STATE BANK OF HYDERABAD (Associate of State Bank of India) TENDER DOCUMENT FOR ELECTRICAL WORKS OF GARSHANKAR BRANCH, Last date for submission of Sealed Tender: at 3.00 PM on 21.11.14 Opening of Sealed Tenders (Technical Bid): at 4.00PM on 21.11.14 Tender to be submitted to: THE DEPUTY GENERAL MANAGER, STATE BANK OF HYDERABAD, ZONAL OFFICE, th 9 FLOOR, ‘KONNECTUS’ TOWER – 1, BHAVBHUTI MARG, (opposite New Delhi Metro Station) NEW DELHI – 11 00 06. Tel : 011 – 23218617/23660532 Contractor has to must provide below their: E- MAIL id : Contact No: Postal address : ____________________________________________ _________________________________________________________ NOTICE INVITING TENDER (NIT) Tender Document : Page 1 of 35 NAME OF WORK : ELECTRICAL WORKS OF GARSHANKAR BRANCH, PUNJAB Sealed tenders are invited from Approved / Reputed Contractors for the above mentioned work in SINGLE BID SYSTEM. 1 Name of the work ELECTRICAL WORKS OF GARSHANKAR BRANCH. 2 Cost of application/tender document. TENDER COST: FREE OF COST. ALL CONTRACTORS MAY PLEASE DOWN LOAD FROM THE BANKS WEB SITE “ www.sbhyd.com/tenders.asp”. DIRECTLY. 3 Date and Time where tender forms are available for sale. (From_____ to ______) TENDERS MODIFIED / PARTLY OR FULLY HANGED/ALTERED/CORRECTED ETC SHALL STANDS SUMMERLY REJECTED. FREE OF COST Download from Bank’s web site : “www.sbhyd.com” Details of website: From 10.10.2014 to 21.11.14 Up to 2.00p.m on 21.11.14 4 5 6 7 Time and last date of submission of Tender Place, Time& Address for submission of tender/contact person /telephone no/email address. Date, Time and Place of opening of tenders Quantum of Earnest Money Deposit (EMD) `______ drawn in favour of _____Payable at ____ 8 Quantum of Security Deposit ______ (percentage) drawn in favour of _____Payable at ____. Amount of bank guarantee. 9 11 Terms of payment of Bills, if any (Penalty clause) Liquidated Damages 11 Stipulated time for completion of the Up to 3.00PM on 21.11.14 Up to 3.00 p.m. on 21.11.14 Address: The Deputy General Manager, State Bank of Hyderabad, Zonal Office, 9th Floor, ‘KONNECTUS’ Tower – 1, Bhavbhuti marg, New Delhi-110006 Tel : 011 – 23218617/23660532 at 4:00PM on 21.11.14 at the Address as detailed above in (5) 2% of the Tender value including EMD i.e. Rs. 3200/- by way of demand draft drawn in favour of D.G.M. , S.B.H., ZONAL OFFICE, NEW DELHI; payable at Hyderabad. 5% of the gross value of the works done. The amount will be with held by the Bank for a period of one year and will be returned to the vendor after a period of one year, in case no defect is reported by the branch for the materials so supplied by them. No interim bill will be honoured. In case of delay in completion of work, a penalty @ the rate of 1% of the value of the work per week subject to a maximum of 10% (as per the value of work) would be strictly imposed. FOUR weeks from date of issue of the work / Tender Document : Page 2 of 35 12 13 14 work/supply. Estimated Value of tender/project Validity period of the tender. Taxes 15 Electronic Payment 16 Any additional Information purchase order. 2.60 LACS Three (3) Months. Rates quoted should include all Taxes, Octroi, vat other charges like Transportation etc. However I.T and WCT will be deducted at source. Electronic payment shall be preferred. All the contractor must furnish details such as 1) Name of the their bank 2) Name of their branch 3) Account number 4) Name of the account holder as in the bank account 5) IFSC code of the branch 6) Sales Tax regn. number 7) PAN number. The rates quoted should be inclusive of Installation & commissioning charges. Dully filled-in Tender Document shall bear the signature and seal of contractor on all pages (otherwise the tender shall be summarily rejected) and such tender document shall be submitted in a sealed cover addressed to The Deputy General Manager, State Bank of Hyderabad, Zonal Office, 9th Floor, ‘KONNECTUS’ Tower – 1, Bhavbhuti marg, (opposite New Delhi Metro Station) New Delhi-110006; on or before the Date & Time stipulated above. The contractor has to must provide their E-mail id, contact nos. and postal address on both bid documents. Henceforth, all official communication form bank shall be through E-mail and SMS also. The name of work as “ TENDER FOR ELECTRICAL WORK OF GARSHANKAR BRANCH” should be clearly super scribed on the sealed cover of bid. Content/ paper/ sheet/ drawing should not be either altered or detached from the original tender document issued to or downloaded by the contractor. The bank reserves the right to cancel or postpone or modify the tenders at any stage without assigning any reason. All the tenderers are advised to quotes for the model having equivalent features as specified in B.O.Q.supported by