PROCUREMENT OF INDIVIDUAL ENVIRONMENTAL CONSULTANT FOR PREPARATION OF ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REPORTS FOR (i) 220 KV JHIMPIR GRID STATION & ASSOCIATED TRANSMISSION LINE AND (ii) 220 KV GHARO GRID STATION & ASSOCIATED TRANSMISSION LINE PROJECT. National Transmission & Despatch Company Limited (NTDCL) was incorporated on 6th November, 1998 and commenced commercial operation on 24 th December, 1998. It was organized to take over all the properties, rights and assets obligations and liabilities of 220 kV and 500 kV Grid Stations and Transmission Lines/Network owned by Pakistan Water and Power Development Authority (WAPDA). NTDC operates and maintains twelve 500 KV and twenty nine 220 KV Grid Stations, 5077 km of 500 KV transmission line and 7359 km of 220 KV transmission line in Pakistan. NTDC (the Employer), intends to hire an individual environmental consultant for conducting EIA study of following two projects for obtaining Environmental Approval from EPA Sindh. Project 1: 220 kV Gharo Grid Station and associated Transmission Lines; (a) 220 kV Transmission Line, 75 KM and (b) 132 kV Transmission Line, 20 KM. Project 2: 220 kV Jhimpir Grid Station and associated Transmission Lines; (a) 220 kV Transmission Line, 70 KM and (b) 132 kV Transmission Line, 172 KM. Required Qualification and Experience: Individual Environmental Consultants having Masters’ Degree in Environmental or Related Sciences with 10 years overall experience and five years specific experience of conducting environmental assessments of heavy transmission lines are invited to submit their sealed technical proposals including CV along with relevant qualification/experience documents and financial proposals (including all taxes) at the address given below. The technical/financial proposals will be received by 12.11.2015 up to 11:00 AM. The technical bids will be opened on the same day at 11:30 AM. The financial bids of only technically qualified bidders will be opened later. Time Period: Total time period of this consultancy service will be six (06) months; three (03) months for each project. Selection Criteria: The Consultant will be selected as per following criteria: The detailed criterion of scoring is given in TORs. Technical Scoring = 80 % Financial Scoring = 20 % Scope of Services and Deliverables: The Consultant will prepare EIA reports of both the projects meeting the requirements of all funding agencies (ADB, WB, USAID etc.) as well as of Government of Pakistan. The Consultant will be responsible for obtaining NOC from EPA Sindh, presenting the EIA in Public Hearing and addressing all the queries raised by EPAs. The deliverables will include 11 (eleven) hard copies and 02 (two) soft copies of each EIA report. Detailed TORs are available at www.ntdc.com.pk or can be obtained by sending email on below mentioned address. NTDCL reserves the right regarding rejection of proposals as defined in Clause 33(1) of PPRA Rules 2004. Manager Environment and Social Impact Cell 140-WAPDA House, Shahrah-e-Quaid-e-Azam, Lahore, Pakistan. Postal Code: 54000 Telephone:+92-42-99202211 Ext 2141 Facsimile number: +92-42-99202414 E-mail address: esic@ntdc.com.pk