TSF Daily Activities Report - 2014/02/11
TSF GA – TSF General Area
LLSD – Lower Llagal Starter Dam
LLD – Lower Llagal Dam
ULD – Upper Llagal Dam
SD1 – Saddle Dam 1
SD2 – Saddle Dam 2
SD3 – Saddle Dam 3
SD4 – Saddle Dam 4
ULCE – UL East Cofferdam
ULCW – UL West Cofferdam
ULDW – UL West Diversion Dam
LLO – Low Level Diversion
ULSE – UL East Spillway
ULSW – UL West Spillway
ULSEW – UL East West Spillway
ES1 – Emergency Spillway 1
ES2 – Emergency Spillway 2
ES3 – Emergency Spillway 3
LBOR – Llagal Borrow
LSTO – Llagal Stockpile
AGG – Aggregates
LA – Left Abutment
RA – Right Abutment
DS – Downstream
US – Upstream
STN – Station
O/S – Offset
N – North
S – South
E – East
W – West
RF – Rockfill
TRF – Transition Rockfill
WL – Waste Limestone
CF – Coarse Filter
FF – Fine Filter
1
1.2
General
Water, Silt and
Sediment Control
Common Excavation
1.3
Foundation Preparation
1.4
Fills
1.1
Comments
None
None
US LA – Contractor continued to remove all loose material using hand tools
and a backhoe. Foundation was approved by QC to place additional RF and
WL. Photo 1
US RA – Contractor continued to remove loose material using hand tools and
an excavator. Photo 2
US LA – Contractor was placing and spreading RF material.
LOWER LLAGAL DAM - Upstream
Description
Comments
2.0
General
None
2.1
Water, Silt and
Sediment Control
None
2.2
Clearing and Grubbing
2.3
Common Excavation
2.4
Foundation Preparation
2.5
Fills
None
RA – None
LA – Contractor continued to excavate the old access road. Photo 3
US RA – None
US LA – None
US LA – None
US RA – None
LOWER LLAGAL DAM – Downstream
3
Description
General
3.2
3.3
Water, Silt and
Sediment Control
Clearing and Grubbing
Common Excavation
3.4
Foundation Preparation
3.1
DH – Drill Hole
PH – Pionjar Hole
IN – Slope Inclinometer
VW – Vibrating Wire Piezometer
FO – Fiber Optic Piezometer
ST – Standpipe Piezometer
SP – Settlement Plate
SM – Surface Monitoring Point
TL – Time Lapse
CM – Construction Management
WAR – West Access Road
None
2
3.0
RE – Rock Excavation
FP – Foundation Preparation
FL – Fills
GT – Geotextiles
GEM – Gabions and Erosion
Mattresses
CNE–Construction Equipment
MSC – Miscellaneous
TF – Test Fill
TP – Test Pit
BH – Borehole
SADDLE DAM 1
Description
1.0
LPF – Low Permeability Fill
RS – Road Surfacing
TPS – Topsoil
OSA – Oversize Aggregate
M1A – Minus 1” Aggregate
WST – Waste Material
COM – Common Fill
FDN – Foundation
SOW – Summary of Work
WSS – Water, Silt, and
Sediment Control
CG – Clearing and Grubbing
Comments
QA noticed that LPF placement was occurring prior to shaping the FF slope.
QA notified QC/PVDC that survey layout the FF design toe and that the
contractor trim the FF slope to the neat lines. Contractor and survey
corrected the issue as per our recommendations.
None
None
None
RA DS – None
RA Core – None
LA Core – Contractor was cleaning foundation using hand tools, air and an
excavator. Contractor was advised to prevent slope changes that does not
meet specification. Photo 4
LA DS – Contractor continued cleaning foundation using hand tools and
backhoe. Further downstream the contractor requested a foundation approval
to place the CF and TRF capping on the outlet of the HMCS. The foundation
[Type text]
TSF Daily Activities Report - 2014/02/11
was approved to place additional material. Slush grout and dental concrete
was placed to meet foundation requirements.
3.5
Fills
3.6
Instrumentation
DS RA – None
Chimney Filter – Test Pit Excavation to measure chimney filter widths ongoing.
DS LA – None
DS RF – None
LPF – Contractor continued to place LPF material. LPF material is at
elevation 184m at the central portion of the alignment, but LPF is lower at
abutments. Photo 5
None
4
UL Fresh Water Diversions
4.1
Description
General
Comments
No activity.
5
TESTING ACTIVITIES
Description
5.1
5.2
5.3
5.4
Comments
Standard Testing Lab
Advanced Testing Lab
Field Tests
Audit
Comparison testing of split LPF, FF, and CF samples.
None
None
None
6
MATERIAL MANAGEMENT
Borrow and Stockpile Areas
Hauling
to
LLD
-
Q22
18K
Borrow
Type
RF
TRF
WL
Rio Yuna
Oversize
LPF
LPF
16P
16L
Area
N13
N13
N13
QC Present
Comments
-
Hauling to LLD
None
None
-
-
None
LLD
-
Yes
-
LPF
-
-
LPF
-
-
Production
From
Sample
LLD
FF
O10N11
-
None
LLD
CF
M11
-
None
Filter
-
-
Dolcasa continues setting up crushing and screening plant
(crushing equipment has arrived onsite)
O11
Location
Diorite
Hauling to LLD
None
QC was conducting test pits in the stockpile. QA observed
limestone fragments in the test pit walls. Photo 6
None. Stockpile exhausted.
Aggregates
Comments
[Type text]
TSF Daily Activities Report - 2014/02/11
Photos:
Photo 1: 20140211_SD1_RA_US_FP_Overview of foundation approval SD1-066
Photo 2: 201402011_SD1_RA_US_FP_Contractor cleaning foundation
[Type text]
TSF Daily Activities Report - 2014/02/11
Photo 3: 20140211_LLD_US_LA_CE_Contractor continued to excavate material from the foundation
Photo 4: 20140211_LLD_Core_LA_FP_Contractor cleaning foundation
[Type text]
TSF Daily Activities Report - 2014/02/11
Photo 5: 20140211_LLD_Core_FL_Overview of LPF placement
Photo 6: 20140211_LBOR_P16_QC completed a TP in the LPF material. Limestone was observed within
the TP.