RFO LIB-2015-001 Annex 1 1. PROJECT DESCRIPTION: GOAL is soliciting potable water supply services to support the United States Agency for International Development’s efforts to respond to the Ebola epidemic in Liberia. USAID has established a number of Ebola Treatment Units (ETUs) throughout the country, including one in Voinjama city, Lofa County. GOAL has been selected to provide clinical and non-clinical support at the ETUs and will take over non-clinical operations from 1st September 2015. GOAL will require potable water supply services at the ETU in Voinjama city. 2. PROJECT SCOPE: Potable water supply is required at the ETU in Voinjama city. GOAL is seeking a professionally qualified Subcontractor/s to provide and deliver potable water in accordance with the quantities and specifications described below. Product Use Estimated daily requirement/Gallons Frequency Potable Water ETU 1,500 Daily 3. TECHNICAL REQUIREMENTS/TASKS: The Subcontractor shall perform the following tasks: 3.1. All potable water delivered shall be of the highest quality upon demand. 3.2 Subcontractor shall provide pricing per gallon for bulk water. GOAL shall determine the bulk water allocation prior to contract award. 3.3. All potable water will be delivered in accordance with the highest commercial standard practices. All deliveries will be made as requested by the GOAL Logistics Officer. 3.4. All water delivered will be free of sediment and contaminants. 4. SUBCONTRACTOR RESPONSIBILITIES: 4.1. The Subcontractor shall provide all required equipment (hoses, couplings, fittings, pumps, flow meter etc.), labor and materials when making each delivery. 4.2. Subcontractor will ensure water delivery vehicle and equipment (hoses, valves and pumps) are free of leaks. 4.3. The Subcontractor shall provide sufficient manpower and qualified technicians for each delivery. 4.3.1. A qualified technician is defined as an individual above the age of eighteen (18), familiar with vehicle water pump and safe delivery operations. 4.4. GOAL has the right to use any measures to check the quantity and quality of water delivered. Subcontractor shall be liable for any discrepancy in water quantity and invoice GOAL according to the quantity received. RFO LIB-2015-001 Annex 1 4.5. All supplied water must be dispensed into the water tanks and not into extra jugs or hand held containers. 5. BUYER RESPONSIBILITIES: 5.1. GOAL will conduct Water Testing of all deliveries using a GOAL approved Water Testing Kit. 6. DELIVERABLES: 6.1. Subcontractor shall provide verified Lab Tests of water upon request from Buyer Procurement Officer. 6.2. A Delivery Ticket or Sales Slip shall accompany each delivery under this agreement with the information listed as determined by GOAL. The GOAL Facility Manager or Site Manager will verify this information. Each Delivery Ticket/Sales Slip or Invoice will be verified by the maintenance supervisors signature followed by GOAL Procurement stamping received. 6.3 Bulk Water Delivery Ticket or Sales Slip information: Name of the Supplier Contract Number Requested Date Name of Requestor Phone Number of Requestor Date of Delivery Location of delivery Quantity Delivered Delivery Ticket will be standard at all compounds and will be in English. 7. SECURITY: 7.1. Subcontractor personnel performing deliveries shall be checked prior to receiving access to the sites. Any detection of prohibited items shall require guest to undergo a more detailed body search (pat down), to include, but not limited to, emptying pockets and removing shoes. Anyone refusing to undergo this process shall be denied access onto the sites. This search shall include a physical search of all, but not limited to, packages, parcels, handbags, backpacks etc. or other items being carried and not contained on the personnel’s body. 8. PLACE OF PERFORMANCE: The ETU in Voinjama city, Lofa County, Liberia. 9. PERIOD OF PERFORMANCE: The period of performance is expected to be from 1 September 2015 to 31 December 2015. GOAL reserves the right to place orders on an ‘as needed’ basis and makes no commitment to any minimum purchase, either monthly or for the duration of the contract. Orders may be placed prior to the period of performance commencement date, with the expectation that delivery may occur on 1 September 2015 at the beginning of the performance period.