Central North Island Blue Duck Trust “Supporting the restoration of Whio” Progress Report for the Central North Island Blue Duck Conservation Charitable Trust Description: Enter name of project, date prepared, and name of author or contact person. Period: Enter reporting period. Two 6 monthly reports will be asked for each year, so your report will either be for the period 1st July - 31st December or 1 January – 30 June. 1. Summary Short summary of the most significant events for your site. What do you most want to tell us about? Usually 3-6 sentences capturing the most significant achievements, issues or lessons learnt during the reporting period. 2. Whio results Summary of whio monitoring results for your site. How many km of river are you monitoring? How many pairs known from the site? How many of these pairs do you consider to be protected by your predator control? Any ducklings seen? Any ducklings fledged? Any comment you wish to make, e.g. deaths or other significant changes since the last reporting period? River Km Stream Monitored # Pairs monitored # Pairs protected by your predator control # Chicks hatched (so far) # Fledged juveniles Comment 3. Predator control Short summary of predator control work. Any changes or issues with your current predator control set up? Any new or extended trap lines? Any poison operations? 1|Page CNIBDT - Contestable Fund – Report Central North Island Blue Duck Trust “Supporting the restoration of Whio” If you are using Goodnature A12 or A24 traps, please specifically report on their effectiveness and any issues or suggested improvements. This information is being collected from all whio sites to help Goodnature improve their new traps. Please summarise kill returns from your site for the reporting period (use table below). Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Stoats Cats Ferrets Weasels Rats Other (please specify) 4. Other information: Please add in here anything you feel is significant that you haven’t already covered. E.g. flood events, changes in community or volunteer involvement at your site, future plans and resource needs, issues you have encountered, barriers or successes for your site. 2|Page CNIBDT - Contestable Fund – Report