SITE MONITORING REPORT
File Ref: 11 421 14
Date: 19 January
Visit no: 2 of 2
2012
Monitoring Officer Glenn Shaw
Time on site:
Time off site:
Tel No: 01245 437117
10:00
11:00
Site Co-ordinator: Glenn Shaw
Tel No: 01245 437117
Site Name: Ugley landfill
Operator: Biffa
Site Representative: Tony Eagle
Permission no’s:
ESS/30/04/UTT,
ESS/02/05/UTT,
ESS/08/04/UTT,
ESS/27/09/UTT.
Permission Number & Romp Date Due N/A
Outstanding Submission of details:
Permission Condition
Scope of Condition and Action to be taken
No.
No.
Constraints:
Weather:
Noise:
Approach Roads:
Ground:
Access:
Slippery
Wheel Cleaning:
Machinery:
In correct position:
Stockpiles:
Bunds:
Dry/ Windy / Rain / Snow
Acceptable/ Not acceptable N/A
Dry / Dusty / Wet / Muddy / Flooded
Dry / Dusty / Wet / Damp / Muddy / Flooded
Obstructed / Not Obstructed / Mud on Road / Ice /
Washer / Spinner / Sweeper / none
Working / Not working
Yes / No / N/A
Height = N/A
Profiled / Grassed / Weeds/ NA
Actions from last site visit:
o Operator to contact WPA in relation to aftercare of the site (ecologist to
visit to see if species rich grassland taking) and the potential for extension
of time application, and;
Check approach road for fragments
Inspection Results Summary:
 Haul Road very clean, neat and tidy.
 Wheel washer working very well.
 Netting Towers have been removed.
 Infilling and restoration ongoing.
 Hydro planting has taken place on Cells 13 &14.
 Cells 1 -3 have depressions which have filled with water and are heavily
infested with weeds.
 No other issues.
Permission
No.
Compliance with Conditions
Condition Scope of Condition and Action to
No.
be taken
Action to be
taken by
Operator or
MPA/WPA
Officer
Actions to be taken before next site visit:
Contact the WPA regarding surcharging and re drilling of Cells 1-3.
Note: The actions noted in this report are required in order to ensure
adequate progress is made and to avoid potential enforcement action
against a breach of planning control.