01. (b)EMPLOYMENT IN AGRICULTURE - SOIL CONSERVATION Notification No. KAE 16 LMW 99 dated 14 -01-04 Published in Gazette dated 09 -02-04 Minimum Wages with effect from 09 -02-04 Cost of Living Allowance to be paid over and above 2491 poin ts Cost of Living Index : 3528-2491=1037 points Minimum wages and VDA from 01 -04-2009 to 31-03-2010. S C H E D U L E (Variable Dearness Allowance at Rs. 35.89/ - per day shall be paid along with the following rates of wages to each category of workmen) Sl. No. 1 1 1.1 1.2 1.3 1.4 1.5 Description Measurement 2 EARTH WORK EXCAVATIONS Earth work borrow pits and formation of contour or graded bund A] Black soil 0 to 30 cm depth B] Black soil 30 to 60 cm depth C] Black soil 60 to 90 cm depth D] in Red sandy loamy soil E] in gravel mixed red soil F] in literate soil Formation of small section bunds at 10 mtrs intervals based on key line 0.09 mtr section Formation of small section bunds at 10 mtrs intervals based on key line 0.18 mtr section Digging and formation of water ways / canals Digging and formation of divertion channel including formation of soil bank on down stream 3 B’lore Division 4 Mysore Belgaum Division Division 5 6 (Rates in Rupees) Gulbarga Division 7 1 cmt 1 cmt 1 cmt 1 cmt 1 cmt 1 cmt 100 mtrs 28.55 31.55 32.15 31.55 32.15 38.50 18.05 28.55 31.55 32.15 31.55 32.15 38.50 18.05 28.55 31.55 32.15 31.55 32.15 38.50 18.05 28.55 31.55 32.15 31.55 32.15 38.50 18.05 100 mtrs 183.00 183.00 183.00 183.00 1 cmt 28.55 28.55 28.55 28.55 2 A] ordinary soil B] hard soil 2. 2.1 2.2 2.3 2.4 3 3.1 LAND LEVELING Digging and leveling in red soil land Digging and leveling in black soil land Digging and formation of bench terrasin g in hilly and costal area [ zone 9 and 10 and western ghat area (approved regions) Zinc terracing works FOUNDATION WORK A S PER SPECIFICATION NOTE: In case of formation of contour and marginal boulder bunds A] If soil depth is less than 15cms formation of bunds by using the available boulders in deviation points foundation upto 0.3 cms. B] Boulder outlet, clean over fall outlet [0. 30 mtrs depth] C] sod strip, shrub check, soded earthern check of specified foundation D] vegetation nala training 0.30 mtr width 0.30 mt r depth trench [one row of vegetative filler strip on down stream side of the nala bund] E] Gully Rivinement 1] Foundation 0.30 mtr depth 2] If the side slope is more than 1.3 :1, 1.5:1, in such situation to bring the slide slope to 1.3:1, 1.5:1. F] 1] foundation f or pitching 2] In the red soil if the bank slope in more than 1.3:2 than to bring th e req uired shape. 3] In black soil if the bank slope is more than 1.5:1 than to bring the req uired shape. 