NL Master Specification Guide for Public Funded Buildings Section 08 62 10 – Plastic Skylights Issued 2008/03/18 PART 1 GENERAL 1.1 RELATED SECTIONS Page 1 of 3 .1 Section 01 33 00 - Submittal Procedures .2 Section 01 74 21 – Construction/Demolition Waste Management and Disposal. .3 Section 01 78 00 - Closeout Submittals .4 Section 05 50 00 - Metal Fabrications 1.2 REFERENCES .1 Canadian General Standards Board (CGSB). .1 .2 .3 .2 Canadian Standards Association (CSA). .1 1.3 CAN/CGSB-12.12, Plastic Safety Glazing. CGSB 41-GP-6M-83, Sheets, Thermosetting Polyester Plastics, Glass Fibre Reinforced. CAN/CGSB-63.14, Plastic Skylights. CSA B111, Wire Nails, Spikes and Staples. SUBMITTALS .1 Product Data: .1 .2 Shop Drawings: .1 .3 Indicate size and description of components, materials, attachment devices, description of frame and finish, and construction details. Manufacturer's Instructions: .1 1.4 Submit manufacturer's printed product literature, specifications and data sheet. Submit manufacturer's installation instructions. CLOSEOUT SUBMITTALS .1 1.5 Provide maintenance data for cleaning and maintenance of plastic domes for incorporation into manual specified in Section 01 78 00 - Closeout Submittals. WARRANTY .1 Provide a written guarantee, signed and issued in the name of the owner, covering the plastic skylights for both material and workmanship for a period of 10 (ten) years from the date of Substantial Completion. NL Master Specification Guide for Public Funded Buildings Section 08 62 10 – Plastic Skylights Issued 2008/03/18 .2 Areas which prove to be defective in any way shall be repaired or replaced and any damage to other work as a result of such defects shall be repaired at no cost to the Owner. PART 2 PRODUCTS 2.1 SKYLIGHT .1 2.2 Page 2 of 3 Plastic skylights: to CAN/CGSB-63.14, Type 2 - Double glazed Class A - Aluminum frame. FRAME FINISH .1 2.3 Class A - Aluminum frame: Class 1, colour anodized to match manufacturer’s standard colour range. SKYLIGHT GLAZING .1 Plastic: to CAN/CGSB-12.12, 5.0 mm thick, acrylic. .2 Dome shape: convex. .3 Outer layer: clear. .4 Inner layer: clear. 2.4 CURB FRAME .1 2.5 Pre-formed metal curb: insulated sandwich construction, with deck flange for attachment. ACCESSORIES .1 Fasteners: screws to manufacturer’s standard. PART 3 EXECUTION 3.1 MANUFACTURER’S INSTRUCTIONS .1 3.2 Compliance: comply with manufacturer’s written data, including product technical bulletins, product catalogue installation instructions and data sheets. INSTALLATION .1 Install skylights in accordance with CAN/CGSB-63.14 and supplement as allows: .1 .2 Erect components plumb, level and in proper alignment. Ensure continuity of envelope air barrier and vapour retarder systems. NL Master Specification Guide for Public Funded Buildings Section 08 62 10 – Plastic Skylights Issued 2008/03/18 .3 .4 .5 3.3 Page 3 of 3 Secure preformed curb assembly to structure. Adjust and seal assembly with provision for expansion and contraction of components. Secure and seal frame to curb. CLEANING .1 Perform cleaning after installation to remove construction and accumulated environmental dirt. .2 Remove traces of primer, caulking; clean doors and frames. .3 Clean aluminum, track and hardware with damp rag and approved non-abrasive cleaner in accordance with manufacture's instructions. .4 Remove protective film from plastic surfaces. .5 Clean interior and exterior plastic surfaces in accordance with manufacturers' instructions. .6 Upon completion of installation, remove surplus materials, rubbish, tools and equipment barriers. 3.4 COMMISSIONING .1 Contractor to instruct maintenance personnel in the operation and maintenance of plastic skylights. .2 Commissioning will be witnessed by Owner’s Representative and certificate will be signed by Contractor, Owner’s Representative and Skylight Representative. END OF SECTION