CAISO Settlements & Billing Real Time Uninstructed Imbalance Energy Settlement CC 6475 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Date: 8/31/09 Table of Contents 1. Purpose of Document 3 2. Introduction 2.1 Background 2.2 Description 3 3 4 3. Charge Code Requirements 3.1 Business Rules 3.2 Predecessor Charge Codes 3.3 Successor Charge Codes 3.4 Inputs – External Systems 3.5 Inputs - Predecessor Charge Codes or Pre-calculations 3.6 CAISO Formula 3.7 Outputs CAISO, 2016 5 5 6 6 6 7 9 15 Page 2 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation 1. Date: 8/31/09 Purpose of Document The purpose of this document is to capture the business and functional requirements for the MRTU SaMC Real Time Uninstructed Imbalance Energy Settlement, Charge Code 6475. 2. Introduction 2.1 Background With the implementation of MRTU, the current radial zonal model will be replaced with Full Network Model and Locational Marginal Price (LMP) model, which will also eliminate the use of Zones for the Settlement of Energy transactions. Locational Marginal Prices will be used in principle to settle Energy transactions. Price Locations and Aggregated Price Locations are defined on collections of network nodes. A LMP will be calculated for each Price Location and each Aggregated Price Location. The Real-Time Market (RTM) is a market for trading Energy and Ancillary Services in Real Time. The bid submission for a given Trading Hour in the RTM is allowed after the Day Ahead Market result publication for the corresponding Trading Day and up to 75 minutes before the start of that Trading Hour. The Real-Time Market processes optimize Energy and Ancillary Services Bids with an objective of satisfying Real-Time Energy needs, mitigating Congestion, allowing resources providing Regulation service to return to preferred operating point within their regulating ranges and allowing recovery of Operating Reserves utilized in Real Time operation. The Real-Time Economic Dispatch (RTED) is responsible for dispatching Imbalance Energy and Ancillary Services at regular intervals. RTED runs automatically every 5 min, at the middle of each 5-min interval. In addition RTED can be executed manually in Manual or Contingency Dispatch modes. Instructed Imbalance Energy (IIE) resulting from RT dispatched instructions will be calculated by CAISO usually by the end of next Trading day. The CAISO calculates and accounts for Imbalance Energy for each Dispatch Interval and settles Imbalance Energy for each Settlement Interval for each resource within the CAISO Control Area and all System Resources Dispatched or scheduled in Real-Time. Imbalance Energy consists of following: IIE - Real Time Instructed Imbalance Energy Settlement (CC 6470) and HASP Energy, Congestion, Loss Pre-Dispatched Settlement (CC 6051) UIE - Real Time Uninstructed Imbalance Energy Settlement (CC 6475) UFE - Real Time Unaccounted for Energy Settlement (CC 6474) To the extent that the sum of the Settlement Amounts for IIE, UIE, and UFE does not equal zero, the CAISO will assess Charges or make Payments in Real Time Imbalance Energy Offset (CC 6477) for the resulting differences to all Scheduling Coordinators based on a pro rata share of their Measured Demand for the relevant Settlement Interval. CAISO, 2016 Page 3 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Date: 8/31/09 In the Real-Time Market, the negative and positive Congestion Charges associated with a valid post-Day-Ahead TOR and ETC schedule change (including changes submitted to the Hour-Ahead Scheduling Process and changes submitted closer to Real-Time where allowed by the contract) will be reversed in CC 6474 RT Instructed Imbalance Energy Settlement on the Settlement Interval. Because Congestion Charges are implicitly collected by the CAISO in the Real-Time settlement and there are no holders of rights to receive Real-Time Congestion revenues under the MRTU design, all charges for RealTime Congestion will be accumulated in a special and separate neutrality account to be distributed back to non-ETC Control Area metered Demand and exports on a per-MWh basis in Real Time Congestion Offset (CC 6774). 