RESUME: JOHN HOOK, MCP
Address: 13176 North Dale Mabry Highway, Tampa, FL 33618-2406
Telephone: (813) 928-1440
Email:
johnhook@yahoo.com
Online Resume: http://www.technical-writer-resume.com/
OBJECTIVE
Assist organizations with technical writing, web development, engineering and/or quality challenges.
PERSONAL INFORMATION
 Author of Conversion Factors for Scientists, Engineers and Students (Prentice Hall)
 HTML Writers Guild—Macintosh and Windows DeskTop Publishing (DTP)
 ISA Scientific Instrumentation and Research Division and ISA Aerospace Industries Division
 Member: American Institute of Aeronautics and Astronautics (AIAA)
 Senior Member: Instrument Society of America (ISA), ISA General Board of Review
 Technical Writer/Editor—Website Developer—ISO 9000 Consultant—Engineer—Trainer—Author
SUMMARY
My experience includes over twenty-five years as a consultant in the engineering, maintenance,
manufacturing, operations, and R&D environments including computer hardware, disaster recovery,
integrated circuit, Internet, electronic and mechanical components, software development and testing,
standards, systems and websites. I also have experience with 21 CFR Part 11, ANS, ANSI, ASME,
CAPA, CFR, cGMP, CMM, CMS, DOD, DOE, FDA, GXP, HTML, IEEE, INPO, ISA, ISO, LOTO, MIL,
NIST, NQA-1, NRC, QSR, SAP, SDLC and SEI requirements, etc. I am an experienced technical
writer/editor, website developer, ISO 9000 specialist, engineer, trainer and author. I have worked
aerospace, commercial, educational institution, government, industrial, insurance, manufacturing,
nuclear, pharmaceutical, refinery and utility positions as both a contractor and employee.
COMPUTER SKILLS
Microsoft DOS, Windows 1.0-3.1, 95, NT, 98, 2000, XP Pro, Vista, 7 and 8, Apple OS X, Parallels
Desktop, VMware Fusion, Microsoft Office Suite (Word, Excel, PowerPoint, Access, Outlook,
PhotoDraw and Publisher), UNIX, SAP ERP, HR, MM and SD Modules, HP/Mercury Quality Center,
HP/Mercury QuickTest Pro, Citrix Systems EDMS, Documentum, Livelink, PVCS, SourceSafe, Sparta
Systems TrackWise, Visual SourceSafe, Mettler FormWeigh.Net, Microsoft Internet Explorer,
FrontPage, Expression Web NetMeeting, HotDog Pro, HotMetal Pro, Active Server Pages (ASPs),
CGI, JavaDoc, JavaScript, Microsoft Office 365, Project, SharePoint and Visio, WordPerfect Office
Suite, Apache OpenOffice Suite, Google Docs, Lotus Notes, FreeHand, Illustrator, PaintShop Pro,
Pixelmator, Adobe Acrobat Pro, Captivate, Dreamweaver, Fireworks, Flash, FrameMaker, Illustrator,
InDesign and Photoshop, ClipMate, FullShot, SnagIt, Thumbs Plus, Norton Utilities, Rational Rose,
Crystal Reports, DataGrabber, Inforarian Quest, Mata Hari, and Research Pro, etc.
ABILITIES
 Ability to draw on vast experiences to produce cost-effective, quality solutions for client needs
 Ability to operate a wide variety of computer platforms using a broad spectrum of software
 Ability to successfully design and implement various types of documentation and systems
 Ability to supervise personnel and get along very well with others, even in difficult situations
ACHIEVEMENTS
 Completed various contracts with some of the most prestigious organizations in this country
 Developed the standardized template for the preparation of various Ely Lilly procedures
 DOE Conduct of Operations (CONOPS), Outstanding National Achievement Award
 DOE Significant Achievement Award for Annunciator Response Procedures (ARPs)
Resume:
John Hook:
Page 1 of 9
HISTORY:
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
Resume:
Health Management Associates (HMA), Centers for Medicare & Medicaid Services
(CMS) Compliance and Implementation Project, Naples, FL (02/13-08/13)
SENIOR TECHNICAL WRITER
Developed documents to comply with and implement CMS requirements including, but
not limited to; Affordable Care Act of 2010 (ACA), Disaster Recovery, Information
Security, Evaluation and Management Services, General Principles of Medical Record
Examinations, History of Present Illness, Review of Symptoms, Medical Record
Documentation, Past, Family, and/or Social Histories, Documentation of Examinations,
General Multisystem Examination, Multiple Organ System Examination, Single Organ
System Examination, Content and Documentation Requirements, etc.
