Employment in Agriculture: Soil Conservation

advertisement
01. (b)EMPLOYMENT IN AGRICULTURE - SOIL CONSERVATION
Notification No. KAE 16 LMW 99 dated 14 -01-04
Published in Gazette dated 09 -02-04
Minimum Wages with effect from 09 -02-04
Cost of Living Allowance to be paid over and above 2491 poin ts
Cost of Living Index : 3528-2491=1037 points
Minimum wages and VDA from 01 -04-2009 to 31-03-2010.
S C H E D U L E
(Variable Dearness Allowance at Rs. 35.89/ - per day shall be paid along with the following
rates of wages to each category of workmen)
Sl.
No.
1
1
1.1
1.2
1.3
1.4
1.5
Description
Measurement
2
EARTH WORK EXCAVATIONS
Earth work borrow pits and formation of contour or
graded bund
A] Black soil 0 to 30 cm depth
B] Black soil 30 to 60 cm depth
C] Black soil 60 to 90 cm depth
D] in Red sandy loamy soil
E] in gravel mixed red soil
F] in literate soil
Formation of small section bunds at 10 mtrs intervals
based on key line 0.09 mtr section
Formation of small section bunds at 10 mtrs
intervals based on key line 0.18 mtr section
Digging and formation of water ways / canals
Digging and formation of divertion channel
including formation of soil bank on down stream
3
B’lore
Division
4
Mysore Belgaum
Division Division
5
6
(Rates in Rupees)
Gulbarga
Division
7
1 cmt
1 cmt
1 cmt
1 cmt
1 cmt
1 cmt
100 mtrs
28.55
31.55
32.15
31.55
32.15
38.50
18.05
28.55
31.55
32.15
31.55
32.15
38.50
18.05
28.55
31.55
32.15
31.55
32.15
38.50
18.05
28.55
31.55
32.15
31.55
32.15
38.50
18.05
100 mtrs
183.00
183.00
183.00
183.00
1 cmt
28.55
28.55
28.55
28.55
2
A] ordinary soil
B] hard soil
2.
2.1
2.2
2.3
2.4
3
3.1
LAND LEVELING
Digging and leveling in red soil land
Digging and leveling in black soil land
Digging and formation of bench terrasin g in hilly
and costal area [ zone 9 and 10 and western ghat
area (approved regions)
Zinc terracing works
FOUNDATION WORK A S PER SPECIFICATION
NOTE: In case of formation of contour and marginal
boulder bunds
A] If soil depth is less than 15cms formation of
bunds by using the available boulders in
deviation points foundation upto 0.3 cms.
B] Boulder outlet, clean over fall outlet [0. 30 mtrs
depth]
C] sod strip, shrub check, soded earthern check of
specified foundation
D] vegetation nala training 0.30 mtr width 0.30 mt r
depth trench
[one row of vegetative filler strip on down
stream side of the nala bund]
E] Gully Rivinement
1] Foundation 0.30 mtr depth
2] If the side slope is more than 1.3 :1, 1.5:1, in such
situation to bring the slide slope to 1.3:1, 1.5:1.
F]
1] foundation f or pitching
2] In the red soil if the bank slope in more than
1.3:2 than to bring th e req uired shape.
3] In black soil if the bank slope is more than 1.5:1
than to bring the req uired shape.
