Specification: Provision of Building Floor Plans, Elevations & Topographical Survey Contents 1. Aim/Requirement ...................................................................................... 4 2. Background Information ........................................................................... 4 2.2. Current Setup............................................................................................ 4 3. The Assignment ....................................................................................... 4 3.1. Primary Requirements .............................................................................. 5 3.2. Selection .................................................................................................. 5 4. Budget .................................................................................................... ..6 5. Contract Management…………………………………………………………..6 3 Introduction 1. Aim/requirement The aim of this specification is to seek a competent Land Surveyor who will provide CITB NI with professional floor plans, elevations and a topographical survey in a format that will enable future adoption or amendment when and if required. 2. Background Information The Construction Industry Training Board (CITB) Northern Ireland was established in 1964 to encourage the adequate training of those employed in, or intending to become employed in, the Construction Industry in Northern Ireland. It is a Non Departmental Public Body (NDPB) under the auspice of the Department for Employment and Learning (DEL). The organisations major source of income is derived by means of a statutory levy paid by construction employers above a set emolument threshold. 2.1 Current Setup CITB NI currently has a number of old site plans and drawings which it wishes to upgrade so as to provide accurate floor plans and elevations of the buildings and facilities at its Nutts Corner premises 3. The Assignment- Scope of Contract Topographical survey of land showing position and outline of all permanent buildings, kerbs, Parking areas, trees and fence line within area shown on attached plan. Elevations of all permanent buildings. Internal survey of main training areas (to the rear of the office accommodation) showing all walls and offices and mezzanine floors as indicated on the attached drawing. Survey to be compatible with existing survey of office areas (provided) and incorporate existing information to provide 1 survey of entire building. Survey of flat roof to office accommodation, locating all channels, features and ducts. Internal survey of additional building located to the rear of main training area showing all walls, offices and training areas over two floors. Provision of survey in “dwg “format – 2 sets of disks. Provision of 1 set of printed drawings. 4 3.1. Primary Requirements The primary requirement of this project is for a competent Land Survey establishment to conduct an on-site survey of buildings and land and produce hard copy and industry standard digital format drawings that can be accessed using standard autocad software. CITB NI would insist that potential providers conduct a site visit in order to assist the accurate pricing of the service with access arranged by contacting the Director of Industry Training & Support or the Premises Officer. 3.2. Selection Performance Criteria: All applicants will be evaluated against the content of their submitted documentation that will inform and convince CITB NI that they have the professionalism, ability and commitment to be the successful applicant. As such applicants will need to demonstrate the following: Minimum of 3 years’ experience in the provision of Land Surveys Evidence of professional competence of the establishment and those who will undertake to provide the survey process with industry recognised certification bodies Evidence of indemnity insurance and valid certificates Evidence of an acceptable record regarding health & safety over the past three years Health & Safety: The successful provider will be required to provide a declaration confirming that they will provide all services to the appropriate legislative and best practice requirements. Financial Assessment: Applicants will be required to provide a quotation based on the completion of all works outlined in the Schedule of Work in Stirling with an indication if the total includes or excludes VAT. Evaluation Criteria Proposals should include a detailed breakdown clearly defining how your bid satisfies or betters the performance criteria stipulated in this document. Tenders will be evaluated using the following criteria: 5 Financial Assessment 100% In the event of a tie the successful provider will be selected on the basis of their Performance Criteria and Health & Safety evidence as demonstrated in their submission. 4. Budget The budget for the project is £5,000 inclusive of VAT 5. Contract Management The successful applicant will liaise with the Director of Industry Training & Support who will act as the client on behalf of CITB NI. 6