Micro Matic (Bar and Restaurant Beer Systems and Closed Loop Chemical Systems)
ISO 9000:2008 Registration Project (Telecommute), Brooksville, FL (03/12-10/12)
SENIOR TECHNICAL WRITER
Worked with the engineers and management to develop the Micro Matic Quality
Assurance Manual and the six (6) required procedures (Document Control, Clause
4.2.3, Record Control, Clause 4.2.4, Internal Audit, Clause 8.2.2, Control of
Nonconforming Items, Clause 8.3, Corrective Action, Clause 8.5.2, Preventive Action,
Clause 8.5.3) for ISO 9000:2008 registration. Developed the Procedure Preparation,
Review and Approval Procedure and a template to aid Subject Matter Experts (SMEs)
and other stakeholders in preparing procedures. Developed other documents needed to
implement and support the Micro Matic Quality Management System (QMS). Found,
made initial contacts with and interviewed five ISO 9001 registrars for the client.
Voalté (Voalté One Hospital Communications System Class III Medical Device), 510(k)
Premarket Notification Submission (Telecommute), Sarasota, FL (06/11-11/11)
SENIOR TECHNICAL WRITER
Interfaced with management and engineers as needed to develop the documents
required by the Food and Drug Administration (FDA) for a Premarket Notification 510(k)
including; Indications for Use, Product Description, Predicate Product Comparison,
Labeling, Sterilization and Packaging Information, Biocompatibility, Level of Concern,
Software Description, Device Hazard Analysis, Software Requirements Specification
(SRS), Architecture Design Chart, Software Design Specification, Traceability Analysis,
Software Development Environment, Verification and Validation, Revision History,
Unresolved Anomalies, Human Factors Study, Software of Unknown Pedigree (SOUP),
Virus Protection Software, Interfaces and Network Infrastructure Products, etc.
Florikan Continental Rollo-Mixer Mark IX Operations and Maintenance Manual, Quality
Assurance Manual and Miscellaneous Documents Project, Sarasota, FL (12/10-06/11)
SENIOR TECHNICAL WRITER
Worked with the engineers, maintenance and operations personnel to develop the
Continental Rollo-Mixer Mark IX Operations Manual including the following procedures;
Raw Materials Filling, Coating Heating, Coating, Dump, Basic Maintenance and
Troubleshooting Tips and Lockout/Tagout (LOTO). Worked with engineers to develop
the QMS including the Florikan Quality Assurance Manual and the six (6) required
procedures (Document Control, Clause 4.2.3, Record Control, Clause 4.2.4, Internal
Audit, Clause 8.2.2, Control of Nonconforming Items, Clause 8.3, Corrective Action,
Clause 8.5.2, Preventive Action, Clause 8.5.3) for ISO 9000:2008 registration.
Developed the Procedure Preparation, Review and Approval Procedure and template.
John Hook:
Page 2 of 9
PROJECT
TITLE
TASK
Global Safety First ReadiMask, National Institutes of Safety and Health (NIOSH) N95
Particulate Respirator Certification (Telecommute), Manasquan, NJ (02/10-08/10)
SENIOR TECHNICAL WRITER
Worked with management and regulators to resolve the originally in-house developed
rejected certification application by addressing concerns and findings with best
practices. Developed the company organizational flowchart. Wrote the Quality
Assurance Manual to comply with and satisfy NIOSH requirements including the
Procedure for the Certification of Respirators and the required Title 42—Public Health,
CFR, Subpart E—Q, Sections 84.40, 84.41, 84.42 and 84.43.