1 cmt
1 cmt
33.00
39.55
33.00
39.55
33.00
39.55
33.00
39.55
1 cmt
1 cmt
1 cmt
25.35
24.10
34.00
25.35
24.10
34.00
25.35
24.10
34.00
25.35
24.10
34.00
1 cmt
22.90
22.90
22.90
22.90
1 cmt
28.55
28.55
28.55
28.55
1 cmt
28.55
28.55
28.55
28.55
1 cmt
30.90
20.90
30.90
30.90
1cmt
28.55
28.55
28.55
28.55
1 cmt
28.55
28.55
28.55
28.55
1 cmt
1 cmt
30.90
28.55
30.90
28.55
30.90
28.55
30.90
28.55
3
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
In case of formation of checks using boulder and
rubble
Foundation work in construction of RRS chec k dam,
vented down, perculation tank, nala bunds, digging
of outlets for nala bunds with a lead of 50 mtrs and
lift upto 1.5 mtrs
A] ordinary soil
B] hard soil
C] very hard soil / s oft rock
D] blasting in rocky soil
Lift charges with an initial lift of 1.5 mtrs and above
“ all types of soils”
A] 0 to 1.5 mtrs
B] 1.5 to 3 mtrs
C] 3.0 to 4.5 mtrs
D] 4.5 to 6.0 mtrs
If seapage water comes additional rate of 10% f or the
above rates has to be included
Core wall [gorg e ] foundation
A] Gorge
B] core trench
[c] digging of of impervious: - soil f or core wall
foundation
[d] formation of core wall from excavated
impervious soil
Formation of nala bund at o.15 mtrs layers by using
soil excavated at outlet point
Digging soil from borrow pit and formation of bun d
at 0.15 mtrs layer
A] upto 1.5 mtrs height from the nala bed
B] more than 1.5 mtrs height from the nala bed
Watering to the soil formed at 0.15 mtr layer
1 cmt
28.55
28.55
28.55
28.55
1 cmt
1 cmt
1 cmt
1cmt
44.50
70.50
124.90
204.65
45.75
73.00
124.90
215.80
42.65
66.80
111.90
178.10
41.40
64.30
110.90
196.00
1 cmt
1 cmt
1cmt
1 cmt
1 cmt
0.00
1.25
2.45
3.70
10%
0.00
1.25
2.45
3.70
10%
0.00
1.25
2.45
3.70
10%
0.00
1.25
2.45
3.70
10%
1 cmt
1 cmt
1 cmt
35.35
70.50
49.45
35.25
72.95
50.10
35.25
66.80
47.60
35.25
64.30
46.40
1 cmt
6.80
6.80
6.80
6.80
1 cmt
5.55
5.55
5.55
5.55
1 cmt
1 cmt
33.00
48.35
33.00
48.35
33.00
48.35
33.00
48.35
4
3.10
3.11
3.12
3.13
4.1
A] bringing water from 1 kmtr distance
B] bringing water more than 1 kmtr distance
Compacting bund at every 0.15 mtrs layers after
watering
Excavation of tanks silt and transporting to the
designated place initial lead of 50 mtr and lift of
1.5mtr is included
A] dry silt
B] wet silt
C] Firming side bund by using the excavated silt
Farm pond, sunken pond form ation
A] All types of soils, excavating the soil, formation
of pond around the pond in the required shape
and diggin g and leveling around the pond in
the req uired shape, etc.
1] 0 - 0.6 mtr
2] o.6- 1.2 mtr
3] 1.2 to 1.8 mtr
4] 1.8 to 2.4 mtr
5] 2.4 to 3.0 mtr
6] 3.0 to 3.6 mtr.
B] Leveling the nearby land by using the excavated
soil from 0.0 to 1.02 mtr depth
C] formation of silt trap f or farm pond
Land reclamation work
A] Main drain [ length X 0.45 X 1.05 mtr]
B] Lateral drain [ length X 0.45 X 0.09 mtr]
1] Use of agave in case of sh rub check, soded
earthern check, filter strip on down stream side
of the nala bund, nala and gully management
A] collection of suckers
B] transportation of suckers / cuttings
1 cmt
1 cmt
1 cmt
11.00
13.15.
11.45
11.00
13.15
11.45
11.00
13.15
11.45
11.00
13.15
11.45
1 cmt
1 cmt
1 cmt
26.60
50.60
5.55
33.00
59.35
6.80
33.00
59.35
7.10
33.00
59.35
7.40
1 cmt
48;25
50.10
52.00
52.00
52.80
61.60
9.90
48.25
50.10
52.00
52.00
52.80
61.60
9.90
63.70
64.30
69.50
69.50
69.50
74.80
9.90
63.70
64.30
69.50
69.50
69.50
74.80
9.90
1 cmt
48.25
48.25
63.70
63.70
1 cmt
1 cmt
37.40
37.40
37.40
37.40
37.40
37.40
37.40
37.40
Per 1000
660.00
660.00
660.00
550.00
5
4.2
4.3
0-10 km
10-20 km
20-30 km
C] digging of trench of 0.30 mtrs width in to 0.3
depth
2] planting of suckers
D] watering [ maximum 2 times ] based on the
climate, soil type, moisture etc, watering at 2 to
3 week’s interval
Use of ipomia / lakki plant or locally available
shrub:- formation shrub check, soded earthern check,
boulder check, rubble check , nala bund, filter strips,
nala and revine man agement.
