No. EHS/11/09 Policy Adopted: May 29, 2009 IMF Environmentally Sustainable Policies and Plans Title: Overall Sustainable Purchasing Policy Scope The scope of each component of this purchasing policy for the IMF HQ1 and HQ2 buildings are as follows: Ongoing consumables: Durable goods: o Electric-powered equipment: o Furniture: Facility alterations and additions: Mercury-containing lamps: Goals The goal of this purchasing policy is to minimize the environmental impacts of purchases and to provide a standard for the purchase of materials for use in the operations, maintenance, and upgrades of buildings. Additionally, the policy is intended to reduce the risk of both occupants and the company to injury and/or health problems. The promotion of sustainable purchasing practices can have beneficial effects on employee health and productivity, life-cycle building maintenance costs, and overall environment. A wide variety of environmentally preferable materials are available, and this policy applies standards to the purchase of materials for use in the IMF’s facilities. Performance Metrics Performance for this policy will be measured by tracking the percentage by cost of each category of purchases that meet the applicable sustainability criteria. Procedures and Strategies The IMF will meet the requirements for Ongoing Consumables and will address the goal, scope, and performance of the following specific policies as listed below. These policies include benchmarks for sustainable purchasing in: Durable goods o Electric-powered equipment o Furniture Facility alterations and additions Mercury-containing lamps Responsible Party The Procurement Division Chief has primary responsibility for the sustainable purchasing policy. Tracking is by the Environmental Sustainability Team, Facilities Management Division. 2 Time period This policy will be put in place for the life of the building, receiving updates yearly to maintain a high standard in environmental policy. This policy will be revised as necessary to continue to meet or exceed the LEED-EB requirements. 3 Subtitle: Sustainable Purchasing: Ongoing Consumables Scope The scope of this purchasing policy for ongoing consumables is the HQ1 and HQ2 building. Goals The goal of this purchasing policy is to minimize the environmental impacts of ongoing consumables purchases. Performance Metrics Performance for this policy will be measured by tracking the percentage by cost of purchases that meet the applicable sustainability criteria. It is the IMF’s policy that at least 40 percent by cost of materials purchased for use in the building by the organization or one of its contractors must meet one or more criteria in the Procedures and Strategies section below. Procedures and Strategies Every attempt will be made to select materials with recycled content, salvaged material, or rapidly renewable materials that reduce environmental impacts associated with extracting, harvesting, and manufacturing virgin materials. The Fund is committed to purchasing ongoing consumables such as paper, toner cartridges, binders, batteries and desk accessories that minimize the impact on the environment. Criteria Whenever possible, materials purchased for use in the building by the organization or one of its contractors will meet at least one of the following criteria: Contains at least 10 percent post-consumer or 20 percent post-industrial material. Contains at least 50 percent rapidly renewable materials. Contains at least 50 percent Forest Stewardship Council (FSC) certified wood. Contains at least 50 percent materials harvested and processed or extracted and processed within 500 miles of the project. Are rechargeable batteries. Responsible Party The responsible party is the Procurement Division and any other vendor company purchasing ongoing consumables on the Fund’s behalf and supplying that information to the Environmental Sustainability Team. The IMF organizational unit requesting the item being procured is also responsible for specifying items that meet this policy. The Environmental Sustainability Team is responsible for compiling the metrics. Tracking The dollar amount of all ongoing consumables purchases will be tracked, as well as the dollar amount of ongoing consumables purchases that are compliant with the environmental criteria. The criterion or criteria met by each purchase will be tracked. Each purchase can be counted for each sustainability criterion that it meets. The percent of ongoing consumables purchases that are compliant with one or more of the specified environmental criteria will be calculated. The compliant percentage will be used to measure performance, as stated above. 4 Tracking sheets will be reviewed quarterly and program adjustments will be made as necessary to achieve targets. Time Period Same as overall policy. 