COMMITTEE OF TESTING LABORATORIES IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING IEC 60309-2:1999-04, Edition 4.0 + A1:2005 Plugs, socket-outlets and couplers for industrial purposes Part 2: Dimensional interchangeability requirements for pin and contact-tube accessories R=Required by Lab S=May be subcontracted 3PPS=Three Phase Power Supply required Clause 7.6 8 Measurement/testing Check of markings Dimensions 9.1 10.2 11.2.1 11.3.1 11.3.8 Protection against electric shock Measurement of contact resistance Test of insertability of conductors Test of insertability of conductors Bending test 11.5.1 11.5.2 11.6 11.7.1 Mechanical test Pull test Votage drop test Temperature-cycling test February 2007 Testing / measuring equipment / material needed Water, petroleum spirit, piece of close Gauges according to Fig. 101,102,107,108, 110, 112, 109, 113, 104, 111, 105, 114, dynamometer, caliper Figure 2: Standard test finger AC source, measuring instruments Figure 13: Gauges Figure 13: Gauges Figure 19: Test device incl. current source and measuring instruments Figure 15: Test device incl. weights and torquemeter Weights and torquemeter Heating cabinet, current source, measuring instruments Heating cabinet, current source, measuring instruments 1/3 Subcontracting R R R R R R R R R R R IEC 60309-2 COMMITTEE OF TESTING LABORATORIES IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT Clause 11.7.2 13 15.1 15.2 Measurement/testing Short-time withstand current test Resistance to ageing Contact pressure test Check of withdrawal force 16.101 17.102 18.2 18.5 19.2 19.3 19.4 20 Check of phase inverting means Check of phase inverting means Test of degrees of protection Humidity treatment Insulation resistance test Electric strenght test Check with gauges Breaking capacity test 21 Normal operation test 22 23.3 Temperature rise test Cord anchorage test 24.1 24.2 24.3 24.4 24.5 25.1 26.1 27.2 27.3 Cold treatment Impact test Mechanical strenght test Flexing test Torque test at screwed glands Torque test at screws Creepage distances, clearances Heat treatment Ball-pressure test February 2007 Testing / measuring equipment / material needed Current source, measuring instruments Heating cabinet Gauges according to table 110, dynamometer Test apparatus according to Fig. 115, gauges according to table 111, dynamometer Appropriate test apparatus Appropriate test apparatus Test equipment according to IEC 60529 and torquemeter Humidity chamber Insulation test equipment High voltage test equipment Gauges according to Fig. 104, 109, 111, 113, dynamometer Appropriate test apparatus, power source, adjustable load (resistors and inductors), measuring instruments Appropriate test apparatus, power source, adjustable load (resistors and inductors), measuring instruments AC source, measuring instruments, temperature measuring device Torquemeter, test apparatus according to Fig. 6 incl. weights Apparatus for torque test Refrigerator Figure 7: impact test apparatus Arrangement according to Fig. 8 Apparatus according to Fig. 9 Appropriate test arrangement incl. metal rods Torquemeter Caliper, appropriate gauges Heating cabinet Heating cabinet, apparatus according to Fig. 10, caliper 2/3 Subcontracting S R R R R R R R R R R S 3PPS S 3PPS S R R R R R R R R R R IEC 60309-2 COMMITTEE OF TESTING LABORATORIES IEC SYSTEM FOR CONFIRMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT Clause 27.4 27.5 28 29 Measurement/testing Glow-wire test Tracking test Corrosion test Short-circuit current withstand test Testing / measuring equipment / material needed Test apparatus according to IEC 60695-2-10 Test apparatus according to IEC 60112 Chemicals, humidity cabinet, heating cabinet Short-circuit testing arrangement according to Fig. 16, 17, 18 incl. appropriate measuring devices Subcontracting R R R S 3PPS Note: The presence of equipment alone does not indicate a satisfactory situation. Assessors must evaluate the equipment design, calibration, uncertainty and documentation to ensure compliance with the directions of the standard. The requirements of ISO Guide 25 regarding validation are applicable, as the tests of this standard are not standardized tests. February 2007 3/3 IEC 60309-2