See www.strongtie.com for latest version Steel Strong-Wall Shearwall - Wood Framing Rev. Date: 10/21/2010 T-MSTRSSW09R Expires 01/2012 SECTION 06 12 19 SHEAR WALL PANELS PART 1 GENERAL 1.1 SECTION INCLUDES A. 1.2 RELATED SECTIONS A. B. C. D. E. 1.3 Prefabricated steel based shear panels designed and constructed to support gravity loads and resist lateral in-plane and out-of-plane wind or earthquake loads in wood-framed wall construction. Section 03 30 00 – Cast-In-Place Concrete – Concrete provides support or anchorage. Section 04 05 00 – Common Work Results for Masonry – Masonry provides support or anchorage. Section 04 20 00 – Unit Masonry – Unit Masonry provides support or anchorage. Section 05 12 00 – Structural Steel Framing – Steel provides support or anchorage. Section 06 10 00 – Rough Carpentry – Wood supported by fastenings or providing support or anchorage. REFERENCES ASTM A36 – Carbon Structural Steel ASTM A449 – Hex Cap Screws, Bolts and Studs, Steel, Heat Treated ASTM A500 – Cold Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes D. ASTM A563 – Carbon and Alloy Steel Nuts E. ASTM A653 – Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process F. ASTM A1011 – Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength LowAlloy, High-Strength Low-Alloy with Improved Formability and Ultra-High Strength G. ASTM F1554 – Anchor Bolts, Steel H. SAE J78 – Self-Drilling Tapping Screws I. ICC-ES AC130 – Acceptance Criteria for Prefabricated Wood Shear Panels J. ICC-ES AC233 – Acceptance Criteria for Wood Screws K. ICC-ES AC322 – Acceptance Criteria for Prefabricated, Cold-Formed Steel Lateral-ForceResisting Vertical Assemblies A. B. C. 1.4 DELIVERY, STORAGE, AND HANDLING A. B. Deliver products to job site in manufacturer’s or distributor’s packaging undamaged, complete with installation instructions. Protect and handle materials in accordance with manufacturer’s recommendations to prevent damage or deterioration. Project Name / Project No. / Date 06 12 19 - 1 Shear Wall Panels PART 2 PRODUCTS 2.1 MANUFACTURERS A. 2.2 MATERIALS A. B. C. 2.3 Steel: 1. Sheet: ASTM A36, ASTM A653, ASTM A1011 2. Structural Shapes: ASTM A500 3. Fasteners: ASTM A36, ASTM A449, F1554, SAE J78 4. Nuts: ASTM A563, ASTM A194 5. Coupler Nuts: ASTM A563 Lumber: 1. Spruce-Pine-Fir, Stud Grade or Better, Minimum Specific Gravity 0.42 Finishes: 1. Electro-plated galvanized, G60, G90 2. Gray Paint FABRICATION A. B. C. 2.4 Manufacturer: Simpson Strong-Tie Co., Inc Shop assembly to occur per the manufacturer’s approved production drawings. Fabrication tolerances per manufacturer. The manufacturer’s identification shall be stamped into the metal or wood part and a label may be attached to the part with adhesive. TESTING A. B. C. Testing to determine allowable loads shall be performed as per ICC-ES Acceptance Criteria 322 (AC322). Testing shall be conducted under the supervision of an independent laboratory. Manufacturer to provide code testing data on all products that have been code tested upon request. PART 3 EXECUTION 3.1 EXAMINATION A. B. 3.2 The panels shall be installed on supporting structural members per the manufacturer’s instructions. Verify that the dimensions of the supporting member are sufficient to receive the specified panels. INSTALLATION A. B. C. All specified fasteners must be installed according to the manufacturer’s instructions. Install all specified fasteners before loading the prefabricated steel shear panel. For all framing members wood shrinkage shall be taken into account. Project Name / Project No. / Date 06 12 19 - 2 Shear Wall Panels Do not overload by exceeding the manufacturer’s catalog allowable load values. Use proper safety equipment. Choose the correct template, from the manufacturer, required for proper bolt placement. Do not cut the steel panel or enlarge the existing holes. Holes up to 1 1/8 inches may be bored through the wood studs at any location corresponding to a hole in the panel flange. H. The prefabricated steel shear panels shall be installed directly on concrete foundations, wood floor systems, masonry foundations or walls, or steel beams per the manufacturer’s instructions. There may be a reduction of allowable load if a prefabricated steel shear panel is installed on a masonry foundation or a steel beam. I. Field replacement of pre-attached wood studs is permitted if the replacement stud has the same or greater dimensions and is attached to the steel panel with SDS ¼-inch-by-1 ½-inch screws. The studs must be spruce-pine-fir stud grade or better. The studs must fit snugly between the top and bottom plates and along the vertical face. J. Prefabricated steel shear panels