WASTEWATER WORKS APPROVAL CONDITIONS WWC1 The system is to be installed, commissioned, operated and maintained in accordance with: 1.1 1.2 1.3 1.4 1.5 1.6 1.7 The plans and specifications submitted including any amendments made/required with this approval Manufacturers, installers and equipment suppliers’ instructions and recommendations In the case of any wastewater products to be installed, the relevant product approval conditions Australia/New Zealand Standard for Sanitary Plumbing and Drainage (AS/NZS 3500.2) The Onsite Wastewater Systems Code All other relevant standards and codes Conditions of this approval WWC2 In accordance with the Regulations, wastewater works must be carried out by a suitably qualified person. Additionally, the required signed Certificates of Compliance and ‘as constructed’ drawings must be submitted to Council and the owner or occupier of the land within 28 days of the work being undertaken WWC3 Council is to be given at least one business days notice at the following stages of work: under floor plumbing with work under water test drain and septic tank installation with drain work under water test subsurface effluent disposal system or irrigation system installation final inspection WWC4 The use of the wastewater system shall not vary from that indicated on the application for approval of the on-site wastewater system WWC5 This approval will expire if the works are not commenced or are commenced but not substantially completed within 24 months after the date of approval WWC6 The existing septic tank is to be disconnected as follows: proper removal of the contents of the tank with the base effectively punctured and the tank backfilled with suitable soil and rubble; or proper removal of the contents of the tank with the tank being removed and disposed of off-site and the area backfilled with suitable compacted material WWC7 The surface irrigation system must comply with the requirements of the On-site Wastewater Systems Code and wastewater engineer’s report. The irrigation system must be commissioned and inspected prior to occupancy of the premises WWC8 The subsurface irrigation system must comply with the requirements of the On-site Wastewater Systems Code and wastewater engineer’s report. The irrigation system must be commissioned and inspected prior to occupancy of the premises WWC9 The subsurface effluent disposal system must comply with the requirements of the On-site Wastewater Systems Code and wastewater engineer’s report WWC10 Pump, sump and alarms to be in strict compliance with the On-site Wastewater Systems Code. All pumped discharges to the CWMS connection point are to comply with AS/NZS 3500.2:2003 and the discharge flow rate into the CWMS is not to exceed 2 litres per second WWC11 Where effluent PVC diverters are installed they are to be actioned once every 4 months to allow the operation of the soakage trenches during the different seasons of the year WWC12 Any discharge of trade wastes from this premises may be subject to further licensing conditions in accordance with Council’s Trade Waste Discharge Policy WASTEWATER WORKS APPROVAL NOTES WWN1 The location of the CWMS connection point for this allotment cannot be confirmed. Contractors should confirm the location and depth of the CWMS connection point prior to any wastewater works being undertaken WWN2 Ensure minimum setback distances of 2500mm from septic tank to side boundary and footings are maintained WASTEWATER SYSTEM REQUIREMENTS WS1 SEPTIC TANK: Minimum effective capacity of litres EFFLUENT DISPOSAL SYSTEM: Connection to Council’s Community Wastewater Management System (CWMS) WS2 SEPTIC TANK: Minimum effective capacity of litres EFFLUENT DISPOSAL SYSTEM: Soakage trench metres long x metres wide. Base of soakage trench to be installed mm below surface level WS3 SEPTIC TANK: Minimum effective capacity of litres SECONDARY TREATMENT: Sand Filter Bed with a minimum effective surface area of m² IRRIGATION DISPOSAL SYSTEM: Minimum effective surface area of m² WS4 SEPTIC TANK: Minimum effective capacity of litres SECONDARY TREATMENT: Manufacturer: Model: IRRIGATION DISPOSAL SYSTEM: Minimum effective area of m² WS5 SEPTIC TANK & EFFLUENT DISPOSAL: Connect to existing septic tank and Council’s Community Wastewater Management System (CWMS) WS6 SEPTIC TANK: Existing septic tank satisfactory EFFLUENT DISPOSAL SYSTEM: Existing effluent disposal system satisfactory WS7 SEPTIC TANK: Existing septic tank satisfactory EFFLUENT DISPOSAL SYSTEM: Soakage trench long x wide Base of soakage trench to be installed below surface level WS8 COMBINED ALL WASTE AEROBIC SYSTEM: Manufacturer: <<Name of Manufacturer>> Model: <<Model>> IRRIGATION DISPOSAL SYSTEM: Minimum effective area of<<area>>m² WS9 SEPTIC TANK: Existing septic tank satisfactory SECONDARY TREATMENT: Existing aerated wastewater system satisfactory IRRIGATION DISPOSAL SYSTEM: Existing irrigation disposal system satisfactory WS10 COMBINED SEPTIC TANK AND AEROBIC UNIT: Existing combined septic tank and aerated wastewater system satisfactory IRRIGATION DISPOSAL SYSTEM: Existing irrigation disposal system satisfactor