4.5 Desired standards of service

advertisement
4.5 Desired standards of service
4.5.1 Purpose
The desired standard of service for a trunk infrastructure network is the standard of
performance stated in the extrinsic material with the key standards of performance stated in
this section.
4.5.2 Water supply network
The desired standard of service for the water supply network is as follows:
(a) ensure drinking water complies with the National Health and Medical Research
Council Australian drinking water guidelines for colour, turbidity and microbiology;
(b) convey potable water from the South East Queensland Water Grid supply points
to consumers in accordance with the Water Act 2000 and Water Supply (Safety
and Reliability) Act 2008;
(c) minimise non-revenue water loss;
(d) locate future trunk infrastructure for the water supply network identified in the
plans for trunk infrastructure in Schedule 3 along an actual alignment identified as
part of a feasibility study;
(e) design the water supply network in accordance with the following:
(i)
the Queensland Urban Utilities Design and Construction Standards,
incorporating the South East Queensland Water Supply and Sewerage
Design and Construction Code (or the SEQ Code), an amendment to the
Water Supply Code of Australia WSA 03-2011;
(ii)
SEQ Code Design Criteria.
(f) design recycled water systems to meet requirements of Water Supply (Safety and
Reliability) Act 2008 in accordance with the State Government regulatory
guidelines.
Editor’s note—Queensland Urban Utilities has prepared a Connections Policy. Where the desired standard of service in the
Interim Connections Policy differs from the desired standard of service for water supply network in section 4.5.2, the Interim
Connections Policy takes precedence.
4.5.3 Sewerage network
The desired standard of service for the sewerage network is as follows:
(a) provide a reliable network that collects, stores, treats and releases sewage from
premises;
(b) locate future trunk infrastructure for the sewerage network identified in the plans
for trunk infrastructure in Schedule 3 along an actual alignment identified as part
of a feasibility study;
(c) design the sewerage network in accordance with the following:
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
(i)
the Queensland Urban Utilities Design and Construction Standards,
incorporating the South East Queensland Water Supply and Sewerage
Design and Construction Code (or the SEQ Code), an amendment to the
Sewerage Code of Australia WSA 02-2002;
(ii)
SEQ Code Design Criteria;
(iii)
the Water Act 2000;
(iv)
all wastewater treatment plant licence conditions.
Editor’s note—Queensland Urban Utilities has prepared a Connections Policy. Where the desired standard of service in the
Interim Connections Policy differs from the desired standard of service for water supply network in section 4.5.3, the Interim
Connections Policy takes precedence.
4.5.4 Stormwater network
(1)
The desired standard of service for the stormwater network is as follows:
(a) the stormwater network is to collect and convey stormwater flows during both
major and minor flood events from existing and future land use in a manner that
minimises risk to property and life and reduces the cost of flood damage to the
community;
(b) locate future trunk infrastructure for the stormwater network identified in the
plans for trunk infrastructure in Schedule 3 along an actual alignment identified as
part of a feasibility study;
(c) design the stormwater network for the areas identified in Map D2 Stormwater
Network DSS Conveyance Standards in accordance with the dual conveyance
standards:
(i)
(ii)
conveyance standard A for a prescribed stormwater area:
(A)
the minimum desired capacity of the combined overland and
underground trunk drainage system is to be the 50 year ARI (2%
AEP) rainfall event;
(B)
the minimum capacity of the underground drainage system is to be
the 2 year ARI (50% AEP) rainfall event, however in some cases the
underground drainage system may need to be upgraded to the 10
year ARI (10% AEP) or 50 year ARI (2% AEP) rainfall event;
(C)
overland flow paths should be provided for the conveyance of flows
in excess of the capacity of the underground drainage system unless
deemed impractical by the Council.
conveyance standard B for an area other than the prescribed stormwater
area:
(A)
the minimum desired capacity of the combined overland and
underground trunk drainage system is to be the 10 year ARI (10%
AEP) rainfall event;
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
(B)
the minimum capacity of the underground drainage system is to be
the 2 year ARI (50% AEP) rainfall event with the overland flow
limited in order to prevent flooding of utility and living areas,
however in some cases the underground drainage system may
need to be upgraded to the 10 year ARI (10% AEP) rainfall event;
(C)
overland flow paths should be provided for the conveyance of flows
in excess of the capacity of the underground drainage system unless
deemed impractical by the Council.
(d) road crossing structures shall be designed to provide an appropriate level of flood
immunity in accordance with the following:
(i)
the latest version of the Queensland Urban Drainage Manual;
(ii)
the Infrastructure Design Planning Scheme Policy;
(iii)
any other applicable codes and standards in a local planning instrument.