2.2 Description The Real Time Uninstructed Imbalance Energy (UIE) Settlement Amount is the payment or charge due to or from a resource for its UIE. UIE Settlement Amount consists of two components: Tier 1 UIE (UIE1) Settlement Amount, accounts for deviations’ from resource IIE Tier 2 UIE (UIE2) Settlement Amount, accounts for deviations’ from resource Day Ahead schedule. For Generating Units, MSS Operators that have elected gross Settlement, System Resources, Participating Load and Pumping Load, the Tier 1 UIE Settlement Amount is calculated for each Settlement Interval as the product of its Tier 1 UIE quantity and its’ Resource-Specific Tier 1 UIE Settlement Interval Price. The Tier 2 UIE Settlement Amount is calculated for each Settlement Interval as the product of its Tier 2 UIE quantity and the simple average of the relevant Dispatch Interval LMPs. For MSS Operators that have elected net Settlement, the Tier 1 UIE Settlement Amount is calculated for each Settlement Interval as the product of its Tier 1 UIE quantity and its’ Real Time Settlement Interval MSS Price. For MSS Operators that have elected net Settlement, the Tier 2 UIE Settlement Amount is calculated for each Settlement Interval as the product of its Tier 2 UIE quantity and its’ Real Time Settlement Interval MSS Price. There is no Tier 1 UIE Settlement Amount for non-Participating Demand and MSS Operators net MSS Demand. Tier 2 UIE Settlement Amount for non-participating Demand is calculated for each Settlement Interval as the sum of Tier 2 UIE LAP Settlement Amount and the Tier 2 UIE Neutrality Amount, where Tier 2 UIE LAP Settlement Amount is calculated for each Settlement Interval as the product of the Tier 2 UIE quantity and the Hourly Real-Time LAP Price. The UIE Settlement Amount for nonParticipating Demand is calculated at the Settlement Interval level and summed up to hourly values. For eligible Participating Intermittent Resources, the CAISO Tariff allows for monthly netting treatment of UIE in Charge Code 711 Intermittent Resources Net Deviation Settlement. As such, this Charge Code shall initially calculate a daily Real Time UIE Settlement Amount for eligible Participating Intermittent Resources. At the end of the month, the daily Real Time UIE Settlement Amount for the eligible Participating Intermittent Resources shall be reversed in Charge Code 722 Intermittent Resource Net Deviation Reversal and a monthly netted UIE Settlement Amount in CC 711 shall be CAISO, 2016 Page 4 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Date: 8/31/09 assessed. In addition, the difference between the monthly netted UIE Settlement Amount calculated in CC 711 and the sum of PIR Real Time UIE Settlement Amount shall be settled in CC 721, Intermittent Resources Net Deviation Allocation. 3. Charge Code Requirements 3.1 Business Rules Bus Req ID Business Rule 1.0 A positive Energy value indicates “Incremental” Energy. 1.1 A negative Energy value indicates “Decremental” Energy. 