Professor David Muh-Cherng Wu Dept. of Industrial Engineering and Management, National Chiao Tung University Hsin-Chu, 300 Taiwan Phone: +886(3)5731-913; Fax: +886(3)5720-610; Email: mcwu@mail.nctu.edu.tw Professor David Muh-Cherng Wu is a Professor of Industrial Engineering and Management at National Chiao Tung University, Hsinchu, Taiwan. He received his PhD in Industrial Engineering from Purdue University in 1988. His research interests include computer integrated manufacturing, supply chain management, and strategic analysis of high-tech industry. He is currently the board member of the Asia Pacific Industrial Engineering and Management Society (APIEMS) and the board member of the Chinese Institute of Industrial Engineers (CIIE), and the board member of Promise Technology Inc. Refereed International Journal Articles (2005-2009) 1. M. C. Wu, Y. Hsiung, and H. M. Hsu, “A tool planning approach considering cycle time constraints and demand uncertainty ,” International Journal of Advanced Manufacturing Technology, Vol. 26, pp. 565-571, 2005, (SCI) 2. M. C. Wu, C. S. Chien, and K. S. Lu, “Downgrade decision for control/dummy wafers in a fab,” International Journal of Advanced Manufacturing Technology, Vol. 26, pp. 585-590, 2005, (SCI) 3. M. C. Wu and K. C. Fu, “An Operator Staffing and Assignment Model for Foundry Fabs,” International Journal of Advanced Manufacturing Technology, Vol. 26, pp. 1429-1`435, 2005, (SCI) 4. M. C. Wu, Y. Hsiung, and H. M. Hsu, “Tool planning in the scenario of multiple existing semiconductor fabs,” International Journal of Advanced Manufacturing Technology, Vol. 27, pp. 145-151, 2005. (SCI) 5. Hsu, S.H., Lee, F.L., & Wu, M.C. (2005). Designing action games for appealing to buyers. CyberPsychology & Behavior, Vol. 8, No. 6, pp. 585-591, 2005 (SSCI) 6. M. C. Wu, S. C. Wu, T. C. Hsia, and S. H. Hsu, “A Similarity Inference Method for Reducing the Cost of Pair Comparison,” International Journal of Advanced Manufacturing Technology, Vol. 27, pp. 774-780, 2006. (SCI). 7. M. C. Wu, C. S. Chien, and K. S. Lu, “Yield Improvement Planning for the recycle Processes of Test Wafers,” International Journal of Advanced Manufacturing Technology, , Vol. 227, pp. 1228-1234, 2006. (SCI) 8. M. C. Wu, Jian-Ren Chen, and Jung-Hong Chuang, “A-trimmed Skeleton for Modeling the Global Shape of Polygons,” International Journal of Advanced Manufacturing Technology,Vol. 27, pp. 1140-1147, 2006. (SCI) 9. M. C. Wu, Y. L. Hung, Y. C. Chang, K. F. Yang, “Dispatching for Semiconductor Fabs With Machine-Dedication Features,” International Journal of Advanced ManufacturingTechnology, Vol. 28, pp978-984, 2006 (SCI) 10. M. C. Wu, S. H. Sun, “A Project Scheduling and Staff Assignment Model Considering Learning Effect,” International Journal of Advanced Manufacturing Technology, Vol. 28, pp 1190-1195, 2006 (SCI) 11. M. C. Wu, W. J. Chang, and C. W. Chiou, “Product Mix Decision in a Mixed-Yield Wafer Fabrication Scenario,” International Journal of Advanced Manufacturing Technology, Vol. 29, pp. 746-752, 2006, (SCI) 12. Hsu, S.H., Lee, F.L., & Wu, M.C. (2006). An integrated approach to achieving optimal design of 2 computer games. Expert Systems with Applications, Vol. 31, pp. 145-149, 2006 (SCI) 13. Muh-Cherng Wu, Sheng-Yu Lin and Chia-Hsin Lin, An Effective Application of Decision Tree to Stock Trading, Expert Systems with Applications, Vol. 31, pp. 270-274, 2006, (SCI) 14. Yai Hsiung , Muh-Cherng Wu, and Hsi-Mei Hsu, “Tool Planning in Multiple Product-Mix Under Cycle Time Constraints for Wafer Foundries Using Genetic Algorithm,” Journal of the Chinese Institute of Industrial Engineers, Vol. 23, No. 2, pp. 174-183, 