(e) the stormwater network is designed on the assumption that the development
achieves the water quality objectives for receiving waters at all times;
(f) water-sensitive urban design practices shall be implemented for all new
development;
(g) waterway rehabilitation and natural channel works shall be designed to conform
with the following:
(2)
(i)
the latest version of the Queensland Urban Drainage Manual;
(ii)
the Infrastructure Design Planning Scheme Policy;
(iii)
provide required hydraulic conveyance of the waterway whilst
maximising the potential environmental value of the waterway;
(iv)
not increase flood levels.
For subsection (1), a prescribed stormwater area means land which is:
(a) included in the following areas of the planning scheme:
(i)
the Emerging community zone;
(ii)
the Rochedale urban community neighbourhood plan;
(iii)
the Albion neighbourhood plan in the following precincts:
(iv)
(A)
the Raceway Precinct;
(B)
the Hunt Street Precinct;
(C)
that part of the Station Street Precinct south of Bogan Street.
the South Brisbane riverside neighbourhood plan in precincts 6 and 7; or
(b) otherwise to be the subject of significant redevelopment at a higher density.
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
4.5.5 Transport network
4.5.5.1 Road network
The desired standard of service for the road network is as follows:
(a) provide a functional road hierarchy that supports the settlement pattern,
commercial and economic activity and freight movement;
(b) support economic development through the efficient movement of freight by
maintaining and enhancing critical links connecting key economic centres
according to the Road hierarchy overlay;
(c) design the road network to comply with the following:
(i)
the standard road cross-sections in the Infrastructure Design Planning
Scheme Policy;
(ii)
the off-peak operation of a road or intersection is no worse than level of
service C;
(iii)
the peak period operation of a road or intersection is no worse than level
of service C, except for a road identified as being highly constrained as
well as most inner city roads where the use of alternative modes of
transport in these areas is anticipated in the mode share targets stated in
Map E3 Transport Network DSS Mode Share Targets;
(iv)
traffic on a local road does not exceed 3,000 vehicles per day;
(v)
access to an industrial area is not via a residential road;
(vi)
transport corridors are planned to provide for future capacity needs.
4.5.5.2 Pathway network
The desired standard of service for the pathway network is as follows:
(a) provide a safe, attractive and convenient pedestrian and cycle pathway network
that links residential areas to employment areas, major activity nodes, education
facilities and public transport interchanges, thereby encouraging walking and
cycling as acceptable travel alternatives;
(b) locate future trunk infrastructure for the pathway network identified in the plans
for trunk infrastructure in Schedule 3 in a location to be determined by a local
planning process or as part of the assessment of a development application;
(c) the design of the pedestrian and cycle pathway network and associated
infrastructure is to comply with an applicable code and standard in a local
planning instrument including the Infrastructure Design Planning Scheme Policy.
4.5.5.3 Public transport (bus stops) network
The desired standard of service for bus stops is as follows:
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
(a) provide public transport infrastructure to support the future mode share targets
stated in Map E3 Transport Network DSS Mode Share Targets including bus stops
and stations, rights of way and transport information;
(b) provide a public transport stop within 400m of each dwelling in an urban area;
(c) ensure full Disability Standards for Accessible Public Transport compliance for
public transport infrastructure by December 2022;
(d) provide priority and a right of way to public transport in key corridors to achieve
the mode share targets stated in Map E3 Transport Network DSS Mode Share
Targets;
(e) maintain or improve network coverage through provision, upgrading and
maintenance of infrastructure;
(f) locate future trunk infrastructure for the public transport (bus stops) network
identified in the plans for trunk infrastructure in a location to be determined
through a local planning process or as part of the assessment of a development
application.
4.5.5.4 Public transport (ferry terminals) network
The desired standard of service for ferry terminals is as follows:
(a) provide public transport infrastructure to support the future mode share targets
stated in Map E3 Transport Network DSS Mode Share Targets including Ferry and
CityCat terminals, rights of way and transport information;
(b) ensure full Disability Standards for Accessible Public Transport compliance for
public transport infrastructure by December 2022;
(c) maintain or improve network coverage through provision, upgrading and
maintenance of infrastructure.
