Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Market Manager User Guide Version 0.08 Date Version Description Author(s) 10/07/2009 0.04 Draft released externally - subject to change C. Tucker 10/19/09 0.05 Added cancel Resource Parameters section, updated screenshots for Energy Trade confirmation C. Tucker 11/13/09 0.06 Minor updates on screen shots of data C. Tucker 10/26/2011 0.07 Updates to trade section regarding trades update C. Tucker © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 1 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ process due to SCR762, Enable a Single Step Cancel/Resubmit of Trades 12/21/2011 0.08 Update submission window references to 14 days ahead of the Operating Day © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. C. Tucker 2 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Table of Contents 1 Introduction ................................................................................................................................ 7 1.1 2 3 4 System Requirements ......................................................................................................... 7 Common System Features ........................................................................................................ 8 2.1 General Navigation ............................................................................................................. 8 2.2 Refresh Button .................................................................................................................... 9 2.3 Copy Tool .......................................................................................................................... 10 Trades ...................................................................................................................................... 12 3.1 Create Energy Trade ......................................................................................................... 12 3.2 Update Energy Trade ........................................................................................................ 18 3.3 Cancel an Unconfirmed Trade .......................................................................................... 23 3.4 Confirm Unconfirmed Trade .............................................................................................. 26 3.5 Create, Update, Cancel or Confirm Capacity Trade ......................................................... 29 3.6 Create, Update, Cancel or Confirm AS Trade .................................................................. 29 Resource-Specific Submissions .............................................................................................. 30 4.1 Create Current Operating Plan ......................................................................................... 30 4.2 Update Current Operating Plan ........................................................................................ 36 4.3 Cancel a Current Operating Plan ...................................................................................... 41 4.4 Create a Three-Part Offer ................................................................................................. 42 4.5 Update Three Part Offer.................................................................................................... 45 4.6 Cancel Three-Part Offer .................................................................................................... 45 4.7 Create an Output Schedule .............................................................................................. 46 4.8 Update Output Schedule ................................................................................................... 48 4.9 Cancel Output Schedule ................................................................................................... 48 4.10 Create an Ancillary Service Offer ...................................................................................... 49 4.11 Update AS Offer ................................................................................................................ 51 4.12 Cancel AS Offer ................................................................................................................ 52 4.13 Create an Incremental or Decremental Energy Offer Curve ............................................. 52 4.14 Update Incremental/Decremental Energy Offer Curve ..................................................... 54 4.15 Cancel Incremental/Decremental Energy Offer Curve ..................................................... 54 5 Bids and Offers ........................................................................................................................ 55 5.1 Create DAM Energy-Only Offer ........................................................................................ 55 © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 3 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 6 7 8 9 5.2 Update DAM Energy-Only Offer Curve ............................................................................. 62 5.3 Cancel DAM Energy-Only Offer ........................................................................................ 65 5.4 Create, Update or Cancel a CRR Offer ............................................................................ 65 5.5 Create, Update or Cancel a DAM Energy Bid .................................................................. 66 5.6 Create, Update or Cancel a PTP Obligation Bid ............................................................... 68 Schedules ................................................................................................................................ 71 6.1 Create Self-Schedule ........................................................................................................ 71 6.2 Update Self-Schedule ....................................................................................................... 78 6.3 Cancel Self Schedule ........................................................................................................ 79 Self-Arranged AS ..................................................................................................................... 83 7.1 Create Self-Arranged AS .................................................................................................. 83 7.2 Update Self-Arranged AS.................................................................................................. 89 7.3 Cancel Self-Arranged AS .................................................................................................. 90 Resource Parameters .............................................................................................................. 94 8.1 Update Generation Resource Parameters........................................................................ 94 8.2 Cancel Generation Resource Parameters ........................................................................ 96 Awards ..................................................................................................................................... 99 10 Notices ................................................................................................................................... 100 11 Verbal Dispatch Instructions (VDI) ........................................................................................ 103 © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 4 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Table of Figures Figure 1: Top Tab Row ................................................................................................................................. 8 Figure 2: Secondary Tab Row ...................................................................................................................... 8 Figure 3: Create Screen in New Browser Window ....................................................................................... 9 Figure 4: Refresh Button ............................................................................................................................... 9 Figure 5: Copy Single Column Value(s) to Different Hour .......................................................................... 10 Figure 6: Copy Single Column Value(s) to Different Hour .......................................................................... 10 Figure 7: Copy Single Column Across Block of Rows and Columns .......................................................... 11 Figure 8: Query Trades Screen .................................................................................................................. 12 Figure 9: Create Energy Trade Screen ....................................................................................................... 13 Figure 10: Create Energy Trade No Existing Submission .......................................................................... 14 Figure 11: Create Energy Trade with Existing Submission ........................................................................ 15 Figure 12: Create Energy Trade with Existing Submission ........................................................................ 16 Figure 13: Submission Successful .............................................................................................................. 17 Figure 14: Submission Unsuccessful .......................................................................................................... 18 Figure 15: Query for Existing Trade ............................................................................................................ 19 Figure 16: Results of Query ........................................................................................................................ 20 Figure 17: Update Energy Trade Screen .................................................................................................... 21 Figure 18: Submission Successful .............................................................................................................. 