2006. (EI)【2007 CIIE Paper Award】 15. M. C. Wu, Y. F. Lo, and S. H. Hsu, “A Case-Based Reasoning Approach to Generating New Product Ideas,” International Journal of Advanced Manufacturing Technology, vol. 30, pp. 166-173, 2006 (SCI) 16. Muh-Cherng Wu and Wen-Jen Chang “A short-term capacity trading method for semiconductor fabs with partnership,” Expert Systems with Applications, Vol. 33, pp. 476-483, 2007 (SCI) 17. Hsu, S. H., Kao, C. H., & Wu, M. C., “Factors Influencing Player Preferences for Heroic Roles in Role-Playing Games (RPG),” CyberPsychology & Behavior, Vol. 10, No. 2, pp. 293-295, 2007(SSCI) 18. S. H. Hsu, M. H. Wen, and M. C. Wu, “Exploring Design Features for Enhancing Players’ Challenges in Strategy Games,” CyberPsychology & Behavior, Vol 10, No. 3, pp. 393-397, 2007 (SSCI) 19. M. C. Wu, Y. F. Lo, and S. H. Hsu, “A Fuzzy CBR Technique for Generating Product Ideas,” Expert Systems with Applications, Vol. 34, pp. 530-540, 2008 (SCI) 20. M. C. Wu and Y. K. Hsu, “Design of BOM Configuration for Reducing Spare Parts Logistic Costs” Expert Systems with Applications, Vol. 34, pp. 2417-2423, 2008 (SCI) 21. M. C. Wu, J. H. Jiang and W. J. Chang, "Scheduling a Hybrid MTO/MTS Semiconductor Fab with Machine-Dedication Feature," International Journal of Production Economics, Vol. 112, No. 1, pp. 416-426, 2008 (SCI). 22. S. H. Hsu, C. C. Lee, M. C. Wu, K. Takano, "A Cross-Cultural Study of Organizational Factors on Safety: Japanese vs. Taiwanese Oil Refinery Plants," Accident Analysis & Prevention, Vol. 40, No. 1, pp. 24-34, 2008 (SSCI) 23. M. C. Wu and T. U. Hung, “A Hit-Rate Based Dispatching Rule for Semiconductor Manufacturing,” International Journal of Industrial Engineering-Theory, Applications and Practice , online version, Vol. 15,No. 1, March 2008 (SCI) 24. M. C. Wu and W. J. Chang “A Multiple Criteria Decision for Trading Capacity between Two Semiconductor Fabs,” Expert Systems with Applications, Vol. 35, pp. 938-945, 2008 (SCI) 25. M. C. Wu, S. J. Chiou, and C. F. Chen, “Dispatching for Make-to-Order Wafer Fabs with MachineDedication and Mask Setup Characteristics”, International Journal of Production Research, Vol 46, pp. 3993-4009, 2008. (SCI) 26. Shang Hwa Hsu, Ching-Han Kao, Muh-Cherng Wu, “Design Facial Appearance for Roles in Video Games,” Expert Systems with Applications, (http://dx.doi.org/10.1016/j.eswa.2008.05.049)(SCI) 27. M. C. Wu, C. F. Chen, and C. F. Shih, "Route Planning for Two Wafer Fabs with Capacity-Sharing Mechanisms," International Journal of Production Research, (DOI:10.1080/00207540802172029), (SCI) 28. Chiou, Chie-Wun and Wu, Muh-Cherng, “Scheduling Semiconductor In-line Steppers in New Product/Process Introduction Scenarios," International Journal of Production Research, (accepted for publication) (SCI) 3 29. H. M. Hsu, T. S. Su, M. C. Wu, and L. C. Huang, “A Multiple Lot-Sizing Decision for Two-Stage Systems with Interrupted Geometric Yield and Non-rigid Demand,” Journal of the Chinese Institute of Industrial Engineers, (accepted for publication)(EI) 30. H. M. Hsu, T. S. Su, M. C. Wu, and L. C. Huang, “Multiple Lot-Sizing Decisions with an Interrupted Geometric Yield and Variable Production Time,” Computers & Industrial Engineering, (accepted for publication) (SCI) 31. Muh-Cherng Wu, Chang-Fu Shih and Chen-Fu Chen, “An Efficient Approach to Cross-Fab Route Planning for Wafer Manufacturing,” Expert Systems with Applications, (accepted for publication) (SCI) 32. Muh-Cherng Wu, Chang-Fu Shih and Chen-Fu Chen, “An Efficient Approach to Cross-Fab Route Planning for Wafer Manufacturing,” International Journal of Production Research, (accepted for publication) (SCI)