4.5.6 Community purposes network
4.5.6.1 Public parks network
The desired standard of service for the public parks network is as follows:
(a) provide an accessible network of parks and recreation facilities that meets the
needs of the population (residents) and employees in accordance with the
following:
(i)
the land provision standard for the public parks network stated in Table
4.5.6.1.1 for the areas identified in Map F2 Community Purposes Network
DSS Areas;
(ii)
the accessibility standard for the public parks network stated in Table
4.5.6.1.2 for the areas identified in Map F2 Community Purposes Network
DSS Areas;
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
(iii)
the minimum size standard for the public parks network stated in Table
4.5.6.1.3 for the areas identified in Map F2 Community Purposes Network
DSS Areas;
(iv)
an applicable code and standard in a local planning instrument for the
configuration, slope and acceptable level of flood immunity for the public
parks network.
(b) locate future trunk infrastructure for the public parks network identified in the
plans for trunk infrastructure in Schedule 3 in accordance with the following:
(i)
where a specific site is conceptually identified for a public park in the
plans for trunk infrastructure for the public parks network, in the specific
location identified;
(ii)
where an indicative location is conceptually identified for a public park in
the plans for trunk infrastructure for the public parks network, in a
location to be determined through a local planning process or as part of
the assessment of a development application.
embellish the public parks network to complement the type and purpose of the
public park in accordance with the embellishment standard for the public parks
network stated in Table 4.5.6.1.4.
Table 4.5.6.1.1—Land provision standard for the public parks network
Public parks network
Land provision (hectare/1,000 persons)
Area A Centres (1)
Area B General urban (1)
Area C
Fringe
Population
(residents)
Employees
Population
(residents)
Employees
Population
(residents)
Local
0.3
N/A
0.8
0.3
N/A
District
0.4
N/A
0.8
N/A
0.8
Metro
0.4
N/A
0.4
N/A
0.4
Urban common
0.02
0.02
0.001
N/A
0.001
Total informal
1.12
0.02
2.001
0.3
1.201
District
0.5
N/A
1.5
N/A
1.5
Metro
0.5
N/A
0.5
N/A
0.5
Total sport
1.0
N/A
2.0
N/A
2.0
Total public parks
network
2.12
0.02
4.001
0.3
3.201
Informal use
Sport
Editor's note—
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
(1)
The rate of land provision should be calculated based on either residents or employees (not the aggregate of both),
whichever represents peak demand (i.e. whichever requires the greater provision of land).
Table 4.5.6.1.2—Accessibility standard for the public parks network
Public parks network
Distance (kilometres)
Area A Centres
Area B General
urban
Area C Fringe
Local
0.4
0.5
N/A
District
2.0
2.0
5.0
Metro
Citywide
Citywide
Citywide
Urban common
Varies
Varies
N/A
District
2.0
2.0
5.0
Metro
Citywide
Citywide
Citywide
Informal use
Sport
Table 4.5.6.1.3—Minimum size standard for the public parks network
Public parks network
Area (hectares)
Area A Centres
Area B General
urban
Area C Fringe
Local
0.2–0.5
0.5
N/A
District
5.0
5.0
5.0
Metro
5.0+
5.0+
5.0+
Urban common
0.3
0.2
N/A
District
1.0–6.0
8.0
8.0
Metro
14.0
14.0
14.0
Informal use
Sport
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
Table 4.5.6.1.4—Embellishment standard for the public parks network
Typical
embellishments
Informal use park
Corridor link park
Informal recreation
node (natural area
park)
Sport park
District
Metro
District
Metro
Informal recreation park
Urban
common
Botanic
garden/
arboretum
Local
District
Metro
District/
Metro
District/
Metro
Playground/play
space
xx
xx
xx
x
x
x
x
Picnic facilities
xx
xx
xx
x
x
xx
xx
Kick-around space
x
xx
xx
x
x
x
Barbecues
xx
xx
x
x
xx
xx
Public toilets
xx
xx
xx
xx
xx
xx
xx
xx
Local
District
Metr
o
Shade
xx
xx
xx
xx
xx
x
xx
xx
xx
xx
xx
xx
Taps/bubblers
x
xx
xx
xx
xx
x
xx
xx
xx
xx
xx
xx
Bins
x
xx
xx
xx
xx
x
xx
xx
xx
xx
xx
xx
Seating
xx
xx
xx
xx
xx
x
xx
xx
xx
xx
x
x
x
xx
x
xx
xx
x
x
x
x
x
x
x
x
x
x
x
x
Paths (pedestrian/
cycle)
Bridge
Boardwalk
x
Part 4 – Priority infrastructure plan – Desired standards of service
x
Effective 30 June 2014
Bike racks
xx
xx
Dog off leash
x
x
Half court
x
x
Rebound wall
x
x
Skate facility
