LIST OF REFERENCE PROJECTS ______________________________________________________________________________________ JSC « MOLDOVA STEEL WORKS» Engineering Projects 1, Industrialnaya str., Rybnitsa, Moldova, 5500, Tel.: +(373555) 4 17 38 Fax: + (373555) 7 79 44, 4 07 22 mob. +(373) 691 29 606 Email: inginir@aommz.com Internet: http://www.aommz.com Upgrading and modernization of steel melting and rolling processes and facilities JSC Moldova Steel Works provides technical support in construction, modernization and up-grading projects related to steel melting and rolling processes. The scope of services includes commissioning of the major production units, implementation of technologies and the know-how, supervision of processes in the phase of reaching the design production figures. The above services are based on the unique expertise gained by MSW’s specialists in numerous modernizations carried out in the major and auxiliary shops of our mill. Innovative thinking of our leading engineers guarantees successful solutions for a wide diversity of challenges arising in the area of steel melting and rolling technologies. THE LIST OF COMPANIES WHO MADE USE OF OUR EXPERIENCE AND KNOWLEDGE: 1. JSC “NOSTA” (Orsko-Khalilovskii Integrated Iron-and-Steel Works) (Novo Troitsk, Russia, 1992 ) – installation and commissioning of ladle drying and heating stands (capacity – 130t). 2. Kremenchugsky Steel Foundry ( Kremenchug, Ukraine, 1992) - installation and commissioning of auxiliary equipment for the EAF-25. 3. JSC “Severstal” (Cherepovets, Russia, 1993) – manufacturing and implementation of auxiliary equipment for the EAF-100. 4. “Antillana de Acero” steel works (Cuba, 1991 – 1993) – training of the personnel in the CCM casting practices - technical assistance in the phase of reaching the design production figures at the Electric Steel Making Shop - technical recommendations in the area of steel melting and casting practices 5. JSC “Kuznetsky Integrated Iron-and-Steel Works” (Novokuznetsk, Russia, 1993) - engineering for the Continuous Casting Machine - training of the personnel in the CCM casting methods and practices 6. AOOT “Sulinsky Steel Works” (Krasnyi Sulin, Russia, 1994) - technical recommendations on the operation of the Continuous Casting Machine - training of the personnel in the CCM casting methods and practices, (the CONCAST CCM) 7. JSC “Amurstal” (Komsomolsk-na-Amure, Russia, 1994) - engineering for the Continuous Casting Machine and supply of the CCM equipment - training of the personnel in the CCM casting methods and practices 8. JSC “Zapadno-Sibirsky Integrated Iron-and-Steel Works” (Novokuznetsk, Russia, 1995) - technical assistance in the stage of mastering the refractory gunning methods for steel ladles - training of the personnel in the refractory gunning practices. 9. JSC “Oskolsky Electric Metallurgy Plant” (Staryi Oskol, Russia, 1995) - technical assistance in the phase of mastering the refractory lining techniques for steel ladles - training of the personnel in the refractory lining techniques 10. Byelorussia Steel Works (Zhlobin, Byelorussia, 1995) - engineering for the refractory fettling process in the EAF and Rolling Mill shops based on the use of import refractory materials - training of the personnel in the refractory fettling methods and practices 11. АPО "Uzmetkombinat” (Bekabad, Uzbekistan, 1995) – engineering for the ladle fettling and gunning practices - training of the personnel in the fettling and gunning practices 12. CJSC “NKMZ” (Novokramatorasky engineering works) (Kramatorsk, Ukraine, 1996) - engineering for the electric steel making facilities (the EAF, the LF, the ladle preparation area, the powders feeding line) – equipment and production techniques 13. Makeevsky Integrated Iron-and-Steel Works (Makeevka, Ukraine, 1996) – technical assistance in the phase of mastering the operation of the Rolling Mill - training of the personnel. 14. “AL EZZ Steel Rebars Co”( Egypt, 1996) Референц лист ОАО «ММЗ» 2 – technical assistance in the phase of mastering the operation of the Rolling Mill - training of the personnel. 15. "YUDIN" Steel Plant ( Taiwan, 1997) - training of the personnel in the operation of the combined rolling mill. 16. Moldova Steel Works (Rybnitsa, Moldova, 1996-1997) - modernisation of the light-section rolling mill – within the consortium of MSW-NKMZ-VNIIMETMASH. 