Project Name: Annual 30000 tons of rubber

advertisement
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Chemical Industry
(20110411-20110415)
Project Name: Henan, Shanxi Open Chemical Investment Holding Group Co., Ltd. annual
output of 120 tons of urea fertilizer and 600,000 tons of construction projects nitro ............. 5
Project Name: Food Co., Ltd. of Henan Province tomorrow CO2 supercritical extraction seed
oil and capsaicin production projects ................................................................................. 6
Project Name: Xingyang China chemical plant with an annual output of 25,000 tons paraffin
technology upgrade project .............................................................................................. 7
Project Name: Annual 30,000 tons of rubber chemicals project ........................................... 7
Project Name: Production of anti-rust lubricant projects drawing 20 million tons .................. 8
Project Name: The annual sales of 5,000 tons of liquid gas station project .......................... 9
Project Name: annual output of 10 tons of bio-diesel project .............................................10
Project Name: Shanghai Matsushita Electric Works Electronic Materials Co., Ltd. increase and
expansion project............................................................................................................10
Project Name: Plastic Products Co., Ltd. Shanghai Tang renovation project ........................11
Project Name: Henan Sheng Chang Industrial Co., Ltd. with an annual output 12 million tons
of high purity graphite electrode projects .........................................................................12
Project Name: China Petroleum & Chemical Corporation Zhumadian Pingyu HTC gas station
expansion project............................................................................................................13
Project Name: Environmental Engineering Co., Ltd. on Haiaogeli 30 million tons / year
sulfuric acid and waste heat utilization projects .................................................................14
Project Name: Annual 0.8 tons of photochromic material and 1,700 tons of optical resin
monomer products production and construction projects ...................................................14
Project Name: Shanghai Zhi Rong Project Technology Co., Ltd. .........................................15
Stages of progress: environmental impact assessment ......................................................15
Project Name: Annual 10 million tons of oil project solution ...............................................16
Project Name: Annual 18 million tons of synthetic ammonia, 300,000 tons of urea, 5 million
square exhaust resources comprehensive utilization project -update ..................................17
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hubei Yingli Chemical Co., Ltd. with an annual output 14,000 tons TCCA
project ...........................................................................................................................19
Project Name: Nanyang PetroChina gas station construction projects the twenty-fourth ......20
Project Name: annual output of 3,000 million square meters of new environmentally friendly
bio-based composite sheet + benzene annual 12 million tons of bio-based non-formaldehyde
glue project ...................................................................... Error! Bookmark not defined.
Project Name: Zhenjiang Chi Mei annual output of 4.62 tons phosphor Chemical Co., Ltd.
Product ..........................................................................................................................21
Project Name: Annual Production of 3,000 tons of 4.4 '- Diaminobenzenesulfonanilide
projects for aniline ..........................................................................................................22
Project Name: annual output of 60 million tons of coal to olefins project ............................23
Project Name: Henan Business Chemical Co., Ltd. are ammonia, urea, energy optimization
system reconstruction project ..........................................................................................24
Project Name: Henan Jinshan Chemical Co., Ltd production of soda ash cleaner production
project ...........................................................................................................................25
Project Name: annual output of 10 tons of bio-fuel ethanol production line construction
project ...........................................................................................................................26
Project Name: Henan East Cheung Albert Chemical Co., Ltd. with an annual output of 25,000
tons of phenolic resin manufacturing projects ...................................................................26
Project Name: Zhen Hong Trading Company South Gas CNG filling stations in the project ...27
Project Name: United Industrial Co., Ltd. Luoyang nimble U.S. reconstruction project to
reconcile oil ....................................................................................................................28
Project Name: Hao Jumbo Group Limited ammonia cleaner production technology
transformation project .....................................................................................................29
Project Name: Annual Production of 4,500 tons of acid, 1,800 tons of cobalt oxide, 500 tons
of cobalt carbonate manganese project ............................................................................29
Project Name: Angel Yeast Co., Ltd. produce 20,000 tons of high construction of active dry
yeast ..............................................................................................................................30
Project Name: Jiangmen Handsome Chemical Development Co., Ltd. 12t / h emulsion
monomer conversion project............................................................................................31
Project Name: Shantou Jet Project Fine Chemical Co., Ltd. .. Error! Bookmark not defined.
Stages of progress: environmental impact assessment ........ Error! Bookmark not defined.
Project Name: Annual 20000m3 anti-static flame retardant EVA Product ............................33
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hubei Co., Ltd. Tianguan rice processing by-products of bio-energy utilization
project ...........................................................................................................................34
Project Name: Hubei solid-Run Technology Co., Ltd. 2,000 tons / year UV photoinitiator
products project ..............................................................................................................35
Project Name: Biological Technology Co., Ltd. Shanghai Zhaorui new production line
nucleotide.......................................................................................................................35
Project Name: Town Jiang Jincheng Environmental Technology Co., Ltd. Solid Waste
Environmental Technology R & D projects ........................................................................36
Project Name: Annual 2 × 60 tons of coal-to-olefins project ..............................................37
Project Name: Shangqiu Xinao Gas Company Limited II Natural Gas Station .......................38
Project Name: China-chemical Co., Ltd. Nanxiong City annual 4kt γ1, 4kt γ2, 4kt Si-69
construction project ........................................................................................................39
Project Name: 500t solvent series cleaning agent, 560 tons water-soluble emulsion type
cleaner, 80 tons of fountain solution construction projects .................................................40
Project Name: 23-valent pneumococcal polysaccharide vaccine project -update ..................41
Project Name: Guangdong New Project Carpoly Technology Material Co., Ltd. ....................42
Stages of progress: started in the construction -EIA at the same time ................................42
Project Name: Liuhua 19-5 field terminal expansion project in Zhuhai Zhuhai .....................42
Project Name: HAN 50 million tons annual output of long-acting nitrogen fertilizers organic
active multi-functional project ..........................................................................................43
Project Name: Paracetamol pamabrom technological transformation of solid expansion
project preparation workshop ..........................................................................................44
Project Name: Annual 30,000 tons zero sodium metasilicate and sodium metasilicate 36,000
tons five projects ............................................................................................................45
Project Name: New Multi-annual 60,000 tons of carbon alcohol alcohol solvent and clean fuel
projects ..........................................................................................................................46
Project Name: Henan Pute kinds of annual output of 1200 tons of polyester filament Ltd.