the brochures. The firms should quote only in the tender and should not give any option of other sizes of storages. Any tender which has quotes more than one option will be summarily rejected. A.C. units should be covered under a performance guarantee for a period of one year for which 5% of the quoted amount will be with held. The tender shall be summarily rejected, if any one of the above said requirements has not been complied with. DEPUTY GENERAL MANAGER Tender Document : Page 3 of 35 NOTICE INVITING TENDER M/S______________________ __________________________ __________________________ E-mail id: Contact nos.: Dear Sirs, TENDER FOR ELECTRICAL WORKS OF GARSHANKAR BRANCH Sealed tenders for supply and installation of compactors at GARSHANKAR Branch are invited from Approved/Reputed contractors for the above mentioned work in SINGLE BID SYSTEM. 1. Contract documents consist of detailed plans, technical specification, schedule of quantities of the various classes of work to be done, and the set of ‘conditions of contract’ to be compiled with by the person whose tender may be accepted. The document can be downloaded from our web site www.sbhyd.com/tenders at free of cost. 2. Tenders which should always be placed in two envelopes, with the name of the project written on the envelopes will be received till 21.11.14 up to 3 PM in the office of Deputy General Manager, Zonal Office, New Delhi. Envelope-1 should contain Earnest Money Deposit, Pre-qualification forms, conditions of contract and technical specifications. Envelope-2 should contain Price bid. The envelope-1 will be opened on 21.11.14 at 4 PM. The committee constituted for the purpose shall scrutinize the documents furnished in envelope-1, and pre-qualify suitable contractors. The price bid of the pre-qualified contractors shall alone be opened and the date and time shall be intimated separately. The decision of the committee regarding pre-qualification of contractors shall be final. 3. The contractors should quote in figures as well as in the words the rates, and amount tenders by them. The amount for each item should be worked out and the requisite totals given. Rates quoted by the contractor in item rate tender in figures and words shall be accurately filled in so that there is no discrepancy in the rates, figures and words. However, if a discrepancy is found, the rates which correspond with the amount worked out by the contractor shall be taken as correct. If the contractor does not work out the amount of an item or it does not correspondent with the rate written either in figure or in words then the rates quoted by the contractor in words shall be taken as correct. Where the rates quoted by the contractor in figures and in words tally but the amount is not worked out correctly the rates quoted by the contractor will be taken as correct and not the amount. 4. The tender document must be filled in English and all the entries must be made by the hand and Written in ink. If any of the documents are missing or un-signed, the tender shall be considered invalid. 5. Earnest money amounting to Rs.3200/-- i.e. 1% of the estimated cost of work is to be deposited with the tender in the form of Demand Draft / Banker’s Cheque drawn in favor of Deputy General Manager, State Bank of Hyderabad, Zonal Office, Delhi and payable at New Delhi otherwise the tender is liable for rejection. Tender Document : Page 4 of 35 6. The successful tenderer will have to pay an amount of initial security deposit/Performance security, which shall be 2% of the accepted value of the tender including the EMD, by means of D.D drawn in favor of Deputy General Manager, State Bank of Hyderabad, Zonal Office, Delhi and payable at New Delhi. The initial security deposit is to be paid by the Contractor to Bank within 10 days of intimation to him of the acceptance of the tender. The initial security deposit will be invested with the bank for the duration of the contract period and will be returned to the contractor with out any interest, after virtual completion of work. No interest is allowed on the above said security deposit. 7. The acceptance of a tender will rest with the Competent Authority, who does not bind himself to accept the lowest tender and reserves to himself the authority to reject any or all of the tenders received, without assigning any reasons. All tenders in which any of the prescribed conditions are not fulfilled, or are incomplete in any respect are liable to be rejected. 8. All compensation or other sums of money payable by the Contractor to Clients under the terms of this contract may be deducted from the security deposit, or from any sum that may be or may become due to the Contractor on any account whatsoever and in the event of the Security Deposit being reduced by reasons of any such deductions, the Contractor shall within 7 days of being asked to do make good in cash or by cheque any sum which have been deducted from his security deposit. 