Erosion and Sedimentation Control Inspection Report Central Massachusetts Regional Stormwater Coalition EROSION AND SEDIMENTATION CONTROL INSPECTION REPORT General Information Project Name Project Location Inspector’s Name Site Operator Date of Inspection Date of Last Inspection Start Time End Time Subject to USEPA Construction General Permit? Yes No If yes, has NOI been approved? Yes No If yes, attach approved NOI to this report. If no, contact contractor immediately to determine status of NOI. Type of Inspection: Regular Pre-Storm Event During Storm Event Describe the weather conditions at time of inspection Describe the current phase of construction Page 1 of 3 Post-Storm Event Erosion and Sedimentation Control Inspection Report Central Massachusetts Regional Stormwater Coalition Erosion and Sediment Control (ESC) on Construction Sites Document any of the following issues found on the construction site, and the corrective action(s) required for each. Issue Status Have all ESC features been constructed before initiating other construction activities? Yes No Is the contractor inspecting and maintaining ESC devices regularly? Yes No Is existing vegetation maintained on the site as long as possible? Yes No Is construction staged so as to minimize exposed soil and disturbed areas? Yes No Are disturbed areas restored as soon as possible after work is completed? Yes No Is clean water being diverted away from the construction site? Yes No Are sediment traps and sediment barriers cleaned regularly? Yes No Are vegetated and wooded buffers protected and left undisturbed? Yes No Are soils stabilized by mulching and/or seeding when they are exposed for a long time? Yes No Has vegetation been allowed to establish itself before flows are introduced to channels? Yes No Is regular, light watering used for dust control? Yes No Is excessive soil compaction with heavy machinery avoided, to the extent possible? Yes No Page 2 of 3 Corrective Action Needed Erosion and Sedimentation Control Inspection Report Central Massachusetts Regional Stormwater Coalition (continued) Issue Status Are erosion control blankets used when seeding slopes? Yes No Are trees and vegetation that are to be retained during construction adequately protected? Yes No Are areas designated as off-limits to construction equipment flagged or easily distinguishable? Yes No If excavated topsoil has been salvaged and stockpiled for later use on the project, are stockpiles adequately protected? Yes No Are temporary slope drains or chutes used to transport water down steep slopes? Yes No Do all entrances to the storm sewer system have adequate protection? Yes No Corrective Action Needed Non-Compliance Actions The municipality shall provide the site operator with a copy of this report, and notice of the corrective action(s) to be taken. The site operator shall have thirty days from the receipt of the notice to commence curative action of the violation. Page 3 of 3