RESUME: JOHN HOOK, MCP Address: 13176 North Dale Mabry Highway, Tampa, FL 33618-2406 Telephone: (813) 928-1440 Email: johnhook@yahoo.com Online Resume: http://www.technical-writer-resume.com/ OBJECTIVE Assist organizations with technical writing, web development, engineering and/or quality challenges. PERSONAL INFORMATION Author of Conversion Factors for Scientists, Engineers and Students (Prentice Hall) HTML Writers Guild—Macintosh and Windows DeskTop Publishing (DTP) ISA Scientific Instrumentation and Research Division and ISA Aerospace Industries Division Member: American Institute of Aeronautics and Astronautics (AIAA) Senior Member: Instrument Society of America (ISA), ISA General Board of Review Technical Writer/Editor—Website Developer—ISO 9000 Consultant—Engineer—Trainer—Author SUMMARY My experience includes over twenty-five years as a consultant in the engineering, maintenance, manufacturing, operations, and R&D environments including computer hardware, disaster recovery, integrated circuit, Internet, electronic and mechanical components, software development and testing, standards, systems and websites. I also have experience with 21 CFR Part 11, ANS, ANSI, ASME, CAPA, CFR, cGMP, CMM, CMS, DOD, DOE, FDA, GXP, HTML, IEEE, INPO, ISA, ISO, LOTO, MIL, NIST, NQA-1, NRC, QSR, SAP, SDLC and SEI requirements, etc. I am an experienced technical writer/editor, website developer, ISO 9000 specialist, engineer, trainer and author. I have worked aerospace, commercial, educational institution, government, industrial, insurance, manufacturing, nuclear, pharmaceutical, refinery and utility positions as both a contractor and employee. COMPUTER SKILLS Microsoft DOS, Windows 1.0-3.1, 95, NT, 98, 2000, XP Pro, Vista, 7 and 8, Apple OS X, Parallels Desktop, VMware Fusion, Microsoft Office Suite (Word, Excel, PowerPoint, Access, Outlook, PhotoDraw and Publisher), UNIX, SAP ERP, HR, MM and SD Modules, HP/Mercury Quality Center, HP/Mercury QuickTest Pro, Citrix Systems EDMS, Documentum, Livelink, PVCS, SourceSafe, Sparta Systems TrackWise, Visual SourceSafe, Mettler FormWeigh.Net, Microsoft Internet Explorer, FrontPage, Expression Web NetMeeting, HotDog Pro, HotMetal Pro, Active Server Pages (ASPs), CGI, JavaDoc, JavaScript, Microsoft Office 365, Project, SharePoint and Visio, WordPerfect Office Suite, Apache OpenOffice Suite, Google Docs, Lotus Notes, FreeHand, Illustrator, PaintShop Pro, Pixelmator, Adobe Acrobat Pro, Captivate, Dreamweaver, Fireworks, Flash, FrameMaker, Illustrator, InDesign and Photoshop, ClipMate, FullShot, SnagIt, Thumbs Plus, Norton Utilities, Rational Rose, Crystal Reports, DataGrabber, Inforarian Quest, Mata Hari, and Research Pro, etc. ABILITIES Ability to draw on vast experiences to produce cost-effective, quality solutions for client needs Ability to operate a wide variety of computer platforms using a broad spectrum of software Ability to successfully design and implement various types of documentation and systems Ability to supervise personnel and get along very well with others, even in difficult situations ACHIEVEMENTS Completed various contracts with some of the most prestigious organizations in this country Developed the standardized template for the preparation of various Ely Lilly procedures DOE Conduct of Operations (CONOPS), Outstanding National Achievement Award DOE Significant Achievement Award for Annunciator Response Procedures (ARPs) Resume: John Hook: Page 1 of 9 HISTORY: PROJECT TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK Resume: Health Management Associates (HMA), Centers for Medicare & Medicaid Services (CMS) Compliance and Implementation Project, Naples, FL (02/13-08/13) SENIOR TECHNICAL WRITER Developed documents to comply with and implement CMS requirements including, but not limited to; Affordable Care Act of 2010 (ACA), Disaster Recovery, Information Security, Evaluation and Management Services, General Principles of Medical Record Examinations, History of Present Illness, Review of Symptoms, Medical Record Documentation, Past, Family, and/or Social Histories, Documentation of Examinations, General Multisystem Examination, Multiple Organ System Examination, Single Organ System Examination, Content and Documentation Requirements, etc. Micro Matic (Bar and Restaurant Beer Systems and Closed Loop Chemical Systems) ISO 9000:2008 Registration Project (Telecommute), Brooksville, FL (03/12-10/12) SENIOR TECHNICAL WRITER Worked with the engineers and management to develop the Micro Matic Quality Assurance Manual and the six (6) required procedures (Document Control, Clause 4.2.3, Record Control, Clause 4.2.4, Internal Audit, Clause 8.2.2, Control of Nonconforming Items, Clause 8.3, Corrective Action, Clause 8.5.2, Preventive Action, Clause 8.5.3) for ISO 9000:2008 registration. Developed the Procedure Preparation, Review and Approval Procedure and a template to aid Subject Matter Experts (SMEs) and other stakeholders in preparing procedures. Developed other documents needed to implement and support the Micro Matic Quality Management System (QMS). Found, made initial contacts with and interviewed five ISO 9001 registrars for the client. Voalté (Voalté One Hospital Communications System Class III Medical Device), 510(k) Premarket Notification Submission (Telecommute), Sarasota, FL (06/11-11/11) SENIOR TECHNICAL WRITER Interfaced with management and engineers as needed to develop the documents required by the Food and Drug Administration (FDA) for a Premarket Notification 510(k) including; Indications for Use, Product Description, Predicate Product Comparison, Labeling, Sterilization and Packaging Information, Biocompatibility, Level of Concern, Software Description, Device Hazard Analysis, Software Requirements Specification (SRS), Architecture Design Chart, Software Design Specification, Traceability Analysis, Software Development Environment, Verification and Validation, Revision History, Unresolved Anomalies, Human Factors Study, Software of Unknown Pedigree (SOUP), Virus Protection Software, Interfaces and Network Infrastructure Products, etc. Florikan Continental Rollo-Mixer Mark IX Operations and Maintenance Manual, Quality Assurance Manual and Miscellaneous Documents Project, Sarasota, FL (12/10-06/11) SENIOR TECHNICAL WRITER Worked with the engineers, maintenance and operations personnel to develop the Continental Rollo-Mixer Mark IX Operations Manual including the following procedures; Raw Materials Filling, Coating Heating, Coating, Dump, Basic Maintenance and Troubleshooting Tips and Lockout/Tagout (LOTO). Worked with engineers to develop the QMS including the Florikan Quality Assurance Manual and the six (6) required procedures (Document Control, Clause 4.2.3, Record Control, Clause 4.2.4, Internal Audit, Clause 8.2.2, Control of Nonconforming Items, Clause 8.3, Corrective Action, Clause 8.5.2, Preventive Action, Clause 8.5.3) for ISO 9000:2008 registration. Developed the Procedure Preparation, Review and Approval Procedure and template. John Hook: Page 2 of 9 PROJECT TITLE TASK Global Safety First ReadiMask, National Institutes of Safety and Health (NIOSH) N95 Particulate Respirator Certification (Telecommute), Manasquan, NJ (02/10-08/10) SENIOR TECHNICAL WRITER Worked with management and regulators to resolve the originally in-house developed rejected certification application by addressing concerns and findings with best practices. Developed the company organizational flowchart. Wrote the Quality Assurance Manual to comply with and satisfy NIOSH requirements including the Procedure for the Certification of Respirators and the required Title 42—Public Health, CFR, Subpart