PROJECT
TITLE
TASK
United Information Technologies (UIT), FairPoint Project, Tampa, FL (12/08-10/09)
COPY EDITOR/SENIOR TECHNICAL WRITER
Worked with FairPoint developers and UIT contractors to build, convert and edit
flowcharts, handouts, job aids, PowerPoint presentations, procedures, scripts and tests
used by customer service, engineers, installers, management and operators etc. All
documentation was reviewed for compliance with FCC regulations by FCC contractors.
Resolved and incorporated comments on a near real-time basis. Documents were then
reverified, approved for publication and delivered to the client. Scheduled and delivered
the training and provided feedback to Fairpoint and UIT, etc.
PROJECT
AES Corporation (A Global Electrical Energy Distributor and Generator), World
Headquarters, SAP Global Rollout Project, Arlington, VA (09/07-03/08)
SENIOR TECHNICAL WRITER
Developed various SAP global template documents for corporate and North American
operations. Developed materials for SAP blueprint sessions and playbacks. Developed,
edited and executed SAP test scripts. Developed Business Process Documents (BPDs)
and the associated master swimlane flowcharts to implement the processes defined in
the BPDs. Developed Global Position Papers . Played a management advisory roll, etc.
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
Resume:
AstraZeneca-MedImmune (BioPharma, Pharmaceuticals and Medical Devices), World
Headquarters, SAP Computer Validation Group, Gaithersburg, MD (04/06-09/07)
SENIOR TECHNICAL WRITING CONSULTANT
Developed, edited, and ran SAP test scripts manually and via HP/Mercury Quality
Center. Reviewed and approved executed SAP test scripts. Used HP/Mercury
QuickTest Pro and Test Director to help develop automated test scripts. Developed and
maintained hundreds of Master Flowcharts to implement Software Development Life
Cycle (SDLC) documentation including; Project Scope and Development Plans, User
Requirements Specifications (URS), Functional Requirements Specifications (FRS), etc.
Wyeth (Pharmaceuticals), Worldwide Headquarters, Policies Upgrade Project
(Telecommute), Collegeville, PA (02/05-08/05)
TECHNICAL CONSULTANT (direct contract with Wyeth corporate management)
Developed the Wyeth Worldwide Environmental Health and Safety (EHS) Policies
Manual, and the Wyeth Corporate EHS Policy, for Robert Essner, President and Chief
Executive Officer (CEO), including; Management Systems, Accident Investigation,
Regulatory Inspections, Safe Work Practices, Capital Projects, Operational Readiness
Reviews (ORRs), Personnel Protective Equipment (PPE), Ergonomics, Process Safety
Management (PSM), Contractor Management, Lab Safety, Change Management,
Machine Guarding, Hazard Communication, Respiratory Protection Program (RPP),
Hazardous Substances, Confined Space Entry and LOTO, etc.
John Hook:
Page 3 of 9
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
Resume:
Boston Scientific Electrophysiology Division (Medical Devices), Manufacturing
Documentation Project, San Jose, CA (03/05-07/05)
SENIOR TECHNICAL WRITER
Assisted production supervisors, engineers and managers with the preparation of
Master Validation Plans (MVPs), Manufacturing Process Instructions (MPIs), Work
Instructions (WIs), Validation Protocols, databases and spreadsheets for various
product lines including; Blazer II Cardiac Ablation Catheters, Chilli Cooled Ablation
Catheters, Explorer Fixed Curve and Rotational Diagnostic Catheters, Polaris Steerable
Diagnostic Catheters and RPM Realtime Position Management Catheters, to comply
with the appropriate FDA requirements including 21 CFR Part 11, etc.
Bristol-Myers Squibb (Pharmaceuticals), Global Shared Services, Information Security
and Service Assurance-Quality Assurance, Princeton, NJ (09/04-01/05)
SENIOR TECHNICAL WRITER/EDITOR
Assisted analysts, architects, developers, engineers and managers with 21 CFR Part 11
and Sarbanes-Oxley Act (SOX) requirements compliance for validated computer
systems, and validated manufacturing systems, etc. Developed and used templates,
procedures and SDLC documents including Basis of Estimates, Scopes of Work,
Project Plans, Design Documents, Software and Hardware Specifications, Test Scripts,
Project Summary Reports and Records Retention Requirements, etc.
