TERMS OF REFERENCE (ToR) FOR HIRING OF CONSULTANCY SERVICE:
1. BACKGROUND:
The Infrastructure and Product Development Division under the Tourism Council of Bhutan
(TCB) is responsible for development of tourism related infrastructure such as
construction/maintenance of trek routes and campsites, roadside amenities including and
restrooms in the country.
With the increasing number of tourists visiting the country every year due to the multiple
initiatives implemented by the government, there is a need to improve trek routes and
campsites and integrated tourism infrastructure with restrooms area in order to provide better
quality services and facilities to the visitors.
The Tourism Council of Bhutan is encouraging and facilitating the private sector to develop
tourism related infrastructure to cater to the needs of the growing number of tourist in the
country. This is being done to improve services and facilities for visitors with minimal cost to
the government as well as keeping the sustainability factor in view.
2. A PRECISE STATEMENT OFOBJECTIVE:
The main objective of hiring a consultancy service is to achieve TCB’s mandate to
develop tourism related infrastructure in the country as per the approved annual plan
such as development of new trek route and campsites, maintenance of bridges and
trek routes, construction of infrastructure for specialized tours, development of
roadside amenities such as cafeteria and restroom facilities along the highways in the
country by end of FY- 2015-2016.
Approximately budget available Nu. 0.480 million for hiring of consultancy service
#
1
Description
Outline of the task to be Remarks
carried
Development of Royal Develop
the
Heritage
Trek drawings/structural,
route(between Bumthang functional design, prepare the
to Trongsa)
cost estimates, tendering,
supervision and measurement.
2
Development of Aja trek Develop
the
route
in
Mongar drawings/structural,
Dzongkhag
functional design, prepare the
cost estimates, tendering,
supervision and measurement.
3
Development of Salt trek
route(between Tashigang,
Pemagatshel
and
Samdrupjongkhar
4
Develop
the
drawings/structural,
functional design, prepare the
cost estimates, tendering,
supervision and measurement.
Development of trek route Develop
the
from
Khaling
to drawings/structural,
Danglingtsho
in functional design, prepare the
Tashigang Dzongkhag
cost estimates, tendering,
supervision and measurement.
5
Re-roofing of Jangothang Supervision,
measurement
campsite(Jhomolhari base and handing and taking over
camp)
6
Re-roofing of restroom at Develop
structural
design,
Chunzom(Paro – Thimphu prepare
cost
estimates,
Highway)
supervision, prepare bills, verify
bills and measurement and
handing and taking over
3. DETAILED OUTLINE OF THETASKS TO BE CARRIED OUT:
i.
The Consultancy firm shall prepare design/drawings and cost estimates wherever
required for the above mentioned projects and closely work with TCB Architect.
ii. The bill of quantities (BoQ) shall be prepared using the latest Bhutan Schedule of
Rates (BSR) for items covered by BSR, rate analysis shall be carried out using the
existing market rates of the materials.
iii. Prepare detail tender documents and evaluate bids received for the purpose of
selecting competent contractor to execute the work.
iv.
Carry out contract management including, regular monitoring or supervision of
construction sites in order to ensure that the construction is being carried out as
per the approved designs.
v. The Consultant should submit comprehensive report to TCB for each visit to sites.
4. SCHEDULE FOR COMPLETION OF TASKS:
The assignment should be completed by end of the FY-2015-2016(5 months)
5. DATA, SERVICES AND FACILITIES TO BE PROVIDED BY THE CLIENT:
The Infrastructure and Product Development Division under the Tourism Council of
Bhutan will provide following relevant documents and data for the purpose of consultant
to carry out the assignment of on time:
i.
List of trek routes and campsites to be developed.
ii. List of trek routes to be surveyed.
iii. List of RSAs to be developed/renovated by TCB and also in partnership with
private people.
6. FINAL OUTPUTS (i.e., REPORT, DRAWINGS, COST ESTIMATES, etc.)
THAT WILL BE REQUIRED BY THE TCB FROM THE CONSULTANT
Development of drawing and design, cost estimates, tender documents, maintenance of
measurement book, final/survey report.
7. COMPOSITION
OF
REVIEW
CONSULTANT’S WORK:
COMMITTEE
TO
MONITOR
The Senior Management of TCB including Director, 4 Division Heads and Head of AFD.
8. PROCEDURE FOR REVIEW OF PROGRESS REPORTS, INCEPTION,
STATUS, FINAL DRAFT AND FINAL REPORTS:
Submission of report on regular basis, presentation project report basis, tour report for each
visit to TCB management.
9. LIST OF KEY POSITIONS WHOSE CV AND EXPERIENCE WOULD BE
EVALUATED.
1) Civil Engineer(if possible to be stationed at TCB office)
2) Electrical Engineer
3) Surveyor(feasibility study for development of new route)