1 cmt 1 cmt 33.00 39.55 33.00 39.55 33.00 39.55 33.00 39.55 1 cmt 1 cmt 1 cmt 25.35 24.10 34.00 25.35 24.10 34.00 25.35 24.10 34.00 25.35 24.10 34.00 1 cmt 22.90 22.90 22.90 22.90 1 cmt 28.55 28.55 28.55 28.55 1 cmt 28.55 28.55 28.55 28.55 1 cmt 30.90 20.90 30.90 30.90 1cmt 28.55 28.55 28.55 28.55 1 cmt 28.55 28.55 28.55 28.55 1 cmt 1 cmt 30.90 28.55 30.90 28.55 30.90 28.55 30.90 28.55 3 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 In case of formation of checks using boulder and rubble Foundation work in construction of RRS chec k dam, vented down, perculation tank, nala bunds, digging of outlets for nala bunds with a lead of 50 mtrs and lift upto 1.5 mtrs A] ordinary soil B] hard soil C] very hard soil / s oft rock D] blasting in rocky soil Lift charges with an initial lift of 1.5 mtrs and above “ all types of soils” A] 0 to 1.5 mtrs B] 1.5 to 3 mtrs C] 3.0 to 4.5 mtrs D] 4.5 to 6.0 mtrs If seapage water comes additional rate of 10% f or the above rates has to be included Core wall [gorg e ] foundation A] Gorge B] core trench [c] digging of of impervious: - soil f or core wall foundation [d] formation of core wall from excavated impervious soil Formation of nala bund at o.15 mtrs layers by using soil excavated at outlet point Digging soil from borrow pit and formation of bun d at 0.15 mtrs layer A] upto 1.5 mtrs height from the nala bed B] more than 1.5 mtrs height from the nala bed Watering to the soil formed at 0.15 mtr layer 1 cmt 28.55 28.55 28.55 28.55 1 cmt 1 cmt 1 cmt 1cmt 44.50 70.50 124.90 204.65 45.75 73.00 124.90 215.80 42.65 66.80 111.90 178.10 41.40 64.30 110.90 196.00 1 cmt 1 cmt 1cmt 1 cmt 1 cmt 0.00 1.25 2.45 3.70 10% 0.00 1.25 2.45 3.70 10% 0.00 1.25 2.45 3.70 10% 0.00 1.25 2.45 3.70 10% 1 cmt 1 cmt 1 cmt 35.35 70.50 49.45 35.25 72.95 50.10 35.25 66.80 47.60 35.25 64.30 46.40 1 cmt 6.80 6.80 6.80 6.80 1 cmt 5.55 5.55 5.55 5.55 1 cmt 1 cmt 33.00 48.35 33.00 48.35 33.00 48.35 33.00 48.35 4 3.10 3.11 3.12 3.13 4.1 A] bringing water from 1 kmtr distance B] bringing water more than 1 kmtr distance Compacting bund at every 0.15 mtrs layers after watering Excavation of tanks silt and transporting to the designated place initial lead of 50 mtr and lift of 1.5mtr is included A] dry silt B] wet silt C] Firming side bund by using the excavated silt Farm pond, sunken pond form ation A] All types of soils, excavating the soil, formation of pond around the pond in the required shape and diggin g and leveling around the pond in the req uired shape, etc. 1] 0 - 0.6 mtr 2] o.6- 1.2 mtr 3] 1.2 to 1.8 mtr 4] 1.8 to 2.4 mtr 5] 2.4 to 3.0 mtr 6] 3.0 to 3.6 mtr. B] Leveling the nearby land by using the excavated soil from 0.0 to 1.02 mtr depth C] formation of silt trap f or farm pond Land reclamation work A] Main drain [ length X 0.45 X 1.05 mtr] B] Lateral drain [ length X 0.45 X 0.09 mtr] 1] Use of agave in case of sh rub check, soded earthern check, filter strip on down stream side of the nala bund, nala and gully management A] collection of suckers B] transportation of suckers / cuttings 1 cmt 1 cmt 1 cmt 11.00 13.15. 