1.2 Instructed Imbalance Energy (IIE) is the calculated Energy expected to be produced or consumed as a result of responding to real-time Dispatch Instructions 1.3 UIE quantities shall be calculated for each resource that has a Day-Ahead Schedule, HASP Intertie Schedule, Dispatch Instruction, Real-Time Interchange schedule or Metered Quantity. 1.4 The PIR resources with PIRELIGFlag = ‘Y’ (resources eligible for monthly PIR Net Deviation settlement) shall be calculated daily as PIR Real Time UIE Settlement Accrual Amount, but settled monthly in Charge Code 711 and CC 721. 2.0 The Settlement Interval UIE Settlement Amount for Generating Unit, System Unit, System Resource, Participating Load and Pumping Load shall be calculated as the sum of: Settlement Interval UIE1 Settlement amount Settlement Interval UIE2 Settlement Amount 3.0 For Generating Units, MSS Operators that have elected gross Settlement, System Resources, Participating Load and Pumping Load, the Tier 1 UIE Settlement Amount is calculated for each Settlement Interval as the product of its Tier 1 UIE quantity and its’ Resource-Specific Tier 1 UIE Settlement Interval Price. 3.0.1 The Resource-Specific Tier 1 UIE Settlement Interval Price for each Settlement Interval shall be calculated for the resource by dividing its Settlement Interval total IIE amount, calculated in CC 6470, and its total IIE Energy quantity. 3.1 The total IIE Energy quantity shall be calculated as the sum of all instructed Energy quantities associated with the Settlement Interval total IIE amount calculated in CC 6470; and this Charge Code calculation makes use of two quantities calculated in the Real-Time Energy Pre-calculation to determine this Energy quantity: SettlementIntervalTotalIIENR and SettlementIntervalResidualIIE. 3.2 For Generating Units, MSS Operators that have elected gross Settlement, Dynamic System Resources, Participating Load and Pumping Load, the Tier 2 UIE Settlement Amount for a resource for each Settlement Interval shall be calculated as the product of its UIE2 quantity and the simple average of the relevant Dispatch CAISO, 2016 Page 5 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Bus Req ID Date: 8/31/09 Business Rule Interval LMPs. The Settlement Interval UIE Settlement Amount for non-Participating Demand resources shall be calculated as the sum of: 4.0 UIE2 LAP Settlement Amount attributable to Hourly Real-Time LAP Price UIE2 Neutrality Amount attributable to Hourly Real-Time LMP 4.1 UIE2 LAP Settlement Amount for non-Participating Demand resources attributable to Hourly Real-Time LAP Price shall be calculated as the product of Hourly RealTime LAP Price and Settlement Interval Real-Time UIE2 for the resource. 4.2 UIE2 Neutrality Amount for non-Participating Demand resources attributable to change in Day Ahead Load Distribution Factors and Real Time Load Distribution Factor. 4.3 Settlement Amount for Demand and net MSS Demand resources shall be calculated at hourly level by summing up the Settlement Interval values. 5.0 For adjustments to the Charge Code that cannot be accomplished by correction of upstream data inputs/recalculation or operator override Pass through Bill Charge logic will be applied. 3.2 Predecessor Charge Codes Charge Code/ Pre-calc Name Real Time Energy Quantity Pre-calculation Real Time Price Pre-calculation Real Time Instructed Imbalance Energy Settlement (CC 6470) MSS Netting Pre-calculation Measured Demand Over Control Area 3.3 Successor Charge Codes Charge Code/ Pre-calc Name Real Time Imbalance Energy Offset (CC 6477) Intermittent Resources Net Deviation Allocation (CC 721) 3.4 Inputs – External Systems CAISO, 2016 Page 6 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Input Req ID 1 2 3 4 Variable Name Date: 