120,000 square meters of polyester filament network projects dry .....................................47
Project Name: Recreation County People's Hospital Medical Technology Building, infectious
diseases and canteen building construction projects ..........................................................48
Project Name: Yucheng County, Henan Zhongyuan gas station project ..............................49
Project Name: Nanxiong City gas pipeline project .............................................................50
Project Name: Annual 35,000 tons of silica nano project ...................................................50
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: New Technology nicotine extraction projects solanesol ................................51
Project Name: Industrial Group Co., Ltd. Shigeru day 500 tons of naproxen Project ............52
Project Name: Qingyuan Deco resin United Chemical Co., Ltd. with an annual output of
50,000 construction projects ............................................................................................53
Project Name: Liangshan Top Thai Equipment Vacuum Salt Salt Co., Ltd. technology projects
......................................................................................................................................54
Project Name: Annual 204.5t natural vitamin E, 250t plant sterols, 3024t fatty acid methyl
ester, 740t of asphalt plant new project ...........................................................................54
Project Name: Dalian Petrochemical Company hydrogen-rich gas recovery project ..............55
Project Name: Field preparation of mixed explosives, vehicles and ground station expansion
project ...........................................................................................................................56
Project Name: Annual 150 tons industrialization projects fipronil ........................................57
Project Name: Annual Production of 10,000 tons of refined PTA Project .............................58
Project Name: Datong Coal Mine Group annual output of 60 million tons of coal to olefins
project ...........................................................................................................................59
Project Name: Golden Pegasus -Dalian Chemical Paint Co., Ltd. oily, water-based paint
10000t / a, architectural coatings 15000t / a and the synthetic resin 10000t / a project ......60
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Henan, Shanxi Open Chemical Investment Holding Group Co., Ltd. annual output of 120
tons of urea fertilizer and 600,000 tons of construction projects nitro
Progress stage: under construction
Construction period: January 2011 -2013 in December
Major equipment: Aerospace gasification gas conversion furnace, centrifugal compressor, air separation
unit, ammonia, urea granulation plant, wash liquid nitrogen, sulfur recovery unit, ammonium nitrate
granulation tower, nitro-compound fertilizer plant etc. -for reference only
Project:
Huanglong Industrial Cluster Project is located in Kaifeng area, Henan, Shanxi open Chemical
Investment Holding Group Co., Ltd. with an annual output 120 million tons and 600,000 tons of urea
fertilizer nitro construction projects, the construction scale: A self-developed countries coal gasification and
other advanced space heaters technology, construction, resource conservation and environmental protection
of the annual output of 120 tons of urea and 600,000 tons of compound fertilizer nitro project. Technology:
Aerospace furnace pulverized coal gasification; purification: low-temperature methanol wash, liquid
nitrogen wash; ammonia: low pressure ammonia synthesis; Urea: An Improved CO2 stripping process;
nitro compound: melt granulation technology. Major equipment space gasification gas conversion furnace,
centrifugal compressor, air separation unit, ammonia, urea granulation plant, wash liquid nitrogen, sulfur
recovery unit, ammonium nitrate granulation tower, nitro-compound fertilizer plant and so on.
The total investment is about 6,272,873,000 yuan, including: self 1,803,479,500 yuan of domestic bank
loans 4,469,393,300 yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Food Co., Ltd. of Henan Province tomorrow CO2 supercritical extraction seed oil and
capsaicin production projects
Progress stage: the record
Construction period: June 2011 In June -2012
Major equipment: 1000L × 3CO2 production line supercritical fluid extraction, soft capsule production line,
packaging production line equipment, test equipment, small-scale supercritical fluid extraction -for
reference only
Project:
Project is located in industrial agglomeration area Xixia County, Henan Province tomorrow Food Co.,
Ltd. CO2 production of seed oil supercritical extraction and capsaicin construction projects, construction
scale and content: The project required 30 acres of land, the new technical center, supercritical extraction
plant, packaging workshop and integrated warehouse in 1, with a total construction area of 8,600 square
meters, purchase 1000L × 3CO2 supercritical fluid extraction production line, soft capsule production line,
packaging production line equipment of the one, small supercritical fluid extraction test equipment 1 set,
and the construction of supporting facilities, etc. . Technology: CO2 supercritical extraction technology.
Flow chart: Raw materials -dry material - smash - mounted kettle - Supercritical CO2 extraction Molecular Distillation Purification - preparation - Generation Products - Packaging - storage .
The total investment is about 52 million yuan, of which 22 million yuan raised by the company 30
million yuan of domestic bank loans.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Xingyang China chemical plant with an annual output of 25,000 tons paraffin technology
upgrade project
Progress stage: the record
Construction period: April 2011 -2011 in December
Major equipment: liquid wax tank, activated carbon absorption tower, and vice tower, chlorine cylinders,
paraffin reactor, radiator, alkali absorption cell, cold water tower -for reference
Project:
The project is located high Xingyang Village Jing Zhaicun, Xingyang China chemical plant with an
annual output of 25,000 tons chlorinated technical upgrading projects, due to the market needs to be in the
chemical factory production line technological transformation of the park, including 3,800 square meters
factory, warehouse 1900 square meters, 300 square meters dormitory, office building 300 square meters,
technology: liquid paraffin and outsourcing companies by the main side effects of chlorine tank and down
the formation of chlorinated paraffin wax absorption tower and the by-product hydrochloric acid, the main
equipment with liquid wax tank, activated carbon absorption tower, and vice tower, chlorine cylinders,
paraffin reactor, radiator, alkali absorption cell, cold water tower.
The total investment is about 55 million yuan, the enterprise itself.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Annual 30,000 tons of rubber chemicals project
Progress stage: under construction
Construction period: March 2011 -2012 in December
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: high pressure synthesis reactor, oxidation reactor, centrifuge, shredders, waste water
treatment equipment -for reference
Project:
Project is located in Hebi City, Baoshan circular economy industrial cluster zone, with an annual output
30,000 tons of rubber chemicals project with an annual output 30,000 tons of rubber chemicals; main raw
materials are aniline, carbon disulfide, caustic soda, sulfur, etc., the production process for aniline, carbon
disulfide , sulfur, synthetic crude in the autoclave M, coarse M using reusable refined organic solvent
extraction, and further oxidation reaction in DM, such as, process gas recovery for the by-product sodium
hydrosulfide; major equipment high pressure synthesis reactor, the oxidation reaction reactor, centrifuge,
shredders, waste water treatment equipment.
The total investment is about 125 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Production of anti-rust lubricant projects drawing 20 million tons
Progress stage: the record
Construction period: May 2011 -2013 in May
Major equipment: boilers, irrigation and other reactions -for reference only
Project:
Project is located in Anyang concentration area Wenfeng District No. 3 middle of the road, drawing antirust lubricant 20 million tons annual output of the project, the project covers 150 acres, the new plant,
warehouse, multi-service building, warehouse, boiler room and other building area 5000 m2. Process: the
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
feed ingredients → heating → cooling → melting → reaction → Packaging → product storage. Boiler
main equipment, irrigation and other reactions. Market forecast: cold drawn steel is used in China each year
about 3,500 tons, whereby projections, the annual profit to be drawing rust agent 1000 tons.
The total investment is about 1 billion yuan.
Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: The annual sales of 5,000 tons of liquid gas station project
Progress stage: the record
Construction period: 2011 years -201 years
Major equipment: 100 cubic meters of liquefied gas storage tanks, 30 cubic residue storage tank,
compressor, automatic metering filling name -for reference only
Project:
Cement plant project is located west of Xiping Xian Rui-ping, with annual sales of 5,000 tons of
liquefied gas terminal project, the project by the company from Shandong Chemical Co., Ltd. purchased
gas Jade Spirit, the filling after the sale to the user, for the year 5000 sales tons of civilian gas station. New
plant 1,500 square meters, 600 square meters of office dormitory, the main equipment 100 cubic meters of
liquefied gas storage tank 3, a 30 cubic residue storage tank, a compressor, automatic measurement of
filling said three. Automatic recovery of gas residue.
The total investment is about 22 million yuan.
Construction Unit:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Post Code:*******
Contact:*******
Tel:*******
Project Name: annual output of 10 tons of bio-diesel project
Progress stage: under construction
Construction period: March 2011 -2013 in March
Major equipment: raw material pretreatment equipment, biodiesel equipment, bio-diesel refining equipment,
diesel tank. -For reference
Project:
Project is located in Pingdingshan chemical industry gathering area, annual output of 10 million tons of
bio diesel project, annual output of 10 million tonnes of biodiesel -a 1 million tons. 33,300 square meters of
new land acquisition, building area of 7760 square meters. Production process: pretreatment,
transesterification, refined, bio-diesel refining. Pretreatment equipment, raw materials, major equipment,
biodiesel equipment, bio-diesel refining equipment, diesel tank.
