4.5 Desired standards of service 4.5.1 Purpose The desired standard of service for a trunk infrastructure network is the standard of performance stated in the extrinsic material with the key standards of performance stated in this section. 4.5.2 Water supply network The desired standard of service for the water supply network is as follows: (a) ensure drinking water complies with the National Health and Medical Research Council Australian drinking water guidelines for colour, turbidity and microbiology; (b) convey potable water from the South East Queensland Water Grid supply points to consumers in accordance with the Water Act 2000 and Water Supply (Safety and Reliability) Act 2008; (c) minimise non-revenue water loss; (d) locate future trunk infrastructure for the water supply network identified in the plans for trunk infrastructure in Schedule 3 along an actual alignment identified as part of a feasibility study; (e) design the water supply network in accordance with the following: (i) the Queensland Urban Utilities Design and Construction Standards, incorporating the South East Queensland Water Supply and Sewerage Design and Construction Code (or the SEQ Code), an amendment to the Water Supply Code of Australia WSA 03-2011; (ii) SEQ Code Design Criteria. (f) design recycled water systems to meet requirements of Water Supply (Safety and Reliability) Act 2008 in accordance with the State Government regulatory guidelines. Editor’s note—Queensland Urban Utilities has prepared a Connections Policy. Where the desired standard of service in the Interim Connections Policy differs from the desired standard of service for water supply network in section 4.5.2, the Interim Connections Policy takes precedence. 4.5.3 Sewerage network The desired standard of service for the sewerage network is as follows: (a) provide a reliable network that collects, stores, treats and releases sewage from premises; (b) locate future trunk infrastructure for the sewerage network identified in the plans for trunk infrastructure in Schedule 3 along an actual alignment identified as part of a feasibility study; (c) design the sewerage network in accordance with the following: Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 (i) the Queensland Urban Utilities Design and Construction Standards, incorporating the South East Queensland Water Supply and Sewerage Design and Construction Code (or the SEQ Code), an amendment to the Sewerage Code of Australia WSA 02-2002; (ii) SEQ Code Design Criteria; (iii) the Water Act 2000; (iv) all wastewater treatment plant licence conditions. Editor’s note—Queensland Urban Utilities has prepared a Connections Policy. Where the desired standard of service in the Interim Connections Policy differs from the desired standard of service for water supply network in section 4.5.3, the Interim Connections Policy takes precedence. 4.5.4 Stormwater network (1) The desired standard of service for the stormwater network is as follows: (a) the stormwater network is to collect and convey stormwater flows during both major and minor flood events from existing and future land use in a manner that minimises risk to property and life and reduces the cost of flood damage to the community; (b) locate future trunk infrastructure for the stormwater network identified in the plans for trunk infrastructure in Schedule 3 along an actual alignment identified as part of a feasibility study; (c) design the stormwater network for the areas identified in Map D2 Stormwater Network DSS Conveyance Standards in accordance with the dual conveyance standards: (i) (ii) conveyance standard A for a prescribed stormwater area: (A) the minimum desired capacity of the combined overland and underground trunk drainage system is to be the 50 year ARI (2% AEP) rainfall event; (B) the minimum capacity of the underground drainage system is to be the 2 year ARI (50% AEP) rainfall event, however in some cases the underground drainage system may need to be upgraded to the 10 year ARI (10% AEP) or 50 year ARI (2% AEP) rainfall event; (C) overland flow paths should be provided for the conveyance of flows in excess of the capacity of the underground drainage system unless deemed impractical by the Council. conveyance standard B for an area other than the prescribed stormwater area: (A) the minimum desired capacity of the combined overland and underground trunk drainage system is to be the 10 year ARI (10% AEP) rainfall event; Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 (B) the minimum capacity of the underground drainage system is to be the 2 year ARI (50% AEP) rainfall event with the overland flow limited in order to prevent flooding of utility and living areas, however in some cases the underground drainage system may need to