17. JSC “Donetsky Steel Works” (Donetsk, Ukraine, 1997) – modernisation of the EAF-2, supply of the equipment, technical assistance in the phase of mastering the production methods and techniques at the modernized EAF 18. JSC “Liepajas Metallurgs” (Liepaja, Latvia, 1997) – installation of the automatic steel ladle dryers – engineering, supply of the equipment, supervision and commissioning of the equipment. 19. АPО "Uzmetkombinat” (Bekabad, Uzbekistan, 1999) – installation of the automatic steel ladle dryers – engineering, supply of the equipment, supervision and commissioning of the equipment. 20. "AL EZZ Steel Rebars Co" ( Egypt, 1998 – 2000 ) - technical assistance in the phase of mastering steel melting and rolling methods and practices - training of the personnel 21. Moldova Steel Works (Rybnitsa, Moldova, 1995-1999) – modernisation of the EAF-120 – 3 stages - modernisation of the CCM in 3 stages to reach the capacity of 1,1 mln. tonnes – (within the consortium of MSW-NKMZVNIIMETMASH). 22. JSC “DonetskySteel Works” (Donetsk, Ukraine, 1999) – supervision and commissioning of Z-21 slide gates for steel ladles – (within the consortium of MSW-NKMZVNIIMETMASH). 23. Moldova Steel Works (Rybnitsa, Moldova, 1999) - modernisation of the wire rod line – (within the consortium of MSW-NKMZ-VNIIMETMASH). 24. АООТ " Metallurgichesky Holding” (Revda, Russia, 1999) ( Russia, Nizhnesergensky Steel Works, Nizhnie Serighi) – engineering for the modernisation of the 250 rolling mill, installation of a wire rod line – supply of the equipment within the consortium of MSW-NKMZ-VNIIMETMASH. 25. DURGAPUR STEEL PLANT (Durgapur, India, 1999) – supply of mold tubes for two CONCAST CCM ( MSW – VNIIMETMASH). 26. Volgogradsky Steel Plant “Krasnyi Octyabri” (Volgograd, Russia, 1999) – expert examination and preparation of the technical proposal on the modernisation of the Electric Steel Melting Shop No.2 with annual output of 1 mln.t of crude steel 27. JSC “Yenakievsky Steel Plant” (Yenakievo, Ukraine, 1999-2001) – a turn-key contract on modernisation of the BOF plant including supply of two Ladle-Furnaces and two CCMs (scope of the contract: engineering of production processes for the LFs and the CCMs, technical assistance in designing, manufacturing, installation and commissioning, performance test and achieving the design figures, training of the personnel) – (within the consortium of MSW-NKMZ-VNIIMETMASH). 28. JSC “Severstal” (Cherepovets, Russia, 1999) - technical assistance in the implementation of the advanced technique of the EAF bottom ramming with Ankerharth refractory mass (within the consortium of MSW, Veitsch-Radex, TECHCOM). 29. JSC “Liepajas Metallurgs” (Liepaja, Latvia, 1999) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 30. АООТ " Metallurgichesky Holding” (Revda, Russia, Nizhnesergensky steel plant, Nizhnie Serighi, 1999) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 31. AOOT “Sulinsky Steel Works” (Krasnyi Sulin, Russia, 2000) - engineering for the phased modernization of the Electric Steel Melting Shop with the annual output of 340,000 tonnes. 32. "Baku Steel Company Limited" ( Baku, Azerbaijan, 2000) - technical services related to the construction and commissioning of the Electric Steel Melting Shop and the Rolling Mill Shop. 33. CJSC “ISTIL – Donetsky Steel Works” (Donetsk, Ukraine, 2000) - technical assistance in the implementation of advanced practices of bottom ramming with Ankerharth refractory mass on the DANIELI EAF and in the implementation of bottom purging methods (within the consortium of MSW, Veitsch-Radex, TECHCOM). Референц лист ОАО «ММЗ» 3 34. АООТ “IZHSTAL” (Izhevsk, Russia, 2000) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 35. JSC “TAGMET” (Taganrog, Russia, 2000) – training of the personnel in operation and maintenance of the Ladle-Furnace Installation and in secondary metallurgy practices. 36. HYUNDAI INCHON IRON & STEEL CO., LTD (South Korea) - implementation of high speed casting practices on the CONCAST CCM (MSW- VNIIMETMASH). 