Pfizer Global Research and Development (PGRD) (Pharmaceuticals), FDA Validated
Computer System Migrations, Groton, CT (01/04-06/04)
SENIOR TECHNICAL WRITER
Assisted management, architects and developers in the migration of FDA validated
computer systems. Developed and used templates, procedures and SDLC documents
including Basis of Estimate, Scope of Work, Project Plans, Design Documents,
Software and Hardware Specifications, Test Scripts and Project Summary Reports etc.,
to comply with SAIC, PGRD and 21 CFR Part 11 requirements, etc.
Roche Diagnostics Corporation (Medical Devices and Pharmaceuticals), Single Strip
System Glucose Meter, Huntsville, AL and Indianapolis, IN (06/03-01/04)
SENIOR TECHNICAL WRITER
Assisted in the development of the rack and test-fixture Automated Test Equipment
(ATE) calibration system for the Roche Single Strip System Glucose Meter. Developed
all system and component-level project specifications. Developed templates,
procedures and design documents including Database Structure, Hardware and
Software Requirements Specifications, Mechanical and Electrical, and Unit and
Integration Tests, etc., to comply with 21 CFR Part 11 requirements, etc.
Eli Lilly and Company (Pharmaceuticals), K103 Parenteral Manufacturing Facility
Startup and Parenteral Health and Safety Programs, Indianapolis, IN (09/01-03/03)
SENIOR TECHNICAL WRITER
Designed and developed operations and maintenance procedure templates and
procedures, such as; CIP, SIP, Data Historian, Equipment Systems and Utilities
Validation, Formulation, Filling, Freeze Drying, Parts Washer, PUAF Unit and SCADA
Operations etc., to support the startup of the K103 Parenteral Manufacturing Facility
and comply with 21 CFR Part 11 and cGMP requirements. Designed and developed the
Parenteral Health and Safety Program Plan Template and Programs, such as;
Contractor Safety, Hazards Communication, LOTO and Lone Operator, etc.
John Hook:
Page 4 of 9
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
Resume:
Spartan Electronics, (Contract Electronics Manufacturer (CEM)) Equipment and
Facilities Operations Project, Brooksville, FL (05/01-09/01)
SENIOR TECHNICAL WRITER
Performed interviews and research, and subsequently developed procedures to
implement Just In Time (JIT), Kanban and Lean Manufacturing practices. Met with and
interviewed executive, management, engineering, operations, maintenance and
production personnel. Determined the appropriate basis standards and wrote and/or
edited standards and procedures to implement the program plan.
Meister Electronics (CEM), Mass Transit Systems Division, Bombardier-Hiawatha
Project, Tampa, FL (03/01-05/01)
COMPLIANCE ENGINEER
Determined analyzed and ensured compliance of components, equipment, materials
and products with contract requirements. Made Failure Modes and Effects Analysis
(FMEA) and Mean Time Between Failure (MTBF) calculations and provided
documentation to support compliance with contract requirements. Met with Meister
Electronics management and engineering personnel and teleconferenced with
Bombardier management and engineering personnel. Wrote the Reliability Availability
Maintainability and Safety (RAMS) Program Plan and other supporting documents.
Bayer Pharmaceuticals Plasma Fractionation Products Facility, Facility Engineering
Standards Policy and Program Plan, Clayton, NC (09/00-12/00)
SENIOR TECHNICAL WRITING CONSULTANT
Determined the requirements for, then designed, tested and implemented, the Facility
Engineering Standards Policy and Program Plan. Determined the appropriate basis
standards and wrote and/or edited standards and procedures to implement the program
plan. Consulted with executive and senior management as needed to develop and
implement the program plan, including the logistic and operational infrastructure.