8/31/09 Description Real Time Uninstructed Imbalance Energy Settlement PTBChargeAdjustmentSettlementIntervalUIEAmount Amount PTB Charge Adjustment Amount for Bjhi Business Associate B, Trading Hour h, and Settlement Interval i ($) Tolerance for small Settlement Interval IIE SmallIIETol Standing data - default value is 0.5 PIRELIGFlag Brtmdh PIR eligibility flag for PIRP Business Associate B per Resource r for Trading Day d and Trading Hour h. ‘Y’ identifies a PIR unit that is eligible to receive monthly netting treatment. ‘N’ identifies PIR unit that is NOT eligible to receive monthly netting treatment. DALoadSchedule BrtuT’I’M’AA’R’pW’F’S’VvL’h DA Load Schedule for Resource r, Resource type t, and Trading Hour h as provided by MQS where Entity Type T’, UDC Index u, MSS Gross/Net Energy Settlement Type I’, and MSS Subgroup M’ are mapped to the Master File and v is TAC AREA ID. 3.5 Inputs - Predecessor Charge Codes or Pre-calculations CAISO, 2016 Page 7 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Input Req ID Variable Name Date: 8/31/09 Predecessor Charge Code/ Pre-calc Configuration 1 HourlyRealTimeLAPPrice uM’AA’h Real Time Price Precalculation 2 SettlementIntervalTotalIIENR BrtuT’I’M’F’S’hi Real-Time Energy Precalculation 3 SettlementIntervalResidualIIE BrtuT’I’M’F’S’hi Real-Time Energy Precalculation SettlementIntervalRealTimeUIE1 BrtuT’I’M’F’S’hi Real-Time Energy Precalculation –map resource type t as an additional attribute SettlementIntervalRealTimeUIE2 BrtuT’I’M’F’S’hi Real-Time Energy Precalculation –map resource type t as an additional attribute 6 SettlementIntervalIIEAmount Brthi Real Time Instructed Imbalance Energy Settlement (CC 6470) 7 HourlyRealTimeLMP uM’ph Real Time Price Precalculation 8 IntervalNodalMeteredCAISODemandQuantity_MDOv erCA AA’mdhi 4 5 Measured Demand over Control Area Pre-calculation Real Time Instructed Imbalance Energy Settlement CC6470 9 SettlementIntervalRealTimeMSSPriceFiltered uM’hi 10 BAResEntitySettlementIntervalMeteredGenerationQ uantity BrtuT’I’Q’M’AA’F’R’pPW’QS’d’Nz’VvHn’L’mdhi MSS Netting Precalc 11 BAResEntitySettlementIntervalMeteredCAISODema ndQuantity BrtuT’I’Q’M’AA’F’R’pPW’QS’d’Nz’VvHn’L’mdhi MSS Netting Precalc 12 DispatchIntervalRealTimeLMPFiltered BrtuM’hif Real Time Price Precalculation 13 HourlyDANodalLDF uM’AA’ph Real Time Price Precalculation 14 HourlyRTNodalLDF uM’AA’ph Real Time Price Precalculation CAISO, 2016 Page 8 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Date: 8/31/09 3.6 CAISO Formula 3.6.1 SettlementIntervalUIESettlementAmount BrtuT’I’M’hi = SettlementIntervalLAPUIESettlementAmount BrtuT’I’M’hi + SettlementIntervalMSSNETUIESettlementAmount BrtuT’I’M’hi + SettlementIntervalTIEGENUIESettlementAmount BrtuT’I’M’hi + SettlementIntervalPLOADUIESettlementAmount BrtuT’I’M’hi + SettlementIntervalMSSGROSSGENUIESettlementAmount BrtuT’I’M’hi SettlementIntervalGENUIESettlementAmount BrtuT’I’M’hi + PIRRealTimeUIESettlementAccrualAmount BrtuT’I’M’hi + 3.6.2 SettlementIntervalGENUIESettlementAmount BrtuT’I’M’hi IF Resource type (t) = Generating Unit, and T’ <> MSS or T’ = MSS and I’ = Gross, and PIRELIGFlag Brtmdh <> ‘Y’ THEN SettlementIntervalGENUIESettlementAmount BrtuT’I’M’hi F' S' F' S' SettlementIntervalUIE1SettlementAmount BrtuT’I’M’F’S’hi = + SettlementIntervalUIE2SettlementAmount BrtuT’I’M’F’S’hi ELSE SettlementIntervalGENUIESettlementAmount BrtuT’I’M’hi =0 3.6.3 SettlementIntervalTIEGENUIESettlementAmount BrtuT’I’M’hi IF Resource type (t) = ITIE or ETIE, and ENTITY_COMPONENT_SUBTYPE = ‘TG’ THEN SettlementIntervalTIEGENUIESettlementAmount BrtuT’I’M’hi = F' SettlementIntervalUIE1SettlementAmount