37. OJSC “TAGMET” (Taganrog, Russia, 2000) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 38. JSC “Amurmetall” (Komsomolsk-na-Amure, Russia, 2001) - engineering for the phased modernization of the Electric Steel Melting Shop with the targeted annual output of 800,000 tonnes - supply of the equipment for the first stage of the modernisation. 39. Mining and Smelting Iron and Steel Works “Krivorozhstal” (Krivoi Rog, Ukraine, 1999) - preparation of a technical-commercial proposal on the designing and supply of the LF and the CCM for the BOF Shop (within the consortium of MSW-NKMZ-VNIIMETMASH). 40. CJSC “ISTIL – Donetsky Steel Works” (Donetsk, Ukraine, 2000) - training of the processes personnel in production practices, in operation and maintenance of the highly efficient LF and CCM at MSW’s site. 41. JSC “Electric Steel Plant “Dnieprospetsstal” (Zaporozhje, Ukraine, 2000) - preparation of a technical-commercial proposal on the design and supply of the LF and the CCM for the EAF-70 (within the consortium of MSW-NKMZ-VNIIMETMASH). 42. JSC “Donetsky Steel Works” (Donetsk, Ukraine, 2001) - preparation of a technical-commercial proposal on the design and supply of the EAF-120, the LF and the CCM for the OpenHearth Furnace - (within the consortium of MSW-NKMZ-VNIIMETMASH). 43. JSC “Donetsky Steel Works” (Donetsk, Ukraine, 2001) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 44. Consortium “MSW-NKMZ-Ukrghipromez”, 2001 - preparation of technical-commercial proposals on demand of the UAE (the United Arab Emirates) for a “turn-key” supply of a family of modern steel mini-mills including the electric steel melting and rolling facilities with the annual output varying from 100,000 tonnes up to 1,2 mln. tonnes of good billets. 45. JSC “Donetsky Steel Works” (Donetsk, Ukraine, 2001) - preparation of a technical-commercial proposal on the supply of the modernised CCM No.1 (annual output of 1 mln. tonnes of steel billets) ex-MSW for the OHF of Donetskii Steel Works. 46. JSC “Nizhnedneprovsky Tube Mill” (Dniepropetrovsk, Ukraine, 2001) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 47. JSC “Ashinsky Steel Works” (Asha, Russia, 2001) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM) - preparation of a technical commercial proposal for the installation of a ladle heating and drying stand of a vertical type. 48. JSC “Revdinsky Hardware-Steel Plant” (Revda, Russia, 2001) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 49. JSC “Serovsky Steel Works” (Serov, Russia, 2001) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 50. JSC “Vyksunsky Steel Works” (Vyksa, Russia, 2001) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). - preparation of a technical-commercial proposal for the modernisation of the steel making facilities with the annual output of 700 000 tonnes. 51. JSC “Zlatoustovsky Steel Works” (Zlatoust, Russia, 2001) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 52. JSC “Cheliabinsky Tube Mill” (Chelyabinsk, Russia, 2001) Референц лист ОАО «ММЗ» 4 - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 53. JSC “Chusovskoi Steel Plant” (Chusovoi, Russia, 2001) - technical assistance in the implementation of the advanced techniques of OHF bottom ramming with Ankerharth refractory mass and of the bottom purging (within the consortium of MSW, Veitsch-Radex, TECHCOM). 54. JSC “Novo-Lipetsky Integrated Iron-and-Steel Works” (Lipetsk, Russia, 2001) - preparation of a technical-commercial proposal for the conversion of the Slab Caster into the CCM with a capacity of 800,000 tonnes of steel billets per year (within the consortium of MSW- NKMZ-VNIIMETMASH). 55. CJSC “ISTIL – Donetsky Steel Works” (Donetsk, Ukraine, 2001) - implementation of castable lining practices for steel ladles used at the LF and the Vacuum Degassing units (within the consortium of MSW- Veitsch-Radex, TECHCOM). 56. JSC “Chusovskoi Steel Plant” (Chusovoi, Russia, 2001) - engineering for the modernisation of the steel making facilities with the annual output of 1 mln. tonnes. 57. JSC “Revdinsky Hardware-Steel Plant” (Revda, Russia, 2001) - engineering for the modernisation of the steel making facilities with the annual output of 800,000 tonnes. 58 JSC “Serp & Molot” (Moscow, Russia, 2002) - preparation of a draft project on the modernisation of a ladle drying and heating installation of a horizontal type. 59. JSC “Severstal” (Cherepovets, Russia, 2002) - theoretical and practical training of the personnel in production practices, in the operation and maintenance of the CCM equipment. 