The total investment is about 130 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Shanghai Matsushita Electric Works Electronic Materials Co., Ltd. increase and expansion
project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Main equipment: Precision injection molding machine, valve assembly platform, online performance
testing platform, automatic spring roll winding machine -for reference only
Project:
Shanghai Comprehensive Industrial Development Zone project is located 148 Ring Road, the new leadfree electronics packaging materials 2000t / a, high temperature insulation material -F Grade 3507t / a
production line.
The total investment is unknown.
Developer: Electronic Materials Co., Ltd. Shanghai Matsushita Electric
Postal Address:*******
Contact:*******
Tel :*******
Design by: Shanghai Environmental Energy Engineering Co., Ltd. -EIA agencies
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Plastic Products Co., Ltd. Shanghai Tang renovation project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: rubber mixing machine, crusher, desulfurization tank, etc. -for reference only
Project:
Jiangqiao project is located in Jiading District of Shanghai Bao Park Rd 399, Project of the original
plastic packaging bags in the production and processing, the annual output of 20 tons, is to change the
production content, the recycling of plastic scrap processing, recycling and processing scale is 12,000 tons /
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
year , including plastic waste and scrap and waste -including polypropylene, polyethylene, polystyrene,
PET, etc. and waste textile raw materials -including polyester fibers, polyacrylonitrile fibers, polypropylene
fibers, etc..
The total investment is unknown.
Construction:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Henan Sheng Chang Industrial Co., Ltd. with an annual output 12 million tons of high purity
graphite electrode projects
Progress stage: under construction
Construction period: March 2011 -2012 in January
Major equipment: differential mill, purification machines, 4,500 tons of horizontal extrusion machine,
horizontal front side electrode vibration molding machine. -For reference
Project:
The project is located before the Township before the village for the north Baofeng, Henan Sheng Chang
Industrial Co., Ltd. with an annual output 12 million tons of high purity graphite electrode project, the
project covers an area of 150 mu, building area of 68,000 square meters, annual output of 12 million tons of
high purity graphite electrode . Technology: Raw materials - broken mill - ratio of kneading - Extrusion -
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
baking impregnation - and fired again. Major equipment differential mill, purification machines, 4,500 tons
of horizontal extrusion machine, horizontal front side electrode vibration molding machine.
The total investment is about 168 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: China Petroleum & Chemical Corporation Zhumadian Pingyu HTC gas station expansion
project
Progress stage: the record
Construction period: April 2011 -2011 in October
Major equipment: tanker -for reference
Project:
Project is located in the western part of the south side of Renmin Road Pingyu County, Henan, China
Petroleum & Chemical Corporation Zhumadian Pingyu HTC station expansion project, which covers an
area of 5.9 acres, the original canopy of 200 square meters, the new 380 square meters, expansion After the
canopy of 580 square meters, the original two lane, add two lanes, a total of four lane extension of the
original 4 tanker, the added 2, a total of 6 sets of tanker after the expansion.
The total investment is about 400 million, funds raised by the enterprise.
Construction:*******
Postal Address:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Environmental Engineering Co., Ltd. on Haiaogeli 30 million tons / year sulfuric acid and
waste heat utilization projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: enamel reactor, stainless steel centrifuge, PTFE pump -for reference only
Project:
The project is located in Fengxian District Shanghai, the new 300,000 tons / year sulfuric acid and waste
heat utilization production line and auxiliary facilities.
The total investment is unknown.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual 0.8 tons of photochromic material and 1,700 tons of optical resin monomer products
production and construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor,
leaching equipment -for reference only
Project:
The second project is located in Shanghai Jinshan Industrial Zone Project: photochromic optical resin
monomer material and products manufacturing, research and development. Annual output of 0.8 tons of
new photochromic materials and 1,700 tons of optical resin monomer product lines and ancillary facilities.
The total investment is unknown.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Shanghai Zhi Rong Project Technology Co., Ltd.
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: compaction machines, separators, conversion equipment, separation equipment, waste
crushing equipment, mixing equipment, burning equipment, grinding equipment, cold rolling mill, hot mill,
reduction furnace, cold isostatic press, Zhongping sintering furnace, air hammer, rotary machine -for
reference only
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Jiading, Shanghai Bao Qian Road, No. 4533, II plant, the new annual output of
lithium iron phosphate cathode material of lithium-ion battery production line of 500 tons, annual output of
lithium iron phosphate cathode material for lithium-ion battery of 500 tons.
The total investment is unknown.
Construction:*******
Contact:*******
Tel :*******
Design:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Annual 10 million tons of oil project solution
Progress stage: under construction
Construction period: March 2011 -2011 in August
Major equipment: distillation column, reboiler, heat exchanger, cooling tower, heat-conducting oil furnace,
tank, etc. -for reference only
Project:
The project is located Fanxian industrial clustering Pu Wang Industrial Park, an annual output of 10
million tons of oil project solution, with an annual 10 million tons of oil soluble; an area of 30 acres.
Technology: to naphtha and light oil as raw material, distillation - off weight - light off - condensation reboiler - products - into the tank. Equipped with main fractionating tower, reboiler, heat exchanger,
cooling tower, heat-conducting oil furnace, tank and so on.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 50 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual 18 million tons of synthetic ammonia, 300,000 tons of urea, 5 million square exhaust
resources comprehensive utilization project -update
Stages of progress: survey and design
Construction period: 2011 -2013
Major equipment: fuel coal storage, screening and conveying system, boiler system, discharging systems,
pumping back style turbine power generation systems, air separation, sulfur recovery, torches, oil depots,
the main unit of urea granulation tower, transportation trestle, packaging.
Project:
The project is located Qinyang Qinbei industry gathering area, a project covering 1,000 acres, building
an annual output of 18 million tons of synthetic ammonia, 300,000 tons of urea, 5 billion cubic meters gas
comprehensive utilization of resources of production equipment, plans put into operation in 2013 .
Projects to high-sulfur coal as raw material, furnace Suimei Lurgi pressurized gasification gas, sulfurtolerant wide temperature transformation Rectisol gas purification, washing liquid nitrogen gas refining
process, low pressure ammonia synthesis process to produce synthetic ammonia; stripping of carbon
dioxide Production of small granular urea products; liquid nitrogen wash out of the release of methane gas
mixed with the synthetic Chi, delivery of industrial gas users, the gas utilization; while supporting the free
separation plant, thermal power plants, railway lines, and the corresponding public project.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is divided into three tenders: 1 Lot: gasification, transformation, purification, ammonia synthesis,
synthesis gas compression refrigeration section in engineering design, including the raw coal storage,
screening and distribution, gasification plant, slag, gas stripping, gas water separation, coal lock gas storage,
compression, etc.; gas cooling transformation, gas treatment, oil tanks, ammonia libraries; rectisol,
ammonia absorption refrigeration, liquid nitrogen wash, air separation, sulfur recovery, and the bid of the
torch Section of the power distribution room, cooling water systems; 2 tenders: urea Section of engineering
design, including urea, the main device, granulation tower, bridge conveyor, packaging and library bags of
urea, urea recycled water, urea distribution room, CO2 compression and purification; 3 tenders: Thermal
Power Plant Engineering Design Section, including coal, fuel storage, screening and conveying system,
boiler system, discharging systems, pumping back style turbine power generation systems.
The total investment is about 2.5 billion.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Tel :*******
Fax :*******
Design by: season Ding Engineering Co., Ltd.
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Project Name: Hubei Yingli Chemical Co., Ltd. with an annual output 14,000 tons TCCA project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor,
leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic
pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for
reference only
Project:
Huangzhou station project is located in Economic Development Zone, within the main layout of the
project construction site there are 14,000 tons / year production plant TCCA, including Section chlorination,
filtration steps, the drying section, the granulation Section; auxiliary works Frozen Air, liquid chlorine
cylinder area, storage tank areas, warehouses, raw material warehouse, office buildings, workshops and
dormitories; utility main power distribution room, the circulating water stations, sewage treatment station,
the plant water supply and drainage, fire protection, community area power distribution, heating and
ventilation. The scale of construction 14,000 tons / year TCCA.