City, County and State Department of Public Safety, Combined Emergency Operations
Center, Austin, TX (05/00-8/00)
SYSTEMS INTEGRATION ENGINEER
Developed and maintained the program level master plan and schedule. Developed and
implemented the program level document management plan, including the support
infrastructure. Developed and implemented the program level risk management plan,
including the support infrastructure. Assisted in the development of the emergency
operations center layout with city, county and state management personnel and the
architect. Advised client on infrastructure design, network architecture and planning.
Customer Service Website-United States Automobile Association (USAA), (Insurance
Company), San Antonio, TX (06/99-10/99)
SENIOR TECHNICAL WRITER AND WEB DEVELOPER
Developed customer service Internet website e-commerce materials and templates.
Produced materials for software coding standards and wrote said standards to meet the
homogenized client, American National Standards Institute (ANSI), Institute of Electrical
and Electronics Engineers (IEEE), International Standards Organization (ISO) and
Software Engineering Institute (SEI), Capability Maturity Model (CMM), Level II software
requirements. Developed customer service, release two user guides, etc., for use by 40
infrastructure and software developers and software test personnel on the website.
John Hook:
Page 5 of 9
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
PROJECT
TITLE
TASK
Baxter Healthcare Renal Products (Medical Devices), Division, Meridian Project, Largo,
FL (11/97-09/98)
SENIOR ENGINEER AND TECHNICAL WRITER
Engineered the Research and Development (R&D), department documentation system
to support and minimize audit findings in the Design History File (DHF), in preparation
for the 510(k) Submission to the Food and Drug Administration (FDA). Participated in
the R&D of medical devices from the perspective of FDA compliance requirements.
Advised client management on a daily basis. Developed various systems and support
documentation including the Project Plan (PP), Product Launch Plan (PLP), Product
Requirements Document (PRD) and Software Requirements Specification (SRS), etc.
Semitool Corporation (Semiconductor Production Equipment), Corporate Maintenance
and Training Program, Kalispell, MT (04/97-08/97)
SENIOR TECHNICAL WRITER AND TRAINING MATERIALS DEVELOPER
Developed task and job skill requirements for the installation, removal, repair,
replacement and testing of components in integrated circuit (IC), manufacturing
equipment. Developed the methods and procedures for the installation, removal, repair,
replacement and testing of components. Field-validated all instructions and procedures.
Department of Energy (DOE), Fluor-Daniel Corporation, Tank Farm Operations,
Hanford Nuclear Energy Reservation, Hanford, WA (11/96-02/97)
SENIOR TECHNICAL WRITER
Reviewed Tank Farm operating procedures for accuracy, usability and compliance with
Basis for Interim Operation (BIO), requirements and incorporated appropriate design,
policy and procedural changes, etc. Developed the procedures for the testing, repair
and replacement of components, loops and systems. Field validated procedures.
PROJECT
TITLE
TASK
UnoVen Refinery, Babcock and Wilcox, Lamont, IL (09/96-11/96)
TRAINING MATERIALS DEVELOPER
Researched task and job skill requirements for unionized refinery workers. Developed
lesson plans and various other training materials for worker qualification. Developed
and implemented the use of Task Qualification Cards (TQCs). Wrote various TQCs.
PROJECT
TITLE
TASK
Entergy Integrated Solutions Inc., Memphis, TN (01/96-07/96)
BUSINESS CONSULTANT AND SENIOR TECHNICAL WRITER
Wrote business improvement process policies and procedures. Produced management
presentation materials for deregulated business activities. Advised client on and initiated
the ISO 9000 certification process and acquired appropriate software.
PROJECT
TITLE
TASK
DOE, Kaiser/Westinghouse, Hanford Nuclear Reservation, Hanford, WA (03/94-05/95)
SENIOR TECHNICAL WRITER (CONOPS Consultant)
Wrote Annunciator Response, Emergency Operating, Environmental Monitoring and
Normal Operating Procedures (ARPs, EOPs, EMPs and NOPs), for critical plant
systems per DOE Order 5480.19, "CONOPS Requirements for DOE Facilities".