60. JSC “Amurmetall” (Komsomolsk-na-Amure, Russia, 2002) - technical assistance and training in methods and practices of electric steel melting with the use of the oxygen/carbon lance manipulator and gas/oxygen burners. 61 JSC “Uglovsky Lime Plant” (Uglovka, Novgorod region, Russia, 2002) - preparation of basic technical proposals on modernisation of the Lime Kiln No.2 and the process automatic control system. 62. CJSC “Nizhneserghinsky Metalware-Steel Plant” (Nizhnie Serighi, Russia, 2002) - engineering for the modernisation of the steel making facilities with annual output of 1 mln. tonnes. 63. CJSC “Nizhneserghinsky Metalware-Steel Plant” (Nizhnie Serighi, Russia, 2002) - technical assistance in the phases of installation, commissioning, achieving the design figures and operating the rolling facilities. 64. "Baku Steel Company Limited" ( Baku, Azerbaijan, 2002) - preparation of a draft project on modernisation of the CCM to produce steel billets 150x150 mm; technical services on a longterm basis in the phase of achieving the design figures for steel making and rolling facilities. 65. CJSC “Nizhneserghinsky Metalware-Steel Plant” (Nizhnie Serighi, Russia, 2002 - 2003) engineering for a preheating furnace with a capacity of 90 t/h, preparation of a draft project on the Furnace Automation System, supply, installation and commissioning of the equipment, training of the personnel. 66. JSC “Yenakievsky Steel Works” (Yenakievo, Ukraine, 2003- 2004 ) - a “turn-key” contract for the second stage of modernisation in the BOF Shop, supply of the second Ladle-Furnace Installation and the CCM, including the engineering of production methods and practices for the LF and the CCM. Technical assistance in the designing and manufacturing of the equipment, in training of the personnel, installation and commissioning, test running and achieving the design performance figures of the production equipment (within the consortium of MSW-NKMZVNIIMETMASH). 67. CJSC “Nizhneserghinsky Metalware-Steel Plant” (Revda, Russia, 2003) - training of the Customer’s process personnel in production practices, operation and maintenance of the highly efficient steel making units – the LF and CCM- at MSW’s site. 68. CJSC “Nizhneserghinsky Metalware-Steel Plant” (Revda, Russia, 2003) - preparation of a draft project on the modernisation of a ladle drying and heating device of a vertical type; - preparation of a draft project on the installation of a ladle drying and heating device of a horizontal type. 69 JSC “Vyksunsky Steel Works” (Vyksa, Russia, 2003) - training of the Customer’s managerial and process personnel of the OHF Shop in production practices, operation and maintenance of the highly efficient steel making units – the LF and the Vacuum Degasser - at MSW’s site. 70 JSC “Omutninsky Steel Plant” (Omutninsk, Russia, 2003) - development of general technical solutions for the modernisation of the steel making facilities with annual output of 350,000 tonnes of steel. 71 JSC “Omutninsky Steel Plant” (Omutninsk, Russia, 2004) - development of the basic engineering for the LF secondary metallurgy techniques and the CCM casting techniques; supply of the Ladle-Furnace Installation and the CCM (within the consortium of MSW-NKMZ). Референц лист ОАО «ММЗ» 5 72 JSC “Kirovogradsky Foundry Works” (Kirovograd, Ukraine, 2004) - expert examination of the mill and development of general technical solutions for the installation of the steel making facilities with annual output of 500,000 tonnes of steel. 73 Steel works (Hama, Syria, 2004) - expert examination and development of basic technical solutions for the modernisation of the electric steel melting and rolling facilities with annual output of 330,000 tonnes of steel. 74 SC «Foundry and Rolling Mill» (Yartsevo, Moscow region, Russia, 2004) - basic engineering on the CCM casting technique; supply of the CCM (within the consortium of MSW-NKMZVNIIMETMASH). 75 JSC “Severstal” (Cherepovets, Russia, 2004) - training of the Severstal’s leading specialist on rolling and quality control. 