The total investment is about 49 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Project Name: Nanyang PetroChina gas station construction projects the twenty-fourth
Progress stage: the record
Construction period: May 2011 -2012 in October
Main Equipment: 30 cubic meters oil tank, two guns tanker -for reference
Project:
County Chengguan Town Square project is located in Dongguan Village Circle and High Blue Line
intersection, Nanyang, Henan, PetroChina gas station twenty-fourth construction projects with a total
building area of 1,200 square meters, including the station house area of 400 square meters , shed 800
square meters; the main equipment of 30 cubic meters oil tank 4, Spear tanker 4, the estimated annual sales
of 3,000 tons of oil.
The total investment is 9,000,000 yuan.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Progress stage: the record
Construction period: July 2011 In July -2013
Major equipment: cold press, hot press machine, coating machines, drying machines, mixers, precision
sliding table saws, etc. -for reference only
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Industrial Cluster Project is located in Puyang County area, annual output of 3,000 million square meters
of new environmentally friendly bio-based composite sheet + benzene annual 120,000 tons of bio-based
non-formaldehyde glue, the total area of 110,000 square meters, total construction area of about 97,400
square meters, of which plant 42,539 square meters, 30,437 square meters warehouse, supporting facilities
11,832 square meters. Chinese Academy of Sciences Research Center test 11,600 square meters.
Technology: The Chinese Academy of Sciences bio-based non-formaldehyde wood adhesives results of the
transformation of patented technologies, environmentally friendly production of formaldehyde-free
composite plates. Major equipment cold press, hot press machine, coating machines, drying machines,
mixers, precision sliding table saws.
The total investment is about 308 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Zhenjiang Chi Mei annual output of 4.62 tons phosphor Chemical Co., Ltd. Product
Progress stage: has the record -in EIA
Construction period: 2011 -2012
Main equipment: automatic control systems, water treatment equipment, vacuum pumps, reactor,
distillation, cooling towers, storage tanks -for reference
Project:
Project is located in Zhenjiang City, Jiangsu Province, Han Feng Road on the 18th Dagang, Zhenjiang
Chimei Chemical Co., Ltd. annual output of 4.62 tons phosphor product project, the project's construction,
including civil works, installation of production equipment and facilities engineering. Production
engineering, including the main ingredients, sintering, drying, crushing, washing and other production
equipment; utilities, including pure water system, power distribution systems, cooling water systems,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
refrigeration units, air compressor room, nitrogen, etc.; environmental projects including waste gas
treatment facilities. Relying on the existing wastewater treatment works.
The total investment is about 28 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Design Units:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Annual Production of 3,000 tons of 4.4 '- Diaminobenzenesulfonanilide projects for aniline
Progress stage: the record
Construction period: April 2011 -2012 in March
Major equipment: refrigeration equipment, sulfonation equipment, reducing equipment and hydrolysis
equipment. -For reference
Project:
Industrial Cluster Project is located in Shan County area, with an annual output of 3,000 tons of 4.4 'Diaminobenzenesulfonanilide for aniline project, the construction scale of 3,000 tons annual output of 4.4' Diaminobenzenesulfonanilide for aniline, the production process: The project uses advanced technology ,
Acetanilide sulfonation, reduction of p-nitroaniline by condensation, hydrolysis and generation, to clean
and environmentally friendly and energy saving requirements. Major equipment, refrigeration equipment,
sulfonation equipment, reducing equipment and hydrolysis equipment. This is the new green leather dye
additives.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The total investment is about 80 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: annual output of 60 million tons of coal to olefins project
Stages of progress: engineering design
Construction period: July 2011 -2013 years
Major equipment: air separation plant, reactor, distillation column, cooling towers, pumps, tanks, automatic
control systems, water treatment equipment. -For reference
Project:
Yili Prefecture in Xinjiang Uygur Autonomous Region Project Chubb Charles County, the construction
scale for the annual output of 60 million tons of coal to olefins.
The total investment is about 19.2 billion.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Fax :*******
Project Name: Henan Business Chemical Co., Ltd. are ammonia, urea, energy optimization system
reconstruction project
Progress stage: under construction
Construction period: March 2011 -2011 in December
Major equipment: installation of cold slag machine set -for reference
Project:
The project is located Yanshi county towns providers are Road 1, Henan providers are Chemical Co., Ltd.
ammonia and urea system energy optimization of reconstruction, reform of urea a separation column, the
second separation column, steam cascade, recycling low-pressure expansion of the steam, reducing steam
consumption; Add slag cooler installed, recycling waste heat three heated desalinated water; circulating
water system, electrical energy-saving, high efficiency motor update out inefficient use of motor energysaving rate of 20%; for existing gas furnace grate to transform, coal consumption per ton of ammonia can
be reduced 5-10%. Transformation process to change the whole system low on the low change processes,
reduce conversion of steam consumption. After the transformation project, the annual 1.6 million tons of
standard coal can be saved.
The total investment is about 15.31 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Henan Jinshan Chemical Co., Ltd production of soda ash cleaner production project
Progress stage: under construction
Construction period: February 2011 -2011 in December
Major equipment: reactors, water treatment equipment, evaporative coolers -for reference
Project:
The project is located Mengzhou industrial clustering, Henan Jinshan Chemical Co., Ltd production of
soda ash cleaner production projects, recommended the use of national cleaner production technologies, on
the part of Section transform, adjust the production process, increase or update production equipment to
achieve energy conservation, energy , pollution reduction and efficiency purposes. Major transformation
include: 1, terminal water projects: water 21,600 tons per year emission reduction, and to the concentration
of ammonia in wastewater from the 50mg / l down to 25mg / l below the 68,000 tons ammonia emissions; 2,
reverse osmosis system water desalination project: using reverse osmosis technology to replace the original
ion exchange technology, simple operation, no environmental pollution, reduce sewage costs, quality of
water stability. With economic, environmental, double benefits; 3, evaporative cooler item: The alternative
to counter evaporative condenser water tube heat exchanger, saving 355,000 tons the year after renovation,
saving 3.14 million kwh; 4, carbonized tower transformation of ammonia wash liquor: to reduce the
amount of water to wash clean the tower 37950 m3 / year, saving steam 5500t / year, reduce the cooking
tower cut losses caused by 2640t / year; 5, high carbon steel tower project: high carbon steel cast iron tower
replaced the original carbon tower. Amount of alkali lye can increase the output of 3 to 5%, to increase
utilization of CO2 into the tower, reducing emissions, reducing the effect of the follow-up section in steam
consumption, and also increase the production capacity of a single tower.
The total investment is about 33.5 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: annual output of 10 tons of bio-fuel ethanol production line construction project
Progress stage: feasibility study being prepared
Construction period: 2011 -2012
Major equipment: distillation column, condenser, preheater, elevator, mill, automatic control systems. -For
reference
Project:
Project is located in Hanzhong City, Shaanxi Province, Yang County, annual production capacity of
100,000 tons bio-fuel ethanol production line, one phase of sweet potato as raw material for ethanol
production to 5 million tons, the second phase of corn straw as raw material for ethanol production 50,000
tons.
