Erosion and Sedimentation Control
Inspection Report
Central Massachusetts Regional
Stormwater Coalition
EROSION AND SEDIMENTATION CONTROL INSPECTION REPORT
General Information
Project Name
Project Location
Inspector’s Name
Site Operator
Date of Inspection
Date of Last Inspection
Start Time
End Time
Subject to USEPA Construction General Permit?
Yes
No
If yes, has NOI been approved?
Yes
No
If yes, attach approved NOI to this report.
If no, contact contractor immediately to determine status of NOI.
Type of Inspection:
Regular
Pre-Storm Event
During Storm Event
Describe the weather
conditions at time of
inspection
Describe the current
phase of construction
Page 1 of 3
Post-Storm Event
Erosion and Sedimentation Control
Inspection Report
Central Massachusetts Regional
Stormwater Coalition
Erosion and Sediment Control (ESC) on Construction Sites
Document any of the following issues found on the construction site, and the corrective action(s) required
for each.
Issue
Status
Have all ESC features been
constructed before initiating other
construction activities?
Yes
No
Is the contractor inspecting and
maintaining ESC devices regularly?
Yes
No
Is existing vegetation maintained on
the site as long as possible?
Yes
No
Is construction staged so as to
minimize exposed soil and disturbed
areas?
Yes
No
Are disturbed areas restored as soon
as possible after work is completed?
Yes
No
Is clean water being diverted away
from the construction site?
Yes
No
Are sediment traps and sediment
barriers cleaned regularly?
Yes
No
Are vegetated and wooded buffers
protected and left undisturbed?
Yes
No
Are soils stabilized by mulching
and/or seeding when they are exposed
for a long time?
Yes
No
Has vegetation been allowed to
establish itself before flows are
introduced to channels?
Yes
No
Is regular, light watering used for dust
control?
Yes
No
Is excessive soil compaction with
heavy machinery avoided, to the
extent possible?
Yes
No
Page 2 of 3
Corrective Action Needed
Erosion and Sedimentation Control
Inspection Report
Central Massachusetts Regional
Stormwater Coalition
(continued)
Issue
Status
Are erosion control blankets used
when seeding slopes?
Yes
No
Are trees and vegetation that are to be
retained during construction
adequately protected?
Yes
No
Are areas designated as off-limits to
construction equipment flagged or
easily distinguishable?
Yes
No
If excavated topsoil has been salvaged
and stockpiled for later use on the
project, are stockpiles adequately
protected?
Yes
No
Are temporary slope drains or chutes
used to transport water down steep
slopes?
Yes
No
Do all entrances to the storm sewer
system have adequate protection?
Yes
No
Corrective Action Needed
Non-Compliance Actions
The municipality shall provide the site operator with a copy of this report, and notice of the corrective
action(s) to be taken. The site operator shall have thirty days from the receipt of the notice to commence
curative action of the violation.
Page 3 of 3