5 Subtitle: Sustainable Purchasing: Electric-Powered Equipment Scope The scope of this purchasing policy for electric-powered equipment for the HQ1 and HQ2 buildings. Goals The goal of this purchasing policy is to minimize the environmental impacts of purchases. Performance Metrics Performance for this policy will be measured by tracking the percentage by cost of purchases that meet the applicable sustainability criteria. It is the building policy that at least 40% by cost of materials purchased for use in the building by the organization or one of its contractors must meet one or more criteria in the Procedures and Strategies section below. Procedures and Strategies The organization is committed to purchasing electric-powered equipment that minimizes the impact on the environment through these methods. Whenever possible, electric-powered equipment purchased for use in the building by the organization or one of its contractors will meet at least one of the following criteria: The equipment is ENERGY STAR labeled The equipment replaces conventional gas-powered equipment Responsible Party Parties responsible are the Procurement Division and the Fund’s Property Manager, reporting to the Operations and Maintenance Section, who is responsible for purchasing electric durable goods. The IMF organizational unit requesting the item being procured is also responsible for specifying items that meet this policy. Consolidation of the metrics, provided by Procurement and the Fund’s Property Manager is the responsibility of the Environmental Sustainability Team. Tracking The dollar amount of all electric goods purchases will be tracked, as well as the dollar amount of electric goods purchases that are compliant with the environmental criteria. The percent of electric goods purchases that are compliant with one or more of the specified environmental criteria will be calculated. The compliant percentage will be used to measure performance, as stated above. Tracking sheets will be reviewed quarterly and program adjustments will be made as necessary to achieve targets. Time Period Same as overall policy. 6 Subtitle: Sustainable Purchasing: Furniture Scope The scope of this purchasing policy for furniture is the IMF buildings HQ1 and HQ2. Goals The goal of this purchasing policy is to minimize the environmental impacts of purchases. Performance Metrics Performance for this policy will be measured by tracking the percentage by cost of purchases that meet the applicable sustainability criteria. It is IMF policy that at least 40 percent by cost of materials purchased for use in the buildings by the IMF or one of its contractors must meet one or more criteria in the Criteria section below. Procedures and Strategies The IMF will make every effort to select furniture products with recycled content, salvaged material, or rapidly renewable materials that reduce environmental impacts associated with extracting, harvesting, and manufacturing virgin materials. The IMF is committed to purchasing furnishings that minimize the impact on the environment by adhering to the criteria below. Criteria At least 40 percent of the furniture purchased for use in the buildings (based on cost), by the IMF, must meet using at least one of the following criteria: Contains at least 70 percent salvaged material from off site or outside the organization. Contains at least 70 percent salvaged from on site through an internal organization materials & equipment reuse program. Contains at least 10 percent post-consumer or 20% post-industrial material. Contains at least 50 percent rapidly renewable materials. Contains at least 50 percent Forest Stewardship Council (FSC) certified wood. Contains at least 50 percent materials harvested and processed or extracted and processed within 500 miles of the project. Responsible Party Parties responsible are the Procurement Division. The IMF organizational unit (primarily the Facilities Design and Construction Section) requesting the item be procured is also responsible for specifying items that meet this policy. Consolidation of the metrics, provided by Procurement and the Fund’s Property Manager is the responsibility of the Environmental Sustainability Team. Tracking The dollar amount of all furniture purchases will be tracked, as well as the dollar amount of furniture purchases that are compliant with the environmental criteria. The criterion or criteria met by each purchase will be tracked. Each purchase can be counted for each sustainability criterion that it meets. The percent of furniture purchases that are compliant with one or more of the specified environmental criteria will be calculated. The compliant percentage will be used to measure performance, as stated above. Tracking sheets will be reviewed quarterly and program adjustments will be made as necessary to achieve targets. 7 Time Period Same as overall policy. 8 Subtitle: Sustainable Purchasing: Facility Alteration And Additions Scope The scope of this purchasing policy for facility alterations and additions is the HQ1 and HQ2 buildings. Goals The goal of this purchasing policy is to minimize the environmental impacts of purchases. Performance Metrics Performance for this policy will be measured by tracking the percentage by cost of purchases that meet the applicable sustainability criteria. It is the IMF’s policy that at least 50 percent by cost of materials purchased for use in the building by the organization or one of its contractors must meet one or more criteria in the section below. Procedures and Strategies The IMF will make every attempt to select materials with recycled content, salvaged materials or rapidly renewable material that reduces the environmental impacts associated with extracting, harvesting and manufacturing virgin materials. In addition, indoor environmental quality will be protected by the purchase of low VOC materials and products. Responsible Party Parties responsible are the Procurement Division. The IMF organizational unit (primarily the Facilities Design and Construction Section) requesting the item be procured is also responsible for specifying items that meet this policy. Consolidation of the metrics, provided by Procurement and