BrtuT’I’M’F’S’hi + S' CAISO, 2016 Page 9 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation F' Date: 8/31/09 SettlementIntervalUIE2SettlementAmount BrtuT’I’M’F’S’hi S' ELSE SettlementIntervalTIEGENUIESettlementAmount BrtuT’I’M’hi = 0 3.6.4 SettlementIntervalPLOADUIESettlementAmount BrtuT’I’M’hi IF Resource_type (t) = LOAD and ENTITY_COMPONENT_TYPE = ‘PL’ SettlementIntervalPLOADUIESettlementAmount BrtuT’I’M’hi = F' S' F' S' SettlementIntervalUIE1SettlementAmount BrtuT’I’M’F’S’hi + SettlementIntervalUIE2SettlementAmount BrtuT’I’M’F’S’hi + F' SettlementIntervalUIE2PLOADLAPSettlementAmount BrtuT’I’M’F’S’hi S' ELSE SettlementIntervalPLOADUIESettlementAmount BrtuT’I’M’hi = 0 3.6.5 Where SettlementIntervalUIE2PLOADLAPSettlementAmount BrtuT’I’M’F’S’hi = (-1) * ( ( A A' u HourlyRealTimeLAPPrice uM’AA’h ) * M' SettlementIntervalRealTimeUIE2 BrtuT’I’M’F’S’hi ) Where DALoadSchedule BrtuT’I’M’AA’R’pW’F’S’vVL’h and SettlementIntervalFilteredDemandQuantity BrtuT’I’M’AA’F’R’pW’S’VvL’mdhi Entity Component Subtype (S’) = ‘PL’ and Apnode Type = ‘Custom’ ELSE SettlementIntervalUIE2PLOADLAPSettlementAmount BrtuT’I’M’F’S’hi = 0 3.6.6 SettlementIntervalLAPUIESettlementAmount BrtuT’I’M’hi IF (t) = ‘LOAD’ and ENTITY_COMPONENT_SUBTYPE (S’) = ‘NPL’ or ‘GL’ THEN CAISO, 2016 Page 10 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Date: 8/31/09 SettlementIntervalLAPUIESettlementAmount BrtuT’I’M’hi = F' SettlementIntervalUIE2LAPSettlementAmount BrtuT’I’M’F’S’hi + S' F' SettlementIntervalUIE2NeutralityAmount BrtuT’I’M’F’S’hi S' ELSE SettlementIntervalLAPUIESettlementAmount BrtuT’I’M’hi = 0 3.6.7 SettlementIntervalMSSNETUIESettlementAmount BrtuT’I’M’hi IF I’ = Net and T’ = MSS THEN SettlementIntervalMSSNETUIESettlementAmount BrtuT’I’M’hi = F' F' SettlementIntervalUIE1MSSNetSettlementAmount BrtuT’I’M’F’S’hi + S' SettlementIntervalUIE2MSSNetSettlementAmount BrtuT’I’M’F’S’hi S' ELSE SettlementIntervalMSSNETUIESettlementAmount BrtuT’I’M’hi = 0 3.6.8 SettlementIntervalMSSGROSSGENUIESettlementAmount BrtuT’I’M’hi IF I’ = GROSS, T’ = MSS, and Resource Type = GEN and PIRELIGFlag Brtmdh <> ‘Y’ THEN SettlementIntervalMSSGROSSGENUIESettlementAmount BrtuT’I’M’hi = F' S' F' S' SettlementIntervalUIE1SettlementAmount BrtuT’I’M’F’S’hi + SettlementIntervalUIE2SettlementAmount BrtuT’I’M’F’S’hi ELSE CAISO, 2016 Page 11 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Date: 8/31/09 SettlementIntervalMSSGROSSGENUIESettlementAmount BrtuT’I’M’hi = 0 3.6.9 PIRRealTimeUIESettlementAccrualAmount BrtuT’I’M’hi IF PIRELIGFlag Brtmdh = ‘Y’ THEN PIRRealTimeUIESettlementAccrualAmount BrtuT’I’M’hi = F' F' SettlementIntervalUIE1SettlementAmount BrtuT’I’M’F’S’hi + S' SettlementIntervalUIE2SettlementAmount BrtuT’I’M’F’S’hi S' ELSE PIRRealTimeUIESettlementAccrualAmount BrtuT’I’M’hi = 0And 3.6.9.1 BASettlementIntervalPIRPUIEAccrualAmount Bhi r t u T' I' M' PIRRealTimeUIESettlementAccrualAmount BrtuT’I’M’hi And 3.6.9.2 BADailyPIRPUIEAccrualAmount B = h i BASettlementIntervalPIRPUIEAccrualAmount Bhi 3.6.9.3 CAISOPIRRealTimeUIESettlementAccrualAmount hi r t u T' I' PIRRealTimeUIESettlementAccrualAmount BrtuT’I’M’hi M' 3.6.9.4 CAISODailyPIRRealTimeUIESettlementAccrualAmount d = CAISOPIRRealTimeUIESettlementAccrualAmount hi h i 3.6.10 Where SettlementIntervalUIE1settlementAmount BrtuT’I’M’F’S’hi = CAISO, 2016 Page 12 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Date: 8/31/09 (-1) * SettlementIntervalRealTimeUIE1 BrtuT’I’M’F’S’hi * SettlementIntervalRealTimeUIE1Price BrtuT'I'M'hi 3.6.10.1 where IF ABS( SettlementIntervalTotalIIE BrtuT’I’M’hi ) >= SmallIIETol THEN SettlementIntervalRealTimeUIE1Price BrtuT'I'M'hi = (-1) * SettlementIntervalIIEAmount Brthi / SettlementIntervalTotalIIE BrtuT’I’M’hi ELSE SettlementIntervalRealTimeUIE1Price BrtuT'I'M'hi = Average ( DispatchIntervalRealTimeLMPFiltered BrtuM’hif) f 3.6.10.2 where SettlementIntervalTotalIIE BrtuT’I’M’hi = F' BrtuT’I’M’F’S’hi (SettlementIntervalTotalIIENR S' + SettlementIntervalResidualIIE BrtuT’I’M’F’S’hi ) 3.6.11 And where SettlementIntervalUIE2SettlementAmount BrtuT’I’M’F’S’hi = (-1) * SettlementIntervalRealTimeUIE2 BrtuT’I’M’F’S’hi * (Average ( f DispatchIntervalRealTimeLMPFiltered BrtuM’hif)) 3.6.12 And where SettlementIntervalUIE2LAPSettlementAmount BrtuT’I’M’F’S’hi = (-1) * ( A A' u HourlyRealTimeLAPPrice uM’AA’h ) * M' SettlementIntervalRealTimeUIE2 BrtuT’I’M’F’S’hi Where (t) = ‘LOAD’ and ENTITY_COMPONENT_SUBTYPE (S’) = ‘NPL’ or ‘GL’ And Where DALoadSchedule BrtuT’I’M’AA’R’pW’F’S’VvL’h and SettlementIntervalFilteredDemandQuantity BrtuT’I’M’AA’F’R’pW’S’VvL’mdhi attributes ENTITY_COMPONENT_SUBTYPE (S’) = ‘NPL’ OR ’GL’ and MSS_GROSS_OR_NET FLAG <> ‘NET’ CAISO, 2016 Page 13 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Date: 8/31/09 3.6.12.1 And where SettlementIntervalFilteredDemandQuantity BrtuT’I’M’AA’F’R’pW’S’VvL’mdhi = BAResEntitySettlementIntervalMeteredCAISODemandQuantity Q' Q d' n' N z' H P BrtuT’I’Q’M’AA’F’R’pPW’QS’d’Nz’VvHn’L’mdhi 3.6.13 And where SettlementIntervalUIE2NeutralityAmount BrtuT’I’M’F’S’hi = Q' p R' A P A' W' Q d' N z' V v H n' L' (SettlementIntervalNeutralityAllocation uM’AA’hi * (BAResEntitySettlementIntervalMeteredCAISODemandQuantity BrtuT’I’Q’M’AA’F’R’pPW’QS’d’Nz’VvHn’L’mdhi / IntervalNodalMeteredCAISODemandQuantity_MDOverCA AA’mdhi )) Where Resource type (t) = ‘LOAD’ and ENTITY_COMPONENT_SUBTYPE (S’) = ‘NPL’ OR ’GL’ 3.6.13.1 Where SettlementIntervalNeutralityAllocation uM’AA’hi = (-1) * [1/6 * (( B r t T' BrtuT’I’M’AA’R’pW’F’S’VvL’h I' )*( R' W ' u uM’AA’ph F' S' V L' p DALoadSchedule v (HourlyRealTimeLMP uM’ph * (HourlyRTNodalLDF M' p - HourlyDANodalLDF uM’AA’ph))))] Where ENTITY_COMPONENT_SUBTYPE (S’) = ‘NPL’ OR ‘GL’ 3.6.14 Where SettlementIntervalUIE1MSSNetSettlementAmount BrtuT’I’M’F’S’hi = (-1) * SettlementIntervalRealTimeUIE1 BrtuT’I’M’F’S’hi * SettlementIntervalRealTimeMSSPriceFiltered uM’hi 3.6.15 Where CAISO, 2016 Page 14 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Date: 8/31/09 SettlementIntervalUIE2MSSNetSettlementAmount BrtuT’I’M’F’S’hi = (-1) * SettlementIntervalRealTimeMSSPriceFiltered uM’hi* SettlementIntervalRealTimeUIE2 BrtuT’I’M’F’S’hi And Where MSS election (I’) = Net T’ = MSS 3.7 Outputs Output ID 1 2 Name Description In addition, all inputs are required to be accessible for review by analysts and report on Settlement statements. SettlementIntervalUIESettlementAmount BrtuT’I’M’hi SettlementIntervalUIE1SettlementAmount 3 BrtuT’I’M’F’S’hi SettlementIntervalUIE2SettlementAmount 4 BrtuT’I’M’F’S’hi SettlementIntervalUIE2LAPSettlementAmount 5 BrtuT’I’M’F’S’hi SettlementIntervalUIE2NeutralityAmount 6 BrtuT’I’M’F’S’hi CAISO, 2016 Settlement Interval UIE Settlement Amount for resource r, resource type t, Trading Hour h, Settlement Interval i ($) Settlement Interval UIE1 Settlement Amount for resource r, resource type t, Trading Hour h, Settlement Interval i ($) Settlement Interval UIE2 Settlement Amount for resource r, resource type t, Trading Hour h, Settlement Interval i ($) Settlement Interval UIE2 Settlement Amount attributable to Hourly RealTime LAP Price for (Load, Aggregated Load, net MSS Load) resource r, Trading Hour h, Settlement Interval i where resource type is one Load or net MSS Load ($) Settlement Interval UIE2 Settlement Amount attributable to Hourly RealTime LMP Price