Action Plan – Berecroft Estate, Harlow 17th September 2008 – updated 16th October 2008/17th November 2008 Location 1 Action Responsibility Estate issues identified: 136 Berecroft Disposing of cigarette butts outside their property. Need to visit. 125 Berecroft Window still boarded 124 Berecroft Temp NO agreed that bushes/tree could be cut back CATV Box No 033D5, 033D6 and 033D8 Needs refixing and covers repairing 197 Berecroft Refill hole in concrete steps, and check on why tenant is running hosepipe to the drain. Remove tyre from lamp-post 221 Berecroft Two fence panels are bowing. LM – Lorraine Murphy, N/Officer SD – Sarah Dangerfield Residents Assoc MH – Michael Halligan Excellent Estates project worker Completion Date Progress LM/PS Issues raised during the following Estate Inspection on 24th September. Confirmation has been received that the majority of jobs have now been completed – to be checked at the next estate inspection booked for 29th October. LM Problem highlighted to tenant Problems with contacting the resident to arrange for work to be completed. NO trying to resolve with resident PS – Property Services RB - Robert Barrett CE – Chris Ellison Tenants were digging a pond – This has been discussed with them Works Complete – Site Inspection 7/1/09 JG – Jane Greer Harlow Council ML – Michelle Lock 41 and 256 Berecroft Remove large tree root. To complete by 31/1/09 14 and 178 Berecroft ivy to be removed To complete by 31/1/09 279 Berecroft Fence - parts missing/different size and colour and graffiti To complete by 31/1/09 310 – 315 Berecroft Fly tipping in bushes behind fences – rubbish to be removed and residents contacted Residents have been approached and asked not to fly tip. This situation will be monitored. 279 Berecroft broken Path outside is broken Responsibility of Highways 32 ,6, 24, 25, 26 and 27, 180, 161, 83 Berecoft Paving outside has sunk 277 – 278 Berecroft Block paving and path 113 Berecroft Dog fouling 12 Berecroft Block paving To complete by 31/1/09 32 Berecroft Handrail end caps To complete by 31/1/09 14 Berecroft Aerial 24 Berecroft Trees overgrown To complete by 31/1/09 33 Berecroft Block paving missing To complete by 31/1/09 LM – Lorraine Murphy, N/Officer SD – Sarah Dangerfield Residents Assoc MH – Michael Halligan Excellent Estates project worker 32, 25, 180 To complete by 31/01/09 83 Highways responsibility To complete by 31/1/09 PS – Property Services RB - Robert Barrett CE – Chris Ellison JG – Jane Greer Harlow Council ML – Michelle Lock 66, 68 and 69 Berecroft Guttering missing To complete by 31/1/09 156 Berecroft Ground areas at different levels 83 Berecroft Dumped rubbish by AMS To review options – consider possibility of landscaping as alternative Rubbish has been removed 7/1/09 125 Berecroft Window broken 64 Berecroft Graffiti on side of house 310 Berecroft Litter bin, no bag and not been emptied Carport by garage 43 Fencing missing Works Completed 7/1/09 311 Berecroft Carport fencing Works Completed 7/1/09 124 Berecroft Carport fencing Works Completed 7/1/09 263 Berecroft Carport fencing Works Completed 7/1/09 160 Berecroft Carport fencing Works Completed 7/1/09 279 Berecroft Carport fencing Works Completed 7/1/09 264 Berecroft Carport ground damaged To complete by 31/1/09 157 – 160 Berecroft Hardstanding behind properties No works to be carried out until issues with tree on highways ground has been resolved. 2 To complete 31/1/09 Litter all over estate – how often is it cleared? Write to residents to get feedback and comments on litter Jane Greer to provide information on who leads the community safety team at the Council JG 04/11/08 To look at ways of improving community safety/ASB working relationships with Harlow’s ML Initial contact with the LM – Lorraine Murphy, N/Officer SD – Sarah Dangerfield Residents Assoc MH – Michael Halligan Excellent Estates project worker PS – Property Services RB - Robert Barrett CE – Chris Ellison ML in process of contacting Marysia from Harlow Council. To involve resident once 1st meeting has taken place. Initial meeting with Marysia took place on 27/11. Agreed to look at drawing up a service level agreement on JG – Jane Greer Harlow Council ML – Michelle Lock community safety team – full breakdown of how this is to be achieved to be inserted Proposed timetable for Excellent Estates – Resident meeting planned for 13/11 @6pm 3 community safety team to be undertaken by 07/11/08 MH/LM key issues which can then be used to undertake consultation with residents. ML leading on. Other outcomes ML to liaise with Inspector Andy Bray about attending JAG meetings and Paula Clugston about the Safer Harlow Partnership. E-mails sent to Andy/Paula 3/12/08 Excellent Estates programme on 20/11/08? Possible works to be included for the project: Bushes opposite 125 Berecroft – Residents previously requested that these be removed. Fencing around car parks – getting damaged and needing painting To consult with residents of the block – might be potential for the RA to do this work 4 To review current arrangements for clearing the bins on the estate. Contractors are selective about what they take from bins To investigate why some bins are overflowing and others are rarely being used ML/JG End Dec 08 Need to clarify what is happening with bins. Would dog bins help the situation. JG to speak to John Grundy at Harlow Council to see if dog bins can be provided. 