Australian Industry Participation (AIP) plan Summary
– Project Phase
1. Project Details
Designated project proponent: Arrow CSG (Australia) Pty Lt
Description of the project: Arrow Bowen Pipeline; Bowen Gas Project
New construction of a coal seam gas production facility.
Arrow’s proposed Bowen Basin developments include the Arrow Bowen Gas Project (BGP) and the
Arrow Bowen Pipeline (ABP).
BGP includes the exploration and extraction of coal seam gas from the Bowen Basin, involving; 450500 wells, field compression facilities, central gas processing facilities, low and medium pressure
water and gas gathering infrastructure, water storage dams, water treatment facilities,
accommodation village, marshalling yard and access roads.
The ABP includes the development of a gas transmission pipeline to Gladstone involving; design and
engineering, procurement of pipe and valves and construction of the pipeline and associated
construction service.
Estimated project value: >$500M
Project location: Bowen Basin, Queensland; Main project operations centre is in Moranbah,
Queensland, and the main corporate centre is in Brisbane, Queensland.
Link to project information: www.arrowenergy.com.au
Project contact for procurement information:
Mr Robert McRuvie
Senior Contract Engineer
E: robert.mcruvie@arrowenergy.com.au
Other project proponents involved in the project: Not applicable
2. Opportunities to supply Goods and Services
Opportunities for
Australian
entities
Opportunities for
non-Australian
entities
Large diameter API (30”) steel transmission pipe & valves
No*
Yes
2 stage Centrifugal compressors
No*
Yes
2 stage screw compressors
No*
Yes
Expected opportunities
Goods
AIP plan Summary – Project Phase
Australian Industry Participation Authority
Version 1.1 April 2014
1
Main Instrumentation (Wellhead skids, Field instruments,
Gauges, Valves – control & actuated)
Yes
Yes
Main Power Distribution (HV Switchboard, switchgear,
transformers)
Yes
Yes
Main automation (automation and control systems)
Yes
Yes
Modular buildings
Yes
Yes
HDPE pipe, liners and valves
Yes
Yes
Valves (ball, check, butterfly etc)
Yes
Yes
Piping Material
Yes
Yes
Cables (HV/LV/Fibre Optic)
Yes
Yes
Motor Control Centres, distribution boards and Ring Main
Units
Yes
Yes
Structural steel
Yes
Yes
Carbon steel Pipe
Yes
Yes
Well drilling equipment
Yes
Yes
Logistics – 4PL
Yes
Yes
Geotech Services
Yes
No
Telecom services
Yes
Yes
Early works (Roads, Fencing, Marshalling Yard, Permitting,
Bridge and Utilities)
Yes
No
Construction Village
Yes
No
Piping fabrication
Yes
Yes
Bulk earthworks
Yes
No
Piling
Yes
No
Foundations
Yes
No
Structural, Mechanical and Piping services
Yes
Yes
Services
AIP plan Summary – Project Phase
Australian Industry Participation Authority
Version 1.1 April 2014
2
Electrical and Instrumentation services
Yes
Yes
Water Treatment facility construction
Yes
Yes
Overhead Powerlines construction
Yes
No
Carbon Steel trunkline construction
Yes
No
Low and medium pressure water and gas gathering system
(High Density Polyethylene Pipe)
Yes
No
Dam construction
Yes
No
ABP Front End Engineering and Design (FEED)
Yes
No
Pipeline Construction of the Steel Gas Transmission
pipeline
Yes
Yes
Well drilling services; including well construction and
completions
Yes
No
Disclaimer: The information provided in the table above is based on an initial assessment by the company. Any questions or issues should
be raised with the project contact.
*These packages will be procured from global entities as there is no Australian manufacturer of
these goods to the standard and size required.
Arrow will utilise the ICN Gateway/ICN QLD to identify local capability.
Arrow will utilise competitive sourcing practices for all opportunities.
3 Standards to be used in the project

Australian Standards or International equivalent will be used as a minimum.
4. AIP activities undertaken by the Project Proponent








Publish supply opportunities above $1M on the ICN Gateway.
Hold Local Supplier Briefings, attend networking events and present at conferences and
workshops to promote supply opportunities, prequalification information and project updates.
Arrow will develop and distribute a supplier information guide during the execute phase of the
project; with the guide made available on www.arrowenergy.com.au and www.arrow.icn.org.au.
Arrow will work with local supplier advocates and ICN Queensland to promote supply
opportunities, local supplier briefings and to proactively identify local capability.
Provide feedback upon to request to all suppliers that were unsuccessful in the ICN Gateway
short listing, prequalification or tendering stages.
Publish the details of winning contractors, including key procurement contact on ICN Gateway.
Report regularly on AIP activities and outcomes on a regular basis.
Flow down the AIP requirements to procurement entities.
AIP plan Summary – Project Phase
Australian Industry Participation Authority
Version 1.1 April 2014
3
5. AIP activities to be undertaken by procurement entities







Publish supply opportunities above $1M on the ICN Gateway.
Actively participate in Arrow Local Supplier Briefings, networking events and workshops to
promote supply opportunities, prequalification information and project updates.
Work with local supplier advocates and ICN Queensland to proactively identify local capability.
Provide feedback upon request to all suppliers that were unsuccessful in the ICN Gateway short
listing, prequalification or tendering stages.
Publish the details of winning contractors, including key procurement contact on ICN Gateway.
Report regularly on AIP activities and outcomes on a regular basis.
Flow down the AIP requirements to subcontractors.
AIP plan Summary – Project Phase
Australian Industry Participation Authority
Version 1.1 April 2014