and Settlement Interval LDF Change Amount for (Load, Aggregated Load, net MSS Page 15 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Output ID Name Date: 8/31/09 Description Load) resource r, Trading Hour h, Settlement Interval i where resource type is one Load or net MSS Load ($) 7 8 9 10 11 12 PTBChargeAdjustmentSettlementIntervalIIEAmou nt BJhi Real Time Uninstructed Imbalance Energy Settlement Amount PTB Charge Adjustment Amount for Business Associate B, Trading Hour h, and Settlement interval i ($) SettlementIntervalUIE1MSSNetSettlementAmoun t BrtuT’I’M’F’S’hi Settlement Interval UIE1 MSS Net Settlement Amount for resource r, resource type t, Trading Hour h, Settlement Interval i ($) SettlementIntervalUIE2MSSNetSettlementAmoun t BrtuT’I’M’F’S’hi SettlementIntervalTotalIIE BrtuT’I’M’hi Settlement Interval Total IIE for Business Associate B, resource r, resource type t, UDC ID u, Entity Type T’, MSS Energy Settlement Election I’, MSS LAP M’, of Trading Hour h, Settlement Interval i ($) SettlementIntervalRealTimeUIE1Price BrtuT'I'M'hi Settlement Interval Real Time UIE 1 Price for resource r, resource type t, for Settlement Interval i, of Trading Hour h. SettlementIntervalNeutralityAllocation uM’AA’hi Settlement Interval Neutrality Allocation for Aggregated Price Node A, Aggregated Price Node Type A’, for Settlement Interval i, of Trading Hour h. PIRRealTimeUIESettlementAccrualAmount 13 Settlement Interval UIE2 MSS Net Settlement Amount for resource r, resource type t, Trading Hour h, Settlement Interval i ($) BrtuT’I’M’hi CAISO, 2016 Accrual Amount of RT UIE Settlement for PIR units only by Business Associate B, Trading Month m, Trading Day Page 16 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Output ID Name Date: 8/31/09 Description d, Trading Hour h, and Settlement Interval i. This value is passed to Market Clearing for trustee account balancing, and is not intended for publication on a Settlements Statements or Invoice. 14 15 16 17 None None SettlementIntervalMSSGROSSGENUIESettleme ntAmount BrtuT’I’M’hi Settlement Interval UIE Settlement amount for MSS GROSS Generators SettlementIntervalMSSNETUIESettlementAmount Settlement Interval UIE Settlement amount for MSS NET Generators BrtuT’I’M’hi SettlementIntervalGENUIESettlementAmount 18 BrtuT’I’M’hi SettlementIntervalLAPUIESettlementAmount 19 20 BrtuT’I’M’hi SettlementIntervalTIEGENUIESettlementAmount BrtuT’I’M’hi SettlementIntervalPLOADUIESettlementAmount 21 BrtuT’I’M’hi Settlement Interval UIE Settlement amount for Generators Settlement Interval UIE Settlement amount Settlement Interval UIE Settlement amount for Tie Generators Settlement Interval UIE Settlement amount for Pump Load 22 CAISOPIRRealTimeUIESettlementAccrualAmoun t hi 23 CAISODailyPIRRealTimeUIESettlementAccrualA mount d UIE Accrual amount for PIR resources for the day 24 SettlementIntervalUIE2PLOADLAPSettlementAm ount BrtuT’I’M’F’S’hi Settlement Interval Participating Load UIE2 Settlement amount attributable to Hourly Real-Time LAP Price CAISO, 2016 UIE Accrual amount for PIR resources for the hour Page 17 of 18 Settlements & Billing Draft BPM - CC 6475 Real Time UIE Settlement: Supporting documentation Output ID Name Description SettlementIntervalFilteredDemandQuantity 25 Date: 8/31/09 BrtuT’I’M’AA’F’R’pW’S’VvL’mdhi Settlement Interval Metered Demand Quantity for Business Associate B, resource r, and resource type t. 26 BASettlementIntervalPIRPUIEAccrualAmount Bhi Settlement Interval PIRP UIE Accrual Amount for Business Associate B 27 BADailyPIRPUIEAccrualAmount B Daily PIRP UIE Accrual Amount for Business Associate B CAISO, 2016 Page 18 of 18