11.45 11.00 13.15 11.45 11.00 13.15 11.45 11.00 13.15 11.45 1 cmt 1 cmt 1 cmt 26.60 50.60 5.55 33.00 59.35 6.80 33.00 59.35 7.10 33.00 59.35 7.40 1 cmt 48;25 50.10 52.00 52.00 52.80 61.60 9.90 48.25 50.10 52.00 52.00 52.80 61.60 9.90 63.70 64.30 69.50 69.50 69.50 74.80 9.90 63.70 64.30 69.50 69.50 69.50 74.80 9.90 1 cmt 48.25 48.25 63.70 63.70 1 cmt 1 cmt 37.40 37.40 37.40 37.40 37.40 37.40 37.40 37.40 Per 1000 660.00 660.00 660.00 550.00 5 4.2 4.3 0-10 km 10-20 km 20-30 km C] digging of trench of 0.30 mtrs width in to 0.3 depth 2] planting of suckers D] watering [ maximum 2 times ] based on the climate, soil type, moisture etc, watering at 2 to 3 week’s interval Use of ipomia / lakki plant or locally available shrub:- formation shrub check, soded earthern check, boulder check, rubble check , nala bund, filter strips, nala and revine man agement. A] collection of cutting of 30 cms length 20mm thickness B] transportation of cuttings / suckers 0-10 km 10-20 km 20-30 km [ for northern district of the state ] C] 1] digging of trench of 0.3 mtrs width and 0.3 mtr. depth 2] planting of cuttings D] watering [upto f ull establishments ] A] sowing of hemata, scabra etc, fodder seeds on bunds B] sowing of kemata, scabra etc, fodder seeds on strips Per 1000 Per 1000 Per 1000 1 cmt 49.00 68.25 82.50 30.90 49.00 68.25 82.50 30.90 49.00 68.25 82.50 30.90 49.00 68.25 82.50 30.90 Per 1000 Per 1000 114.40 211.50 114.40 211.50 114.40 211.50 114.40 211.50 Per 1000 176.00 176.00 176.00 176.00 Per 1000 Per 1000 Per 1000 19.50 33.00 48.75 19.50 33.00 48.75 19.50 33.00 48.75 19.50 33.00 48.75 1 cmt Per 1000 Per 1000 100 mtrs 30.90 110.00 197.90 7.10 30.90 110.00 197.90 7.10 30.90 110.00 197.00 7.10 30.90 110.00 197.00 7.10 1sqmt 0.85 0.85 0.85 0.85 6 II. LOADING AND UNLOADING WORKS : Sl. No. 1 1 Description 2 Cement, stone and other materials A] rubble stones, boulder stones, size stones, jelly etc B] sand C] Cement / steel D] clay / impervious soil E] Khus grass Note: * Mysore, Chamrajnagar, Mandya, ** Hassan and Chickmaglur *** Dhakshin Kannada, Udupi and Kodagu (Districts) Measurement 3 LOADING B’lore, Gulbarga, Mysore Belgaum 4 5 (Rates in Rupees) UNLOADING B’lore, Gulbarga, Mysore Belgaum 6 7 1 cub mtr 22.50 19.30 12.05 10.15 1 cub mtr 18.55 9.15 1 ton 1 cub mtr 360 clumps 25.10 18.55 23.00 * 16.10 ** 17.30 ***14.45 36.15 16.10 23.00 * 8.05 ** 8.65 *** 7.40 36.20 8.05 23.00 25.10 9.15 23.00 7 III. TRANSPORTATION OF MATE RIAL BY MANUAL LABO UR (HEADLOAD): Rubble. Boulder, Rough stone, Size Sl. Distance stone, and jelly ston e, dressed stone (1 Clay & Sand (1 cub NO. cub mtr.) . (Rates in rupees) Applies to all division 1 Above 50 mtrs upto 100 mtrs 14.85 2 Above 10mtrs upto 150 mtrs 23.10 3 Above 150 mtrs upto 200 mtrs 31.85 4 Above 200 mtrs upto 250 mtrs 39.10 5 Above 250 mtrs upto 300 mtrs 49.20 mtr.) 11.55 18.55 25.50 31.30 39.55 NOTE: 1. All Categories of employees : 3 paise per point per d ay over and above 2491 points. 2. The daily rates of wages and VDA of dif ferent categories of employment are computed by dividing the total monthly wage by ‘26’. 3. Districts included in the respective Divisions are given below: Bangalore Division Mysore Division Belgaum Division Gulbarga Division Bangalore Urban Banglaore Rural Kolar Tumkur Chitradurga Shimoga Davangere Dakshina Kannada /Udupi Chickmagalur Hassan Mandya Mysore / chamarajanagar Madikeri Bijapur / Bagalkot Belgaum Dharwad Gadag Haveri Uttarakannada Note: Paise to be rounded off either to nearest 50 paise or to a rupee. Gulbarga Bidar Raichur Koppal Bellary