STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2)roject Name: __________________________________(FMR/CER #): ____________________roject site location:________________________________________________________________ LMSSC Project Manager:____________________________________________________________ Contractor Company:________________________________________________________________ Contractor Project Superintendent:____________________ Contact Tel: _____________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2) Employ special precautions if rain forecast reaches 50%. These precautions include: Increased inspection frequency to daily for storm water pollution control and material storage areas to rectify ongoing releases or to identify and prevent any possible release. Reduction in activities that can cause material to come into contact with rain water. Perform inspection within 24 hours after rain event. Evaluate effectiveness of the storm water control and document evaluation. Routine inspection: ( Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Routine inspection: ( Post-rain inspection: ( Inspection Date: ___________ Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Post-rain inspection: ( Inspection Date: ___________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2)roject Name: __________________________________(FMR/CER #): ____________________roject site location:________________________________________________________________ LMSSC Project Manager:____________________________________________________________ Contractor Company:________________________________________________________________ Contractor Project Superintendent:____________________ Contact Tel: _____________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2) Inspection Item Was the (all weather construction) entrance maintained or barricaded? Was all erosion control measures needing repairs completed? Routine inspection: ( Observation Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Routine inspection: ( Post-rain inspection: ( Inspection Date: ___________ Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Post-rain inspection: ( Inspection Date: ___________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2)roject Name: __________________________________(FMR/CER #): ____________________roject site location:________________________________________________________________ LMSSC Project Manager:____________________________________________________________ Contractor Company:________________________________________________________________ Contractor Project Superintendent:____________________ Contact Tel: _____________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2) Is sediment prevented from entering any storm drain ditch, or watercourse through the use of silt fencing, hay bales, sand bags, gravel, surface depressions or other approved methods? Are the practices that reduce tracking sediment onto public and private roads, being maintained by the Routine inspection: ( Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Routine inspection: ( Post-rain inspection: ( Inspection Date: ___________ Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Post-rain inspection: ( Inspection Date: ___________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2)roject Name: __________________________________(FMR/CER #): ____________________roject site location:________________________________________________________________ LMSSC Project Manager:____________________________________________________________ Contractor Company:________________________________________________________________ Contractor Project Superintendent:____________________ Contact Tel: _____________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2) contractor? Are construction, demolition and excavation materials stored under a roof or structure, or covered with a tarp or plastic visqueen where feasible to prevent or minimize contact with rain water or run-on water or be dispersed by wind? Routine inspection: ( Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Routine inspection: ( Post-rain inspection: ( Inspection Date: ___________ Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Post-rain inspection: ( Inspection Date: ___________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2)roject Name: __________________________________(FMR/CER #): ____________________roject site location:________________________________________________________________ LMSSC Project Manager:____________________________________________________________ Contractor Company:________________________________________________________________ Contractor Project Superintendent:____________________ Contact Tel: _____________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2) Are all paved areas swept in anticipation of storm event? Was any sediment or debris washed into storm drain systems? Did the contractor disposed of the construction debris on a regular basis and not allow any accumulation of such materials? Routine inspection: ( Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Routine inspection: ( Post-rain inspection: ( Inspection Date: ___________ Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Post-rain inspection: ( Inspection Date: ___________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2)roject Name: __________________________________(FMR/CER #): ____________________roject site location:________________________________________________________________ LMSSC Project Manager:____________________________________________________________ Contractor Company:________________________________________________________________ Contractor Project Superintendent:____________________ Contact Tel: _____________ STORM WATER INSPECTION ITEMS FOR LMSSC (Fac. 1 and 2) If a spill occurred, did the appropriate ESH or local emergency response agencies receive immediately notice? Has any storm runoff occurred since the last inspection? Include project site map to specify methods of storm water pollution prevention control. Routine inspection: ( Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Routine inspection: ( Post-rain inspection: ( Inspection Date: ___________ Pre-rain inspection: (Post-rain inspection: (nspector name: _____________ ___________ Routine inspection: ( Pre-rain inspection: ( Inspector name: ____________________________ Post-rain inspection: ( Inspection Date: ___________