TEM and TEM POWER SUPPLY MRR MINUTES AND ACTION ITEMS Rev. 1 The TEM and TEM Power Supply MRR was held on Thursday, September 16. The following were in attendance: Lowell Klaisner, SLAC Dick Horn, SLAC Pat Hascall, SLAC Gunther Haller, SLAC Brigitte Estey, SLAC Jerry Clinton, SLAC Pat Lujan, SLAC Brett Pugh, SLAC Tracy Shepherd, NASA/GSFC Nick Virmani, NASA/GSFC Thom Perry, NASA/GSFC T. Alvarez, NASA/GSFC Bernard Graf, NASA/GSFC Art Whipple, NASA/GSFC James Lohr, NASA/GSFC L. Fetter, NASA/GSFC The following action items were noted 1. Expand response to Peer Review RFA 5 to demonstrate that the screening and qualification testing that has been performed to date is adequate. ACTIONEE: Gunther Haller 2. Conduct telecom to review ASICs screening plan. ACTIONEE: Gunther Haller, Nick Virmani 3. Prepare written worst case analysis for ASICs. ACTIONEE: Gunther Haller 4. Formally capture issues regarding engineering model performance and the impact to flight build, if any. ACTIONEE: Gunther Haller 5. Provide email regarding ASIC ESD precautions to GSFC attendees ACTIONEE: Gunther Haller 6. Routing review needs to happen before start of production. Need to ensure test and MIPs are clearly identified in the routing. 1 TEM and TEM POWER SUPPLY MRR MINUTES AND ACTION ITEMS Rev. 1 ACTIONEE: Brigitte Estey 7. Provide closure plan for EEE parts qualification issues not closed by start of production. ACTIONEE: Brigitte Estey 8. Verify GTC does daily testing of personal ESD control devices and documents that this testing is being performed. ACTIONEE: Pat Lujan 9. Verify standard rework procedures are documented at GTC. ACTIONEE: Pat Lujan 2