Building Walkthrough Event Name Date Time When doing the walk-through indicate a status of C(lean), N(ot clean) or D(amaged). Use the Comments column to elaborate on any condition other than C. Continue comments on back if necessary. Location Before Main Lobby Floor/walls Furniture Lights off Bathrooms Floor/walls Furniture Stalls Classroom, 2&3 Floor/walls Furniture Bathroom Lights off Worship Hall Floor/walls Furniture Lights off After Comments indicate if there is damage here *pay careful attention to make sure the switches are off. Fireside room Floor/walls Coffee Bar Furniture Linens Lights off Upper Gallery Floor/walls Furniture Lights Off Lower Gallery Floor/walls Furniture Lights off Classroom, 4&5 Floor/walls Furniture Light off Kitchen *If thermostat shows Temporary or Hold push button on lower left to reset to program Signatures: Before event: Opener Event Coordinator After event: Closer Event Coordinator Building Walkthrough v18May2015