22 Figure 19: Submission Unsuccessful .......................................................................................................... 23 Figure 20: Cancel Energy Trade Screen .................................................................................................... 24 Figure 21: Cancellation Successful ............................................................................................................. 25 Figure 22: Cancellation Unsuccessful ......................................................................................................... 26 Figure 23: Results Table Showing Unconfirmed Trades ............................................................................ 27 Figure 24: Update Energy Trade Screen showing trade available for confirmation ................................... 28 Figure 25: Confirmation Showing Matching Trade Was Submitted ............................................................ 28 Figure 26: Confirmed Trade ........................................................................................................................ 29 Figure 27: Query Current Operating Plan Screen....................................................................................... 30 Figure 28: Create Current Operating Plan screen ...................................................................................... 31 Figure 29: Create Current Operating Plan Screen with No Existing Submission ....................................... 32 Figure 30: Create Current Operating Plan Screen with Existing Submission ............................................. 33 Figure 31: Submission Successful .............................................................................................................. 35 Figure 32: Submission Unsuccessful .......................................................................................................... 36 Figure 33: Query for Existing COP ............................................................................................................. 37 Figure 34: Results of Query ........................................................................................................................ 38 Figure 35: Update Current Operating Plan Screen ..................................................................................... 39 Figure 36: Submission Successful .............................................................................................................. 40 Figure 37: Submission Unsuccessful .......................................................................................................... 41 Figure 38: Query Three-Part Offer Screen ................................................................................................. 42 Figure 39: Create Three-Part Offer Screen ................................................................................................ 43 Figure 40: Query Output Schedule ............................................................................................................. 46 Figure 41: Create Output Schedule Screen ................................................................................................ 47 Figure 42: Query Ancillary Services Offer Screen ...................................................................................... 49 Figure 43: Create Ancillary Service Offer Screen (for online reserves) ...................................................... 50 Figure 44: Query Incremental/Decremental Energy Offer Curves screen .................................................. 52 Figure 45: Create Incremental/Decremental Energy Offer Curve Screen .................................................. 53 Figure 46: Query DAM Energy-Only Offers Screen .................................................................................... 55 Figure 47: Create DAM Energy-Only Offer Screen .................................................................................... 56 Figure 48: Create DAM Energy-Only Offer Screen with No Existing Submission ...................................... 57 Figure 49: Create DAM Energy-Only Offer Screen with Existing Submission............................................ 58 Figure 50: Values from Existing Submission Copied to Details Table ........................................................ 59 Figure 51: Submission Successful .............................................................................................................. 60 Figure 52: Submission Unsuccessful .......................................................................................................... 61 Figure 53: Query for Existing Offer ............................................................................................................. 62 © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 5 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 54: Results of Query ........................................................................................................................ 63 Figure 55: Update DAM Energy-Only Offer Screen .................................................................................... 64 Figure 56: Update Successfully Submitted ................................................................................................. 64 Figure 57: Create CRR Offer Screen .......................................................................................................... 65 Figure 58: Query CRR Offers Screen ......................................................................................................... 66 Figure 59: Create DAM Energy Bid Screen ................................................................................................ 67 Figure 60: Query DAM Energy Bids Screen ............................................................................................... 68 Figure 61: Create PTP Obligation Bid Screen ............................................................................................ 69 Figure 62: Query PTP Obligation Bids Screen ........................................................................................... 70 Figure 63: Query Self-Schedule Screen ..................................................................................................... 71 Figure 64: Create Self-Schedules Screen .................................................................................................. 72 Figure 65: Create Self-Schedule Screen with No Existing Submission ...................................................... 73 Figure 66: Create Self-Schedule Screen with Existing Submission ........................................................... 74 Figure 67: Values from Existing Submission Copied to Details Table ........................................................ 75 Figure 68: Submission Successful .............................................................................................................. 76 Figure 69: Submission Unsuccessful .......................................................................................................... 77 Figure 70: Query for Existing Self-Schedule ............................................................................................... 78 Figure 71: Update Self-Schedule Screen ................................................................................................... 79 Figure 72: Update Successful ..................................................................................................................... 79 Figure 73: Update Self-Schedule Screen ................................................................................................... 80 Figure 74: Schedule Successfully Cancelled .............................................................................................. 81 Figure 75: Schedule Cancellation Unsuccessful ........................................................................................ 81 Figure 76: Query AS Self Arrangement ...................................................................................................... 83 Figure 77: Create AS Self-Arrangement Screen......................................................................................... 84 Figure 78: Create AS Self-Arranged Screen with No Existing Submission ................................................ 85 Figure 79: Create AS Self-Arrangements Screen with Existing Submission .............................................. 85 Figure 80: Values from Existing Submission Copied to Details Table ........................................................ 86 Figure 81: Submission Successful .............................................................................................................. 87 Figure 82: Submission Unsuccessful .......................................................................................................... 88 Figure 83: Query for Existing Self-Arranged AS ......................................................................................... 89 Figure 84: Update Self-Arranged AS Screen .............................................................................................. 90 Figure 85: Update Successful ..................................................................................................................... 90 Figure 86: Cancel Self-Arranged AS Screen .............................................................................................. 91 Figure 87: Successfully Cancelled .............................................................................................................. 92 Figure 88: Self-Arranged AS Cancellation Unsuccessful ........................................................................... 92 Figure 89: Query Resource Parameters Screen......................................................................................... 94 Figure 90: Create Resource Parameters Screen........................................................................................ 95 Figure 91: Resource Parameters Screen ................................................................................................... 