Daily Trench Journal Area C Trench 1 June 22, 2005 We are starting to take out wall 1111. We are probably below the wall now, but the wall had been slightly pedestalled. We got a good amount of pottery from within the wall and even a thin bronze pin. I am attempting to preserve the pebble surface that is below the wall. My goal is to get both walls out today and hopefully to articulate 1117 below wall 1111 and through the western half of the trench to the large stone boundary. We achieved the removal of walls 1110 and 1111. Some stubs are left, but these will be flattened tomorrow. Then we will clean up and remove the rest of 1117 through HAP sampling methods.