76 JSC “Magnitogorsky Integrated Iron-and Steel Works” (Magnitogorsk, Russia, 2004) - technical and technological assistance in the phase of mastering the continuous casting techniques on the VAI CCM. 77 "Baku Steel Company Limited" ( Baku, Azerbaijan, 2004) - theoretical and practical training in production techniques, operation, maintenance of the LF Installation; training in the labour organization at the LF. 78 JSC “Chusovskoi Steel Works” (Chusovoi, Russia, 2004) - theoretical and practical training of the managerial staff from JSC “Chusovskoi Steel Works”. 79 JSC “Magnitogorsky Integrated Iron-and-Steel Works” (Magnitogorsk, Russia, 2004) - theoretical and practical training of the personnel from JSC “MIISW” in production techniques, operation, maintenance of the rolling equipment; training in the labour organization in the Rolling Mill Shop. 80 “Uralskaya Stal” LTD (Novotroitsk, Russia, 2004) - basic engineering on the modernisation of the Electric Steel Melting Shop with annual output of 1,6 mln. tonnes of steel billets. 81 “Uralskaya Stal” LTD (Novotroitsk, Russia,, 2005) - theoretical and practical training of the personnel from “Uralskaya Stal” LTD in production techniques, operation, maintenance of the high performance EAF; training in the labour organization in the Electric Steel Melting Shop. 82 АPО "Uzmetkombinat” (Bekabad, Uzbekistan, 2005) - expert examination of the CCM in the Electric Steel Melting Shop, preparation of a technical task on the modernization of the CCM. 83 JSC “Chusovskoi Steel Works” (Chusovoi, Russia, 2005) - basic engineering for the construction of the Electric Steel Making Shop with annual output of 700,000 tonnes of good steel billets. 84 JSC “Magnitogorsky Integrated Iron-and-Steel Works” (Magnitogorsk, Russia, 2005) - theoretical and practical training of the personnel from JSC “MIISW” (140 specialists) in production techniques, operation, maintenance of the steel making equipment; training in the labour organization in the Electric Steel Melting Shop. 85 JSC “Omutninsky Steel Plant” (Omutninsky, Russia, 2005) - preparation of technical documentation (draft) on the installation of vertical drying stands for steel ladles, preheating stands to preheat steel ladles prior to tapping of steel from the Open-Hearth Furnaces, drying and heating stands for tundishes. 86 JSC “Liepajas Metallurgs” (Liepaja, Latvia, 2005) - preparation of (draft) technical documentation and development of mounting/dismounting methods for a new system of axial clamping of 385x710 rolls on the 350 Rolling Mill 87 JSC “Novorosmetall” (Novorossisk, Russia, 2005) - theoretical and practical training of the personnel from JSC “Novorosmetall” in production techniques, operation, maintenance of the steel making equipment; training in the labour organization in the Electric Steel Melting Shop 88 JSC “Energomashspetsstal” (Kramatorsk, Ucraine, 2005) - expert examination of the Mill’s production facilities and infrastructure, preparation of a technical task on the basic engineering to modernize the electric steel melting facilities. 89 JSC “Omutninskii Steel Plant” (Omutninsk, Russia, 2005) - practical training of the personnel in the know-how, operation and maintenance of the Ladle-Furnace Installation. 90 JSC “Amurmetall” (Komsomolsk-na-Amure, Russia, 2005) - development of basic technical solutions to stabilize operation of the production line in the Electric Steel Melting Shop No.2. 91 JSC “Amurmetall” (Komsomolsk-na-Amure, Russia, 2006) - basic engineering on the modernization of the Electric Steel Melting Shop No.2 to achieve annual output of 2 mln. tonnes of good steel billets. 91 JSC “Magnitogorsky Integrated Iron-and-Steel Works” (Magnitogorsk, Russia, 2006) Референц лист ОАО «ММЗ» 6 - technical assistance in the commissioning and mastering of the operation of the ultra high power EAF No.1 (160 t) with annual output of 2 mln. tonnes of steel. 92 JSC “Magnitogorsky Integrated Iron-and-Steel Works” (Magnitogorsk, Russia, 2006) - technical assistance in the operation and maintenance of the Rolling Mill 170 . 93 JSC “Magnitogorsky Integrated Iron-and-Steel Works” (Magnitogorsk, Russia, 2006) - technical assistance in the commissioning and reaching the designed performance figures of the ultra high power EAF No.2 (160t) with annual output of 2 mln. tonnes of steel. 