The total investment is about 440 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Henan East Cheung Albert Chemical Co., Ltd. with an annual output of 25,000 tons of
phenolic resin manufacturing projects
Progress stage: under construction
Construction period: January 2011 -2011 in September
Major equipment: 12,000 liters reactor, transformer, air grinder -for reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in fine chemical industry cluster in Kaifeng area, Henan, Cheung Wai Yip Tung
Chemical Co., Ltd. with an annual output of 25,000 tons of phenolic resin manufacturing projects, with an
annual output of 25,000 tons of phenolic resin, the introduction of 12,000 liters reactor 5 sets, transformers
2, jet milling machine 5, the process: phenol, formaldehyde, catalyst, condensation - heat treatment discharge process - test packaging and storage products used in abrasives, refractories, brake linings,
foundry, fireworks, construction materials.
The total investment is about 120 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Zhen Hong Trading Company South Gas CNG filling stations in the project
Progress stage: under construction
Construction period: March 2011 -2012 in March
Major equipment: filling equipment, fire fighting equipment, etc. -for reference only
Project:
The project is located south of Henan Lingbao, Zhen Hong Trading Company Natural Gas CNG filling
stations south of the project, the use of Natural Gas Co., Ltd. Xi'an Qin's natural gas, natural gas filling
stations Lingbao south of the construction of a CNG. The filling station covers an area of about 1.5 acres,
all gas stations Qinhua Natural Gas Co., Ltd. home from West Point shipped by luck trailers, construction
equipment, complete sets of CNG gas stations, and the other to increase the purchase of luck and gas
equipment fire equipment.
The total investment is about 6.8 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: United Industrial Co., Ltd. Luoyang nimble U.S. reconstruction project to reconcile oil
Progress stage: under construction
Construction period: March 2011 -2011 in October
Major equipment: tanks, gear pumps, filter, vacuum pump, blow molding machines, injection molding
machines, air compressors boilers, transformers, filling machine, sealing machine, inkjet printer, forklift
package testing equipment and lubricants -for reference
Project:
The project is located high Longzhen Vulcan Yanshi concave, United Industrial Co., Ltd. Luoyang
nimble oil to reconcile the U.S. reconstruction projects, the construction scale: for in the original site, an
area of 21.6 acres and a building area of 4,500 square meters, 4,300 tons of oil to reconcile. Major
equipment tanks, gear pumps, filter press, vacuum pumps, blow molding, injection molding machines, air
compressors boilers, transformers, filling machine, sealing machine, inkjet printer, forklift package testing
equipment and lubricants. Main process: Test → feed additives dehydration → → → → Test → subharmonic loading → storage.
The total investment is about 30 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: Hao Jumbo Group Limited ammonia cleaner production technology transformation project
Progress stage: under construction
Construction period: March 2011 -2011 in April
Major equipment: coolers, molten salt furnace, scrubber, filter -for reference only
Project:
Project is located in Zhumadian City, Hao Jumbo Group Limited ammonia cleaner production
technology transformation project, a division of the Group of ammonia synthesis system for clean
production transformation, construction contents include: 1, room temperature desulfurization
transformation; 2, IIIJ transformation of ammonia synthesis ; 3, water desalination and recycled water ultra
low emission system transformation; 4, evaporative condensers transformation. 5, all non-constant pressure
from the thermal alkylation purified alcohol transformation of ammonia synthesis feed gas. Project to
introduce advanced clean production technologies of the original ammonia synthesis system for
technological transformation of all aspects of the annual emission reduction SO26.86 tons, saving 32
million tons, saving 7,350 tons of standard coal.
The total investment is about 75 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Annual Production of 4,500 tons of acid, 1,800 tons of cobalt oxide, 500 tons of cobalt
carbonate manganese project
Stages of progress: environmental impact assessment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor,
leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic
pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for
reference only
Project:
Yangzhou Chemical Industrial Park Project is located in Fine Chemical Zone F1, scale: acid-4500t / a;
carbonate, cobalt and manganese-500t / a; oxide, cobalt and manganese-1800t / a; resin grade PTA-10000t /
a.
The total investment is unknown.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Angel Yeast Co., Ltd. produce 20,000 tons of high construction of active dry yeast
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor -for
reference
Project:
The project is located west of Guangxi Liucheng industrial land within the industrial park, covering
about 200 acres. Production process is mainly sugar cane molasses as carbon source, while adding other
nutrients and vitamins, through the gradual expansion of strains from the culture slant, and then separating,
washing, filtration and other steps obtained finished high active dry yeast, produce 20,000 tons of high
activity dry yeast.
The total investment is about 400 million yuan.
Owner:*******
Post Code:*******
Contact Person:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Jiangmen Handsome Chemical Development Co., Ltd. 12t / h emulsion monomer
conversion project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: tank class, towers, heat exchangers, reactors, pumps, reflux pumps, etc. -for reference
only
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
The project is located in Jiangmen solvent factory Jianghai Chemical Industry Co., Ltd., will stop
production of fatty alcohol Jianghai chemical production line through the transformation into a 12t / h
emulsion of butyl acrylate monomer production line, using the original plant and the project workshop, do
not new construction sites and site infrastructure.
The total investment is unknown.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Construction period: 2011 -2012
Major equipment: reactors, high-speed dispersion machine, enamel kettle, centrifuges, tanks, centrifugal
fans, steam vacuum pumps, multistage pumps, liquid pumps. -For reference
Project:
Project is located in Chenghai District of Shantou City, Salt Clan Liu Hung Industrial Zone town of Lu,
the project is mainly engaged in stripping solution, alkaline etching, acid etching, copper quantitative
thinning fluid, pre-etching solution, retired film liquid, ultra thick of liquid, clear slot agent production, the
largest scale of production were 300 tons, 1200 tons, 2400 tons, 1200 tons, 1200 tons, 600 tons, 600 tons
and 300 tons.
The total investment is about 1.60 million.
Construction Unit:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual 20000m3 anti-static flame retardant EVA Product
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: Force-type mixer, rotary dryer to melt materials, spray-drying scrubber, the wheel rolling
mixer, etc. -for reference only
Project:
Project is located in the town of Hubei Xiseshanqu estuary village gate nine, the new production plant
and related public works, construction scale: 20000m3 / a anti-static flame retardant EVA products.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: Hubei Co., Ltd. Tianguan rice processing by-products of bio-energy utilization project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: immersion tank, separator, shock grinding, fiber storage tanks, filters, air drying
equipment -for reference
Project:
Project is located in the town of Wang Jiazhou Honghu Wulin Village, the project through the leaching
process with the production of rice bran rice bran oil, rice bran oil production after the bran meal after a
separation, hydrolysis, fermentation processes produce fertilizer, feed and strengthen the solvent. For the
production of rice husk silica and carbon. Mainly by the production facilities, public works facilities,
storage areas and plant composition of the former District and other regional facilities, is expected to put
into operation 8,000 tons of annual production of rice bran oil, strengthen the feed, 29,000 tons, 5,000 tons
of solvents, 1,000 tons of organic fertilizer, silica 12000 tons, 4,000 tons of activated carbon.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hubei solid-Run Technology Co., Ltd. 2,000 tons / year UV photoinitiator products project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor,
leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic
pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for
reference only
Project:
Project area is located in chemical park Dongbao Jingmen City, construction, UV initiators of domestic
production base of products, completion of the project will achieve an annual output of YK-FMT
photoinitiator 200 tons, YK-TPO photoinitiator 1,000 tons, YK-XBPO light initiator 800 tons.
The total investment is about 48 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel 0724 -2351332
Fax 0724 -2360469
Project Name: Biological Technology Co., Ltd. Shanghai Zhaorui new production line nucleotide
Stages of progress: environmental impact assessment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor,
leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic
pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for
reference only
Project:
Xin Zhuang Industrial zone project work at -103 block -east of Cross River, North River south of the
open space. Construction of a comprehensive building construction area 2117m2, C workshop a
construction area 4293m2, A production workshop area of a building 675m2, A warehouse of a
construction area of 2117m2, and the production of wastewater treatment station and other related
supporting equipment.
