University of California, Davis School of Veterinary Medicine Administrative Complex - 2829530 Page 1 REQUEST FOR QUALIFICATIONS CONTENTS Advertisement Format Requirements of the Submittal Required Response Items Statement of Qualifications Form ADVERTISEMENT ARCHITECTURAL AND ENGINEERING SERVICES FOR SCHOOL OF VETERINARY MEDICINE ADMINISTRATIVE COMPLEX - 2829530 UNIVERSITY OF CALIFORNIA, DAVIS CAMPUS The University of California, Davis campus requests the submission of written statements of qualifications by Thursday, December 6, 2012, 4:00 p.m. for consideration to provide full architectural and engineering programming and design for the School of Veterinary Medicine (SVM) Administrative Complex Project. Estimated construction cost is $15.5 million. Programming will commence in early January 2013. Schematic Design will commence in Spring 2013 with Design Development and Construction Document phases to follow thereafter. Construction is estimated to begin in summer 2014. The Project will be a Construction Manager at Risk contract delivery method. A partial programming document has been created, and will be given to the successful firm to complete programming and begin designing. The design team shall include an architect as the prime consultant (Design Professional) with sub-consultants for mechanical engineering, electrical engineering, LEED consultation, and cost estimating. This Project will construct a new approximately 29,000 gsf stand-alone building for the SVM administrative and support programs, and the relocation of the Scrubs Café. The new building will be located in the Arboretum West District located near the southeast entrance of the Health Sciences District (HSD) off of Garrod Drive. The Project consists of the following: 1. Construction of a new 20,000 gsf stand-alone administrative building for the SVM. The building will be configured and programmed to support the needs of the following SVM divisions: School of Veterinary Medicine Executive Office, Academic and Student Programs, Academic Personnel and Staff Administration, Fiscal Administration, Research and Graduate Education, Development, and Information Technology. 2. The building will also accommodate the relocation of the Scrubs Café, approximately 9000 gsf food service facility, from its current location in the Medical Sciences 1B building. 3. The Project includes demolition of Surge IV (current Vet Med Dean’s Office). 4. A separate Project will include relocation of the roadway into the HSD district that will be completed as part of the Putah Creek Lodge Parking Lot Expansion project. The University is seeking a design team that will form a creative partnership with the campus and the eventual Construction Manager (Contractor) to create an efficient program, and design for the facility while remaining sensitive to meeting stringent schedule and budget goals. Relevant qualifications shall include extensive and proven experience in designing similar buildings with construction costs in excess of $8 million, preferably in a University environment. Firms must demonstrate their history in meeting project budgets and schedules, and their ability to provide effective and experienced support during the construction administration phase. The School of Veterinary Medicine Administrative Complex Project is funded by campus funds. Questions about the project may be directed to Jill Tomczyk at jctomczyk@ucdavis.edu. The Request for Qualifications including the format requirements and Statement of Qualifications form is available at: http://dcm.ucdavis.edu/designprofes/ or contact Mary Ramos at (530) 754-1061. Two copies of statement of qualifications forms and other required materials are to be submitted to Mary Ramos, Design and Construction Management, University of California, 255 Cousteau Place, Davis, CA 95618. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Design Professional may be required to show evidence of its equal employment opportunity policy. The successful Design Professional and its consultants will be required to follow the nondiscrimination requirements set forth in the Executive Design Professional Agreement and to pay prevailing wage at the location of the work if applicable. University of California, Davis School of Veterinary Medicine Administrative Complex - 2829530 Page 2 FORMAT REQUIREMENTS OF THE SUBMITTAL Wire or comb bound Table of Contents Dividers with tabs labeled with each required response item heading below. Bound copies must be received at the address listed in the advertisement (Attention: Mary Ramos) NO LATER THAN THE TIME INDICATED IN THE ADVERTISEMENT. All submittals will be kept by the University and will not be returned to the submitting firms. REQUIRED RESPONSE ITEMS Letter of Interest (1 page maximum) Summarize strengths of the project team for the commission. Include information describing the firm’s efforts to create an equal opportunity workplace. Organization Chart Indicate relationship between firms and individuals comprising the project team. Indicate role, firm and key individual names and titles. Provide a more detailed organization chart in key staff list. Executive Architect Qualifications Complete the enclosed form. Relevant Project Experience (10 pages maximum) Evidence of Architect’s proven experience in the programming, design and construction administration of administrative office buildings and/or with a food service