E—Q, Sections 84.40, 84.41, 84.42 and 84.43. PROJECT TITLE TASK United Information Technologies (UIT), FairPoint Project, Tampa, FL (12/08-10/09) COPY EDITOR/SENIOR TECHNICAL WRITER Worked with FairPoint developers and UIT contractors to build, convert and edit flowcharts, handouts, job aids, PowerPoint presentations, procedures, scripts and tests used by customer service, engineers, installers, management and operators etc. All documentation was reviewed for compliance with FCC regulations by FCC contractors. Resolved and incorporated comments on a near real-time basis. Documents were then reverified, approved for publication and delivered to the client. Scheduled and delivered the training and provided feedback to Fairpoint and UIT, etc. PROJECT AES Corporation (A Global Electrical Energy Distributor and Generator), World Headquarters, SAP Global Rollout Project, Arlington, VA (09/07-03/08) SENIOR TECHNICAL WRITER Developed various SAP global template documents for corporate and North American operations. Developed materials for SAP blueprint sessions and playbacks. Developed, edited and executed SAP test scripts. Developed Business Process Documents (BPDs) and the associated master swimlane flowcharts to implement the processes defined in the BPDs. Developed Global Position Papers . Played a management advisory roll, etc. TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK Resume: AstraZeneca-MedImmune (BioPharma, Pharmaceuticals and Medical Devices), World Headquarters, SAP Computer Validation Group, Gaithersburg, MD (04/06-09/07) SENIOR TECHNICAL WRITING CONSULTANT Developed, edited, and ran SAP test scripts manually and via HP/Mercury Quality Center. Reviewed and approved executed SAP test scripts. Used HP/Mercury QuickTest Pro and Test Director to help develop automated test scripts. Developed and maintained hundreds of Master Flowcharts to implement Software Development Life Cycle (SDLC) documentation including; Project Scope and Development Plans, User Requirements Specifications (URS), Functional Requirements Specifications (FRS), etc. Wyeth (Pharmaceuticals), Worldwide Headquarters, Policies Upgrade Project (Telecommute), Collegeville, PA (02/05-08/05) TECHNICAL CONSULTANT (direct contract with Wyeth corporate management) Developed the Wyeth Worldwide Environmental Health and Safety (EHS) Policies Manual, and the Wyeth Corporate EHS Policy, for Robert Essner, President and Chief Executive Officer (CEO), including; Management Systems, Accident Investigation, Regulatory Inspections, Safe Work Practices, Capital Projects, Operational Readiness Reviews (ORRs), Personnel Protective Equipment (PPE), Ergonomics, Process Safety Management (PSM), Contractor Management, Lab Safety, Change Management, Machine Guarding, Hazard Communication, Respiratory Protection Program (RPP), Hazardous Substances, Confined Space Entry and LOTO, etc. John Hook: Page 3 of 9 PROJECT TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK Resume: Boston Scientific Electrophysiology Division (Medical Devices), Manufacturing Documentation Project, San Jose, CA (03/05-07/05) SENIOR TECHNICAL WRITER Assisted production supervisors, engineers and managers with the preparation of Master Validation Plans (MVPs), Manufacturing Process Instructions (MPIs), Work Instructions (WIs), Validation Protocols, databases and spreadsheets for various product lines including; Blazer II Cardiac Ablation Catheters, Chilli Cooled Ablation Catheters, Explorer Fixed Curve and Rotational Diagnostic Catheters, Polaris Steerable Diagnostic Catheters and RPM Realtime Position Management Catheters, to comply with the appropriate FDA requirements including 21 CFR Part 11, etc. Bristol-Myers Squibb (Pharmaceuticals), Global Shared Services, Information Security and Service Assurance-Quality Assurance, Princeton, NJ (09/04-01/05) SENIOR TECHNICAL WRITER/EDITOR Assisted analysts, architects, developers, engineers and managers with 21 CFR Part 11 and Sarbanes-Oxley Act (SOX) requirements compliance for validated computer systems, and validated manufacturing systems, etc. Developed and used templates, procedures and SDLC documents including Basis of Estimates, Scopes of Work, Project Plans, Design Documents, Software and Hardware Specifications, Test Scripts, Project Summary Reports and Records Retention Requirements, etc. Pfizer Global Research and Development (PGRD) (Pharmaceuticals), FDA Validated Computer System Migrations, Groton, CT (01/04-06/04) SENIOR TECHNICAL WRITER Assisted management, architects and developers in the migration of FDA validated computer systems. Developed and used templates, procedures and SDLC documents including Basis of Estimate, Scope of Work, Project Plans, Design Documents, Software and Hardware Specifications, Test Scripts and Project Summary Reports etc., to comply with SAIC, PGRD and 21 CFR Part 11 requirements, etc. Roche Diagnostics Corporation (Medical Devices and Pharmaceuticals), Single Strip System Glucose Meter, Huntsville, AL and Indianapolis, IN (06/03-01/04) SENIOR TECHNICAL WRITER Assisted in the development of the rack and test-fixture Automated Test Equipment (ATE) calibration system for the Roche Single Strip System Glucose Meter. Developed all system and component-level project specifications. Developed templates, procedures and design documents including Database Structure, Hardware and Software Requirements Specifications, Mechanical and Electrical, and Unit and Integration Tests, etc., to comply with 21 CFR Part 11 requirements, etc. Eli Lilly and Company (Pharmaceuticals), K103 Parenteral Manufacturing Facility Startup and Parenteral Health and Safety Programs, Indianapolis, IN (09/01-03/03) SENIOR TECHNICAL WRITER Designed and developed operations and maintenance procedure templates and procedures, such as; CIP, SIP, Data Historian, Equipment Systems and Utilities Validation, Formulation, Filling, Freeze Drying, Parts Washer, PUAF Unit and SCADA Operations etc., to support the startup of the K103 Parenteral Manufacturing Facility and comply with 21 CFR Part 11 and cGMP requirements. Designed and developed the Parenteral Health and Safety Program Plan Template and Programs, such as; Contractor Safety, Hazards Communication, LOTO and Lone Operator, etc. John Hook: Page 4 of 9 PROJECT TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK Resume: Spartan Electronics, (Contract Electronics Manufacturer (CEM)) Equipment and Facilities Operations Project, Brooksville, FL (05/01-09/01) SENIOR TECHNICAL WRITER Performed interviews and research, and subsequently developed procedures to implement Just In Time (JIT), Kanban and Lean Manufacturing practices. Met with and interviewed executive, management, engineering, operations, maintenance and production personnel. Determined the appropriate basis standards and wrote and/or edited standards and procedures to implement the program plan. Meister Electronics (CEM), Mass Transit Systems Division, Bombardier-Hiawatha Project, Tampa, FL (03/01-05/01) COMPLIANCE ENGINEER Determined analyzed and ensured compliance of components, equipment, materials and products with contract requirements. Made Failure Modes and Effects Analysis (FMEA) and Mean Time Between Failure (MTBF) calculations and provided documentation to support compliance with contract requirements. Met with Meister Electronics management and engineering personnel and teleconferenced with Bombardier management and engineering personnel. Wrote the Reliability Availability Maintainability and Safety (RAMS) Program Plan and other supporting documents. Bayer Pharmaceuticals Plasma Fractionation Products Facility, Facility Engineering