The total investment is unknown.
Construction:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Town Jiang Jincheng Environmental Technology Co., Ltd. Solid Waste Environmental
Technology R & D projects
Progress stage: has the record -in EIA
Construction period: 2011 -2013
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: crushers, sorters, loaders, trash compactors, scrapers, landfill operating machinery,
automatic control systems, water treatment equipment, vacuum pumps, reactor, distillation columns, tanks for reference only
Project:
The project is located in Zhenjiang City, Jiangsu Province, Zhenjiang New Area International Chemical
Industrial Park, the town of Jiang Jincheng Environmental Technology Co., Ltd. Solid Waste
Environmental Technology R & D project, comprehensive utilization of plasticizer residues 4,000 tons /
year, industrial production of dioctyl phthalate ester plasticizer 1,400 tons / year and 2,200 tons for
industrial use diatomite additives / year; production of PVA glue, 2,000 tons / year; comprehensive
utilization of waste 2,800 tons of latex / year, production of water-based latex paint interior and exterior
wall coating 14,000 tons / year.
The total investment is about 105 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual 2 × 60 tons of coal-to-olefins project
Progress stage: has the record
Construction period: 2011 -2013
Major equipment: air separation plant, reactor, distillation column, cooling towers, pumps, tanks, automatic
control systems, water treatment equipment. -For reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Yangcheng County, Shanxi Jinyang City, Chi Town, Qin coal chemical circular
economy industrial park, construction scale of annual output of 2 × 60 tons of coal to olefins project
construction in two phases.
The total investment is about 30 billion yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Shangqiu Xinao Gas Company Limited II Natural Gas Station
Progress stage: the record
Construction period: December 2011 In December -2012
Major equipment: tank, gas storage tanks, vaporization facilities, the station power supply facilities, fire
facilities -for reference only
Project:
The project is located suiyang industry gathering area, Shangqiu Xinao Gas Company Limited Natural
Gas Station Phase II, storage capacity: 60 million cubic meters, the main construction contents: 100 cubic
meters of liquefied natural gas storage tank 8, 3500 m3 Spherical 2, the gasification facilities, the station
power supply facilities, fire facilities
The total investment is about 20 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel:*******
Project Name: China-chemical Co., Ltd. Nanxiong City annual 4kt γ1, 4kt γ2, 4kt Si-69 construction
project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor,
leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic
pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for
reference only
Project:
The project is located in Dongguan Da Ling Shan -Nanxiong Industrial Transfer Park, Kaohsiung City
Fine Chemical Industrial Base of Jinan, the new annual 4kt γ1, 4kt γ2, 4kt Si-69 construction projects,
products, annual production scale of 3 - chloropropyl trichloro Silane -referred to as γ1 4000 tons,
chloropropyl triethoxysilane -abbreviated γ2 4000 tons of silane coupling agent double - [Y--triethoxysilyl
propyl] - tetrasulfide -referred to as Si- 69 4000 tons. The project covers an area of 20933.3m2, 31.4 acres
of the contract.
The total investment is about 35 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: 500t solvent series cleaning agent, 560 tons water-soluble emulsion type cleaner, 80 tons of
fountain solution construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor,
leaching equipment, evaporators, heat-conducting oil furnace, dryer, grinder, centrifugal pumps, magnetic
pumps, pipeline pumps, centrifugal fans, steam vacuum pumps, and more pumps, liquid pumps, etc. -for
reference only
Project:
The project is located Nanxiong City Fine Chemical Industrial Base, the new series of annual output 500
tons of solvent cleaning agent, 560 tons water-soluble emulsion type cleaner, 80 tons of fountain solution
construction projects. The project covers an area of 16500m2, the main products include: solvent series
cleaning agent 500 tons / year, water-soluble emulsion type cleaner 560 tons / year, fountain solution 80
tons / year.
The total investment is about 17.5 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Tel :*******
Project Name: 23-valent pneumococcal polysaccharide vaccine project -update
Stages of progress: preliminary design
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting, pumps, magnetic pumps, pipeline pumps, centrifugal fans, steam vacuum,
thermal oil furnace, multi-stage pumps, liquid pumps, etc. - for reference only
Project:
Project is located in Tianjin, Henan Central Road, Airport Economic Zone, total construction area of
29,900 square meters, including office, quality control, research and building area of about 8300 square
meters, the framework structure, five; vaccine production plant area of about 19,000 square meters, frame
structure , three; fire pump house, sewage treatment station, power stations, substations, concierge facilities,
about 2,600 square meters, the frame structure, single layer. Maximum height of 24 meters, the largest
single-span span of 8 meters, 2 meters deep pit.
The total investment is 162.48 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Post Code:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Guangdong New Project Carpoly Technology Material Co., Ltd.
Stages of progress: started in the construction -EIA at the same time
Construction period: March 2011 -2013 in March
Major equipment: tank class, towers, heat exchangers, reactors, pumps, reflux pumps, etc. -for reference
only
Project:
Project is located in Jiangmen Duruan town SCIP -Du Ruan Zhenzi Cotton Village Ushiyama, the
project covers an area of 99922.6m2. The project with an annual output 210,000 tons: 40,000 tons of
furniture paint, resin 3 million tons, 30,000 tons curing agent, thinner 1 million tons, latex paint 10 million
tons.
The total investment is about 250 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Liuhua 19-5 field terminal expansion project in Zhuhai Zhuhai
Stages of progress: environmental impact assessment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 -2012
Major equipment: compressors, filters, buffer tank, vacuum release skid, air separation equipment, gas skid,
transport vehicles, unloading column, control system, leakage alarm system, medium voltage equipment,
high pressure devices. -For reference
Project:
Project is located in Zhuhai City, Guangdong Province, south of Hengqin Island, the existing scale of the
project dealing with 16 × 108m3 / a, Liuhua 19-5 field development planning based on the terminal and
pier facilities in Zhuhai, Huizhou 21-1 gas field, Panyu 30-1 gas field and Liuhua 19-5 field of natural gas
and condensate produced by the same sea to transfer to Zhuhai terminal, the expansion is completed the
total size of 20 × 108m3 / a. The gas field deal by the end of Zhuhai, the requirements to downstream users,
while recovery of light hydrocarbons in natural gas, liquefied petroleum gas production and stability of
higher value-added products such as light hydrocarbon, relying on existing facilities Sinotrans.
The total investment is unknown.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal address:*******
Postal Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: HAN 50 million tons annual output of long-acting nitrogen fertilizers organic active multifunctional project
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Progress stage: the record
Construction period: April 2011 -2012 in December
Major equipment: tower granulation, nitrogen storage tank and set the physical tank, chemical reaction tank
units, grain bodies, material hoist, steam generating device, material mixer, automatic packaging machine,
W-type receiving hopper, vibrating screen, scrolling screen, conducting oil furnace, granulation tower -for
reference only
Project:
Mechanical and electrical manufacturing projects are located in Lake Park, the annual output of 500,000
t Long HAN nitrogen fertilizers organic active multi-functional projects, expansion of 5 production lines,
annual output of 500,000 t Long HAN multifunctional organic nitrogen fertilizer activity; process
technology: materials primary processing - mixing - front pre-reaction - smash - Forming - Drying Finished grade - packaging and storage; major equipment tower granulation 1, N set of physical storage
tank and tank, the chemical reactor of the 4 , grain bodies, material hoist the 6 sets, steam equipment,
material mixer, automatic packaging machine, W-type receiving hopper, vibrating screen, scroll screen,
heat-conducting oil furnace, granulation tower.