x
x
x
x
x
xx
xx
xx
xx
xx
xx
Sports field/s
xx
xx
Sports court/s
xx
xx
Spectator seating
xx
xx
Boat ramp/s
x
x
x
x
x
x
Fishing platform/
pontoon
x
x
x
x
x
x
xx
xx
xx
xx
x
x
Earthworks,
landscaping
xx
xx
xx
xx
xx
x
x
x
Garden beds
x
xx
xx
xx
xx
Internal roads
xx
xx
x
xx
xx
xx
xx
Internal car parks
xx
xx
x
xx
xx
xx
xx
Fencing
xx
xx
xx
x
xx
x
xx
xx
xx
xx
xx
xx
Lighting
x
xx
xx
xx
xx
x
xx
xx
xx
xx
xx
xx
Signage
xx
xx
xx
xx
xx
x
xx
xx
xx
xx
xx
xx
Fitness equipment
x
x
x
x
x
x
x
x
x
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
Irrigation
xx
xx
xx
Editor's note—
For the embellishment standard:
x x – Essential
x – Desirable where appropriate
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
4.5.6.2 Land for the community facilities network
The desired standard of service for the land for the community facilities network is to
provide an accessible network of land for community facilities that meets the needs of the
population and employees in accordance with the following:
(a) the land provision standard for the land for the community facilities network
stated in Table 4.5.6.2.1 for the areas identified in Map F2 Community Purposes
Network DSS Areas;
(b) the accessibility standard for the land for the community facilities network stated
in Table 4.5.6.2.2 for the areas identified in Map F2 Community Purposes Network
DSS Areas;
(c) the service population standard for the land for the community facilities network
stated in Table 4.5.6.2.3 for the areas identified in Map F2 Community Purposes
Network DSS Areas;
(d) the minimum size standard for the land for the community facilities network
stated in Table 4.5.6.2.4 for the areas identified in Map F2 Community Purposes
Network DSS Areas;
(e) the location of future trunk infrastructure for the land for the community facilities
network identified in the plans for trunk infrastructure in Schedule 3 in accordance
with the following:
(i)
where a specific site is conceptually identified for land for community
facilities in the plans for trunk infrastructure for the land for the
community facilities network, the land for community facilities is to be
located in the specific location identified;
(ii)
where an indicative location is conceptually identified for land for
community facilities in the plans for trunk infrastructure for the land for
the community facilities network, the land for community facilities is to
be located in a location to be determined through a local planning
process or as part of the assessment of a development application.
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
Table 4.5.6.2.1—Land provision standard for the land for the community facilities network
Land for the community
facilities network
Service level
Land provision (m2/1,000 persons)(1)
Area A Centres
Area B General urban
Area C Fringe
Population
Employees
Population
Employees
Population
Employees
Community
service/leisure
Local(2)
360
60
360
60
0
60
Community
service/leisure
District
550
N/A
550
N/A
550
N/A
Community
service/leisure
Principal
83
N/A
83
N/A
83
N/A
Community
service/leisure
Metro
11
N/A
11
N/A
11
N/A
1,004
60
1,004
60
644
60
Total for community
service/leisure
Arts and culture
District
200
N/A
200
N/A
200
N/A
Arts and culture
Principal
53
N/A
53
N/A
53
N/A
253
0
253
0
253
0
District
625
200
625
200
625
200
Principal
233
N/A
233
N/A
233
N/A
Total for arts and
culture
Sport and recreation
(excluding sports park)
Sport and recreation
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
(excluding sports park)
Sport and recreation
District
Refer to public parks network desired standard of service (district sports park)
Principal
Refer to public parks network desired standard of service (district sports park)
Metro
Refer to public parks network desired standard of service (metro sports park)
(sports park)
Sport and recreation
(sports park)
Sport and recreation
(sports park)
Total for sport and recreation
858
200
858
200
858
200
Total land for the community facilities
network
2,116
260
2,116
260
1,756
260
Editor's note—
(1)
The rate of land provision is based on the peak demand arising from the population or employees and therefore is not the aggregate of the population and employee demand.
(2)
A local community facility is to be provided if part of an industrial area servicing over 20,000 employees.
