TEM and TEM POWER SUPPLY MRR MINUTES AND ACTION ITEMS
Rev. 1
The TEM and TEM Power Supply MRR was held on Thursday, September 16. The
following were in attendance:
Lowell Klaisner, SLAC
Dick Horn, SLAC
Pat Hascall, SLAC
Gunther Haller, SLAC
Brigitte Estey, SLAC
Jerry Clinton, SLAC
Pat Lujan, SLAC
Brett Pugh, SLAC
Tracy Shepherd, NASA/GSFC
Nick Virmani, NASA/GSFC
Thom Perry, NASA/GSFC
T. Alvarez, NASA/GSFC
Bernard Graf, NASA/GSFC
Art Whipple, NASA/GSFC
James Lohr, NASA/GSFC
L. Fetter, NASA/GSFC
The following action items were noted
1. Expand response to Peer Review RFA 5 to demonstrate that the screening and
qualification testing that has been performed to date is adequate.
ACTIONEE: Gunther Haller
2. Conduct telecom to review ASICs screening plan.
ACTIONEE: Gunther Haller, Nick Virmani
3. Prepare written worst case analysis for ASICs.
ACTIONEE: Gunther Haller
4. Formally capture issues regarding engineering model performance and the impact
to flight build, if any.
ACTIONEE: Gunther Haller
5. Provide email regarding ASIC ESD precautions to GSFC attendees
ACTIONEE: Gunther Haller
6. Routing review needs to happen before start of production. Need to ensure test
and MIPs are clearly identified in the routing.
1
TEM and TEM POWER SUPPLY MRR MINUTES AND ACTION ITEMS
Rev. 1
ACTIONEE: Brigitte Estey
7. Provide closure plan for EEE parts qualification issues not closed by start of
production.
ACTIONEE: Brigitte Estey
8. Verify GTC does daily testing of personal ESD control devices and documents
that this testing is being performed.
ACTIONEE: Pat Lujan
9. Verify standard rework procedures are documented at GTC.
ACTIONEE: Pat Lujan