94 JSC “Amurmetall” (Komsomolsk-na-Amure, Russia, 2006) - theoretical and practical training of the personnel from JSC “Amurmetall” (70 specialists) in know-how, production techniques, operation, maintenance of the steel making equipment; training in the labour organization in the Electric Steel Melting Shop. 95 JSC “Iron-and-Steel Works after A.K.Serov” (Serov, Russia, 2006) - theoretical and practical training of the personnel from JSC “Iron-and-Steel Works after A.K.Serov” in know-how, production techniques, operation, maintenance of the steel making equipment; training in the labour organization in the Electric Steel Melting Shop. 96 CJSC “Omutninsky Steel Plant” (Omutninsk, Russia, October 2006) - technical assistance in the commissioning and mastering of the operation of the Ladle-Furnace Installation. 97 JSC “Amurmetall” (Komsomolsk-na-Amure, Russia, November 2006) technical assistance in the commissioning and reaching of the designed performance of the modernized EAF - 125 with annual output of 1 mln. tonnes. 98 CJSC “Omutninsky Steel Plant” (Omutninsk, Russia, November 2006) - theoretical and practical training of the personnel in know-how, production techniques, operation, maintenance of the Continuous Casting Machine. 99 CJSC “Omutninsky Steel Plant” (Omutninsk, Russia, December 2006) - technical assistance in the commissioning and reaching the designed performance figures of the CCM. 100 JSC “Magnitogorsky Integrated Iron-and-Steel Works” (Magnitogorsk, Russia, December 2006) - practical training of the personnel from JSC “MIISW” at MSW’s site in the Electric Steel Melting Shop and the Rolling Mill Shop. 101 JSC “Amurmetall” (Komsomolsk-na-Amure, Russia, April 2007) - basic engineering on the modernisation of the Rolling Mill Shop to reach annual output of 960,000 tonnes of rolled products. 102 SC «Foundry and Rolling Mill» (Yartsevo, Moscow region, Russia , April - June 2007) - technical assistance in commissioning and reaching the designed performance of the CCM. 103 JSC “Magnitogorsky Integrated Iron-and-Steel Works” (Magnitogorsk, Russia, June 2007) - practical training of rolling specialists from JSC “MIISW” at MSW’s site in the Rolling Mill Shop and in the departments of the mill. 104 CJSC “STAKS” (Krasnyi Sulin, Russia, August 2007) - basic engineering on modernisation of the Electric Steel Melting Shop and construction of the Rolling Mill Shop with annual output of 780,000 tonnes. 105 JSC «Liepaias Metalurgs» (Liepaja, Latvia, February 2008) - technical assistance in the installation of a vertical inert gas purging system in the bottom of the Open Hearth Furnace, TECHCOM - ММЗ. 106 JSC “Amurmetall” (Komsomolsk-na-Amure, Russia, March 2008) - technical assistance in achieving the designed performance figures of the production line: the EAF - the LF - the CCM). 107 JSC “IZHMASH” Steel Works (Izhevsk, Russia, June 2008) - expert examination of the Mill’s production facilities and infrastructure to prepare a technical task on the basic engineering to build the production complex of electric steel melting and rolling facilities. 108 JSC “Novokramatorskii engineering works” (Kramatorsk, Ukraine, July 2008) - practical training of metallurgical specialists from JSC “NKMZ” at MSW’s site in the Electric Steel Melting Shop and in the technical departments of the mill. 109 JSC “Novokramatorsky engineering works” (Kramatorsk, Ukraine, August 2008) - technical assistance in building the refractory lining of the EAF-50 at JSC “NKMZ”. 110 JSC “Seversky Tube Mill” (Polevskoi, Russia, September – November 2008) - technical assistance in the commissioning of the EAF-130. 111 JSC “Volzhsky Tube Mill” (Volzhskii, Russia, October 2008) - practical training of specialists from JSC “Volzhskii Tube Mill” at MSW’s site in the Electric Steel Melting Shop and in the departments of the mill. Референц лист ОАО «ММЗ» 7 112 JSC “Seversky Tube Mill” (Polevskoi, Russia, January 2009) - technical assistance in the operation of the EAF-130. 113 “OMZ-Spetsstal” LTD. (Kolpino, Russia, January - February 2009) - practical training of specialists from “OMZ-Spetsstal” LTD at MSW’s site in the Electric Steel Melting Shop and in the departments of the mill. Technical Director JSC “Moldova Steel Works” Rybnitsa, Moldova, February, 2009 A.N.Saviuk