Borras Construction Limited RISK ASSESSMENT Document No. Issue date Review Due Approved By: EXCAVATIONS RA005 September 2014 September 2016 K Blatchford Generic Risks NO. PERSONS AT RISK IDENTIFIABLE HAZARD RISK CONTROL MEASURES TO BE PUT IN PLACE P S R Employee Failure of trench support/trench sides 2 3 H 2 All Falls into excavations (plant/materials/ persons) 2 2 M 3 Employee Existing services 2 2 M 4 Employee Sudden flooding 1 3 M 1 5 Employee 6 Employee 7 Employee Contaminated ground Hazardous atmospheres Oxygen deficiency All excavations shall be covered by a permit to break ground that is to be completed prior to breaking ground. Work on and in excavations will only be undertaken by competent persons. Excavations will be formally inspected before entry at the start of every shift, where works have been carried which affect the stability, or where a substantial collapse has occurred. A record of the inspections of open excavations shall be maintained at least every 7 days. Suitable supervision will be provided to ensure correct use of trench support systems. Monitoring of work in excavations will be carried out by H & S Advisors during site inspections. Excavations shall be supported or battered to prevent collapse. Before digging any trench pit, tunnel, or other excavations, the required temporary support shall be determined and the necessary materials obtained. Where battering or stepping the sides of excavations the soil and weather conditions shall be taken into account to determine the correct angle of repose. All excavations where significant risks are evident will be guarded by suitable means. Where there is a risk that materials will fall into the excavation the barriers shall be provided with toe boards. Where mobile plant is operating suitable exclusion zones and/or stop planks will be put in place. There shall be a suitable means of access and egress from any excavation. Ladders provided for access/egress will be suitably secured. Plant and materials shall not be stored close to the sides of excavations. Services will be located and exposed prior to carrying out excavations using cable avoidance tools, existing service drawings, local client knowledge and site observations (note: CAT detectors may not identify some live services if they do not draw a current) Trial holes to be dug to confirm the depth of the service. Cables shall be treated as live unless otherwise confirmed. Safe digging practices including hand digging, prohibiting use of mechanical means of excavation within 500mm of an identified service, use of insulated tools when carrying out hand digging next to line of service Exposed services shall be supported as necessary; they shall not be used as hand or footholds. Back filling shall be carried out with care to prevent and unintended damage to services Ground conditions will be ascertained prior to digging. 1 3 2 3 Contaminated ground will be tested and necessary precautions taken. i.e. PPE, Special welfare arrangements, M specialist contractors. A formal system of work will be developed where excavations are classed as confined spaces. M 2 3 M A formal system of work will be developed where excavations are classed as confined spaces. THE NEXT PAGE MUST BE COMPLETED AND SIGNED TO ENSURE THAT THIS RISK ASSESSMENT IS SITE SPECIFIC RESIDUAL RISK P S R 1 3 M 1 2 L 1 2 L 1 3 M 1 3 M 1 3 M 1 3 M Borras Construction Limited RISK ASSESSMENT Document No. Issue date Review Due Approved By: EXCAVATIONS RA005 September 2014 September 2016 K Blatchford Site Specific Risks Contract No. Contract Name: NO. RISK IDENTIFIABLE HAZARD PERSONS AT RISK P S CONTROL MEASURES TO BE PUT IN PLACE R 1 2 3 4 5 6 Reviewed for Site use by; Sign: Print Name: Risk Assessment Notes Definitions ACCIDENT HAZARD RISK PROBABILITY SEVERITY An unplanned, uncontrolled event which has led to damage, ill health or injury A condition or practice with the potential to cause harm, damage, ill health, injury or other loss The combination of the probability that a HAZARD will result in an ACCIDENT and the severity of that ACCIDENT The likelihood of an accident occurring The outcome of accident Probability (P) 1 = Unlikely 2 = Possible 3 = Probable Severity (S) 1 = Minor 2 = Serious 3 = Major P=1 P=2 P=3 S=1 L L M S=2 L M H Key S=3 M L = Acceptable Risk, reduce if possible H M = Tolerable Risk, reduce using control measures H H = Unacceptable risk, re-assess hazard Date: RESIDUAL RISK P S R