Punch List, Chemistry Lecture Hall Renovation Project

advertisement
Gray'd items = Needs attention from Chem Dept.
Yellow = Pending from Outside the Chem Dept
Pink = Pending from CIDDE
Updated: 12 April 2002 22 February 02 8 February 02 1 February 02
Draft Number: 28 November 2001
Punch List, Chemistry Lecture Hall Renovation Project
24 January 2002 7 January 2002
3 January 2002
The three Chemistry lecture halls have been extensively renovated and the audio-visual systems completely reinstalled and updated. Substantial improvement in the functionality and attractiveness of the halls has resulted.
We realize that some of the work is not yet complete, but it also appears that some of the work has been
neglected or overlooked. Therefore the Renovations Committee decided it was appropriate to create a Punch
List of as many incomplete renovation tasks as we could identify in 50 minutes, to create a report on these, and
to submit that report to the appropriate people, all in order to ensure the Lecture Halls are complete in every
respect, in time for the start of the Spring semester. On 21 Nov 01, we will post this where all Chemistry
faculty members can read it and solicit their contributions. We will update the above Draft Number whenever
we update the report. Any of us would be happy to elaborate on any of the items in the list.
FM = Facilties Management. (MM = Mike Marsico; 4-9545)
Punch List Item
Chalkboard ledges
Chalkboard trim
Chalkboard motors
12A
Missing
Complete, 4/02
ok
Too noisy,
drastically
improved as of
3/02
12
Missing
Complete, 4/02
Too noisy,
drastically
improved as of
3/02
12B
Missing
Complete, 4/02
ok
Too noisy,
drastically
improved as of
3/02
Comment
Needed for all boards in
each room.
These urgently need to be
fixed. Some lecturers are
too short to move the
boards by hand and thus
rely on the motors.
.
Chalkboard motors
Chalkboard switches
Still too slow,
but drastically
improved as of
3/02
Operate
“backwards”
Ok, 3/02
Still too slow,
but drastically
improved as of
3/02
Operate
“backwards”
Ok, 3/02
Chalkboard limit
switches not working.
Status of above items (FM: MM 624-9545)…
Still too slow,
but drastically
improved as of
3/02
Operate
“backwards”
Ok, 3/02
Currently, toggle “down” to
get board to go up. Also,
correct the labels.
Check all, for both up and
down.
1-18, 3:50 pm: JJG left voice mail for MM; no response as of 1/24..
1-24, 4:18 pm; JJG left voice mail for MM.
1-25, 8:15am; MM called: Chalkboard manufacturer has submitted a plan of action to MM, he will review it with the architect today, then have the
manufacturer "repair" CSC-12. If that is ok, then other rooms will be similar fixed. Repairs include speed, noise, missing trim and ledges.
2-1, 11:30 am; phone conversation with MM: Architect has approved "retrofit" plan; letter written to "Polyvision" requesting room 12 be fixed – FM
will then either approve such changes for the rest of the rooms, or request a complete replacement. No schedule yet set.
2-7: Phone call from MM: Chem needs to approve (or not) the one retrofitted board in CSC-12.
2-8: Polled a variety of faculty regarding the one retrofitted board in CSC-12, consensus is that it is a dramatic improvement over the previous
version BUT it is still two slow (at least double the speed from about 11 seconds to move position to about 5 seconds), AND the switches are wrong
(you should toggle up, to move a board up, and toggle down to move a board down, there should be a three position switch – up will move the board
up without holding the switch, middle will stop the board at any point, down will move the board to the complete down position AND the labels on
the switches are wrong – replace "view" and "nonview" with "up" and "down".)
2-8: Expected MM to visit Fri afternoon – no show.
2-11: Expected MM to visit Monday early am – no show.
106738036
1
Printed: 2/12/16
Gray'd items = Needs attention from Chem Dept.
Yellow = Pending from Outside the Chem Dept
Pink = Pending from CIDDE
2-11: Met MM around noonish (?): (1) Boards discussed as noted above. He will continue to strive for the improvements; the "speed" issue is likely
to be most difficult to accomplish.