96 Figure 92: Cancellation Successful ............................................................................................................. 96 Figure 93: Resource Parameter Cancellation Unsuccessful ...................................................................... 98 Figure 94: Notices Screen ......................................................................................................................... 100 Figure 95: Notices Screen with results displayed ..................................................................................... 101 Figure 96: View Verbal Dispatch Instructions Summary Screen .............................................................. 103 Figure 97: View VDI Details Screen .......................................................................................................... 103 Figure 98: Submission Successful ............................................................................................................ 104 © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 6 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 1 Introduction This user guide describes how to create and edit submissions using the Market Manager user interface. The system features covered in this document include: Trades Resource-Specific Submissions Bids and Offers Schedules Self-Arranged Ancillary Services Resource Parameters Awards Notices Verbal Dispatch Instructions The guide provides instructions for creating, updating and canceling submissions by providing a screen shot with instructions for performing the necessary user interactions. The user instructions appear on the left and the expected results that display on the screen appear on the right. Within the instructions, business rules derived from protocols are displayed in a yellow box: Business rule: A current operating plan cannot be cancelled. Tips for data entry and rules imposed by the system are displayed in a blue box: Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ Since the user interaction is the same or similar for many types of submissions, the guide only presents detailed instructions for one submission type and then cites only differences among similar submissions. For example, detailed instructions are written for creating, updating and cancelling a DAM Energy-Only Offer Curve, and only the differences or exceptions are documented for CRR Offers. GENERAL NOTICE- All data submission examples in this document are fictitous and do not represent any actual resource or QSE-submitted data. 1.1 System Requirements IE 6.0 Valid ERCOT digital certificate with appropriate nodal role assigned © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 7 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 2 Common System Features This section describes system features common across all submission types. 2.1 General Navigation The main sections of the Market Manager are accessible by clicking the appropriate tab on the top or first row. Trades is the default section that displays when you launch Market Manager. Figure 1: Top Tab Row Most sections have multiple sections within—for example, Resource-Specific submissions contains: Current Operating Plan Three-Part Offer Output Schedule Ancillary Service Offer Inc/Dec Offer The first tab on the left is the default tab for each subsection. Figure 2: Secondary Tab Row Screens used to create, update or cancel a submission open in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 8 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 3: Create Screen in New Browser Window 2.2 Refresh Button The main screen has a Refresh button next to the Create New select tool. Because the Market Manager does not auto-refresh, you may want to click the Refresh button to update information. For example, if you cancel a bid, the underlying Bids and Offers screen will continue to display that bid as a row in the results table, until you either click Refresh or navigate away and return to this page. Figure 4: Refresh Button © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 9 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 2.3 Copy Tool The copy tool is an Excel-like tool that allows the user to select an entire column, and copy those values to a different hour or across hours. 2.3.1 To copy a single column to a different hour: 1. Highlight column to be copied by clicking on the column header (hour). The cells will be shaded orange. (see Figure 5) Hold down ctrl key and click column header of the hour to be populated (see 2. Figure 6). All cells in that particular column will be populated with the copied value(s) Figure 5: Copy Single Column Value(s) to Different Hour Figure 6: Copy Single Column Value(s) to Different Hour 2.3.2 To copy a single column across block of rows and columns: 1. Highlight column to be copied by clicking on the column header (hour). The cells will be shaded orange. (see Figure 5) 2. Select shift key and click column header of the end hour of the range of columns to be populated (see Figure 7) © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 10 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ All cells for that particular block, from the start row and hour to the end row and hour, will be populated with the copied value. This will result in a block of inputs populated with the same value. Figure 7: Copy Single Column Across Block of Rows and Columns © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 11 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 3 Trades The Trades submissions include: Energy Trade Capacity Trade Ancillary Service Trade 3.1 Create Energy Trade Figure 8: Query Trades Screen User Actions Results 1. Navigate to the Trades section by clicking on the Trades tab. The query screen for Trades displays. 2. Select Energy Trade from the list and click the Create New Button The Create Energy Trade screen opens in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 12 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 9: Create Energy Trade Screen User Actions 3. Results Complete all required fields in the top section of the form. (required fields shown with bold labels) Operating Day – select or enter Business Rules: Submission window: 7days prior to Operating Day until end of Adjustment Period. Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ Trade Parties – select buyer and seller Page defaults with the user’s QSE as both parties. Change one to the appropriate trade party. Note: Use your keyboard to ‘type-ahead’ in the list. All QSEs begin with the letter ‘Q’. Type the letters of the QSE’s short name to locate the appropriate trade party. Note: When both Trade Parties are the same, fields are shown to allow the user to enter a net trade – DSR use only. Enter ‘S’ for Sale and ‘P’ for purchase. Settlement Point – select either a Load Zone, Hub or Resource Node 4. Click Query for Existing Submission Note: The system only allows you to select one type of settlement point. When you select, for example, a Load Zone, the Hub and Resource Node lists automatically change to N/A Initiates a query to find existing submissions with matching © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 13 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ button operating day and resource name The page refreshes (see next two screens) Note: This is not required, but highly recommended to avoid over-writing all or part of a previous submission Figure 10: Create Energy Trade No Existing Submission User Actions Results If there is not a match, the message “No existing submissions were found” displays © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 14 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 11: Create Energy Trade with Existing Submission User Actions Results If there is a submission with the same operating day, buyer, seller and settlement point, those results are displayed in the Existing Transaction table. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 15 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 12: Create Energy Trade with Existing Submission User Actions 5. Click the Copy Values to Above Table button (optional) Results Screen refreshes to display the values from the existing submission as editable values in the table above Note: If there is an existing submission (and you don’t copy the values to the top table), the new submission will overwrite the old one for the hours specified in the new submission. Any portions of the old submission containing hours not specified in the new one will be maintained. Note: You can copy a transaction forward to the next day by querying for the existing submission you wish to copy, changing the date in the Create screen header to a different Operating Day and submitting it successully. 6. Finish creating trade by entering or Note: The Product tool allows you to select hours 1-24; 7-22; or 1-6, 23 © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 16 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ revising values for all desired hours. and 24. You enter MW value and click Apply. All selected hours are populated. MW must be 0 to 9999.9. Price must be -9999.99 to 9999.99 The Clear Table button clears the table of all values. 7. Click Submit button The page refreshes (See next two screens) Note: Clicking the Close button closes the window without saving changes. Figure 13: Submission Successful User Actions Results The confirmation message confirms that the transaction was successfully received and confirmed. If the transaction was submitted, but is still awaiting confirmation, a message will be displayed “Transaction successfully submitted but unable to confirm acceptance. Please query to verify confirmation.” © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 17 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 14: Submission Unsuccessful User Actions 8. 