STANDARD SPECIFICATION FOR ROAD MAINTENANCE SCHEDULES HOLD POINTS WITNESS POINTS STANDARD SPECIFICATION FOR ROAD MAINTENANCE – SCHEDULES – HOLD POINTS – WITNESS POINTS – PAGE 1 NOVEMBER 2014 STANDARD SPECIFICATION FOR ROAD MAINTENANCE SCHEDULES HOLD POINTS WITNESS POINTS PROJECT INFORMATION Project Number; . . . . . . . . . . . . . . . . RFT Number; . . . . . . . . . . . . . . . . . . Project title; ............................................................. ............................................................. ............................................................. Superintendent; Name; . . . . . . . . . . . . . . . . . . . . . . . . . . Phone number; . . . . . . . . . . . . . . . . . . . Contact person (Project Manager/Officer) Name; . . . . . . . . . . . . . . . . . . . . . . . . Phone number; . . . . . . . . . . . . . . . . . . . STANDARD SPECIFICATION FOR ROAD MAINTENANCE – SCHEDULES – HOLD POINTS – WITNESS POINTS – PAGE 2 NOVEMBER 2014 CLAUSE TITLE Misc. Provisions - Camp Site/Compound/Workshop 1.8.2 9 Misc. Provisions - Explosives 1.9 9 Misc. Provisions – Extraction Areas - Crushing Or Screening 1.10.2 9 Misc. Provisions – Work Health and Safety – WHS Management Plan 1.13.2 11 Misc. Provisions - Work On Railway Sites 1.15 12 Misc. Provisions - Work In The Vicinity Of Traffic Counting Stations 1.16 12 Provision For Traffic - Work In Rural Areas 2.7 17 Provision For Traffic - Work In Built Up Areas - Working Times 2.8.1 17 Provision For Traffic – Nt Specific Signs - Non-Standard Signs 2.10.4 19 Provision For Traffic – Nt Specific Signs - Temporary Speed Limits 2.10.8 19 Provision For Traffic - Temporary Bridging 2.17 21 Provision For Traffic – Contractor’s Plant and Equipment – Floodlights 2.18 21 Provision For Traffic – Portable Traffic Signals - Temporary Speed Limits 2.21.1 22 Earthworks & Drainage – In Cut - Rock 3.5.2 24 Earthworks & Drainage – In Cut - Unsuitable Material/Weathered rock 3.5.3 24 Earthworks & Drainage – Removal of Excess Material 3.8 26 Earthworks & Drainage - Conformance – Proof Rolling – Submit procedure 3.15.2 27 Earthworks & Drainage - Conformance – Conformance Testing 3.15.3 27 Grading & Gravel Sheeting - Conformance - Proof Rolling – Submit Procedure 5.10.2 41 Grading & Gravel Sheeting - Conformance - Conformance Testing 5.10.3 41 Stabilization Maintenance – Materials - Additives 6.4.2 46 Stabilization Maintenance – In Situ Stabilization - Spreading 6.5.4 46 Stabilization Maintenance – In Situ Stabilization - Mixing 6.5.5 47 Stabilization Maintenance – Conformance - Testing 6.7.2 48 Bituminous Surface Maintenance - Spray Sealing – Areas Less Than 300 sq. m - Spraying 7.15.2 56 Bituminous Surface Maintenance - Spray Sealing – Areas Less Than 300 sq. m – Application of Aggregate 7.15.6 57 DATE SCHEDULE 1 - HOLD POINTS INITIALS 1.1 PAGE No HOLD POINTS AND WITNESS POINTS SCHEDULES SECTION 1. STANDARD SPECIFICATION FOR ROAD MAINTENANCE – SCHEDULES – HOLD POINTS – WITNESS POINTS – PAGE 3 NOVEMBER 2014 Spray Sealing - Application Spray Rates 8.14.4 66 Spray Sealing - Application of Aggregate 8.15 66 Concrete Maintenance – Handling and Placing - Verification 9.9 74 Concrete Maintenance – Existing Services 9.14 76 Drainage Maintenance – Materials - Precast Reinforced Concrete Box Culverts – Provide drawings before fabrication 10.4.3 77 Drainage Maintenance – Construction Of Culverts And Structures Setting Out 10.5.1 78 Drainage Maintenance – Construction Of Culverts And Structures Backfill – Concrete strength & approval before placing fill 10.5.10 79 Drainage Maintenance – Subsoil Drains - Laying And Backfilling 10.10.6 80 Protection Works Maintenance - Stone Pitching - Grouted Stone Pitching 11.6.2 83 Road Furniture Maintenance - Road Signs – Manufacture, Supply & Delivery - Materials 12.8.1 89 Road Furniture Maintenance - Road Signs – Installation & Maintenance – Daily Log 12.10.14 91 Pavement Marking – Removal of Markings 13.6.10 98 Landscape Maintenance – Pruning – Pruning Operations – Approval to prune branches >75mm overhanging road 14.15.2 104 Landscape Maintenance – Pruning – Pruning Operations – Use mulched prunings on gardens in road reserve 14.15.2 104 Landscape Maintenance – Replacement of Plants - Horticulturist 14.17.2 105 Street Sweeping - Detergent 17.9 136 DATE INITIALS PAGE No CLAUSE TITLE SECTION Schedule 1 - Hold Points (cont’d) STANDARD SPECIFICATION FOR ROAD MAINTENANCE – SCHEDULES – HOLD POINTS – WITNESS POINTS – PAGE 4 NOVEMBER 2014 Miscellaneous Provisions - As Constructed Information 1.5 7 Miscellaneous Provisions – Work Health & Safety - Safety Officer 1.13.1 11 Provision for Traffic - Traffic Control 2.13 20 Earthworks & Drainage – Conformance – Proof Rolling – Notice of proof rolling 3.15.2 27 Conformance Testing - Notice Of Testing – Copy of order for test 4.8 29 Conformance Testing - Notice Of Testing – Notice prior to reworking 4.8 29 Grading & Gravel Sheeting – Conformance - Proof Rolling - Notice 5.10.2 41 Bituminous Surface Maintenance - Spray Sealing Areas <300sq m Preparation For Sprayer Run - Inspection 7.15.3 57 Spray Sealing – Scope – Cycle & Pedestrian Shared Path Maintenance 8.4.1 62 Spray Sealing - Sampling Of Binder – Collection of Samples 8.10.5 64 Spray Sealing – Spraying - Notice 8.14 65 Spray Sealing – Spraying - Preparation For Sprayer Run - Inspection 8.14.5 66 Concrete Maintenance – Materials – Reinforcement - Inspection 9.3.6 73 Concrete Maintenance - Formwork 9.8 74 Concrete Maintenance – Handling & Placing - Notice 9.9 74 Drainage Maintenance – Materials - Precast Reinforced Concrete Box Culverts - Notice 10.4.3 77 Drainage Maintenance - Construction Of Culverts And Structures Excavation 10.5.2 78 Drainage Maintenance - Construction Of Culverts And Structures Backfill - Notice 10.5.10 79 Pavement Marking – Contractor’s Materials & Equipment 13.5 96 Pavement Marking – General – Approval of equipment 13.6.1 97 Landscape Maintenance – Irrigation Operation & Maintenance – System Shutdown - Notice 14.25.5 108 Slashing & Weed Control – Vegetation Control – Chemicals – Submit list of chemicals 15.7.3 115 Slashing & Weed Control – Vegetation Control – Chemicals – Provide permits 15.7.3 115 DATE INITIALS CLAUSE TITLE PAGE No SCHEDULE 2 - WITNESS POINTS SECTION 1.2 STANDARD SPECIFICATION FOR ROAD MAINTENANCE – SCHEDULES – HOLD POINTS – WITNESS POINTS – PAGE 5 NOVEMBER 2014