2-22: Still only one/third of the boards in 12 have been changed (change not considered adequate). Sent email to MM requesting status update.
Chalkboard eraser
cleaner
Share the
existing one.
Get one for the
wet chem bench.
Installed, outside
the hall.
Share the
existing one.
Get one for the
wet chem bench.
Use one outside
either 12A or
12B
Works ok
Move outside
the lecture hall?
Responsibility of Chem
Dept to find a common
installation area.
(Patty/Joe)
2/8: PP will order two
more.
1-10: Initial e-mail sent to Patty.
1-24: E-mail to Patty: Where should the one eraser cleaner be kept? Or should we have one for each lecture hall? It seems silly to me, to buy
"three". I think we should mount the one eraser cleaner, in some "publically accessible" area near the lecture halls, in such a way that it can be used
by anyone at anytime. Ideas?
1-25; E-mail from Patty: The kitchen by 12B might be a good place. I believe that door is usually left unlocked and that should be far enough away
from 12B to eliminate the noise problem. There is a small refrigerator in there so we know it would be easy to access wiring.
2/8: Conversation with PP and reflecting the fact that erasers are being "clapped" on the new wood slats in CSC-12A; lets just install an eraser
cleaner in each of the three wet chem benches.
2/11: PP – two more eraser cleaners yet to be ordered.
2/22: PP – two additional eraser cleaners not yet to hand.
Punch List Item
Main projection screen
Broken Chairs
Arm Covers
Data port for lecturer’s
portable.
Data port for dedicated
computer.
Switch panel on
lecturer’s bench
Spot Lights
Spot Light Switches
Safety Lights
106738036
12A
Down limit
switch not set.
Still not set as of
2/8/02.
None
12
Down limit
switch not set.
12B
Down limit
switch not set.
Comment
Screen is going to be
damaged, fix immediately.
One
One
Has been fixed
1/3/02
What mechanism is in
place to repair/replace
chairs as they break?
Check all
Multiple ones
already missing.
Check all
What mechanism is in
place to repair/replace arms
as they break?
Needs to be
activated
immediately.
1/24 – Works?
Missing?
Needs to be
activated
immediately.
1/24 – Works?
Missing?
Needs to be
activated
immediately.
Works, 1-14-02
Missing?
CIDDE provides one port per classroom;
if a 2nd one is needed, someone else
needs to pay for it.
All switches
need to be
labeled.
Check all
All switches
need to be
labeled.
One burned out
In improper
order.
In improper
order.
All switches
need to be
labeled.
One burned out
as of 4/12/02
In improper
order.
Need key
Need key
2
It was not obvious to us
whether this port was ever
installed.
Status, as of 1/3/02, is not
known. 1/28, EW states all
are still backwards
P.P. does not have a key;
1/3/02.
Printed: 2/12/16
Gray'd items = Needs attention from Chem Dept.
Punch List Item
Data Projector
12A
Temp in place.
Permanent unit
purchased by
Chem, rec'd
1/15, and handed
over to CIDDE
on 1/30.
Still temp as of
2/8/02.
Yellow = Pending from Outside the Chem Dept
Pink = Pending from CIDDE
12
Missing.
Ok, 1/3/02
12B
Missing.
Needs realigned.
Ok, 1/4/02.
1/30: Rewiring
accomplished to
allow portables
to bypass Cyviz
– one cable yet
missing for
Cyviz.
Rebuild the
mounting
mechanism for
the 2nd
projector.
Comment
In all cases, install the data
projector so that the image
is as low as possible.
Demo camera
Missing
Missing
Missing
Not delivered as of 1/3/02.
Wired mics
Missing
Missing
Missing
Cannot find in Chemistry
as of 1/3/02.
Wired mics not available in Chemistry as of 1/3/02. CIDDE state they were delivered in late Dec, 2001. No on in Chemisty can find
them (black "pencil cases" embossed with "Sure").
Elmo Copy Stand
Housing
Hinged box for
secure “in-hall”
storage needs to
be designed and
installed.
Hinged box for
secure “in-hall”
storage needs to
be designed and
installed.