5 Investigate the possibility of introducing dog bins on the estate ML/JG End Dec 08 6 Confirm when the guttering works are planned for the estate PS tbc 7 Confirm whether there are any plans to replace kitchens at the current time. (Separate visit needed to 58 as their kitchen in a particularly PS ML/JG discussed 13/1/09 – issue with funding for HDC JG has discussed with her colleague – initial indication is that there is no funding for the forthcoming financial year. ML/JG currently looking at alternative funding options. e-mailed DR for a response 16/10/08 Drainage works required – consultants will be taking the lead ion this. Decent Homes Surveys are currently being undertaken with anticipated completion due in December. This information will then inform LM – Lorraine Murphy, N/Officer SD – Sarah Dangerfield Residents Assoc MH – Michael Halligan Excellent Estates project worker PS – Property Services RB - Robert Barrett CE – Chris Ellison JG – Jane Greer Harlow Council ML – Michelle Lock poor state) 8 Community projects: our priorities for our planned programme of works. 58 Berecroft – Kitchen has been inspected – works issued (RN w/top, re-attach 2 cupboard doors) Sarah Dangerfield to provide details on residents previously involved with the youth council to Caroline Kaldani. Upon receipt of information from SD SA to facilitate a meeting with the youth council to identify the way forward SA to support the Youth Council in developing the land with the circle so that this can be utilised by the youngsters in a constructive way which is beneficial to the wider community SD 07/11/08 RB 12/12/08 Sarah Dangerfield to forward a list of the current residents involved with the RA to Caroline Kaldani SD 07/11/08 SA to facilitate a meeting with the RA to discuss the way forward, and how this can link into the action point below. RB/LM 12/12/08 Residents are keen to develop the play area on the top field. Sarah Dangerfield to provide details to Caroline of the current residents group so that Rob can liaise with them to support their application for funding. It was also identified that the Council owes this play area and JG to confirm the position with them with regards to lighting and the current condition of the area SD/RB/JG Planter area project – possibility of re starting this as area is now very LM – Lorraine Murphy, N/Officer SD – Sarah Dangerfield Residents Assoc MH – Michael Halligan Excellent Estates project worker PS – Property Services RB - Robert Barrett CE – Chris Ellison See attached RI action plan for Berecroft. RB has met with the police and Pitney Bowes (franking machines) and there is the possibility of funding for the lighting to the play area on the back field. Will need council consent to install this. Funding has been acquired to the value of £2.5K from Pitney Bowes for the playing field Consider whether this could be incorporated JG – Jane Greer Harlow Council ML – Michelle Lock overgrown again into the Parringdon School allotment project Projects identified for 2009/10 9 Grounds Services: To consider whether there is any mileage in one organisation taking responsibility for the grounds services and whether there could be one provider. ML/JG Berecroft Credit Union Berecroft Youth Club Berecroft Jobs Fair Grow your own Lifestyle Gardeners Club (links with Paringdon School & Essex Police) Berecroft Fishing Club Berecroft Playing Area Dec 08 LM To develop Estate Champions to be involved with the NO in the management of the grounds services and other estate management issues as appropriate. 10 11 To send out information to residents on how they can report incidents of ASB Garage no 172 roofing and wall is dangerous and needs making safe plus repairing – rubbish on garage roofs to be cleared and metal fencing surrounding parking and garage areas to be fixed and replaced as necessary Garage 256 Berecroft Wall at rear falling down LM – Lorraine Murphy, N/Officer SD – Sarah Dangerfield Residents Assoc MH – Michael Halligan Excellent Estates project worker Residents Association to take on this role, Need to clarify expectations to the RA and to work with them to ensure representation of the whole estate. LM 30/11/08 This information to be included in the next Newsletter Newsletter sent 25/11/08 to SD/Cheema for comments and RA article. Newsletter distributed by Cheema on 12/12, next newsletter will be distributed March 09 London Maintenance to rebuild brick walls to garage. RN roof material and guttering as per future programmed works to all garages. To trial this garage e.g. of future programmed works to all garages. London Maintenance to make safe until programme of works commence PS – Property Services RB - Robert Barrett CE – Chris Ellison JG – Jane Greer Harlow Council ML – Michelle Lock Garage 9 Berecroft Down pipe and guttering To complete by 31/1/09 Garage block 1 – 6 Berecroft Graffiti Completed 7/1/09 Garage 12 Berecroft Caravan dumped Garage block 108 Berecroft Unsafe Inspected and brickwork cleared to be safe 7/1/09 Garage block 72 Berecroft Rubbish on garage roofs To complete by 31/1/09 Garage 49 Berecroft Door To complete as programme of works. Garage 180 – 183 Graffiti on garage doors Works completed 7/1/09 Garage block 227 – 232 Graffiti and side wall unsafe To make safe prior to planned works commencing. Garage 149 Berecroft Unsafe wall To make safe prior to planned works commencing. Garage 155 Berecroft Wall To make safe before planned programme of works commence Garage 142 Berecroft Wall To make safe before planned programme of works commence Garage 203 Berecroft Graffiti To complete by 31/1/09 LM – Lorraine Murphy, N/Officer SD – Sarah Dangerfield Residents Assoc MH – Michael Halligan Excellent Estates project worker PS – Property Services RB - Robert Barrett CE – Chris Ellison JG – Jane Greer Harlow Council ML – Michelle Lock LM – Lorraine Murphy, N/Officer SD – Sarah Dangerfield Residents Assoc MH – Michael Halligan Excellent Estates project worker PS – Property Services RB - Robert Barrett CE – Chris Ellison JG – Jane Greer Harlow Council ML – Michelle Lock