be upgraded to the 10 year ARI (10% AEP) rainfall event; (C) overland flow paths should be provided for the conveyance of flows in excess of the capacity of the underground drainage system unless deemed impractical by the Council. (d) road crossing structures shall be designed to provide an appropriate level of flood immunity in accordance with the following: (i) the latest version of the Queensland Urban Drainage Manual; (ii) the Infrastructure Design Planning Scheme Policy; (iii) any other applicable codes and standards in a local planning instrument. (e) the stormwater network is designed on the assumption that the development achieves the water quality objectives for receiving waters at all times; (f) water-sensitive urban design practices shall be implemented for all new development; (g) waterway rehabilitation and natural channel works shall be designed to conform with the following: (2) (i) the latest version of the Queensland Urban Drainage Manual; (ii) the Infrastructure Design Planning Scheme Policy; (iii) provide required hydraulic conveyance of the waterway whilst maximising the potential environmental value of the waterway; (iv) not increase flood levels. For subsection (1), a prescribed stormwater area means land which is: (a) included in the following areas of the planning scheme: (i) the Emerging community zone; (ii) the Rochedale urban community neighbourhood plan; (iii) the Albion neighbourhood plan in the following precincts: (iv) (A) the Raceway Precinct; (B) the Hunt Street Precinct; (C) that part of the Station Street Precinct south of Bogan Street. the South Brisbane riverside neighbourhood plan in precincts 6 and 7; or (b) otherwise to be the subject of significant redevelopment at a higher density. Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 4.5.5 Transport network 4.5.5.1 Road network The desired standard of service for the road network is as follows: (a) provide a functional road hierarchy that supports the settlement pattern, commercial and economic activity and freight movement; (b) support economic development through the efficient movement of freight by maintaining and enhancing critical links connecting key economic centres according to the Road hierarchy overlay; (c) design the road network to comply with the following: (i) the standard road cross-sections in the Infrastructure Design Planning Scheme Policy; (ii) the off-peak operation of a road or intersection is no worse than level of service C; (iii) the peak period operation of a road or intersection is no worse than level of service C, except for a road identified as being highly constrained as well as most inner city roads where the use of alternative modes of transport in these areas is anticipated in the mode share targets stated in Map E3 Transport Network DSS Mode Share Targets; (iv) traffic on a local road does not exceed 3,000 vehicles per day; (v) access to an industrial area is not via a residential road; (vi) transport corridors are planned to provide for future capacity needs. 4.5.5.2 Pathway network The desired standard of service for the pathway network is as follows: (a) provide a safe, attractive and convenient pedestrian and cycle pathway network that links residential areas to employment areas, major activity nodes, education facilities and public transport interchanges, thereby encouraging walking and cycling as acceptable travel alternatives; (b) locate future trunk infrastructure for the pathway network identified in the plans for trunk infrastructure in Schedule 3 in a location to be determined by a local planning process or as part of the assessment of a development application; (c) the design of the pedestrian and cycle pathway network and associated infrastructure is to comply with an applicable code and standard in a local planning instrument including the Infrastructure Design Planning Scheme Policy. 4.5.5.3 Public transport (bus stops) network The desired standard of service for bus stops is as follows: Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 (a) provide public transport infrastructure to support the future mode share targets stated in Map E3 Transport Network DSS Mode Share Targets including bus stops and stations, rights of way and transport information; (b) provide a public transport stop within 400m of each dwelling in an urban area; (c) ensure full Disability Standards for Accessible Public Transport compliance for public transport infrastructure by December 2022; (d) provide priority and a right of way to public transport in key corridors to achieve the mode share targets stated in Map E3 Transport Network DSS Mode Share Targets; (e) maintain or improve network coverage through provision, upgrading and maintenance of infrastructure; (f) locate future trunk infrastructure for the public transport (bus stops) network identified in the plans for trunk infrastructure in a location to be determined through a local planning process or as part of the assessment of a development application. 