A] collection of cutting of 30 cms length 20mm
thickness
B] transportation of cuttings / suckers
0-10 km
10-20 km
20-30 km [ for northern district of the state ]
C] 1] digging of trench of 0.3 mtrs width and 0.3 mtr.
depth
2] planting of cuttings
D] watering [upto f ull establishments ]
A] sowing of hemata, scabra etc, fodder seeds on
bunds
B] sowing of kemata, scabra etc, fodder seeds on
strips
Per 1000
Per 1000
Per 1000
1 cmt
49.00
68.25
82.50
30.90
49.00
68.25
82.50
30.90
49.00
68.25
82.50
30.90
49.00
68.25
82.50
30.90
Per 1000
Per 1000
114.40
211.50
114.40
211.50
114.40
211.50
114.40
211.50
Per 1000
176.00
176.00
176.00
176.00
Per 1000
Per 1000
Per 1000
19.50
33.00
48.75
19.50
33.00
48.75
19.50
33.00
48.75
19.50
33.00
48.75
1 cmt
Per 1000
Per 1000
100 mtrs
30.90
110.00
197.90
7.10
30.90
110.00
197.90
7.10
30.90
110.00
197.00
7.10
30.90
110.00
197.00
7.10
1sqmt
0.85
0.85
0.85
0.85
6
II. LOADING AND UNLOADING WORKS :
Sl.
No.
1
1
Description
2
Cement, stone and other materials
A] rubble stones, boulder stones, size
stones, jelly etc
B] sand
C] Cement / steel
D] clay / impervious soil
E] Khus grass
Note: * Mysore, Chamrajnagar, Mandya,
** Hassan and Chickmaglur
*** Dhakshin Kannada, Udupi and
Kodagu (Districts)
Measurement
3
LOADING
B’lore,
Gulbarga,
Mysore
Belgaum
4
5
(Rates in Rupees)
UNLOADING
B’lore,
Gulbarga,
Mysore
Belgaum
6
7
1 cub mtr
22.50
19.30
12.05
10.15
1 cub mtr
18.55
9.15
1 ton
1 cub mtr
360 clumps
25.10
18.55
23.00
* 16.10
** 17.30
***14.45
36.15
16.10
23.00
* 8.05
** 8.65
*** 7.40
36.20
8.05
23.00
25.10
9.15
23.00
7
III. TRANSPORTATION OF MATE RIAL BY MANUAL LABO UR (HEADLOAD):
Rubble. Boulder, Rough stone, Size
Sl.
Distance
stone, and jelly ston e, dressed stone (1
Clay & Sand (1 cub
NO.
cub mtr.) .
(Rates in rupees)
Applies to all division
1
Above 50 mtrs upto 100 mtrs
14.85
2
Above 10mtrs upto 150 mtrs
23.10
3
Above 150 mtrs upto 200 mtrs
31.85
4
Above 200 mtrs upto 250 mtrs
39.10
5
Above 250 mtrs upto 300 mtrs
49.20
mtr.)
11.55
18.55
25.50
31.30
39.55
NOTE: 1. All Categories of employees : 3 paise per point per d ay over and above 2491 points.
2. The daily rates of wages and VDA of dif ferent categories of employment are computed by dividing the total
monthly wage by ‘26’.
3. Districts included in the respective Divisions are given below:
Bangalore Division
Mysore Division
Belgaum Division
Gulbarga Division
Bangalore Urban
Banglaore Rural
Kolar
Tumkur
Chitradurga
Shimoga
Davangere
Dakshina Kannada /Udupi
Chickmagalur
Hassan
Mandya
Mysore / chamarajanagar
Madikeri
Bijapur / Bagalkot
Belgaum
Dharwad
Gadag
Haveri
Uttarakannada
Note: Paise to be rounded off either to nearest 50 paise or to a rupee.
Gulbarga
Bidar
Raichur
Koppal
Bellary
Download