Table 4.5.6.2.2—Accessibility standard for the land for the community facilities network
Land for the community
facilities network
Service level
Distance (kilometres)
Area A Centres
Area B General urban
Area C Fringe
Population
Population
Population
Employees
Employees
Employees
Community service/leisure
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
Community
service/leisure
Local(1)
1
2
1
2
N/A
N/A
Community
service/leisure
District
2
N/A
2
N/A
5
N/A
Community
service/leisure
Principal
5
N/A
5
N/A
10
N/A
Community
service/leisure
Metro
N/A
N/A
N/A
N/A
N/A
N/A
Arts and culture
District
2
N/A
2
N/A
5
N/A
Arts and culture
Principal
5
N/A
5
N/A
10
N/A
District
3
3
3
3
5
5
Principal
5
N/A
5
N/A
10
N/A
District
Refer to public parks network desired standard of service (district sports park)
Principal
Refer to public parks network desired standard of service (district sports park)
Arts and culture
Sport and recreation
Sport and recreation
(excluding sports park)
Sport and recreation
(excluding sports park)
Sport and recreation
(sports park)
Sport and recreation
(sports park)
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
Sport and recreation
Metro
Refer to public parks network desired standard of service (metro sports park)
(sports park)
Editor's note—
(1)
A local community facility is to be provided if part of an industrial area servicing over 20,000 employees.
Table 4.5.6.2.3—Service population standard for the land for the community facilities network
Land for the community Service level
facilities network
Persons
Area A Centres
Area B General urban
Area C Fringe
Population
Employees
Population
Employees
Population
Employees
Community service/leisure
Community
service/leisure
Local(1)
5,000
20,000
5,000
20,000
N/A
N/A
Community
service/leisure
District
20,00030,000
N/A
20,000–
30,000
N/A
20,000–
30,000
N/A
Community
service/leisure
Principal
150,000
N/A
150,000
N/A
150,000
N/A
Community
service/leisure
Metro
1,200,000
N/A
1,200,000
N/A
1,200,000
N/A
District
20,000
N/A
20,000
N/A
20,000
N/A
Arts and culture
Arts and culture
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
Arts and culture
Principal
150,000
N/A
150,000
N/A
150,000
N/A
District
40,000
40,000
40,000
40,000
40,000
40,000
Principal
150,000
N/A
150,000
N/A
150,000
N/A
District
Refer to public parks network desired standard of service (district sports park)
Principal
Refer to public parks network desired standard of service (district sports park)
Metro
Refer to public parks network desired standard of service (metro sports park)
Sport and recreation
Sport and recreation
(excluding sports park)
Sport and recreation
(excluding sports park)
Sport and recreation
(sports park)
Sport and recreation
(sports park)
Sport and recreation
(sports park)
Editor's note—
(1)
A local community facility is to be provided if part of an industrial area servicing over 20,000 employees.
Table 4.5.6.2.4—Minimum size standard for the land for the community facilities network
Land for the
Service level
community facilities
network
Area (m2)
Area A Centres
Area B General urban
Area C Fringe
Population
Population
Population
Employees
Employees
Employees
Community service/leisure
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
Community space
Local(1)
1,200
1,200
1,200
1,200
N/A
N/A
Community space
District
2,000
N/A
2,000
N/A
2,000
N/A
Community
service/group space
District
2,000
N/A
2,000
N/A
2,000
N/A
Community
service/group space
Principal
4,000
N/A
4,000
N/A
4,000
N/A
Libraries
District
3,000
N/A
3,000
N/A
3,000
N/A
Libraries
Principal
6,500
N/A
6,500
N/A
6,500
N/A
Libraries
Metro
13,000
N/A
13,000
N/A
13,000
N/A
Arts and crafts
District
2,000
N/A
2,000
N/A
2,000
N/A
Arts and crafts
Principal
4,000
N/A
4,000
N/A
4,000
N/A
Performance space
District
2,000
N/A
2,000
N/A
2,000
N/A
Performance space
Principal
4,000
N/A
4,000
N/A
4,000
N/A
District
8,000
8,000
8,000
8,000
8,000
8,000
Arts and culture
Sport and recreation
Indoor sport and
recreation facilities
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
Indoor sport and
recreation facilities
Principal
15,000
N/A
15,000
N/A
15,000
N/A
Aquatic
facilities/swimming
pools
District
10,000
N/A
10,000
N/A
10,000
N/A
Aquatic
facilities/swimming
pools
Principal
20,000
N/A
20,000
N/A
20,000
N/A
Sport and recreation
District
Refer to public parks network desired standard of service (district sports park)
Principal
Refer to public parks network desired standard of service (district sports park)
Metro
Refer to public parks network desired standard of service (metro sports park)
(sports park)
Sport and recreation
(sports park)
Sport and recreation
(sports park)
Editor's note—
(1)
A local community facility is to be provided if part of an industrial area servicing over 20,000 employees.
Part 4 – Priority infrastructure plan – Desired standards of service
Effective 30 June 2014
Download