Standards Policy and Program Plan, Clayton, NC (09/00-12/00) SENIOR TECHNICAL WRITING CONSULTANT Determined the requirements for, then designed, tested and implemented, the Facility Engineering Standards Policy and Program Plan. Determined the appropriate basis standards and wrote and/or edited standards and procedures to implement the program plan. Consulted with executive and senior management as needed to develop and implement the program plan, including the logistic and operational infrastructure. City, County and State Department of Public Safety, Combined Emergency Operations Center, Austin, TX (05/00-8/00) SYSTEMS INTEGRATION ENGINEER Developed and maintained the program level master plan and schedule. Developed and implemented the program level document management plan, including the support infrastructure. Developed and implemented the program level risk management plan, including the support infrastructure. Assisted in the development of the emergency operations center layout with city, county and state management personnel and the architect. Advised client on infrastructure design, network architecture and planning. Customer Service Website-United States Automobile Association (USAA), (Insurance Company), San Antonio, TX (06/99-10/99) SENIOR TECHNICAL WRITER AND WEB DEVELOPER Developed customer service Internet website e-commerce materials and templates. Produced materials for software coding standards and wrote said standards to meet the homogenized client, American National Standards Institute (ANSI), Institute of Electrical and Electronics Engineers (IEEE), International Standards Organization (ISO) and Software Engineering Institute (SEI), Capability Maturity Model (CMM), Level II software requirements. Developed customer service, release two user guides, etc., for use by 40 infrastructure and software developers and software test personnel on the website. John Hook: Page 5 of 9 PROJECT TITLE TASK PROJECT TITLE TASK PROJECT TITLE TASK Baxter Healthcare Renal Products (Medical Devices), Division, Meridian Project, Largo, FL (11/97-09/98) SENIOR ENGINEER AND TECHNICAL WRITER Engineered the Research and Development (R&D), department documentation system to support and minimize audit findings in the Design History File (DHF), in preparation for the 510(k) Submission to the Food and Drug Administration (FDA). Participated in the R&D of medical devices from the perspective of FDA compliance requirements. Advised client management on a daily basis. Developed various systems and support documentation including the Project Plan (PP), Product Launch Plan (PLP), Product Requirements Document (PRD) and Software Requirements Specification (SRS), etc. Semitool Corporation (Semiconductor Production Equipment), Corporate Maintenance and Training Program, Kalispell, MT (04/97-08/97) SENIOR TECHNICAL WRITER AND TRAINING MATERIALS DEVELOPER Developed task and job skill requirements for the installation, removal, repair, replacement and testing of components in integrated circuit (IC), manufacturing equipment. Developed the methods and procedures for the installation, removal, repair, replacement and testing of components. Field-validated all instructions and procedures. Department of Energy (DOE), Fluor-Daniel Corporation, Tank Farm Operations, Hanford Nuclear Energy Reservation, Hanford, WA (11/96-02/97) SENIOR TECHNICAL WRITER Reviewed Tank Farm operating procedures for accuracy, usability and compliance with Basis for Interim Operation (BIO), requirements and incorporated appropriate design, policy and procedural changes, etc. Developed the procedures for the testing, repair and replacement of components, loops and systems. Field validated procedures. PROJECT TITLE TASK UnoVen Refinery, Babcock and Wilcox, Lamont, IL (09/96-11/96) TRAINING MATERIALS DEVELOPER Researched