The total investment is about 600 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Paracetamol pamabrom technological transformation of solid expansion project preparation
workshop
Progress stage: the record
Construction period: April 2011 -2012 in December
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: shaped tablet machine, freezer, drug polishing machine, high efficiency and variable
speed intelligent sugar coating machine, etc -for reference
Project:
Projects are located in key urban industrial agglomeration East, paracetamol pamabrom technological
transformation of solid preparation workshop expansion, renovation and expansion of the project
Paracetamol pamabrom solid preparation workshop 4, with a total area of 3,700 square meters, including:
conversion of a 700 square m; new three, 3,000 square meters. New energy efficient equipment are shaped
tablet machine, freezer, drug polishing machine, high efficiency machines and variable speed intelligent
sugar coating machine 40 -set. Upon completion, annual output of Paracetamol pamabrom, verapamil
hydrochloride delayed release capsules, etc. 1 billion -tablets.
The total investment is about 35 million yuan.
Construction unit:*******
Contact:*******
Tel:*******
Project Name: Annual 30,000 tons zero sodium metasilicate and sodium metasilicate 36,000 tons five
projects
Progress stage: the record
Construction period: April 2011 -2011 in December
Major equipment: stainless steel storage tanks, steel tanks, stove, dryer, evaporation kettle, fans, transport
equipment, etc. -for reference only
Project:
Project is located in the ancient town Tangyin ancient Yin Yin Village, an annual output of 30,000 tons
of zero sodium metasilicate and sodium metasilicate 36,000 tons five projects, the project covers an area of
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
45 acres, including construction workshops, storage and ancillary facilities , building area of 11,000 square
meters, annual output of 30,000 tons of zero sodium metasilicate and sodium metasilicate 36,000 tons five;
Process Technology: The liquid caustic soda and sodium silicate as raw materials, mixed - concentration dry - crystal grain - product; mainly equipped with stainless steel tanks, steel tanks, stove, dryer,
evaporation kettle, fan, transmission equipment.
The total investment is about 120 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: New Multi-annual 60,000 tons of carbon alcohol alcohol solvent and clean fuel projects
Progress stage: under construction
Construction period: March 2011 -2011 in September
Major equipment: storage tanks, reaction tanks and deployment of storage and transportation, fire fighting
equipment, etc. -for reference only
Project:
Project offices located in key cities in East King sets new multi-annual 60,000 tons of carbon alcohol
alcohol solvent and clean fuel projects, covering 46 acres of land, plant construction area of 16,000 square
meters. This project uses the ethanol plant, ethanol plant, methanol plant and other waste containing more
carbon alcohol as raw material, the use of international advanced technology and equipment, membrane
osmotic dehydration, moisture content below 0.5% are multi-carbon alcohol solvent of new products. Ether
by adding additives to the esterification reaction of an alternative fuel, diesel, liquefied petroleum gas and
other resources of the high clean alcohol fuel. Mainly used for: -1 to replace diesel as a power plant boiler
with a new type of fuel ignition -2 liquefied petroleum gas as an alternative to large hotels, guest houses,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
fuel oil stove. Major equipment storage tanks, reaction tanks and deployment of storage and transportation,
fire fighting equipment.
The total investment is about 20 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Henan Pute kinds of annual output of 1200 tons of polyester filament Ltd. 120,000 square
meters of polyester filament network projects dry
Progress stage: under construction
Construction period: March 2011 -2013 in March
Major equipment: Foreign netting machine, foreign stereotypes; foreign automatic docking machine -for
reference only
Project:
The project is located Suiping middle of the road then weekly -concentration area, Henan Pute kinds of
annual output of 1,200 tons of polyester filament yarn 12 million square meters single-dry polyester mesh
project, covering 140 acres, the production plant 5 ; raw materials and finished products 4, office 1, R & D
Center 1, 2 staff quarters, with an annual output of 1,200 tons of polyester filament 12 million square
meters of polyester dryer fabric projects; the main process: polyester monofilament process: Admission test
chip drying section → → → modified multi-component high-pressure metering melt spinning extrusion →
→ → dehydration cooling water bath forming a drafting machine → → → two hot water tank drawing
machine → → three pull hot air box hot box extension machine → → four single wire drawing machine oil
→ → → addition to static testing testing grading → → → winding packaging and storage; polyester dryer
fabric production process: raw materials, incoming inspection → → weaving warp a shape plug → → →
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
→ packaging and storage of secondary setting, the international advanced level of technology; major
equipment headed the introduction of foreign multi-component monofilament production line 2, 2 sets of
weaving machines abroad, the foreign setting machine 1; foreign full- automatic docking machine 1, and
other ancillary products.
The total investment is about 150 million yuan.
Construction units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Recreation County People's Hospital Medical Technology Building, infectious diseases and
canteen building construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display -for reference
Project:
Project is located in Gansu Province, County Recreation District, total construction area of 7423.48m2,
the three monomers: a construction area of 4845.48m2 medical technology building, a building area of
infectious diseases 1900.80m2 building and a building 677.20m2 the canteen area.
The total investment is about 17,730,900 yuan.
Construction Unit:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel:*******
Design by: Shenzhen Municipal Design and Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Yucheng County, Henan Zhongyuan gas station project
Progress stage: the record
Construction period: April 2011 -2011 in July
Major equipment: tanks, tanker, fire and environmental facilities -for reference
Project:
The project is located south of Business Highway Wing, Yucheng County, Henan Zhongyuan gas
stations, the project covers an area of 1884 square meters, with the station 326 square meters, fuel shed 525
square meters. 15 cubic meters oil tank 4, where: 2 diesel storage tanks, gasoline storage tank 2, after the
total capacity equivalent to 60 cubic meters, with annual sales of gasoline and diesel oil of 3,000 tons.
Process Technology: Process for the tanker - tank - oil - oil pump - gauge - users, technology infrastructure
will be in strict accordance with the gas refueling stations for design and construction construction. Mainly
equipped with storage tanks, tanker, fire fighting and environmental protection facilities.
The total investment is about 3.6 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Nanxiong City gas pipeline project
Progress stage: under construction
Construction period :2011-month in March -2015-12
Major equipment: gas furnace, gasifier, water, coal preparation system, air separation plants, pipelines,
valves automatic control system, measurement systems, pressure systems, pipe cleaning equipment, high
pressure natural gas pipelines, valves, automatic control system, storage tank, tank, pressure vessels,
centrifugal pumps, in addition to coke pump, oil pump Coke -for reference only
Project:
The project is located Nanxiong City, Nanxiong City gas pipeline project, the construction scale of
300.00 square meters, liquefied natural gas terminal in the main building there, high pressure regulator
station for the pipeline network, etc., covers an area of 11411.0 square meters
The total investment is about 97.56 million yuan, of which 6 million yuan investment in civil
engineering, equipment investment 20 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Annual 35,000 tons of silica nano project
Progress stage: the record
Construction period: April 2011 In April -2012
Major equipment: drying machine, processing machine, dust machines, packaging machines, etc. -for
reference only
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Industrial Cluster Project is located in Sui area, annual output of 35,000 tons of nano silica projects,
annual production capacity of 35,000 tons of silica nano-scale technology as follows: raw materials primary white carbon black --- --- drying process --- Packaging --- dust. Major equipment for drying
machines, processing machines, dust machines, packaging machines, etc.
The total investment is about 300 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: New Technology nicotine extraction projects solanesol
Progress stage: the record
Construction period: June 2011 In June -2012
Major equipment: furnace, mill, decarboxylation carbonation tank, absorption tanks, concentration tank, a
vacuum distillation reactor, centrifuge, filter, filling lines, and -for reference
Project:
The project is located Dianxiang Qu Cai Ruyang County village for the new technology nicotine,
solanesol extraction project, covering 48 acres, the annual output of nicotine, solanesol 10 tons; process
technology: the abandoned tobacco and tobacco stems low times as raw materials, carbon decarboxylation sulfuric acid absorption - centrifuge - Vacuum Concentration - salting separation - vacuum distillation product testing and other techniques, extraction of nicotine; major equipment furnace, mill, decarboxylation
carbonation tank, absorption cans, concentrate kettle, vacuum distillation reactor, centrifuge, filter, filling
lines.