PROJECT
TITLE
TASK
Bussman ISO 9000 Certification Project, Ballwin, MO (10/93-12/93)
ISO 9000 PROCEDURE WRITER
Reviewed ISO 9000 certification plans, policies and procedures. Wrote instructions and
procedures per ISO 9000 certification requirements for management, Quality Assurance
(QA), manufacturing, customer service, pick and pack, and shipping personnel.
Resume:
John Hook:
Page 6 of 9
PROJECT
TITLE
TASK
DOE, (MK-Ferguson), Weldon Spring EPA Superfund, St. Charles, MO (01/93-08/93)
SENIOR TECHNICAL WRITER
Wrote plant procedures per DOE Order 5480.19, "CONOPS Requirements for DOE
Facilities", for the removal of wastes. Produced LOTO lesson plans and tests.
PROJECT
TITLE
TASK
DOE, Pinellas Plant (General Electric/Martin-Marietta), Largo, FL (07/90-01/93)
SENIOR TECHNICAL WRITER (CONOPS Consultant)
Developed documentation templates. Wrote operations and maintenance documents
per DOE Order 5480.19, "CONOPS Requirements for DOE Facilities". Received "DOE
CONOPS Outstanding National Achievement Award". Developed the Preventative
Maintenance Instructions (PMIs), per DOE Order 4330.4A, "Conduct of Maintenance".
PROJECT
TITLE
TASK
DOE, Westinghouse Savannah River Plant (SRP), Aiken, SC (03/90-07/90)
SENIOR TECHNICAL WRITER
Wrote instrumentation and controls (I&C), preventative maintenance (PM), calibration
and functional testing procedures for components, loops and systems to satisfy safetyrelated program requirements. Produced various loop diagrams and drawings.
PROJECT
TITLE
TASK
Comanche Peak Nuclear Power Station, Glenrose, TX (10/89-12/89)
INSTRUMENTATION AND CONTROLS SYSTEM ENGINEER
Performed I&C system scaling calculations including, process variables, process control
signals, instrument data, head/tail corrections and error value methodologies, etc.
PROJECT
TITLE 2
TASK 2
TITLE 1
TASK 1
Nine Mile Point Nuclear Station, Lycoming, NY (03/89-10/89)
BALANCE OF PLANT (BOP), I&C COORDINATOR
Scheduled and tracked calibrations, etc. Calculated and assigned setpoints, etc.
IN-SERVICE INSPECTION (ISI), ENGINEER (Document Review)
Reviewed ISI data for final acceptance and return-to-service. Validated ISI results, etc.
PROJECT
TITLE
TASK
DOE, SRP, "K" Reactor Restart, Aiken, SC (11/88-12/88)
RESTART ENGINEER
Wrote procedures to support DOE requirements for the inception of a new position:
Area Representative (AR). The AR had overall responsibility for reactor area activities.
PROJECT
TITLE
TASK
DOE, E.I. duPont, SRP, Aiken, SC (06/88-11/88)
TECHNICAL WRITER
Wrote administrative, calibration and maintenance procedures for Measurement and
Test Equipment (M&TE) and process instruments. Made walkdowns with procedures.
PROJECT
TITLE
TASK
Baxter Healthcare Products (Pharmaceuticals), Marion, NC (02/88-05/88)
TECHNICAL WRITER
Wrote sequence and theory of operation manuals for various equipment and processes.
Developed a Total Productive Maintenance (TPM), program. Made presentations.
PROJECT
TITLE
TASK
RJR Mechanical Inc., Spartanburg, SC (11/87-2/88)
CONTROL SYSTEM ENGINEER
Specified, designed and started-up industrial processes I&C systems. Specified,
purchased and started-up CAD system. Negotiated with clients and contractors.
Resume:
John Hook:
Page 7 of 9
PROJECT
TITLE
TASK
Strandberg Engineering Laboratories, Taylors, SC (8/87-11/87)
FIELD SERVICE ENGINEER
Installed calibrated and maintained textile industry equipment, at all client facilities.
PROJECT
TITLE
TASK
Fluor-Daniel International, Greenville, SC (05/87-08/87)
SENIOR TECHNICAL WRITER
Developed "Training The Instructor" materials. Developed various system manuals.