task and job skill requirements for unionized refinery workers. Developed lesson plans and various other training materials for worker qualification. Developed and implemented the use of Task Qualification Cards (TQCs). Wrote various TQCs. PROJECT TITLE TASK Entergy Integrated Solutions Inc., Memphis, TN (01/96-07/96) BUSINESS CONSULTANT AND SENIOR TECHNICAL WRITER Wrote business improvement process policies and procedures. Produced management presentation materials for deregulated business activities. Advised client on and initiated the ISO 9000 certification process and acquired appropriate software. PROJECT TITLE TASK DOE, Kaiser/Westinghouse, Hanford Nuclear Reservation, Hanford, WA (03/94-05/95) SENIOR TECHNICAL WRITER (CONOPS Consultant) Wrote Annunciator Response, Emergency Operating, Environmental Monitoring and Normal Operating Procedures (ARPs, EOPs, EMPs and NOPs), for critical plant systems per DOE Order 5480.19, "CONOPS Requirements for DOE Facilities". PROJECT TITLE TASK Bussman ISO 9000 Certification Project, Ballwin, MO (10/93-12/93) ISO 9000 PROCEDURE WRITER Reviewed ISO 9000 certification plans, policies and procedures. Wrote instructions and procedures per ISO 9000 certification requirements for management, Quality Assurance (QA), manufacturing, customer service, pick and pack, and shipping personnel. Resume: John Hook: Page 6 of 9 PROJECT TITLE TASK DOE, (MK-Ferguson), Weldon Spring EPA Superfund, St. Charles, MO (01/93-08/93) SENIOR TECHNICAL WRITER Wrote plant procedures per DOE Order 5480.19, "CONOPS Requirements for DOE Facilities", for the removal of wastes. Produced LOTO lesson plans and tests. PROJECT TITLE TASK DOE, Pinellas Plant (General Electric/Martin-Marietta), Largo, FL (07/90-01/93) SENIOR TECHNICAL WRITER (CONOPS Consultant) Developed documentation templates. Wrote operations and maintenance documents per DOE Order 5480.19, "CONOPS Requirements for DOE Facilities". Received "DOE CONOPS Outstanding National Achievement Award". Developed the Preventative Maintenance Instructions (PMIs), per DOE Order 4330.4A, "Conduct of Maintenance". PROJECT TITLE TASK DOE, Westinghouse Savannah River Plant (SRP), Aiken, SC (03/90-07/90) SENIOR TECHNICAL WRITER Wrote instrumentation and controls (I&C), preventative maintenance (PM), calibration and functional testing procedures for components, loops and systems to satisfy safetyrelated program requirements. Produced various loop diagrams and drawings. PROJECT TITLE TASK Comanche Peak Nuclear Power Station, Glenrose, TX (10/89-12/89) INSTRUMENTATION AND CONTROLS SYSTEM ENGINEER Performed I&C system scaling calculations including, process variables, process control signals, instrument data, head/tail corrections and error value methodologies, etc. PROJECT TITLE 2 TASK 2 TITLE 1 TASK 1 Nine Mile Point Nuclear Station, Lycoming, NY (03/89-10/89) BALANCE OF PLANT (BOP), I&C COORDINATOR Scheduled and tracked calibrations, etc. Calculated and assigned setpoints, etc. IN-SERVICE INSPECTION (ISI), ENGINEER (Document Review) Reviewed ISI data for final acceptance and return-to-service. Validated ISI results, etc. PROJECT TITLE TASK DOE, SRP, "K" Reactor Restart, Aiken, SC (11/88-12/88) RESTART ENGINEER Wrote procedures to support DOE requirements for the inception of a new position: Area Representative (AR). The AR had overall responsibility for reactor area activities. PROJECT TITLE TASK DOE, E.I. duPont, SRP, Aiken, SC (06/88-11/88) TECHNICAL WRITER Wrote administrative, calibration and maintenance procedures for Measurement and Test Equipment (M&TE) and process instruments. Made walkdowns with procedures. PROJECT TITLE TASK Baxter Healthcare Products (Pharmaceuticals), Marion, NC (02/88-05/88) TECHNICAL WRITER Wrote sequence and theory of operation manuals for various equipment and processes. Developed