the Fund’s Property Manager is the responsibility of the Environmental Sustainability Team. Criteria At least 50 percent of the materials purchased for renovations undertaken (based on cost), by the IMF, must meet using at least one of the following criteria: Contains at least 10 percent post-consumer and/or 20 percent postindustrial material. Contains at least 70 percent material salvaged from off-site or outside the organization. Contains at least 70 percent material salvaged from on-site through an internal organization materials and equipment reuse program. Contains at least 50 percent rapidly renewable materials. Contains at least 50 percent Forest Stewardship Council (FSC) certified wood. Contains at least 50 percent materials harvested and processed or extracted and processed within 500 miles of the project. Adhesives and sealants have VOC content less than the current VOC content limits of South Coast Air Quality Management District (SCAQMD) Rule #1168, or sealants used as fillers that meet or exceed the requirements of the Bay Area Air Quality Management District Regulation 8, Rule 51. Paints and coatings have VOC emissions that do not exceed the VOC and chemical component limits of Green Seal’s Standard GS-11 requirements. Non-carpet finished flooring is FloorScore-certified and constitutes a minimum of 25 percent of the finished floor area. Carpet meets the requirements of the CRI Green Label Plus Carpet Testing Program. Carpet cushion meets the requirements of the CRI Green Label Testing Program. Composite panels and agrifiber products contain no added urea-formaldehyde resins. 9 Tracking The purchasing team is responsible for purchasing tracking. The dollar amount of all applicable purchases will be tracked, as well as the dollar amount of applicable purchases that are compliant with the environmental criteria. The criterion or criteria met by each purchase will be tracked. Each purchase can be counted for each sustainability criterion that it meets. The percent of applicable purchases that are compliant with one or more of the specified environmental criteria will be calculated. The compliant percentage will be used to measure performance, as stated above. Tracking sheets will be reviewed quarterly and program adjustments will be made as necessary to achieve targets. Time Period Same as overall policy. 10 Subtitle: Sustainable Purchasing: Reduced Mercury in Lamps Scope The scope of this purchasing policy for mercury-containing light bulbs is the HQ1 and HQ2 building and site. Goals The goal of this purchasing policy is to minimize the environmental impacts of purchases. Performance Metrics Performance for this policy will be measured by using the picogram per lumen hour of the lamp purchasing plan for the building. Of all light bulbs purchased, 90 percent (by number of bulbs) will comply with the purchasing plan and meet the targets for mercury content. Procedures and Strategies Wherever practical, high efficiency light bulbs will be used in the building and on site rather than incandescent light bulbs. A Light Bulb Purchasing Plan will be prepared that minimizes the weighted average mercury content (in picograms per lumen-hour) of all light bulbs in the building and on site. The weighted average mercury content (in picograms per lumen-hour) of all light bulbs included in the plan will be 90 picograms per lumen-hour or less. (Note: 1 point is earned for 90 pcg/lu-hr or less, 2 points are earned for 70 pcg/lu-hr or less). Screw-based, integral compact fluorescent lamps (CFL’s) will be excluded from the plan and performance calculation if they comply with voluntary industry guidelines for maximum mercury content published by the National Electrical Manufacturers Association (NEMA). Criteria: Only the specific mercury containing light bulbs (manufacturer and product number) listed in the Light Bulb Purchase Plan (maintained by the Facilities Operation and Maintenance Section) may be purchased by the IMF or one of its contractors. Responsible Party Party responsible is the Property Manager, reporting to the Chief, Operations and Maintenance Section, Facilities Management Division. Tracking To document that the Light Bulb Purchasing Plan is being followed, records will be kept of all acquisitions of light bulbs for use in the building and grounds. Calculations demonstrating that each type of light bulb purchased has a picogram per lumen-hour mercury content that is less than or equal to the mercury content specified in the Light Bulb Purchasing Plan will be documented. Calculations - The annual weighted average mercury content of these light bulbs will be calculated by: a) adding up the total weight of mercury in all the light bulbs acquired during the performance period (picograms of Hg); and then b) adding up the lifetime light output of all the mercury containing light bulbs in lumen-hours (lumen-hours are calculated by multiplying the rated hours (life)** of each light bulb by the mean light output in lumens); and finally, c) dividing the total mercury content of all mercury containing light bulbs calculated in a) above by the total lifetime light output of all the mercury content light bulbs calculated in b) above. 11 ** Rated hours of life are defined as stated by the manufacturer: three hours on and 20 minutes off for linear fluorescents and compact fluorescents; 11 hours on for HID lamps. Rated hours of life given for instant-start ballast should be used instead of program-start. Time Period Same as overall policy.