PROJECT
TITLE
TASK
Mallinckrodt Diagnostics Division (Pharmaceuticals), Raleigh, NC (01/87-04/87)
TECHNOLOGIST
Developed Computerized Instrument Maintenance System (CIMS), (FDA validation).
PROJECT
TITLE
TASK
Pigeon Point Refuse Derived Fuel Station, New Castle, DE (08/86-11/86)
I&C STARTUP ENGINEER
Responsible for I&C systems startup including the Distributive Control System (DCS).
PROJECT
TITLE
TASK
Comanche Peak Nuclear Power Station, Glenrose, TX (06/86-08/86)
DESIGN VERIFICATION ENGINEER
Checked drawings against actual "As-Built" configurations to verify design compliance.
PROJECT
TITLE
TASK
Instrument Society of America (ISA), Training Center, Raleigh, NC (03/86-04/86)
LABORATORY ASSISTANT/INSTRUCTOR
Assisted in the "Process Instrumentation Theory, Operation and Maintenance" course.
PROJECT
TITLE
TASK
United States Steel Corporation, Gary, IN (12/85-02/86)
PROJECT ENGINEER
Implemented Computerized Instrument Maintenance System (CIMS), processes.
PROJECT
TITLE
TASK
Arnold Air Force Station, Missile & Rocket Test Facility, Tullahoma, TN (03/85-09/85)
TECHNICAL WRITER/EDITOR (PROCEDURE REVIEW)
Developed I&C procedures for the missile, rocket and jet engine testing facilities.
PROJECT
TITLE
TASK
D.C. Cook Nuclear Power Station, Bridgeman, MI (12/84-02/85)
LEAD I&C ENGINEER
Directed contractors. Performed a ten-year review and update of I&C procedures.
PROJECT
TITLE
TASK
Shearon Harris Nuclear Power Station, New Hill, NC (08/84-11/84)
TECHNICAL WRITER
Wrote I&C procedures for Safety Related and other systems in support of plant startup.
PROJECT
TITLE
TASK
Clinton Nuclear Power Station, Clinton, IL (06/84-08/84)
ASSOCIATE I&C ENGINEER AND STARTUP TEST ENGINEER
Wrote I&C procedures for FSAR, Tech Spec and Setpoint Document requirements.
PROJECT
TITLE
TASK
Waterford III Nuclear Power Station, Taft, LA (07/83-03/84)
TECHNICAL WRITER
Wrote I&C procedures for components, loops and systems. Performed walkdowns.
Resume:
John Hook:
Page 8 of 9
PROJECT
TITLE
TASK
Diablo Canyon Nuclear Station, Avila Beach, CA (03/83-05/83)
TRAINING COORDINATOR
Implemented training of I&C technicians and engineers. Assigned ANSI certifications.
PROJECT
TITLE
TASK
Palo Verde Nuclear Power Station, Wintersburg, AZ (04/82-03/83)
TECHNICAL WRITER
Wrote I&C procedures for components, loops and systems. Performed walkdowns.
PROJECT
TITLE
TASK
Allegheny Power Station, Kittanning, PA (07/81-11/81)
QUALITY ASSURANCE SUPERVISOR
Ensured materials met design criteria. Signed verifications. Trained some personnel.
PROJECT
TITLE 2
TASK 2
TITLE 1
TASK 1
San Onofre Nuclear Power Station, San Onofre, CA (08/80-04/81)
TRAINING AND MAINTENANCE ENGINEER
Assisted in training workers for steam generator repairs. Directed various repair efforts.
TECHNICAL WRITER
Wrote procedures at the Westinghouse Nuclear Services R&D Center, Churchill, PA.
PROJECT
TITLE
TASK
Babcock and Wilcox, Beaver Falls, PA (05/74-08/80)
VARIOUS
Various projects involving process controls and precision measurement sciences.
SECURITY Clearances Granted: Confidential, Secret, Top Secret and Cryptography
Resume:
John Hook:
Page 9 of 9