The total investment is about 32 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Industrial Group Co., Ltd. Shigeru day 500 tons of naproxen Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: storage tank, measuring tanks, reactor, reactor against the thin, high-speed dispersing
machine, mixing tank, sanding machines, three roller machine, thinner cans, storage tanks and so on. -For
reference
Project:
Project is located in Wu Zhujiadun Jianghan District 159, the new production line of annual output of
500 tons of naproxen, naproxen 500 tons put into production.
The total investment is 104,189,000 yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel 0724 -2351332
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Qingyuan Deco resin United Chemical Co., Ltd. with an annual output of 50,000
construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: storage tank, measuring tanks, reactor, reactor against the thin, high-speed dispersing
machine, mixing tank, sanding machines, three roller machine, thinner cans, storage tanks and so on. -For
reference
Project:
Project is located in Dong Hua Zhenqing Yingde Chinese Yuan Fine Chemical Industry Park, East fixed
base in Britain and Germany west of the scale of construction projects for the alkyd 3,000 tons / year, 3,000
tons of unsaturated polyester resin / year, 4,000 tons of amino resin / year acrylic resin 20,000 tons / year,
electrophoresis paint resin 10,000 tons / year, water-based resin, 5,000 tons / year, UV resin, 5,000 tons /
year, totaling 50,000 tons / year.
The total investment is 269,582,900 yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Liangshan Top Thai Equipment Vacuum Salt Salt Co., Ltd. technology projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor,
leaching equipment, evaporator -for reference
Project:
Project is located in Liangshan Yi Autonomous Prefecture town of Salt Salt Yanyuan county took to the
streets 3, covers an area of 13,340 square meters, vacuum equipment, the technological transformation of
salt, the production capacity from 80,000 tons / year up to 12t / a.
The total investment is about 16.5 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel :*******
Project Name: Annual 204.5t natural vitamin E, 250t plant sterols, 3024t fatty acid methyl ester, 740t of
asphalt plant new project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: extraction equipment, water treatment equipment, automation equipment, reactor, multistage membrane absorbers, drum filters, injectors, ball mill, leaching equipment, roasting furnace,
evaporator, pump, pipeline pump, magnetic pump , centrifugal fan, steam vacuum pumps, multistage
pumps, liquid pumps, etc. -for reference only
Project:
Project is located in Yangzhou City Industrial Park Guangling food processing area, an area of 32225m2,
green area of 7610m2, construction of production plants, office buildings, storage, and environmental
facilities. Project goes into production will reach an annual output of 204.5t natural vitamin E, 250t plant
sterols, 3024t fatty acid methyl ester, 740t of asphalt plant.
The total investment is 108.88 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Dalian Petrochemical Company hydrogen-rich gas recovery project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: compressors, membrane separation devices -for reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
The project is located in the mountains Ganjingzi District, Dalian Petrochemical Company 1st Street
plant, the project design scale of new hydrogen recovery facilities 68000Nm3 / h, 60 ~ 110% of operating
flexibility. The project facilities for the annual operating hours of 8400 hours. Project will remove triphenyl
device PSA unit, the new arrangement of the hydrogen recovery unit. The south of the existing heating
triphenyl device, the west side of the triphenyl device power distribution room, north and east of the device
path. Device in accordance with the function of the relative concentration of different principles of
arrangement, from west to east as the raw material compressor shed -area of 35m × 17m = 595m2,
membrane separation unit -an area of 15m × 5m × 2 = 150m2, hydrogen compressor shed - an area of 24m
× 24m = 576m2. Triphenyl distribution room in the existing access from 5 meters south of the project as a
power distribution room -an area of 20m × 5m = 100m2. Project Management Gallery use of raw materials
and the hydrogen compressor compressor shed roof between the existing pipe gallery system.
The total investment is about 99,960,600 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Field preparation of mixed explosives, vehicles and ground station expansion project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: crushers, screw conveyor, the water phase cans, oil cans, emulsifier, automatic charging
machine -for reference
Project:
Aetna Chemical Co., Ltd. located in Dalian project plant in the region, scale of construction projects:
Emulsion 3000 t / a; porous granular ANFO 5000 t / a. The project land area 20000m2, new construction
area: 7150m2. The project will build pharmaceutical Workshop emulsion explosives, ammonium nitrate
Treasury, explosion embankment, blast walls and so on.
The total investment is about 73.4 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Annual 150 tons industrialization projects fipronil
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: reactors, centrifugal filter, storage tank, vacuum pump, heat exchanger, metering pumps,
thin film evaporator, cooling unit, DSC control system, fire alarm systems, gas -liquid phase
chromatography -for reference
Project:
Project is located in Dalian Economic and Technological Development Zone in Northeast Avenue 488
Champ pesticide production base in Dalian Chemical Industry Co., Ltd. Champ C workshop, the new
annual output of 150 tons of fipronil production line put into operation, annual output of 150 tons of
fipronil.
The total investment is about 39.5 million yuan.
Construction unit:*******
Postal Address:*******
Tel :*******
Fax :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual Production of 10,000 tons of refined PTA Project
Progress stage: the record
Construction period :2011-4 to the 2011-10
Major equipment: Beating reactor, distillation towers, closed centrifuge -for reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Shaoxing County, 10,000 tons of refined PTA project, hire plant 1,500 square
meters, the purchase of beating reactor, distillation columns, centrifuges and other equipment, closed 20
units -sets. Printing and dyeing enterprises in waste water using a base reduction of wastewater out of the
residue production of 10,000 tons / year of refined benzene = formic acid.
The total investment is about 7.5 million yuan, including fixed asset investment: 700 million -equipment,
675; installation of 25;, 50 million working capital.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Datong Coal Mine Group annual output of 60 million tons of coal to olefins project
Progress stage: project phase
Construction period: 2012 -2014
Major equipment: air separation plant, reactor, distillation column, cooling towers, pumps, tanks, automatic
control systems, water treatment equipment. -For reference
Project:
Project is located in Datong City, plans to build an annual output of 60 million tons of coal to olefins
project, currently going through pre-clearance.
The total investment is not set, the enterprise self 30%, 70% of bank loans.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Project Name: Golden Pegasus -Dalian Chemical Paint Co., Ltd. oily, water-based paint 10000t / a,
architectural coatings 15000t / a and the synthetic resin 10000t / a project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012
Major equipment: storage tank, measuring tanks, reactor, reactor against the thin, high-speed dispersing
machine, mixing tank, sanding machines, three roller machine, thinner cans, storage tanks and so on. -For
reference
Project:
Pine Island project is located in Dalian Chemical Industry Park, the total area of 82,404.2 square meters,
with a total floor plan in accordance with the production area, tank farm layout. Production plant located
north of a production plant layout, finished products, raw materials, libraries, fire water, fire water pump
house and so on. Tank farm located in the northwestern side of the factory, furnished with tank, pump room
and other ancillary buildings. Production plant producing this project as Category A category. Item 1 # A
plant for the synthetic resin plant, 2 # A plant for the production of oil-based industrial paint shop, 5 # A
plant for the production of marine anti-corrosion paint shop, paint plant for the production of waterborne
architectural coatings and water-based industrial paint shop. Scale of production: oil, water-based paint
10000t / a, architectural coatings 15000t / a and the synthetic resin 10000t / a.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044