APPENDIX C.2 Vessel Caribena Condition Survey M/V Caribena ON. D1153441, 272 PASSENGERS CONDITION SURVEY CS-01- March/15/2011 Condition Survey Date: March 15, 2011 Inspection Date: February 28, 2011 Inspected by: Eng. Carlos E. Claudio Location: Fajardo Terminal, Playa Puerto Real, Puerto Rico Built: 2004, LOA 80 FT., NET/GR Ton. 64/95 Hull: Aluminum Propulsion/Gears: Detroit Diesel (2) 12 MTU 2000/Twin Disc Actual Status: Out of service, Dry dock inspection expires February 28, 2012. Next annual COI expires April 28, 2011. 1 Confidential Index: Scope of Work Analysis Condition Survey Report 2 Confidential Scope of Work: The purpose of this report is to present actual operating conditions of M/V Caribena as per owner’s instruction after a visual inspection of on board equipment. Pictures and comments report presentation of outstanding items to be correct in way to maintain vessel in operating conditions. Analysis and recommendations on immediate and long terms maintenance projections included. 3 Confidential Analysis: Vessel in good condition with a lot of maintenance work to be accomplished. Dry Docking may be needed for underwater propulsion system repairs since vibration problems are present at Port Side Propulsion Tailshaft. Tailsaft lateral movements are visible at packing area with vibration at rudder quadrant at low revolutions. Look like rudder cutlass bearing at rudder post has to be replaced and alignment of main engine will be required. Upper deck seats are been renew. Windows water leaks through passenger and pilot house. Vessel in good overall conditions. 4 Confidential Condition Survey Report Vessel: M/V Caribena Report Date: March 15, 2011 Inspection Date: February 28, 2011 Report: Condition Survey, CS-01-March/15/2011 By: Carlos E. Claudio Location - Fore Peak Tank: Fore peak bilge suction cut off valve missing; install piping, valve, and reach rod assembly. Collision bulkhead Deck above bulked Repair access hath cover looking handle: 5 Confidential Broken handle Location: Pilot House: Heavy water leaks into instrumentation console remove windows, correct as required. Pilot House 6 Confidential Fire Alarm Panel service and certify by authorized technician. Service alarm panel Location – Main Deck: Passenger area, window removal to correct water leaks and reinstallation: 7 Confidential Windows water leaks Passenger area windows Windows water leaks: 8 Confidential Windows water leaks; 9 Confidential 10 Confidential Fire Damper inspection access plates open at Port and Stbd sides aft: 11 Confidential Fire Damper Stbd side Fire Damper Stbd side Fire Damper Port side Fire Damper Port side 12 Confidential Main Engines removal inserts plate water leaks at overhead, seal with marine grade silicon gasket material: Port side overhead 13 Confidential Stbd side overhead Port side Udder Deck Stbd side Upper Deck 14 Confidential After deck bitt double plate welded to Main Deck has squared corner - remove, cut radius, and reinstall. Relocate Air Conditioning air supply ducts from storage compartment to side of duct, typical Port and Stbd. 15 Confidential Storage Compartment Storage Compartment Relocate to side of duct work Lock installation at port side aft access door. Location - Void Space No. 2: Clean bilges sea water and maintain manhole gasket and seat. 16 Confidential Location - Void Space No. 5, (Steering Compartment): Clean bilges from oily waste water: 17 Confidential Forward bulkhead After transom Steering Pump No. 1 oil leak repair at gauge T fitting. 18 Confidential Steering Pump Oil leak at fitting Port side rudder quadrant vibrates at low speed, measure rudder clearances by underwater inspection. Port side rudder assembly Location - Engine Room: Packing Box No. No. 1 (Port), add packing and align Main Engine. Packing Box No. No. 2 (Stbd), add packing. Port side Packing Box Stbd side Packing Box 19 Confidential Port side after Stbd side after Main Engine No. 1 (Port), turbo charger oil leak repairs, correct oil leaks, and wash: Port side Main Engine Main Engine No. 2 (Stbd), correct oil leaks and wash, correct flex connector exhaust leak: 20 Confidential Stbd side Main Engine Modify Main Engines and Generator sea cooling water strainers cleaning cover for easy opening: Strainers Generators Strainers Main Engines Main Engine exhaust leaks, open for inspection: 21 Confidential Port side Stbd side Battery Chargers test for proper operation and connect into jointion box removing existing plug connector: 22 Confidential Battery chargers Charger electrical connector Battery banks maintain and install cut off selector switches as required. 23 Confidential Battery bank Battery bank Generator No. 2 (Stbd) starting solenoid, renew. Starting solenoid Generator No. 1 (Port) troubleshoot to determine why it will stop when Main Generator Breaker at Main Switch Board is turn to off position. Main Engine No. 2 (Stbd) cooling water to wet exhaust pipe manifold at after bulkhead renewal, including internal spray nozzle. Insulate as required after repairs and testing. 24 Confidential Main Engine No. 1 (Port) cooling water to wet exhaust pipe manifold at after bulkhead renewal including internal spray nozzle. Remove insulation for repairs and reinsulated after repairs and testing: 25 Confidential Clean bilges by removing all gratings, scraping, vacuum, pressure wash, disposal of generated waste oily water material. Fire Pump water seal renewal. 26 Confidential Bilge Pump water seal renewal. Main Engines correct oil leaks, clean and wash. Fire Damper removal at Stbd side to renew waste Main Deck flange connection: 27 Confidential Fire Damper maintain and reinstallation. Fire Damper at Port side, removal, maintain, and test for proper operation. 28 Confidential Fire Damper Port side Fire Damper Port side. Relocate Battery Charger at Stbd side to avoid salty air spray from ventilation fan: Battery chargers relocate Location – Upper Deck: Remove damaged seats and renew as required. 29 Confidential 30 Confidential 31 Confidential