4.5.5.4 Public transport (ferry terminals) network The desired standard of service for ferry terminals is as follows: (a) provide public transport infrastructure to support the future mode share targets stated in Map E3 Transport Network DSS Mode Share Targets including Ferry and CityCat terminals, rights of way and transport information; (b) ensure full Disability Standards for Accessible Public Transport compliance for public transport infrastructure by December 2022; (c) maintain or improve network coverage through provision, upgrading and maintenance of infrastructure. 4.5.6 Community purposes network 4.5.6.1 Public parks network The desired standard of service for the public parks network is as follows: (a) provide an accessible network of parks and recreation facilities that meets the needs of the population (residents) and employees in accordance with the following: (i) the land provision standard for the public parks network stated in Table 4.5.6.1.1 for the areas identified in Map F2 Community Purposes Network DSS Areas; (ii) the accessibility standard for the public parks network stated in Table 4.5.6.1.2 for the areas identified in Map F2 Community Purposes Network DSS Areas; Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 (iii) the minimum size standard for the public parks network stated in Table 4.5.6.1.3 for the areas identified in Map F2 Community Purposes Network DSS Areas; (iv) an applicable code and standard in a local planning instrument for the configuration, slope and acceptable level of flood immunity for the public parks network. (b) locate future trunk infrastructure for the public parks network identified in the plans for trunk infrastructure in Schedule 3 in accordance with the following: (i) where a specific site is conceptually identified for a public park in the plans for trunk infrastructure for the public parks network, in the specific location identified; (ii) where an indicative location is conceptually identified for a public park in the plans for trunk infrastructure for the public parks network, in a location to be determined through a local planning process or as part of the assessment of a development application. embellish the public parks network to complement the type and purpose of the public park in accordance with the embellishment standard for the public parks network stated in Table 4.5.6.1.4. Table 4.5.6.1.1—Land provision standard for the public parks network Public parks network Land provision (hectare/1,000 persons) Area A Centres (1) Area B General urban (1) Area C Fringe Population (residents) Employees Population (residents) Employees Population (residents) Local 0.3 N/A 0.8 0.3 N/A District 0.4 N/A 0.8 N/A 0.8 Metro 0.4 N/A 0.4 N/A 0.4 Urban common 0.02 0.02 0.001 N/A 0.001 Total informal 1.12 0.02 2.001 0.3 1.201 District 0.5 N/A 1.5 N/A 1.5 Metro 0.5 N/A 0.5 N/A 0.5 Total sport 1.0 N/A 2.0 N/A 2.0 Total public parks network 2.12 0.02 4.001 0.3 3.201 Informal use Sport Editor's note— Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 (1) The rate of land provision should be calculated based on either residents or employees (not the aggregate of both), whichever represents peak demand (i.e. whichever requires the greater provision of land). Table 4.5.6.1.2—Accessibility standard for the public parks network Public parks network Distance (kilometres) Area A Centres Area B General urban Area C Fringe Local 0.4 0.5 N/A District 2.0 2.0 5.0 Metro Citywide Citywide Citywide Urban common Varies Varies N/A District 2.0 2.0 5.0 Metro Citywide Citywide Citywide Informal use Sport Table 4.5.6.1.3—Minimum size standard for the public parks network Public parks network Area (hectares) Area A Centres Area B General urban Area C Fringe Local 0.2–0.5 0.5 N/A District 5.0 5.0 5.0 Metro 5.0+ 5.0+ 5.0+ Urban common 0.3 0.2 N/A District 1.0–6.0 8.0 8.0 Metro 14.0 14.0 14.0 Informal use Sport Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 Table 4.5.6.1.4—Embellishment standard for the public parks network Typical embellishments Informal use park Corridor link park Informal recreation node (natural area park) Sport park District Metro District Metro Informal recreation park Urban common Botanic garden/ arboretum Local District Metro District/ Metro District/ Metro Playground/play space xx xx xx x x x x Picnic facilities xx xx xx x x xx xx Kick-around space x xx xx x x x Barbecues xx xx x x xx xx Public toilets xx xx xx xx xx xx xx xx Local District Metr o Shade xx xx xx xx xx x xx xx xx xx xx xx Taps/bubblers