Cost Modeling 1. Detailed bottom-up estimations Best for detailed design phase Sum up costs starting at component level 2. Analogous estimations Best for similar missions Compare design with similar item (system, subsystem, component) 3. Parametric estimations Best for conceptual/preliminary design phase Use CER's (cost estimating relationships) Express cost as function of one or more design sizing parameters (usually weight and/or power) Generated by regression analysis of cost data from known systems Beware of exceeding valid parameter range! (but 10% OK) CBS (Cost Breakdown Structure) Read Ch. 20 in Wertz & Larson (also talks about Work Breakdown Structure --WBS) RDT&E (Research, Development, Testing & Evaluation) Space Segment Launch Segment Ground Segment Program Level Costs (wrap-arounds or “wraps”) -- Table 20-7 Mgmt, Engr., Prod. Assurance Sys. Test & Eval. TFU (Theoretical First Unit) Table 20-4 RDT&E only Table 20-5 TFU only Table 20-6 RDT&E and TFU for Earth-orbiting s/c Protoflight – refurbish test model and fly it – use only 30% of TFU cost On-line cost models (JSC web site) http://www.jsc.nasa.gov/bu2/models.htm Models Space/vehicle level Expendable LV’s DSN cost estimating (this one estimates the cost of estimating the cost – really) Mission operations (includes DSN for planetary missions) Inflation factors Example CER: Thermal subsystem TFU cost (FY00$K) = 50.6 X 0.707 X = thermal ctrl. wt. in kg. Std. Error (1) = 61% Notes: Use of FY00$K (constant-year dollars) Can use Table 20-1 to correct for inflation Start with high-level estimates (total s/c mass) Use only item 2 (Tables 20-4, 20-5, 20-6) Then go to more detail (indiv. subsystem masses) Replace item 2 with sub-items (2.1 – 2.6) Use cost adjustments in Table 20-8 (e.g., for composites, new designs) TABLE 20-4 (abbrev.) Cost Component 1. Payload 1.1 IR 1.2 Visible 1.3 Comm. Antenna Comm. electr. 2. s/c bus 2.1 Struct./therm. 2.2 TT&C 2.3 Att. Ctrl. Determ. Control 2.4 Power 3. AKM 4. Ground Equip. 5. Program Level Parameter, X Applicable Range aper. diam. (m) 0.2-1.2 m. wt. (kg) wt. (kg) dry wt. (kg) wt. (kg) wt. (kg) dry wt. (kg) dry wt. (kg) EPS wt BOL pwr (kg W) Total imp. (N s) RDT&E + TFU H/W cost ($K) CER 0 + 110791 X0.562 Std. Error 16629[0.65]