Site-Specific Review Checklist

advertisement
11/10
TIER TWO/SITE SPECIFIC CHECKLIST
Grantee:
Date:
Prepared By:
Phone Number:
Location:
The Tier One environmental review covers the geographic area of the project. Tier Two addresses the specific sites/activities
once identified. The purpose of the Tier Two review is to document environmental compliance for a specific site/activity not
cleared in Tier One. The Tier Two review consists of a review of the Tier One strategies and this environmental checklist with
documentation for each site/activity proposed for CDBG funding.
DIRECTIONS - Write “1” in the second column if the compliance area was satisfactorily cleared as part of the Tier One Review; OR
write “2” if the compliance must be determined or impacts mitigated for this specific site/activity. Compliance documentation must
contain verifiable source documents and relevant base data and be attached for inclusion in the ERR. If the compliance area was covered in
the Tier One review, no information is required in column 3.
Statutes, Executive Orders, &Regulations at
24 CFR §58.5
Tier
1/2
Compliance Documentation
Historic Preservation
[36 CFR Part 800]
Floodplain Management
[24 CFR 55, Executive Order 11988]
Wetland Protection
[Executive Order 11990]
Coastal Zone Management Act
[Sections 307I and (d)]
Sole Source Aquifers
[40 CFR 149]
Endangered Species Act
[50 CFR 402]
Wild and Scenic Rivers Act
[Sections 7(b), and (c)]
Clean Air Act
[Sections 176(c) and (d)]
Farmland Protection Policy Act
[7 CFR 658]
Noise Abatement and Control
[24 CFR 51B]
Explosive and Flammable Operations
[24 CFR 51C]
Airport Clear Zones and Accident
Potential Zones [24 CFR 51D]
Toxic Chemicals and Radioactive Materials
[24 CFR 58.5(i)(ii)]
Environmental Justice
[Executive Order 12898]
Coastal Barriers Resources Act
Is the project located in a coastal barrier resource area?
No; Cite Source Documentation:
Yes, Federal assistance may not be used in such an area.
Airport Runway Clear Zones and Clear Zones Disclosures
Does the project involve the sale or acquisition of existing property within a Civil Airport's Runway Clear Zone, Approach Protection
Zone or a Military Installation's Clear Zone?
No; Cite Source Documentation:
Yes; Disclosure statement must be provided and a copy of the signed disclosure statement must be maintained in the
Environmental Review Record.
11/10
Summary of Findings and Conclusions
If an Environmental Assessment was required in Tier One, documentation of additional compliance areas may be
summarized here with documentation attached.
List the Tier One Strategies/Mitigation Measures for Specific Sites and the evaluation for each.
Site Specific Finding/Determination:
Preparer’s Signature:__________________________________________________
Name and Title of Preparer: _______________________________ Date: __________________