Hinged box for
secure “in-hall”
storage needs to
be designed and
installed.
These devices need to be in
the room permanently.
Greg (Chem Dept) will
work with the Chem
Machine Shop to take care
of this. Initated, 12/7/01.
1/24/02: Email to GM: How is Dennis doing on the Elmo housings?
1/25/02: Email from GM: 1/25/02, Email from GM: I haven't checked the machine shop for the Elmo progress...tomorrow, will do.
2/22: Requested GM to purse finishing 12B re: Elmo housing.
Slide projector
Campus Phone
Missing front row of
chairs.
106738036
Missing
Missing
Missing
Missing
Missing
Missing
ok as is Upon
consultation
with MM
decided to install
all missing
chairs.
15 chairs
missing.
ok as is Upon
consultation
with MM
decided to install
all missing
chairs.
Under discussion
2/7 & 2/11. Upon
consultation
with MM
decided to install
all missing
chairs.
3
How are these to be used?
Install in lecturer’s bench,
with phone number for
CIDDE immediate
response team.
We feel the missing chairs
in 12 must be installed
while the missing chairs in
12A and 12B are not really
needed.
Printed: 2/12/16
Gray'd items = Needs attention from Chem Dept.
Railings
(added 11-27-01)
Top of media closets
Periodic Table
Yellow = Pending from Outside the Chem Dept
Pink = Pending from CIDDE
Install; Upon
Install; Upon
Install; Upon
The bottom row of chairs in
consultation
consultation
consultation
each hall is currently a
with MM
with MM
with MM
safety concern due to the
decided to install decided to install decided to install
large step down
all missing
all missing
all missing
immediately in front of that
chairs; therefore chairs; therefore chairs; therefore
riser. Consult with FM to
railings not
railings not
railings not
see if this should remedied
needed.
needed.
needed.
by installing a railing
and/or the missing chairs in
front of that rise.
Needs finished
Needs finished
Needs finished
Missing; under
Missing; under
Missing; under Chem Dept’s responsibility
design, 4/02
design, 4/02
design, 4/02
to set one up on each
dedicated computer.
E-mail to Ed, 1/16: Can you take a picture of a periodic table, like the one attached, saved as screen capture from this web site:
http://pearl1.lanl.gov/periodic/default.htm, and set it up so that it is the default image displayed when the projector is turned on and no input
is provided? Or maybe set it so one of the "input selection" buttons just shows this one image?
1/30-31: JJG and TC exchanged e-mails and images – TC will implement the image change.
2/11: Conversation with MM. chairs/railings discussed. Bottom line is that MM will recommend 20 additiona chairs be installed in CSC-12 and 10
additional chairs each in 12A and 12B. These chairs will obviate the need for railings. The extra chairs will be extremely beneficial for exam taking
as well as improving the safety.
Electronics rack
Add padlock
Done
Add padlock
Done
Add padlock
Done
Missing
File password
with Chem Dept
receptionist.
Missing
File password
with Chem Dept
receptionist.
Computer security
Add padlock.
Complete
Add padlock.
Complete
Finished (3D
computer
installed).
File password
with Chem Dept
receptionist.
Finished
Keyboard tray
LCD Monitor
Hitachi Starboard EM
Panel (1024x768)
Missing
Missing; on
hand –
installation in
progress.
Missing
Missing; on
hand –
installation in
progress.
Dedicated computer
PC Sound
Missing
Missing; on
hand –
installation in
progress.
Greg (Chem Dept) will
work with the Chem Dept
machine shop to do this.
Ron (Chem Dept) will take
care of this as soon as he is
informed of video card
requirements.
On 1/7, JJG asked Ron to
order remaining two cpus.
Ron (Chem Dept) will
work with the Chem Dept
machine shop to do this.
Needed asap so that the
computers can be ordered
and installed. Need cabling
and software installation,
and some security, yet (as
of 4/15/02).
Ensure PC sound Ensure PC sound Ensure PC sound
is piped to
is piped to
is piped to
speakers.
speakers.
speakers.