x xx xx xx xx x xx xx xx xx xx xx Bins x xx xx xx xx x xx xx xx xx xx xx Seating xx xx xx xx xx x xx xx xx xx x x x xx x xx xx x x x x x x x x x x x x Paths (pedestrian/ cycle) Bridge Boardwalk x Part 4 – Priority infrastructure plan – Desired standards of service x Effective 30 June 2014 Bike racks xx xx Dog off leash x x Half court x x Rebound wall x x Skate facility x x x x x xx xx xx xx xx xx Sports field/s xx xx Sports court/s xx xx Spectator seating xx xx Boat ramp/s x x x x x x Fishing platform/ pontoon x x x x x x xx xx xx xx x x Earthworks, landscaping xx xx xx xx xx x x x Garden beds x xx xx xx xx Internal roads xx xx x xx xx xx xx Internal car parks xx xx x xx xx xx xx Fencing xx xx xx x xx x xx xx xx xx xx xx Lighting x xx xx xx xx x xx xx xx xx xx xx Signage xx xx xx xx xx x xx xx xx xx xx xx Fitness equipment x x x x x x x x x Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 Irrigation xx xx xx Editor's note— For the embellishment standard: x x – Essential x – Desirable where appropriate Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 4.5.6.2 Land for the community facilities network The desired standard of service for the land for the community facilities network is to provide an accessible network of land for community facilities that meets the needs of the population and employees in accordance with the following: (a) the land provision standard for the land for the community facilities network stated in Table 4.5.6.2.1 for the areas identified in Map F2 Community Purposes Network DSS Areas; (b) the accessibility standard for the land for the community facilities network stated in Table 4.5.6.2.2 for the areas identified in Map F2 Community Purposes Network DSS Areas; (c) the service population standard for the land for the community facilities network stated in Table 4.5.6.2.3 for the areas identified in Map F2 Community Purposes Network DSS Areas; (d) the minimum size standard for the land for the community facilities network stated in Table 4.5.6.2.4 for the areas identified in Map F2 Community Purposes Network DSS Areas; (e) the location of future trunk infrastructure for the land for the community facilities network identified in the plans for trunk infrastructure in Schedule 3 in accordance with the following: (i) where a specific site is conceptually identified for land for community facilities in the plans for trunk infrastructure for the land for the community facilities network, the land for community facilities is to be located in the specific location identified; (ii) where an indicative location is conceptually identified for land for community facilities in the plans for trunk infrastructure for the land for the community facilities network, the land for community facilities is to be located in a location to be determined through a local planning process or as part of the assessment of a development application. Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 Table 4.5.6.2.1—Land provision standard for the land for the community facilities network Land for the community facilities network Service level Land provision (m2/1,000 persons)(1) Area A Centres Area B General urban Area C Fringe Population Employees Population Employees Population Employees Community service/leisure Local(2) 360 60 360 60 0 60 Community service/leisure District 550 N/A 550 N/A 550 N/A Community service/leisure Principal 83 N/A 83 N/A 83 N/A Community service/leisure Metro 11 N/A 11 N/A 11 N/A 1,004 60 1,004 60 644 60 Total for community service/leisure Arts and culture District 200 N/A 200 N/A 200 N/A Arts and culture Principal 53 N/A 53 N/A 53 N/A 253 0 253 0 253 0 District 625 200 625 200 625 200 Principal 233 N/A 233 N/A 233 N/A Total for arts and culture Sport and recreation (excluding sports park) Sport and recreation Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 (excluding sports park) Sport and recreation District Refer to public parks network desired standard of service (district sports park) Principal Refer to public parks network desired standard of service (district sports park) Metro Refer to public parks network desired standard of service (metro sports park) (sports park) Sport and recreation (sports park) Sport and recreation (sports park) Total for sport and recreation 858 200 858 200 858 200 Total land for the community facilities network 2,116 260 2,116 260 1,756 260 Editor's note— (1) The rate of land provision is based on the peak demand arising from the population or employees and therefore is not the aggregate of the population and employee demand. (2) A local community facility is to be provided if part of an industrial area servicing over 20,000 employees. Table 4.5.6.2.2—Accessibility standard for the land for the community facilities