STATE AGENCY FOR METROLOGY AND TECHNICAL SURVEILLANCE License № 374/23.05.2007 Sofia, 23 May 2007 FRUITION OF TECHNICAL SURVEILLANCE HIGH RISK EQUIPMENT Reference to cl.34a, paragraph 1, section 1 of the Low for technical requirements for products LICENSE CENTER FOR TESTING AND EUROPEAN CERTIFICATION Headquarters and address: Stara Zagora, 23 Patriarch Evtimii blv Reg.f.file no.215 / 2002 Stara Zagora County Court, BULSTAT 123618423 To carry out TECHNICAL SURVEILLANCE HIGH RISK EQUIPMENT as follows: 1. Steam generators, working at overpressure up to 0,05 MРa including. 2. Water heating generators, working at heating water temperatures up to 110 °C including. 3. Static installed vessels for fluids from group 2 at overpressure up to 1,6 MPa and vessels’ wall temperatures up to 200 °С for which the result of capacity multiplication in litters and maximum limited pressure in MPa do not increase 4000 figures in accordance to p. 2.2.2. 4. Static installed vessels for fluids from group 1 at overpressure up to 1,6 MPa and vessels’ wall temperatures up to 200 °С for which the result of capacity multiplication in litters and maximum limited pressure in MPa do not increase 50 figures. 5. Vessels in the distributors pressure installation in the electrical station and substation. 6. Transportable pressure equipment used for class 2 substances transporting in according to ADR or RID, excluding that one by point 2.2.9 7. Vessels, intended for storage and class 2 fluids transportation which are periodically under pressure during their empting. 8. Columns for gas dividing at temperature lower than minus 130°С, as also for the apparatus directly connected with them – dividing columns heating exchangers, condensers – evaporators, evaporating vessels, absorbers, filters and other. 9. Refrigerators installations vessels. 10. Static installed vessels for hydrocarbon condensed gases for gas supplying of gas equipment and installation – paragraph 15. 11. Static installed bottles for storage of condensed, compressed or dissolved under pressure gases. 12. Pipeline with external diameter 76 mm and higher and transporting area temperature over 115°С up to 250°С or pressure over 0,07 Mpa up to 1,6Mрa including. 13. Pipeline with external diameter 76 mm and higher and transporting area temperature from 250°С up to 350°С or pressure over 1,6 Mpa up to 4,0 Mрa including. 14. Pipeline with external diameter 76 mm and higher and transporting area temperature from 350°С up to 450°С or pressure over 4,0 Mpa up to 8,0 Mрa including. 15. Equipment, installation and pipeline for condensed hydrocarbon gas supplying of installation and gas installation in administrative, residential and public buildings and construction site. 16. Gas – main, gas installation, gas regulating station, combustible installation, bottles, gas and other installation in administrative, residential and public buildings and construction site. 17. Distributing gas – mains of natural gas distributing company and relevant equipment. 18. Automobile gases installation for compressed natural gas or condensed hydrocarbon gas. 19. Gas laboratories equipment and installation. 20. Gas installation for tourism. 21. State acetylene installation with working pressure higher than 0,05 MPa for which the pressure product in MPa and capacity in dm3 and does not increase 30 figures. 22. Acetylene installation with working pressure lower than 0,05 MPa. 23. Bottle installation for acetylene supplying. 24. Acetylene metal pipeline from station, generators or bottle supplying installation. 25. Manual operation loading capacity cranes with loading capacity up to 5 t and railway roads which are relevant. 26. Manual operation loading capacity cranes with moving mechanism and pneumatic or hydraulic lifting cylinder with loading capacity up to 5 t and railway roads which are relevant. 27. Cantilever crane 28. Jibs and columns crane with load capacity up to 1 t and railway roads which are relevant. 29. Level lifting crane with fixed boom without loading carriage or mechanism for rotation or moving. 30. Moving loading crane for installation of masts, towers, pipes, installed on the equipment under installation. 31. Loading electrical carriages moving on over –ground railway roads, uninstalled at cranes and railway roads which are relevant. 32. Electric hoists, uninstalled at cranes. 33. Load –clamping devices – hooks, electromagnets, spreaders and other which is additive equipment to the lifting devices. 34. Changeable load -clamping devices, hanged up on the loading capacity hook – ropes, pliers, traverse, vacuum clamps and other. 35. Pallets, baskets, containers, except specific devices used in the metallurgic manufacture and general purpose transporting containers. 36. Movable working platforms. 37. Floor control bridge crane with loading – capacity up to 5 t and railway roads which are relevant. 38. Elevators up to and including 7 floors in residential only 39. Small loading elevators with loading –capacity out to 300 kg 40. Platform loading elevators 41. Travel -loading construction lifting devices. 42. Load-hanging rope lines 43. Portable ski-drags 44.Up to 500 m length ski-drags without medial bearing and movable draw-bars. CHAIRWOMAN OF THE AGENCY: OLGA MANAFOVA