3.2 Correct the information causing the error, and resubmit by clicking on the Submit button when finished. Results If the transaction was not successfully submitted, the screen will display error messages and highlight fields with errors. Error may be caused by missing or invalid information. Update Energy Trade To update a trade, you must first query to locate it. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 18 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 15: Query for Existing Trade User Actions 9. In the query table, enter the operating day and trade type at a minimum. You may also select a trade parties and settlement point. 10. Click Show Results button. Results The screen refreshes to display the results in the table below. Note: The default view is Unconfirmed Trades. Click the Confirmed Trades tab to view confirmed trades. The pencil icon at the right indicates the trade was created by you and can be updated. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 19 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 16: Results of Query User Actions 11. Double-click on the results row Results The Update Trade screen opens in a new window. Note: Single-clicking the row highlights the row as shown above. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 20 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 17: Update Energy Trade Screen User Actions 12. Enter changes to the offer. Results The screen refreshes (See below) 13. Click Update button. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 21 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 18: Submission Successful User Actions Results The confirmation message confirms that the transaction was successfully received and confirmed. If the transaction was submitted, but is still awaiting confirmation, a message will be displayed “Transaction successfully submitted but unable to confirm acceptance. Please query to verify confirmation.” © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 22 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 19: Submission Unsuccessful User Actions Results 14. Correct the information causing the error, and resubmit by clicking on the Submit button when finished. 3.3 If the transaction was not successfully submitted, the screen will display error messages and highlight fields with errors. Error may be caused by missing or invalid information. Cancel an Unconfirmed Trade To cancel a trade, query for it the same as you would to update it. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 23 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 20: Cancel Energy Trade Screen User Actions 1. Select the time range for the hours you want to cancel and click the Cancel Submission button. Results The screen will refresh to display one of the following two screens. Note: To cancel the entire submission, enter hours 1-24 for the time range. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 24 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 21: Cancellation Successful User Actions Results The screen will refresh to display a confirmation message and the results of your cancellation in the table © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 25 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 22: Cancellation Unsuccessful User Actions Results The screen will refresh to display an error message. An error could result from submitting hours for which there are no values or submitting a cancellation after the deadline has passed for making changes. 3.4 Confirm Unconfirmed Trade To confirm a trade, you must query to locate unconfirmed trades. Note: If you query for an operating day and trade type only, you will see all your unconfirmed trades of that type for the day. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 26 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 23: Results Table Showing Unconfirmed Trades User Actions Results 1. To confirm a trade by submitting a matching trade, select the row of the trade you want to match and doubleclick to open in a new window. The Create Energy Trade opens in a new window for review (see next screen). 2. To view this as a confirmed trade, click on the Confirmed Trades table The trade displays in the Confirmed Trades table, as shown below. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 27 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 24: Update Energy Trade Screen showing trade available for confirmation User Actions 3. Results To confirm a trade by submitting a matching trade, review the trade on the screen, then select the Submit Matching Trade button. • The screen will refresh to display a confirmation message (see next screen). Figure 25: Confirmation Showing Matching Trade Was Submitted © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 28 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 26: Confirmed Trade 3.5 Create, Update, Cancel or Confirm Capacity Trade Similar to Energy Trades, with these exceptions: No settlement points Trades are hour-based, not interval-based 3.6 Create, Update, Cancel or Confirm AS Trade Similar to Energy Trades, with these exceptions: No settlement points Trades are hour-based, not interval-based AS type is specified © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 29 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 4 Resource-Specific Submissions The resource-specific submissions include: Current Operating Plan Three-Part Offer Output Schedule Ancillary Service Offer Incremental/Decremental Offer 4.1 Create Current Operating Plan Figure 27: Query Current Operating Plan Screen User Actions Results 1. Navigate to the Resource-Specific submissions section by clicking on the Resource-Specific tab. The query screen for Current Operating Plan displays. 2. Select Current Operating Plan from the list and click the Create New Button The Create Current Operating Plan screen opens in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 30 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 28: Create Current Operating Plan screen User Actions 3. Results Complete all required fields in the top section of the form. (required fields shown with bold labels) Operating Day – select or enter Business Rules: Submission window: 8 days prior to Operating Day until end of Adjustment Period. QSEs must submit a COP for the next 7 days for each resource it represents Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ Resource Name – select 4. Click Query for Existing Submission button Initiates a query to find existing submissions with matching operating day and resource name The page refreshes (see next two screens) Note: This is not required, but highly recommended to avoid over-writing all or part of a previous submission © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 31 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 29: Create Current Operating Plan Screen with No Existing Submission User Actions Results If there is not a match, the message “No existing submissions were found” displays © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 32 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 30: Create Current Operating Plan Screen with Existing Submission User Actions Results If there is a submission with the same operating day and Resource, those results are displayed in the Existing Transaction table. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 33 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ User Actions 5. Click the Copy Values to Above Table button (optional) Results Screen refreshes to display the values from the existing submission as editable values in the table above Note: If there is an existing submission (and you don’t copy the values to the top table), the new submission will overwrite the old one for the hours specified in the new submission. Any portions of the old submission containing hours not specified in the new one will be maintained. 6. Finish creating COP by entering, selecting or revising values for each Note: MW must be 0 to 9999.9. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 34 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ field for each hour. All fields are required for all hours. 7. Click Submit button The Clear Table button clears the table of all values. The page refreshes (See next two screens) Note: Clicking the Close button closes the Create Current Operating Plan window without saving changes. Figure 31: Submission Successful User Actions Results The confirmation message confirms that the transaction was successfully received and confirmed. If the transaction was submitted, but is still awaiting confirmation, a message will be displayed “Transaction successfully submitted but unable to confirm acceptance. Please query to verify confirmation.” © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 35 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 32: Submission Unsuccessful User Actions 8. 4.2 Results Correct the information causing the error, and resubmit by clicking on the Submit button when finished. If the transaction was not successfully submitted, the screen will display error messages and highlight fields with errors. Error may be caused by missing or invalid information. Update Current Operating Plan To update a COP, you must first perform a query to locate the COP. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 36 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 33: Query for Existing COP User Actions 1. 2. In the query table, enter the operating day at a minimum. You may also select a resource name and check/uncheck boxes to indicate if you want to see COPs that have been submitted, have not been submitted or both Results The screen refreshes to display the results in the table below. Note: If you leave both boxes checked, and don’t select a resource, the system will display all resources available for the selected operating day and show a checked box for all that have been submitted. Click Show Results button. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 37 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 34: Results of Query User Actions 3. Double-click on the results row Results The Update COP screen opens in a new window. Note: Single-clicking the row highlights the row as shown above. