Section 861 – CLEANING SEDIMENTATION STRUCTURES 861.1 DESCRIPTION – This work is removal and disposal of sediment deposited in erosion and sedimentation control structures and/or devices. 861.3 CONSTRUCTION – When sediment accumulation has reached a point one-third the depth of the sediment structure or device, remove and dispose of the sediment so it does not erode into the construction areas and/or natural waterways. Do not damage the structure or device. 861.4 MEASUREMENT AND PAYMENT – Cubic Meter (Cubic Yard) The sediment removed will normally be measure by the number of full loads hauled multiplied by the rated capacity of the hauling equipment, in cubic meters (cubic yards). Cross-sectional measurements will be used for large quantities and when not using hauling equipment.