Plan the Market Renewal
Pathfinders programme has been established. The purpose of the programme is to regenerate
areas of low housing demand and housing market failure. Due to the nature of the pathfinders
programme large volumes of clearance and demolition will be undertaken and large-scale
disconnections will be required.
Current documented processes require all disconnections to be initiated and driven by the
Supplier, therefore in order for Local Authorities (working in partnership with the pathfinders
programme) to initiate the required works they will have to identify and contact the current
Supplier. However, due to the volume of sites (and possibly Suppliers) involved, to date this
process has been extremely time consuming.
It was therefore agreed that a new process for large-scale disconnections1 should be
documented, in which the local authority are able to initiate the process. This process should only
be used where the time constraints and volumes involved render the normal disconnection
process inappropriate.
It is important that Suppliers are kept informed of the Distribution Business’s actions. The
Distribution Business involved should ensure that the Supplier/s responsible for the affected
Metering Points are identified and informed of the disconnection as soon as possible.
Working Practice:
It is envisaged that Distribution Businesses will treat each Large Scale Disconnection as an
individual project, therefore in order to aid the process a nominated project manager will be
responsible for communicating with the Local Authority. Once the MPAN has been disconnected,
the Distribution Business should follow the normal process and send all required information.
It is recommended that the following steps are taken when undertaking the Large Scale
Disconnection process:
1
Large scale disconnections are programmes of disconnections which are initiated by the Local Authority.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 223 of 227
Working Practices Product Set (WPPS)
1. Local Authority – Compile programme of disconnection works.
2. Local Authority and Distribution Business – liaise in order to agree programme of
disconnections and anticipated timescales. Agree responsibility for ensuring that properties
are unoccupied.
3. Distribution Business – Schedule works.
4. Distribution Business – Contact MPAS to get MPANs and Supplier names if necessary. If
appropriate this step should be carried out before the disconnections, however it may be
carried out afterwards. Where time allows the Distribution Business may request a
disconnection notice (D0132) from the Supplier.
5. Distribution Business – Disconnect power to premises. Remove meter (if present and if
removal is appropriate) and label with address. Notify MOp of removed meter details and
final reads.
6. Distribution Business – Issue notice to confirm power disconnected to Local Authority.
7. Distribution Business – Contact Supplier to confirm actions regarding disconnections, and
if necessary inform Supplier of requirement for meter asset to be collected.
Supplier – arrange for Meter Asset to be retrieved if necessary.
8. Distribution Business – Pass information regarding MPAN disconnection to MPAS.
9. MPAS – Disconnect MPAN and confirm de-registration of MPAN to Supplier (and any
pending Supplier).
10. Supplier – Receive and process Disconnection - terminate agents for the disconnected
MPAN
Impact of not implementing WP:
If the Local Authorities are forced to identify every affected Supplier before initiating
disconnections, work carried out by the Pathfinders programme will be considerably delayed.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 224 of 227
Working Practices Product Set (WPPS)
WP 144. The use of Site Visit check codes 02 and 20
WP no:
144
Status:
Implemented by
Industry
Implementation
Date:
Title:
The use of Site Visit check codes 02 and 20
Version:
1.1
Originator:
WP type:
W
Originator Ref:
Related WP(s)
132
DST Issue No:
Date raised:
July 2006
DST Doc Ref:
Product Area (s):
Parties Affected:
22/02/2007
IREG
Suppliers, NHHDCs, Meter
Operators
Retail Design
Products Impacted:
Last Amended:
22/02/07 Phil Hunt
Change History:
WPPS CP 83 version 1.1 approved at MDB on 27/7/06
Context:
There is a recognised inconsistency in the use of site visit check codes 02 (site not occupied) and
20 (no access) that are sent to the Supplier from agents. Analysis of historic flows shows that
sites alternate between 02 and 20. This information is important to Suppliers, particularly in
ascertaining if a site is vacant or not.
This WP gives guidance on the scenarios in which each code should be used.
Working Practice:
Use of the 02 (site not occupied) Site Visit Check Code
The code 02 should only be used where there is clear evidence that the premise is vacant.
Evidence for a site being vacant should include at least one of the following:
Property derelict
Site boarded up
No furniture / fittings
Uncollected Post
New property that is empty
Where possible, the additional information field should be used to give more details such as
Estate Agent phone number.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 225 of 227
Working Practices Product Set (WPPS)
The code 02 should not be used if there is evidence of the following;
Energy being consumed on the site (including meter advances on a gas meter that is accessible),
use code 20
Site has been demolished, use code 35
Site is suspected to be demolished, use code 34
Site appears to be habited, use code 20
Site is an unmanned premise eg mobile phone mast, use code 37
Site is a Holiday let, use code 20
Site is undergoing building works and is uninhabited, use code 20
Use of the 20 (no access) Site Visit Check Code
The 20 code should be used when the site appears to be occupied but:
There is no answer when calling
Site is a Holiday let and nobody is in
Site is undergoing building works and is uninhabited
The code 20 should not be used in the following circumstances:
No access as De-energised use code 04
Property demolished use code 35
Site is suspected to be demolished, use code 34
Site is unmanned premise eg mobile phone mast, use code 37
Meter is blocked and cannot read display, use code 22
Customer will not allow access to meter, use code 21
Premise is locked and there is no key or code to gain access, use code 38
Site is unsafe and unable to access Meter, use code 18
Where possible the additional information field should be used to give more details.
Impact of not implementing WP:
Sites continue to be identified incorrectly as not occupied or no access and the Supplier is unable
to ascertain how to get access to the site to gain a meter reading
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 226 of 227
Working Practices Product Set (WPPS)
Also, if a Supplier is unable to reliably identify long term vacant sites then this could lead to
potential Settlement inaccuracies if sites are incorrectly reported as such by a Supplier.
Version :
5.4
Status :
Approved
Date :
01 Nov 2007
Page 227 of 227