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 38 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 35: Update Current Operating Plan Screen User Actions 4. Enter changes to the COP. 5. Click Update button. Results The screen refreshes (See below) © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 39 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 36: Submission Successful User Actions Results The confirmation message confirms that the transaction was successfully received and confirmed. If the transaction was submitted, but is still awaiting confirmation, a message will be displayed “Transaction successfully submitted but unable to confirm acceptance. Please query to verify confirmation.” © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 40 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 37: Submission Unsuccessful User Actions 6. Results Correct the information causing the error, and resubmit by clicking on the Submit button when finished. 4.3 If the transaction was not successfully submitted, the screen will display error messages and highlight fields with errors. Error may be caused by missing or invalid information. Cancel a Current Operating Plan Business rule: A COP cannot be cancelled, only updated. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 41 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 4.4 Create a Three-Part Offer In places where Three-Part Offers are similar to Current Operating Plans, this document references those sections. The differences are documented. Figure 38: Query Three-Part Offer Screen User Actions 1. 2. Navigate to the Resource-Specific submissions section by clicking on the Resource-Specific tab. Select Three-Part Offer from the list and click the Create New Button Results The query screen for Current Operating Plan displays. Note: The Current Operating Plan query screen is the default landing page for Resource-Specific Offers. You must click the Three-Part Offer tab to access the query screen for Three-Part Offers. The Create Three-Part offer screen opens in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 42 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 39: Create Three-Part Offer Screen User Actions 3. Results Complete all required fields in the top section of the form. (required fields shown with bold labels) Operating Day – select or enter Business Rules: Submission windows: 14 days prior to Operating Day until DayAhead at 10:00, and, if for the next operating day, from the time DRUC results are posted until the end of the adjustment period. Only TPOs for resources that are not DAM-committed or RUCcommitted may be submitted, updated or cancelled during the adjustment period. A valid TPO submission will automatically cancel any Output Schedule for that same resource for the same time period. Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ Resource Name – select Expiration Date – select or enter 4. Energy Offer Curve Only button Clicking this refreshes the screen to display only the Energy © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 43 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ (optional) 5. Click Query for Existing Submission button Offer Curve fields. When this option is selected, the button toggles to Three-Part Offer. Clicking that restores all fields. Initiates a query to find existing submissions with matching operating day and resource name The page refreshes (see COP for examples) Note: This is not required, but highly recommended to avoid over-writing all or part of a previous submission 6. Click the Copy Values to Above Table button (optional) Screen refreshes to display the values from the existing submission as editable values in the table above Note: If there is an existing submission (and you don’t copy the values to the top table), the new submission will overwrite the old one for the hours specified in the new submission. Any portions of the old submission containing hours not specified in the new one will be maintained. 7. Finish creating TPO by entering or selecting all required fields in lower section of form. Start-Up: Note: Price must be 0 to 9999.99 Hot Start-up $ Inter Start-up $ Cold Start-up $ The Clear Table button clears the table of all values. FIP % FOP % Note: Must enter % as 0 to 100.0 Min Energy $ Note: Price must be -9999.99 to 9999.99 Energy Offer Curve Note: MW must be 0 to 9999.9. Price must be -9999.99 to 9999.99 Inc/Exc – Select inclusive or exclusive When creating curve, up to 10 rows are allowed Qty/Price FIP % FOP % 8. Reason code Select from the drop-down: Fuel, Out, DSCM Note: Reason code is optional unless the offer is being updated after the Resource has been committed by the day-ahead market. In that case, the reason code is required. 9. Click Submit button The page refreshes (See COP) Note: Clicking the Close button closes the window without saving changes. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 44 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 4.5 Update Three Part Offer Follows the same steps as updating a COP. Business rules for time frames for updating a TPO vary, however; see table above. 4.6 Cancel Three-Part Offer See business rules in table above. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 45 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 4.7 Create an Output Schedule In places where Output Schedules are similar to Current Operating Plans, this document references those sections. The differences are documented here. Figure 40: Query Output Schedule User Actions 1. 2. Navigate to the Resource-Specific submissions section by clicking on the Resource-Specific tab. Select Output Schedule from the list and click the Create New Button Results The query screen for Current Operating Plan displays. Note: The Current Operating Plan query screen is the default landing page for Resource-Specific Offers. You must click the Output Schedule tab to access the query screen for Output Schedules. The Output Schedule screen opens in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 46 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 41: Create Output Schedule Screen User Actions 3. Results Complete all required fields in the top section of the form. (required fields shown with bold labels) Operating Day – select or enter Business Rules: Submission window: 14 days prior to operating day until end of adjustment period. If an Output Schedule is submitted and a Three-Part Offer or Energy Offer Curve exists for the same time frame, the system will not use the Output Schedule, unless the cancel flag is set. (See below) Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ Resource Name – select Delete TPO for overlapping hours? Flag (optional) Flag defaults to “no”. Clicking yes will cause the system to use the Output Schedule and not the TPO for any overlapping hours. “No” © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 47 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ means that the TPO will remain in the system. 4. Click Query for Existing Submission button Initiates a query to find existing submissions with matching operating day and resource name The page refreshes (see COP for examples) Note: This is not required, but highly recommended to avoid over-writing all or part of a previous submission 5. Click the Copy Values to Above Table button (optional) Screen refreshes to display the values from the existing submission as editable values in the table above Note: If there is an existing submission (and you don’t copy the values to the top table), the new submission will overwrite the old one for the hours specified in the new submission. Any portions of the old submission containing hours not specified in the new one will be maintained. 6. 7. Finish creating Output Schedule by entering output level in MW for 5mintue intervals in lower section of form. Click Submit button Note: MW must be 0 to 9999.9 The Clear Table button clears the table of all values. The page refreshes (See COP) Note: Clicking the Close button closes the window without saving changes. 4.8 Update Output Schedule Follows the same steps as updating a COP. May be edited until end of adjustment period. 4.9 Cancel Output Schedule May be cancelled until end of adjustment period. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 48 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 4.10 Create an Ancillary Service Offer In places where Ancillary Service Offers are similar to Current Operating Plans, this document references those sections. The differences are documented here. Figure 42: Query Ancillary Services Offer Screen User Actions 1. 2. Navigate to the Resource-Specific submissions section by clicking on the Resource-Specific tab. Select Ancillary Service Offer from the list and click the Create New Button Results The query screen for Current Operating Plan displays. Note: The Current Operating Plan query screen is the default landing page for Resource-Specific Offers. You must click the Ancillary Service Offer tab to access the query screen for Ancillary Service Offers. The Ancillary Service screen opens in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 49 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 43: Create Ancillary Service Offer Screen (for online reserves) User Actions 3. Results Complete all required fields in the top section of the form. (required fields shown with bold labels) Operating Day – select or enter Business Rules: Submission window: 14 days prior to operating day until day-ahead at 10:00 (or longer if an alert is issued to extend the window) Offers may also be extended after the DAM until the end of the adjustment period, but would only be used if a SASM is run. Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ Resource Name – select Expiration – select or enter Note: Defaults to midnight the day following the operating day If changed, must set time at least 3 hours later than current time. AS Type – AS categories are: Online reserves including: Reg Up, RRS, On-Line Non Spin (default) Regulation Down Non-Spin 4. Click Query for Existing Submission Initiates a query to find existing submissions with matching © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 50 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ button operating day and resource name The page refreshes (see COP for examples) Note: This is not required, but highly recommended to avoid over-writing all or part of a previous submission 5. Click the Copy Values to Above Table button (optional) Screen refreshes to display the values from the existing submission as editable values in the table above Note: If there is an existing submission (and you don’t copy the values to the top table), the new submission will overwrite the old one for the hours specified in the new submission. Any portions of the old submission containing hours not specified in the new one will be maintained. 6. Finish creating AS Offer by entering required fields in lower section of form. Fix/Var – defaults to Variable, may select Fixed Business Rule: MW/Price – Enter a MW value and price for each type of AS A variable offer may be awarded any capacity amount up to the MW value entered. A fixed offer must be awarded all or none of the exact amount of MW entered in the offer. Only Load resources may submit fixed offers. Note: MW values must be 0 to 9999.9. Price must be -9999.99 to 9999.99 Clicking Clear Table button clears all values in quantity block. Add quantity block (optional) Clicking this adds a new quantity block. Business Rule: Up to 5 quantity blocks may be created. If any multi-hour blocks are created, they will apply to all quantity blocks. Add multi-hour block (optional) – Select a time frame and click Apply button. Clicking Apply refreshes the screen and shades the cells for the selected time frame. Business Rule: The multi-hour block indicates that the offer must be cleared for all of the hours of the multi-hour block or not cleared at all. Offers for hour that are not multi-hour block can be offered for that single hour. If any multi-hour blocks are created, they will apply to all quantity blocks. 7. Click Submit button The page refreshes (See COP) Note: Clicking the Close button closes the window without saving changes. 4.11 Update AS Offer Follows the same steps as updating a COP. May be edited until DAM Submission deadline and then once again in the adjustment period. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 51 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 4.12 Cancel AS Offer May be cancelled until DAM Submission deadline. May also be cancelled in the adjustment period. 4.13 Create an Incremental or Decremental Energy Offer Curve In places where Incremental/Decremental Energy Offer Curves are similar to Current Operating Plans, this document references those sections. The differences are documented here. Figure 44: Query Incremental/Decremental Energy Offer Curves screen User Actions 1. 2. Navigate to the Resource-Specific submissions section by clicking on the Resource-Specific tab. Select Incremental/Decremental Offer from the list and click the Create New Button Results The query screen for Current Operating Plan displays. Note: The Current Operating Plan query screen is the default landing page for Resource-Specific Offers. You must click the Incremental/Decremental Energy Offer Curves tab to access the query screen for Incremental/Decremental Energy Offer Curves. The Incremental/Decremental Energy Offer Curves screen opens in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 52 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 45: Create Incremental/Decremental Energy Offer Curve Screen User Actions 3. Results Complete all required fields in the top section of the form. (required fields shown with bold labels) Operating Day – select or enter Business Rules: Submission window: 14 days prior to operating day until end of adjustment period Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ Resource Name – select Expiration – select or enter 4. Note: Defaults to midnight the day following the operating day If changed, must set time at least 3 hours later than current time. Incremental/Decremental – select one Selecting a radio button refreshes the screen with the selected form. Click Query for Existing Submission button Initiates a query to find existing submissions with matching operating day and resource name The page refreshes (see COP for examples) Note: This is not required, but highly recommended to avoid over-writing all or part of a previous submission 5. Click the Copy Values to Above Screen refreshes to display the values from the existing © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 53 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Table button (optional) submission as editable values in the table above Note: If there is an existing submission (and you don’t copy the values to the top table), the new submission will overwrite the old one for the hours specified in the new submission. Any portions of the old submission containing hours not specified in the new one will be maintained. 6. 7. Finish creating Inc/Dec Offer by entering required fields in lower section of form. FIP% FOP% Note: MW values must be 0 to 9999.9. Price must be -9999.99 to 9999.99 Qty/Price – Enter a MW value and price for each hours Clicking Clear Table button clears all values in table. Add new row Clicking this adds a new row. Up to 10 rows are allowed Click Submit button The page refreshes (See COP) Note: Clicking the Close button closes the window without saving changes. 4.14 Update Incremental/Decremental Energy Offer Curve Follows the same steps as updating a COP. 4.15 Cancel Incremental/Decremental Energy Offer Curve Follows the same steps as cancelling a Three Part Offer. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 54 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 5 Bids and Offers This user guide will provide detailed instructions for creating and updating a DAM Energy-Only Offer. The other types of bid and offers are similar; the guide will only document those differences. 5.1 Create DAM Energy-Only Offer Figure 46: Query DAM Energy-Only Offers Screen User Actions Results 1. Navigate to the Bids and Offers section by clicking on the Bids and Offers tab. The query screen for DAM Energy-Only Offers displays. 2. Select DAM Energy-Only Offer from the list and click the Create New Button The Create DAM Energy-Only Offer screen opens in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 55 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 47: Create DAM Energy-Only Offer Screen User Actions 3. Results Complete all required fields in the top section of the form. (required fields shown with bold labels) Operating Day – select or enter Business Rule: Submission window: 14 days prior to Operating Day until DayAhead at 10:00 Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ Settlement Point – select either a Load Zone, Hub or Resource Node Note: The system only allows you to select one type of settlement point. When you select, for example, a Load Zone, the Hub and Resource Node lists automatically change to N/A Offer ID – enter This is a user created ID. Note: The system accepts up to 12 alpha-numeric characters. Expiration Business Rule: Expiration window: current time until midnight of the selected operating day 4. Click Query for Existing Submission Initiates a query to find existing submissions with matching operating day, settlement point and offer ID © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 56 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ button The page refreshes (see next two screens) Note: This is not required, but highly recommended to avoid over-writing all or part of a previous submission Figure 48: Create DAM Energy-Only Offer Screen with No Existing Submission User Actions Results If there is not a match, the message “No existing submissions were found” displays © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 57 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 49: Create DAM Energy-Only Offer Screen with Existing Submission User Actions Results If there is a submission with the same operating day, settlement point and offer ID, those results are displayed in the Existing Transaction table © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 58 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 50: Values from Existing Submission Copied to Details Table User Actions 5. Click the Copy Values to Above Table button (optional) 6. Finish creating offer by entering quantity and price values for desired hours in lower section of form. Fix/Var/Curve – List defaults to curve Results Screen refreshes to display the Qty/Price values from the existing submission as editable values in the table above Business Rule: Curve – indicates the user is building a curve and will use multiple curve rows. May enter up to 10 rows. Fixed – indicates the user is submitting a fixed offer and will only fill out one row Variable – indicates the user is submitting a variable offer and © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 59 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ will only fill out one row Qty/Price – enter a megawatt value and price for all desired hours Note: MW must be 0 to 9999.9. Price must be -9999.99 to 9999.99 (See Copy Tool for shortcuts to entering values) The Clear Table button clears the table of all values. Multi-hour block – select hour range for a multi-hour block and click Apply. (optional) To remove the multi-hour block(s), click the Cancel Multi-Hour Blocks button. 