a Total Productive Maintenance (TPM), program. Made presentations. PROJECT TITLE TASK RJR Mechanical Inc., Spartanburg, SC (11/87-2/88) CONTROL SYSTEM ENGINEER Specified, designed and started-up industrial processes I&C systems. Specified, purchased and started-up CAD system. Negotiated with clients and contractors. Resume: John Hook: Page 7 of 9 PROJECT TITLE TASK Strandberg Engineering Laboratories, Taylors, SC (8/87-11/87) FIELD SERVICE ENGINEER Installed calibrated and maintained textile industry equipment, at all client facilities. PROJECT TITLE TASK Fluor-Daniel International, Greenville, SC (05/87-08/87) SENIOR TECHNICAL WRITER Developed "Training The Instructor" materials. Developed various system manuals. PROJECT TITLE TASK Mallinckrodt Diagnostics Division (Pharmaceuticals), Raleigh, NC (01/87-04/87) TECHNOLOGIST Developed Computerized Instrument Maintenance System (CIMS), (FDA validation). PROJECT TITLE TASK Pigeon Point Refuse Derived Fuel Station, New Castle, DE (08/86-11/86) I&C STARTUP ENGINEER Responsible for I&C systems startup including the Distributive Control System (DCS). PROJECT TITLE TASK Comanche Peak Nuclear Power Station, Glenrose, TX (06/86-08/86) DESIGN VERIFICATION ENGINEER Checked drawings against actual "As-Built" configurations to verify design compliance. PROJECT TITLE TASK Instrument Society of America (ISA), Training Center, Raleigh, NC (03/86-04/86) LABORATORY ASSISTANT/INSTRUCTOR Assisted in the "Process Instrumentation Theory, Operation and Maintenance" course. PROJECT TITLE TASK United States Steel Corporation, Gary, IN (12/85-02/86) PROJECT ENGINEER Implemented Computerized Instrument Maintenance System (CIMS), processes. PROJECT TITLE TASK Arnold Air Force Station, Missile & Rocket Test Facility, Tullahoma, TN (03/85-09/85) TECHNICAL WRITER/EDITOR (PROCEDURE REVIEW) Developed I&C procedures for the missile, rocket and jet engine testing facilities. PROJECT TITLE TASK D.C. Cook Nuclear Power Station, Bridgeman, MI (12/84-02/85) LEAD I&C ENGINEER Directed contractors. Performed a ten-year review and update of I&C procedures. PROJECT TITLE TASK Shearon Harris Nuclear Power Station, New Hill, NC (08/84-11/84) TECHNICAL WRITER Wrote I&C procedures for Safety Related and other systems in support of plant startup. PROJECT TITLE TASK Clinton Nuclear Power Station, Clinton, IL (06/84-08/84) ASSOCIATE I&C ENGINEER AND STARTUP TEST ENGINEER Wrote I&C procedures for FSAR, Tech Spec and Setpoint Document requirements. PROJECT TITLE TASK Waterford III Nuclear Power Station, Taft, LA (07/83-03/84) TECHNICAL WRITER Wrote I&C procedures for components, loops and systems. Performed walkdowns. Resume: John Hook: Page 8 of 9 PROJECT TITLE TASK Diablo Canyon Nuclear Station, Avila Beach, CA (03/83-05/83) TRAINING COORDINATOR Implemented training of I&C technicians and engineers. Assigned ANSI certifications. PROJECT TITLE TASK Palo Verde Nuclear Power Station, Wintersburg, AZ (04/82-03/83) TECHNICAL WRITER Wrote I&C procedures for components, loops and systems. Performed walkdowns. PROJECT TITLE TASK Allegheny Power Station, Kittanning, PA (07/81-11/81) QUALITY ASSURANCE SUPERVISOR Ensured materials met design criteria. Signed verifications. Trained some personnel. PROJECT TITLE 2 TASK 2 TITLE 1 TASK 1 San Onofre Nuclear Power Station, San Onofre, CA (08/80-04/81) TRAINING AND MAINTENANCE ENGINEER Assisted in training workers for steam generator repairs. Directed various repair efforts. TECHNICAL WRITER Wrote procedures at the Westinghouse Nuclear Services R&D Center, Churchill, PA. PROJECT TITLE TASK Babcock and Wilcox, Beaver Falls, PA (05/74-08/80) VARIOUS Various projects involving process controls and precision measurement sciences. SECURITY Clearances Granted: Confidential, Secret, Top Secret and Cryptography Resume: John Hook: Page 9 of 9