network Land for the community facilities network Service level Distance (kilometres) Area A Centres Area B General urban Area C Fringe Population Population Population Employees Employees Employees Community service/leisure Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 Community service/leisure Local(1) 1 2 1 2 N/A N/A Community service/leisure District 2 N/A 2 N/A 5 N/A Community service/leisure Principal 5 N/A 5 N/A 10 N/A Community service/leisure Metro N/A N/A N/A N/A N/A N/A Arts and culture District 2 N/A 2 N/A 5 N/A Arts and culture Principal 5 N/A 5 N/A 10 N/A District 3 3 3 3 5 5 Principal 5 N/A 5 N/A 10 N/A District Refer to public parks network desired standard of service (district sports park) Principal Refer to public parks network desired standard of service (district sports park) Arts and culture Sport and recreation Sport and recreation (excluding sports park) Sport and recreation (excluding sports park) Sport and recreation (sports park) Sport and recreation (sports park) Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 Sport and recreation Metro Refer to public parks network desired standard of service (metro sports park) (sports park) Editor's note— (1) A local community facility is to be provided if part of an industrial area servicing over 20,000 employees. Table 4.5.6.2.3—Service population standard for the land for the community facilities network Land for the community Service level facilities network Persons Area A Centres Area B General urban Area C Fringe Population Employees Population Employees Population Employees Community service/leisure Community service/leisure Local(1) 5,000 20,000 5,000 20,000 N/A N/A Community service/leisure District 20,00030,000 N/A 20,000– 30,000 N/A 20,000– 30,000 N/A Community service/leisure Principal 150,000 N/A 150,000 N/A 150,000 N/A Community service/leisure Metro 1,200,000 N/A 1,200,000 N/A 1,200,000 N/A District 20,000 N/A 20,000 N/A 20,000 N/A Arts and culture Arts and culture Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 Arts and culture Principal 150,000 N/A 150,000 N/A 150,000 N/A District 40,000 40,000 40,000 40,000 40,000 40,000 Principal 150,000 N/A 150,000 N/A 150,000 N/A District Refer to public parks network desired standard of service (district sports park) Principal Refer to public parks network desired standard of service (district sports park) Metro Refer to public parks network desired standard of service (metro sports park) Sport and recreation Sport and recreation (excluding sports park) Sport and recreation (excluding sports park) Sport and recreation (sports park) Sport and recreation (sports park) Sport and recreation (sports park) Editor's note— (1) A local community facility is to be provided if part of an industrial area servicing over 20,000 employees. Table 4.5.6.2.4—Minimum size standard for the land for the community facilities network Land for the Service level community facilities network Area (m2) Area A Centres Area B General urban Area C Fringe Population Population Population Employees Employees Employees Community service/leisure Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 Community space Local(1) 1,200 1,200 1,200 1,200 N/A N/A Community space District 2,000 N/A 2,000 N/A 2,000 N/A Community service/group space District 2,000 N/A 2,000 N/A 2,000 N/A Community service/group space Principal 4,000 N/A 4,000 N/A 4,000 N/A Libraries District 3,000 N/A 3,000 N/A 3,000 N/A Libraries Principal 6,500 N/A 6,500 N/A 6,500 N/A Libraries Metro 13,000 N/A 13,000 N/A 13,000 N/A Arts and crafts District 2,000 N/A 2,000 N/A 2,000 N/A Arts and crafts Principal 4,000 N/A 4,000 N/A 4,000 N/A Performance space District 2,000 N/A 2,000 N/A 2,000 N/A Performance space Principal 4,000 N/A 4,000 N/A 4,000 N/A District 8,000 8,000 8,000 8,000 8,000 8,000 Arts and culture Sport and recreation Indoor sport and recreation facilities Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014 Indoor sport and recreation facilities Principal 15,000 N/A 15,000 N/A 15,000 N/A Aquatic facilities/swimming pools District 10,000 N/A 10,000 N/A 10,000 N/A Aquatic facilities/swimming pools Principal 20,000 N/A 20,000 N/A 20,000 N/A Sport and recreation District Refer to public parks network desired standard of service (district sports park) Principal Refer to public parks network desired standard of service (district sports park) Metro Refer to public parks network desired standard of service (metro sports park) (sports park) Sport and recreation (sports park) Sport and recreation (sports park) Editor's note— (1) A local community facility is to be provided if part of an industrial area servicing over 20,000 employees. Part 4 – Priority infrastructure plan – Desired standards of service Effective 30 June 2014