7. Click Submit button The screen refreshes to display shading for the selected hours Business Rule: The multi-hour block indicates that the offer must be cleared for all of the hours of the multi-hour block or not cleared at all. Offers for hours that are not multi-hour blocked can be cleared for that single hour. The page refreshes (See next two screens) Note: Clicking the Close button closes the Create DAM EnergyOnly Offer window without saving changes. Figure 51: Submission Successful User Actions Results The confirmation message confirms that the transaction was successfully received and confirmed. If the transaction was submitted, but is still awaiting confirmation, a message will be displayed “Transaction successfully submitted but unable to confirm acceptance. Please query to verify confirmation.” © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 60 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 52: Submission Unsuccessful User Actions 8. Correct the information causing the error, and resubmit by clicking on the Submit button when finished. Results If the transaction was not successfully submitted, the screen will display error messages and highlight fields with errors. Error may be caused by missing or invalid information. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 61 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 5.2 Update DAM Energy-Only Offer Curve To update an offer, you must first perform a query to locate the offer. Figure 53: Query for Existing Offer User Actions 9. In the query table, enter the operating day at a minimum. You may also enter a settlement point and offer ID Results The screen refreshes to display the results in the table below. 10. Click Show Results button. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 62 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 54: Results of Query User Actions 11. Double-click on the results row Results The Update DAM Energy-Only Offer screen opens in a new window. Note: Single-clicking the row highlights the row as shown above. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 63 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 55: Update DAM Energy-Only Offer Screen User Actions 12. Enter changes to the offer. Results The screen refreshes (See below) 13. Click Update button. Figure 56: Update Successfully Submitted User Actions Results The confirmation message confirms that the transaction was successfully received and confirmed. If the transaction was © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 64 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ submitted, but is still awaiting confirmation, a message will be displayed “Transaction successfully submitted but unable to confirm acceptance. Please query to verify confirmation.” 5.3 Cancel DAM Energy-Only Offer Follow the steps for cancelling a Three Part Offer. 5.4 Create, Update or Cancel a CRR Offer CRR Offers follow the same rules as DAM Energy-Only Offers with the following exceptions: There is no Expiration field Instead of Settlement Points, users select Source and Sink Additional fields exist for CRR Account Holder, CRR ID and NOIE Peak Load There is no curve option for entering Qty/Price To query for CRR offers, you must navigate to the CRR Offer query screen, by clicking the CRR Offer tab. Figure 57: Create CRR Offer Screen © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 65 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 58: Query CRR Offers Screen 5.5 Create, Update or Cancel a DAM Energy Bid DAM Energy Bids follow the same rules as DAM Energy-Only Offers with the following exception: The ID field is labeled Bid ID, not Offer ID To query for DAM Energy Bids, you must navigate to the DAM Energy Bids query screen, by clicking the DAM Energy Bids tab. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 66 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 59: Create DAM Energy Bid Screen © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 67 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 60: Query DAM Energy Bids Screen 5.6 Create, Update or Cancel a PTP Obligation Bid PTP Obligation Bids follow the same rules as DAM Energy-Only Offers with the following exceptions: There is no Expiration field Instead of Settlement Points, users select Source and Sink There is no curve option for entering Qty/Price The ID field is labeled Bid ID, not Offer ID To query for PTP Obligation Bids, you must navigate to the PTP Obligation Bids query screen, by clicking the PTP Obligation Bids tab. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 68 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 61: Create PTP Obligation Bid Screen © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 69 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 62: Query PTP Obligation Bids Screen © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 70 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 6 Schedules This section has two types of schedules: DC Tie Schedules – this section will be included in a later version of this document. Self-Schedules 6.1 Create Self-Schedule Figure 63: Query Self-Schedule Screen User Actions Results 1. Navigate to the Schedules section by clicking on the Schedules tab. The query screen for DC Tie Schedules displays. 2. Select Self-Schedules from the Submission Type list and click Create New button. The create screen for Self-Schedules displays in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 71 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 64: Create Self-Schedules Screen User Actions 3. Results Complete all required fields in the top section of the form. (required fields shown with bold labels) Operating Day – select or enter Business Rule: Submission window: 14 days prior to Operating Day until end of adjustment period Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ Source – select either a Load Zone, Hub or Resource Node Note: The system only allows you to select one type of settlement point. When you select, for example, a Load Zone, the Hub and Resource Node lists automatically change to N/A Sink – select either a Load Zone, Hub or Resource Node 4. Click Query for Existing Submission button Initiates a query to find existing submissions with matching operating day, source and sink The page refreshes (see next two screens) Note: This is not required, but highly recommended to avoid over-writing all or part of a previous submission © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 72 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 65: Create Self-Schedule Screen with No Existing Submission User Actions Results If there is not a match, the message “No existing submissions were found” displays © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 73 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 66: Create Self-Schedule Screen with Existing Submission User Actions Results If there is a submission with the same operating day, source and sink, those results are displayed in the Existing Transaction table © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 74 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 67: Values from Existing Submission Copied to Details Table User Actions 5. Click the Copy Values to Above Table button (optional) 6. Finish creating offer by entering /revising MW values for desired hours in lower section of form. 7. Click Submit button Results Screen refreshes to display the MW values from the existing submission as editable values in the table above Note: The Product tool allows you to select hours 1-24; 7-22; or 1-6, 23 and 24. You enter MW value and click Apply. All selected hours are populated. The page refreshes (See next two screens) Note: Clicking the Close button closes the window without saving changes. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 75 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 68: Submission Successful User Actions Results The confirmation message confirms that the transaction was successfully received and confirmed. If the transaction was submitted, but is still awaiting confirmation, a message will be displayed “Transaction successfully submitted but unable to confirm acceptance. Please query to verify confirmation.” © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 76 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 69: Submission Unsuccessful User Actions 8. Correct the information causing the error, and resubmit by clicking on the Submit button when finished. Results If the transaction was not successfully submitted, the screen will display error messages and highlight fields with errors. Error may be caused by missing or invalid information. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 77 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 6.2 Update Self-Schedule To update a self-schedule, you must first perform a query to locate the schedule. Figure 70: Query for Existing Self-Schedule User Actions 1. In the query table, enter the operating day at a minimum. You may also enter a source and sink 2. Click Show Results button. 3. Double-click on the row for the schedule you want to update Results The screen refreshes to display the results in the results table. The update screen opens in a new window, shown below. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 78 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 71: Update Self-Schedule Screen User Actions 4. Enter changes to the offer. 5. Click Update button. Results The screen refreshes (See below) Figure 72: Update Successful 6.3 Cancel Self Schedule © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 79 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ To cancel all or part of a self-schedule, you must first query for the schedule as described in the Update section. Figure 73: Update Self-Schedule Screen User Actions 1. 2. Enter the time range for hours you want to cancel. Click Cancel Submission button. Results The screen refreshes (See below) Note: If you want to cancel the entire submission, select hours 1 – 24 for the time range. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 80 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 74: Schedule Successfully Cancelled User Actions Results The screen displays a confirmation message and updates the detail table to display the updated information. Figure 75: Schedule Cancellation Unsuccessful User Actions Results © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 81 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ The screen displays an error message that explains why the cancellation was unsuccessful. In this example, the deadline for updating a self-schedule had already passed. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 82 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 7 Self-Arranged AS An AS Self-Arrangement is submitted by a QSE. The AS Self-Arrangement is used in the calculation for how much AS must be procured by DAM or SASM. 7.1 Create Self-Arranged AS Figure 76: Query AS Self Arrangement User Actions Results 1. Navigate to the Self-Arranged AS section by clicking on the SelfArranged AS tab. The query screen for Self-Arranged AS displays. 2. Click Create New button. The create screen for Self-Arranged AS displays in a new window. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 83 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 77: Create AS Self-Arrangement Screen User Actions 3. Results Complete all required fields in the top section of the form. (required fields shown with bold labels) Operating Day – select or enter Business Rule: Submission window: 14 days prior to Operating Day until dayahead at 10:00 If SASM exists, submission window open from SASM alert until SASM execution Note: Dates/times may be selected using the calendar widget or entered into the text field. If entered, the format is ‘mmm dd yyyy hh:mm’ 4. AS Type – select Reg-Up, Reg Down, RRS or Non-Spin Selecting RRS as the AS Type refreshes the screen with the appropriate table for providing RRS-GN, RRS-LD, and RRS-NC information. Click Query for Existing Submission button Initiates a query to find existing submissions with matching operating day and AS type The page refreshes (see next two screens) Note: This is not required, but highly recommended to avoid over-writing all or part of a previous submission © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 84 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 78: Create AS Self-Arranged Screen with No Existing Submission User Actions Results If there is not a match, the message “No existing submissions were found” displays Figure 79: Create AS Self-Arrangements Screen with Existing Submission © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 85 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ User Actions Results If there is a submission with the same operating day and AS Type, those results are displayed in the Existing Transaction table Figure 80: Values from Existing Submission Copied to Details Table User Actions 5. Click the Copy Values to Above Table button (optional) 6. Finish creating offer by entering /revising MW values for desired hours in lower section of form. 7. Click Submit button Results Screen refreshes to display the MW values from the existing submission as editable values in the table above Note: The Product tool allows you to select hours 1-24; 7-22; or 1-6, 23 and 24. You enter MW value and click Apply. All selected hours are populated. The page refreshes (See next two screens) Note: Clicking the Close button closes the window without saving changes. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 86 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 81: Submission Successful User Actions Results The confirmation message confirms that the transaction was successfully received and confirmed. If the transaction was submitted, but is still awaiting confirmation, a message will be displayed “Transaction successfully submitted but unable to confirm acceptance. Please query to verify confirmation.” © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 87 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 82: Submission Unsuccessful User Actions 8. Correct the information causing the error, and resubmit by clicking on the Submit button when finished. Results If the transaction was not successfully submitted, the screen will display error messages and highlight fields with errors. Error may be caused by missing or invalid information. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 88 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 7.2 Update Self-Arranged AS To update a self-arranged AS, you must first perform a query to locate the submission. Figure 83: Query for Existing Self-Arranged AS User Actions 9. In the query table, enter the operating day at a minimum. You may also enter an AS Type Results The screen refreshes to display the results in the results table. The update screen opens in a new window, shown below. 10. Click Show Results button. 11. Double-click on the row for the schedule you want to update © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 89 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 84: Update Self-Arranged AS Screen User Actions 12. Enter changes to the offer. Results The screen refreshes (See below) 13. Click Update button. Figure 85: Update Successful 7.3 Cancel Self-Arranged AS © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 90 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ To cancel all or part of a self-arranged AS, you must first query for the submission as described in the Update section. Figure 86: Cancel Self-Arranged AS Screen User Actions 14. Enter the time range for hours you want to cancel. 15. Click Cancel Submission button. Results The screen refreshes (See below) Note: If you want to cancel the entire submission, select hours 1 – 24 for the time range. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 91 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 87: Successfully Cancelled User Actions Results The screen displays a confirmation message and updates the detail table to display the updated information. Figure 88: Self-Arranged AS Cancellation Unsuccessful © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 92 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ User Actions Results The screen displays an error message that explains why the cancellation was unsuccessful. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 93 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 8 Resource Parameters In the Resource Parameters section, you can modify the parameters for a selected resource. The resource types include: Generation Resources Controllable Load Resources Non-Controllable Load Resources This document gives detailed instructions for modifying parameters for a generation resource. The mechanism for modifying parameters for load resources are the same. 8.1 Update Generation Resource Parameters Figure 89: Query Resource Parameters Screen © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 94 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ User Actions Results 1. Navigate to the Resource Parameters section by clicking on the Resource Parameters tab. The query screen for Resource Parameters displays. 2. Select Generation Resource Parameters from the list and click the Show Results button A list of Resources displays Figure 90: Create Resource Parameters Screen User Actions Results 1. Double click the row containing the desired Resource. A new window will open containing the Resource Parameters. 2. Make any updates. Click the Submit button The page refreshes (See next two screens) Note: Clicking the Close button closes the window without saving changes. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 95 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 8.2 Cancel Generation Resource Parameters To cancel submitted Generation Resource Parameters and return to the registered values, you must first open the Resource Parameters screen. Figure 91: Resource Parameters Screen User Actions 3. Click Cancel Submission button. Results The page refreshes (See next two screens) Figure 92: Cancellation Successful © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 96 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ User Actions Results The screen displays a confirmation message. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 97 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 93: Resource Parameter Cancellation Unsuccessful User Actions Results The screen displays an error message that explains why the cancellation was unsuccessful. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 98 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 9 Awards This section will be updated in a later version of this document. © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 99 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 10 Notices In the Notices section, you can view notices sent by ERCOT, filtered by priority if desired. The notice types include: Alert COP Warning Emergency Notices Market Message RUC Commitment Figure 94: Notices Screen © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 100 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ Figure 95: Notices Screen with results displayed © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 101 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ User Actions Results 1. Navigate to the Notices section by clicking on the Notices tab. The filter screen for Notices displays. 2. Select the Notice Type from the list and click the Show Results button A list of the requested Notices will be displayed © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 102 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ 11 Verbal Dispatch Instructions (VDI) In the VDI section, you can view and acknowledge VDIs sent by ERCOT. Figure 96: View Verbal Dispatch Instructions Summary Screen User Actions 1. Results Double click the row containing the VDI you want to view. A new window will open displaying the VDI. Figure 97: View VDI Details Screen © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 103 Market Manager User Guide ERCOT Public ________________________________________________________________________________________________________________________________________________ User Actions 1. Click Acknowledge button Results The page refreshes (See next screen) Note: Clicking the Close button closes the window without saving changes. Figure 98: Submission Successful © 2008-2009 Electric Reliability Council of Texas, Inc. All rights reserved. 104