1/24/02: Unofficial word is that the monitors have been received, that they are not the same as were ordered, and that they might be sent back. (See
NL's article in the 1/22/02 Pittsburgh Campaign Chronicle, on the JANUS system to understand what this monitor is to do.
2/1: RZ (Chem) will install one LCD monitor (12B) until the Janus system is ready to install (e-mail sent 2/1).
2/8: Padlock to monitor case has be installed (no monitor yet).
2/22: Requested update from MM re: keyboard tray.
VGA Cable
106738036
Missing
Available
Missing
Available
4
Missing
Available
Need dedicated VGA cable
stored in “mic drawer” for
the lecturer’s portable.
Printed: 2/12/16
Gray'd items = Needs attention from Chem Dept.
Yellow = Pending from Outside the Chem Dept
Pink = Pending from CIDDE
Remote Mouse
Missing ?
Missing ?
Laser pointer
Missing
Available
Missing
Available
Demo camera
connector
Check
Check
Works, 12/20
3D Screen
Wireless transmitters
Missing transmitters?
Water faucets
Hot water
Missing.
Available and
works – be sure
NOT to move
either mouse
while booting
up.
Missing
Available. Also,
green one
available from
receptionist.
Check
Ron (Chem Dept) will take
care of this.
The Chem Dept should
store a laser pointer and
spare batteries in the “mic
drawer” in each Lec Hall.
Ensure all three demo
bench demo camera
connectors are identical and
functioning.
--Relocate as per Facilities Management will
separate
correct their mistake (set
instructions.
for semester break).
Extra batteries
Extra batteries
Extra batteries
Chemistry department will
stored w/ mics in stored w/ mics in stored w/ mics in take care of this. One mic
lecture halls.
lecture halls.
lecture halls.
kept in the hall; the second
Done 12/01.
Done 12/01.
Done 12/01.
in CSC-232.
No, as of 1/7/02 No, as of 1/7/02
One missing.
E-mail sent to fac on
Replaced by
1/5/02. Resent 1/10/02.
Chem, 2/02.
Add aspirator
Add aspirator
Add aspirator
Also, ensure a lecturer can
Done.
Done.
Done.
safely wash their hands
without being splashed.
This might require a second
faucet.
Doesn’t work
Doesn’t work
Doesn’t work
1/25/02: Phone conversation with MM: Hot water problem should be repaired next week.
2/8/02: Hot water still does not work.
2/22: Requested update from MM re: Hot water and inadequate cold water pressure.
Paper towel holder
Missing
Missing
Missing
Signage
Missing
Missing
Missing
Pencil Sharpeners
Missing
Missing
Missing
Eliminate
Eliminate.
Done!
Eliminate
Portable screen
106738036
5
Install near to sink as
possible.
Need prominent sign
outside of each lecture hall.
Install several in each
room; these are necessary
for students during exams.
Responsibility of Chem
Dept. Most of us feel that
these portable screens
detract from the
attractiveness of the lecture
hall. Their function is
replaced by the Elmo/Data
Computer.
Printed: 2/12/16
Gray'd items = Needs attention from Chem Dept.
Yellow = Pending from Outside the Chem Dept
Pink = Pending from CIDDE
1/24/02: Discussion 'tween GM, CW, MG appear to have resulted in the ok of a plan to install a "wall mounted", manual pull down screen in CSC12, to be used with a second overhead projector. While the portable screens in 12A and 12B can be eliminated.
Access panels that were
installed for chalk
board motor access.
Floor
Movable Demo bench
Entry Doors “hold
openers”.
Entry Door Keys
Clock that can be seen
by all students.
--
Remove as they
are not needed.
--
They interfere with
projection area.
Paint
Paint
Paint
Find separate
storage area
--
Find separate
storage area
The concrete floor in the
student seating area should
be painted to improve its
appearance.
Many lecturers will not
need the portable demo
bench; they should be
easily moved out of the
lecture hall when not
needed.
Missing
Missing (both
doors)
Missing
Missing
--
Missing. New
one installed.
Missing
Missing. New
one installed.
Missing
The entry doors have locks
installed; we feel these will
never be used, but the keys
should be in possession of
someone in the Chem Dept.
