EXHIBIT A
SCOPE OF WORK
TO:
Universal Design Masonry
A.
JOB SPECIFIC INCLUSIONS – The Subcontractor's "Scope of Work" includes the following:
Item No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
JOB NAME:
Gilbert Christian High
SUBCONTRACT NO: 092017-003
Description
The subcontractor agrees to furnish all labor, material, equipment and supervision required
to complete all Masonry work. Refer to General Structural Notes, sheets S-101 & S-102
of Construction Documents for general masonry requirements, and in accordance with the
Contract documents.
Notwithstanding any provision herein to the contrary, in the event that, during the
performance of this agreement, the price of material and/or any other necessary
commodities significantly increases or decreases, through no fault of the Subcontractor,
the price of any materials, components, or goods to be furnished under this agreement
shall remain fixed and the Subcontractor shall bear sole responsibility for any cost
overruns or retain any cost savings as a result of the change.
The subcontractor shall be responsible to coordinate and assist with job site project
planning to ensure the work is continuous.
The subcontractor shall notify the Project Superintendent of requested inspection dates
and times, and be present during all inspections.
SITE MASONRY
Furnish and install all trash enclosure masonry work per Architectural and Structural
drawings. Furnish and install all Brick Veneer per drawings
Furnish and install all masonry work for site screen. Furnish and install all Brick Veneer
per drawings.
Furnish and install all masonry work for site monument sign. Furnish and install all Brick
Veneer per drawings
Furnish and install all Brick Cap work for the site monument sign and site screen per
drawings.
Furnish and Grout all masonry work per Architectural and Structural drawings.
Furnish and install all steel reinforcing in masonry including rebar and bond beam wire
reinforcing.
BUILDING MASONRY
Furnish and install all Masonry, CMU, work per Architectural and Structural drawings
Wall types identified on Drawing A-601, Wall type Details. Wall Type locations identified
on Architectural Floor Plans.
Furnish and install all CMU Bench/Locker Stand, reference drawing A-203, key note
Provide Masonry stem walls per plans and specifications.
Furnish and install all Loose Fill Vermiculite in all open cells
Furnish and install all Solid Grouted CMU per Structural,
Furnish and install all steel reinforcing in masonry including rebar and bond beam wire
reinforcing.
Signature
Print Name
Page 1 of 3
Date
6900 East Indian School Road, Suite 200
Scottsdale, Arizona 85251
Tel: 480.850.6900
Fax: 480.850.6901
www.armays.com
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Furnish and install all Brick Veneer per floor plans, elevations and details.
Furnish and install all pre-cast materials identified on Exterior Building Elevations and
Drawing A-604. The subcontractor shall provide shop drawings for Architect Review of all
pre-cast materials.
a. Column Base
b. Column, including Trim Detail at Top of Column and Cap
c. Key Stones
d. Vent
e. Quoin
f. Window Surround Header
g. Window Surround Sill
h. Window Deltoid Surround Header
i. Window Arch Surround Header
j. Door Surround Header
k. Door Jamb Surround
l. Pilaster Header
m. Eve Molding
Coordinate all openings in walls with other trades. i.e. Mechanical, Electrical, Plumbing,
Doors and Fire Protection subcontractors.
Verify all openings in masonry with manufacturer’s shop drawings as provided by AR
Mays, including elevator doors and reinforcing.
Protect all masonry walls and concrete floors from mortar and grout splash. Broadcast
sand on floors as necessary. Clean any splash upon completion.
Layout and install all steel embed plates; steel lintels and anchor bolts in masonry, Dry
pack under all embed plates and lintels. Embed plates and steel lintels provided by
others.
Furnish and install all required Dry pack in all Masonry penetrations created by Electrical,
Fire Alarm, Fire Sprinkler, Mechanical and Plumbing trades.
Provide setting and bracing for hollow metal frames in masonry, as provided by others.
Grout all hollow metal door frames.
Coordinate vertical reinforcement to avoid conflicts with beam bearing conditions as to not
require the cutting of vertical reinforcement.
Strike all exposed joints including all interior and exterior side of walls and back side of
parapet walls.
Fill all joist bearing pockets with masonry upon completion of their installation.
Provide all reinforcement, grout and block products and methods per specifications.
Provide and install all required masonry control joints and materials. Reference structural
sheets and specifications.
Install weep holes in masonry as required.
Provide and place all temporary walls bracing as required.
Provide and place all temporary shoring for masonry openings.
Provide a designated masonry dumpster, and haul off of masonry debris for disposal in
approved landfill. Location of dumpster shall be by the Project Superintendent.
Brick veneer and Polyurethane/G.F.R.C/Precast Color Legend per Architectural Drawing
A-301. Final Color Selection by Architect.
a. FAUX Brick Veneer, Coronado Stone Products, 1A Jolla
b. Precast, Light Gray
Signature
Print Name
Page 2 of 3
Date
6900 East Indian School Road, Suite 200
Scottsdale, Arizona 85251
Tel: 480.850.6900
Fax: 480.850.6901
www.armays.com
39
40
41
42
43
44
45
46
Provide all masonry ties and brick ties in order to complete all pier details.
Install all bolts for sill angles and flashing for brick and stone in masonry per plan. Bolts
provided by others.
Install all top plate parapet bolts in masonry per plan. Bolts provided by others
Provide all mechanical fasteners.
Provide wall patch for fasteners.
Mechanically fasten and adhere all precast concrete per plans and General Notes
Materials are to be delivered to job site and staged per the job site superintendent.
Clean masonry at each lift to deter efflorescence.
B.
JOB SPECIFIC EXCLUSIONS – The Subcontractor's "Scope of Work" excludes the following items:
Item No.
Description
1
Taxes
C.
CHANGES IN SCOPE OF WORK
1
The overhead and profit allowance for extra work performed on a time and material basis
shall not exceed ten percent (10%).
2
The Subcontractor agrees to the following prices which include all fringes, insurance,
taxes, overhead and profit for changes in "Scope of Work”:
Foreman $35.00/hr.
Mason: $30.00/hr.
Labor: $20.00/hr.
D.
SCHEDULE AND PERFORMANCE – The Subcontractor shall meet or exceed the following
performance requirements. Work tasks shall be accomplished concurrently :
1
Project requirements:
Complete All Masonry Work in 90 calendar days.
Site Masonry Work in 6 calendar days
Building Structural Masonry Work in 50 calendar days
Building Brick Veneer in 38 calendar days
Precast Products in 26 calendar days
E.
SUBMITTALS – The Subcontractor shall submit six (6) copies of product data and samples within 10
days after Subcontract Award.
F.
PAYMENT AND PERFORMANCE BOND WILL NOT BE REQUIRED.
Signature
Print Name
Page 3 of 3