with 2x4 pre-attached studs may also be used in 2x6 wall framing. Install with wall flush to one face of the framing and add furring to the opposite side. K. Prefabricated steel shear panels may be installed with solid or multi-ply headers per the manufacturer’s instructions. L. Concrete installation: The prefabricated steel shear panel must be installed directly on a concrete foundation over two anchor bolts per the manufacturer’s instructions. The panel base plate must be secured to the anchor bolts with high strength or standard nut matching the anchor bolt grade. M. Masonry or steel installation: Installation of the prefabricated steel shear panels on masonry walls or foundations or steel beams may be permitted, subject to the approval of the code official based on calculations and details prepared by the registered design professional. N. Wood floor installation: Installation of the prefabricated steel shear panels on a wood floor shall be per the manufacturer’s instructions. The anchor rods must extend up through the floor system, and solid blocking must be installed under the center and each end of the wall. The floor sheathing must be bored or notched at each anchor rod to allow standard nuts to be set flush with the top of sheathing. The panels must be placed over the anchor rods directly on the floor sheathing and bear on the nuts. The shear transfer plate must be attached to the panel with ¼-inch diameter or No. 14 self-tapping screws (provided with Wood Floor Connection Kit) and to the rim joist with 10d common nails. O. The top of the prefabricated steel shear panel must be attached to wood top plates or a beam with SDS ¼-inch-by-3 ½-inch screws per the manufacturer’s instructions. P. Garage Portal System: Installation of the prefabricated steel shear panels with the Portal Frame Connection Kit (SSWP-KT), when specified by the registered design professional shall be per the manufacturer's instructions. The SSWPS straps shall be attached to the steel panel with #14 self-drilling screws (included with Portal Frame Connection Kit) and to the wood header with 10d x 2 1/2" minimum nails. The header must span continuously across the length of the panel. Single-wall portal header support shall be installed per the manufacturer's instructions. Q. Balloon Framing Installation: Install panels per the manufacturer’s instructions. The bottom prefabricated steel shear panel must be an “-STK” model with factory installed hold-down elements. The panels must be connected with threaded rods extending through the holddown element, lower wall top plate, and upper wall bottom plate. The panels must be secured with double nuts at the panel to panel joint and a single nut at the bottom of the hold-down element. A minimum of two nominal 2-by-6, spruce-pine-fir stud grade or better studs must be installed on each side of the panel. Alternate full height members may be required by the registered design professional. The attachment to the full height studs and at the top and bottom of the balloon framed panels must be per the manufacturer’s or registered design professional’s instructions. R. Two-story stacked installation: Install panels per the manufacturer’s instructions. The bottom prefabricated steel shear panel must be an “-STK” model with factory installed hold-down elements. The panels must be connected with threaded rods extending through the holddown element, wood floor system, and upper wall bottom plate. The panels must be secured with a standard nut at the top and bottom of the hold-down element. The remainder of the upper panel installation shall be per Section 3.2N. D. E. F. G. Project Name / Project No. / Date 06 12 19 - 3 Shear Wall Panels S. T. 3.3 The maximum shim thickness between the top of the prefabricated steel shear panel and the top plates or header is 7/8-inch using SDS ¼-inch-by-3 ½-inch screws. Refer to manufacturer’s instructions for information on greater shim thickness. Anchor bolt nuts should be finger-tight plus 1/3 to ½ turn with a wrench. Do not use an impact wrench to tighten nuts on the anchor bolts. FIELD QUALITY CONTROL A. B. Determine that the proper part is being used in the correct application and has been fabricated by the approved manufacturer by observation of the stamp into the metal part and/or the adhesive label on the product denoting part and manufacturer name. Before substituting another brand, confirm load capacity based on published testing data and calculations per Section 2.4. The engineer/designer of record shall evaluate and give written approval for substitution prior to installation. Project Name / Project No. / Date 06 12 19 - 4 Shear Wall Panels