Florida Department of Transportation FLORIDA’S TURNPIKE ENTERPRISE GENERAL USE (ENVIRONMENTAL MITIGATION) PERMIT Date Received: County: TP Reference: Section: BMP: TP/ - SP EMP: Permit: / - 853 State Road: Applicant: Address: Telephone No.: Fax No.: Email: Mobile No.: Applicant requests permission from the State of Florida, Department of Transportation and Florida’s Turnpike Enterprise to perform environmental clean-up work at this location. Date of Spill: Spill Material: FHP Citation Number: Affected Area:__________ sq. ft. LAT: _ _ . _ _ _ _ _ LONG: _ _ . _ _ _ _ _ Name of Contractor: Contractor’s Address: Telephone No: Fax No: Contractor’s e-mail Mobile No: The Applicant understands and agrees to the following general conditions: 1. The Applicant is responsible for the supervision of the permitted work (see 11 and 12 below): 2. The site is within _____________________________ City Limits. 3. Applicant declares that prior to submitting this application the applicant has ascertained the location of all existing utilities, both aerial and underground. A letter of notification and plan of improvement was mailed on: , to the following utilities/municipalities: 4. This permit is a license for permissive use only the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in the Applicant. 5. Whenever it is determined by the Department that it is necessary for the construction, repair, improvement, maintenance, safe and efficient operation, alteration or relocation of all or any portion of such highways, or that it is necessary for the public transportation facility, any and all of the Applicant’s facilities or operations shall be immediately removed from said highway, or reset or relocated thereon as required by the Department, all at the expense of the Applicant. 6. The Applicant’s construction, maintenance, or operations shall not interfere with the property and rights of any prior Applicant. 7. The privileges set out and permitted herein are permitted only to the extent of the Department’s right, title, and interest in the property to be used by the Applicant. 8. To the extent allowed by law, the Applicant indemnifies and holds harmless the Department and the Enterprise, their officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the indemnifying party and persons employed or utilized by the indemnifying party in the performance of the permitted work. 9. The Applicant shall observe all Department safety regulations during construction. The applicant shall safely conduct the public through the project area in accordance with Part VI of the Manual of Uniform Traffic Control Devices, Index 600, of the Department’s Roadway and Traffic Design Standards, and the Florida’s Turnpike Enterprise Roadway Lane Closure Policy dated 01/24/2005, as amended and supplemented, by displaying necessary safety devices and taking whatever other measures are required or appropriate. The applicant shall continuously maintain pedestrian features to meet Americans with Disability Act (ADA) standards. Roadway Permits/Forms/ General Permits/General Permit Form 05/09/2007 1 10. In case the applicant fails to meet any of the permit requirements, as determined by the Department or the Enterprise, the applicant shall be BARRED from performing further work under this permit and will be required to bring into compliance or to remove said work from the right-of-way at no cost to the Department or the Enterprise, and the applicant shall remain bound by the provisions of Paragraph 8 above. 11. Applicant is required ( ) not required ( ) to employ a Florida registered Prime Professional Engineer to supervise the permitted work, as determined by the Department or the Enterprise according to the nature of the work. 12. All work shall meet the Department’s Standards and be certified by the Applicant (or the Prime Professional Engineer if one is required), that the work has been completed in accordance with the State of Florida’s latest Department of Transportation Standard Specifications for Road and Bridge Construction, and in accordance with all rules, regulations, policies, plans, special provisions, and safety standards pertaining to this type of work. The Prime Professional Engineer is: P.E. No: , and is located at telephone number: 13. All materials and equipment are subject to inspection by the Department or Enterprise, or their designees. 14. All Department property shall be restored to its original condition as far as practical, in keeping with the Department’s specifications, and in a manner satisfactory to the Department or the Enterprise. 15. The attached drawing and special provisions covering details of this proposed work shall be made part of this permit. 16. The Applicant shall commence field work in good faith within days from the date of permit approval and shall be completed within days. If the beginning date is more than 60 days beyond the date of permit approval, the Applicant must review the permit with the Florida’s Turnpike Enterprise Permit Office, to assure that no changes have occurred that would affect the permit approval. If work has not begun in good faith within 365 days, this permit shall become void. 17. The Enterprise Permits Office is located at the Florida’s Turnpike Pompano Beach Service Plaza, Pompano Beach, FL, 33069, P.O. Box 9828, Ft. Lauderdale, FL, 33310-9828, and telephone number (954) 934-1100. The Enterprise representative for this permit is, telephone number . The Applicant shall notify this representative forty-eight (48) hours in advance of the pre-construction meeting, and again forty-eight (48) hours before beginning work. 18. The Applicant affirms the truth of statements made (whether expressed or implied) in this application and of all design drawings presented to support this application. Any misrepresentations of fact by the applicant or their agents may be cause for revocation of an issued permit. 19. Special Instructions: Provide 2 copies of all reports and correspondences that you provide Florida Department of Environment or other regulatory agency. Submitted for Applicant by: Typed Name & Title Signature Date Prime Professional Engineer: ________________________________ _______________________________ Typed Name & Title Signature Date ________________________________________________________________________________________ Roadway Construction is proposed or underway. No ( ) Yes ( Recommended for approval: Title: Approved by: ) W.P.I. No.: Date___ Date_____________ Enterprise Maintenance Engineer or Designee Roadway Permits/Forms/ General Permits/General Permit Form 05/09/2007 2