component included. Provide project data, photographs, graphics or other applicable material for a minimum of three relevant projects, similar in scope, with a construction value in excess of $8,000,000 for which construction has been completed within the last 10 years. Programming & Methodology Approach (1 page maximum) Provide narrative of your team’s approach to detailed programming of similar spaces. Include your team’s methodology for providing services in a cost-effective and efficient manner. Discuss how you may deal with a fast-track schedule and your reaction to working under a compressed schedule. Qualifications of Architect’s Project Manager (1 page maximum) Evidence of the Project Manager’s experience and expertise in similar projects (i.e., project type, delivery method type). Include a description of the Project Manager’s level of responsibility and decision making authority within the firm. Experience of Sub-consultants (1 page maximum per sub-consultant) Evidence of sub-consultant’s proven experience in the programming, design and construction administration of similar spaces. Include qualifications for the following disciplines: Mechanical Engineering Electrical Engineering LEED Consultation Cost Estimating Sustainable Design Experience Indicate the extent of experience and training in sustainable design, and LEED certified projects for the key individuals listed in the organization chart. Include LEED experience of all sub-consultants listed above. Key Staff (1 page maximum) Provide a list of all key individual staff and consultants on the project team proposed for this project, indicating firm name and title. Briefly describe each individual’s role. University of California, Davis School of Veterinary Medicine Administrative Complex - 2829530 Page 3 Key Staff Resumes (1 page maximum per individual) Provide a resume for each key staff and consultant listed on the project team. Include all relevant experience with similar projects and indicate the duties performed for each project listed. Indicate the name of the firm where employed for each project listed; the experience does not necessarily have to have occurred with the current employer. University of California, Davis School of Veterinary Medicine Administrative Complex - 2829530 Page 4 STATEMENT OF QUALIFICATIONS School of Veterinary Medicine Administrative Complex Project No. 2829530 Company Information Firm Name Primary (Street) Address Firm Established (Year) Phone Email Type of Organization: Corporation If Corporation, incorporated in the State of Principal (P) and Associates (A): Check “P” or “A” for each Name Employer Identification Number: P A Degree or Certificate Institution License Number: (for Design Professionals) Experience Provide project data, photographs, graphics or other applicable material for a minimum of 3 relevant projects, similar in scope, with a construction value in excess of $8,000,000 for which construction has been completed within the last 10 years. Project No. 1 - Project Title & Owner Delivery Method Year Completed Approx Gross Square Footage Public Works Project? Construction Cost $ College / University? Describe Similar Project Elements / Scope Identify team members and firms that worked on this project that are also proposed to work on the project identified in this Statement of Qualifications: University of California, Davis School of Veterinary Medicine Administrative Complex - 2829530 Page 5 Project No. 2 - Project Title & Owner Delivery Method Year Completed Approx Gross Square Footage Public Works Project? Construction Cost $ College / University? Describe Similar Project Elements / Scope Identify team members and firms that worked on this project that are also proposed to work on the project identified in this Statement of Qualifications: Project No. 3 - Project Title & Owner Delivery Method Year Completed Approx Gross Square Footage Public Works Project? Construction Cost $ College / University? Describe Similar Project Elements / Scope Identify team members and firms that worked on this project that are also proposed to work on the project identified in this Statement of Qualifications: References (3 minimum) 1. 2. 3. (Completed By) (Date) Note: Please attach to this form any other information you wish us to consider, such as your firm's brochure or a discussion of your recent work. Privacy Information The State of California Information Practices Act of 1977 requires the University to provide the following information to individuals who are asked to supply information about themselves: The principal purpose for requesting the information on this form is for use in the selection process for Professionals commissioned by the University. University Policy authorizes maintenance of this information. Furnishing all information requested on this form is mandatory - failure to provide such information will delay or may even prevent completion of the action for which the forms is being filled out. Information furnished on this form will be used by the University of California Davis campus in the consideration of commissions to Professionals. Individuals have the right to access to this record as it pertains to themselves. The official responsible for maintaining the information contained on this form is the Assistant Vice Chancellor & Campus Architect, Design and Construction Management, University of California, Davis, California.