Relocate the existing AC
clock from above the exit
door to the side of the
media closet such that it
can be seen by all students.
1/24/02: Email to PP: Clock location in 12A and 12B. Can we move the clock from above the exit door, to be on the side of the media cabinent that
faces the student seats? I'm sure there is electrical power in the media closet that can be "tapped" into. Can you consider this and let me know if it
can be accomplished, and if yes, about when it might be done. One "complication" is that CIDDE "owns" the media closets, so we might need their
"ok" and/or assistance (i.e., a key!).
1/25/02; Email from PP: I will look at the clock situation with Bill today and see what options we have.
2/1: Email sent to PP requesting update as to status.
2/8: Discussion with PP – will just but battery powered clocks in 12A and 12B on side of media cabinent.
2/22: PP – battery powered clocks in hand (not yet installed).
Thresholds
Chalkboard lights shine
on overhead screen
Remove
Remove
Remove
Fix
--
Fix
Re-check?
Dual Hi/Low
Projection
(added 11-27-01).
106738036
Add capability
Re-check?
Add capability
6
Add capability
These too tall thresholds on
the entry doors present
serious safety hazards when
wheeling in a cart with
demo chemicals. Remove
them completely.
The left set of chalkboard
fluorescents lights “bleeds”
onto the projection screen
since the lights were not
installed in their proper
location – add a “mask” to
reduce this problem.
Persons in the front rows of
the lecture halls might have
a hard time seeing the very
Printed: 2/12/16
Gray'd items = Needs attention from Chem Dept.
Wheel to hold
polarizers etc in front
of dual projectors.
Not needed
Yellow = Pending from Outside the Chem Dept
Pink = Pending from CIDDE
Not Needed
Needed,
including switch
and wiring.
Redesign
needed, 4/02.
high projection area. Add
the necessary wiring so that
a second projector (checked
out as needed from the
Dept or CIDDE) can be set
up to simultaneously
project the same image as
on the main projection area,
on the roll down screen that
partially covers the
chalkboards. VGA splitter
cable?
Greg will work with EShop to accomplish this.
Sketch given to GM 1/7/02.
1/24/02 Email query to GM: How is the e-shop doing on the "filter wheel"?
1/25/02, Email from GM: I haven't submitted the wheel design to the EE shop...tomorrow, will do.
2/1, Email to GM requesting if this could be completed by 2/13.
2/8, from GM: Wheel won't work; will use 90-deg hinged mechanism to move 8" sq polarizers in and out of light path.
2/11, from GM: Movable mechanism for polarizers in place – need to add motor and controls.
2/22: from GM: Waiting on info from CIDDE engineers re: switch.
New set of polarizers
Not needed
Not Needed
Needed
Greg will purchase new
ones..
Needed.
to GM 1/30.
Needed.
Done as of
2/8/02.
Ed is to provide this to
Greg Meisner alone.
GM to arrange with Chem
Dept machine shop to do
this.
1/24/02 Email query to GM: How are we doing with finding replacement polarizers?
1/25/02, Email from GM: I ordered the polarizing film this morning.
2/8/02, Polarizing film on hand, has not yet been tested.
2/22: GM has installed the film – not yet tested.
Key to projection
booth.
Strengthen latches on
computer and
electronics cabinent
doors.
Not Needed
Not Needed
Needed.
Started as of 2/8.
Needed

Turn hot water valve on in 12, turn hot water and cold water valve on in 12, water comes out in 12!
(Hot water supply is not on.)

Is it possible for the wireless microphone sound to be taped to the audio cassette system in the
electronics rack? This feature would be nice as it would allow us to record our named lectureships.
Alternatively, we could use the Chemistry department’s wireless mic/transmitter system, have the
lecture where two mics, and record on the installed equipment using the electronics rack “inputs”.

The CIDDE engineers removed the Chem department’s wireless mic system from CSC-12; we need to
recover that equipment.

Establish a SOP for software installation, update, and general computer maintenance for the three
systems in the lecture halls.
106738036
7
Printed: 2/12/16