9. Tender containing any condition leading to unknown / indefinite liability, are liable to be summarily rejected. 10. Canvassing in connection with tenders is strictly prohibited and the tenders submitted by the contractors who resort to canvassing will be liable to rejection. 11. The tenderer should quote their (own) rates for undertaking the work. 12. All taxes including Sales Tax, Vat, Octroi or any other statutory obligation / tax on material or on finished works like work’s contract tax, turn over tax etc. in respect of this contract, as applicable, shall be payable by contractor including transportation and TA / DA of the workers at site and the Bank will not entertain any claim whatsoever in this respect 13. Income Tax will be recovered @ 2 % plus surcharge or as applicable as per Government Rules 14. Works Contract Tax will be recovered @ 4.0% plus surcharge or as applicable as per Government Rules 15. Time is the essence of the contract. The work should be completed in FOUR weeks from the date of the work order issued to the contractor to commence the work. The successful Contractor will have to give CPM/PERT chart of various activities of works to be done so that the work gets completed within the stipulated time. The chart shall be submitted within 7 days from the date of acceptance of the tender. 16. Tenders for works shall remain open for acceptance for a period of 90 days from the date of opening of tenders. If the tenderer withdraws his tender before the expiry of the said period or makes any modifications in terms and condition of the tender which are not acceptable to the Bank, then the bank without prejudice to any other right or remedy is at liberty to forfeit the earnest money. Tender Document : Page 5 of 35 17. It will be obligatory on the part of the tenderer to tender and sign the tender documents for all the component parts and that, after the work is awarded, he will have to enter into an agreement for each component with the competent authority in the bank. 18. The tenderer, apart from being a competent contractor must co-ordinate himself with the agencies of appropriate class who are eligible to tender for (I) Electrical (II) Air – Conditioning etc. 19. The tenderer should visit the site to ascertain the working conditions and local authority regulations / restrictions if any and other information required for the proper execution of the work. 20. The work may be carried out on any floor level as per site condition. Please note that materials and machines are required to be carried on head load and the same must be accounted in the costing. Please note that no separate cost shall be allowed for head load. 21. The quantities of various items given in the schedule of quantities are approximate. The quantities of work may vary at time of allotment / execution of work. Bank reserves the right to omit / delete any item(s) of work from the schedule at the time of allotment / before. Contractor will be paid for the actual work done at the site duly verified by the concerned official of the bank. 22. The unit price shall be deemed to be fixed price. In case of extra items, a record of labour charges paid shall be maintained and shall be presented regularly to the Employer’s for checking. The settlement will be made based on figures arrived at jointly and taking unit price given in the contract assigned to the successful Tenderer. In case of extra items where similar or comparable items are quoted in the tender, extra rates shall be based on tender rates. 23. If the rate quoted by the contractor for any item / items are not workable or abnormally lower than the market rate, the bank may demand Bank guarantee from the contractor for satisfactory completion of these work. The bank guarantee amount will be not less than 50% of the estimated amount of the items for which the rates are not workable or abnormally low. This bank guarantee will be released after completion of these works (unworkable and abnormally low rated items) to the satisfaction of the bank. 24. The contractor shall submit the gant chart/ bar chart/ pmp as well as shall submit the insurance cover for the work in the form of CAR policy within seven (7) days from the acceptance of work order. 25. The work has to be started within 7 (Seven) Days from the date of receipt of work order/ mark out at site; whichever is latter. In case of work not being started within this stipulated period, the bank reserves the right to cancel the work order duly forfeiting the Earnest money deposit 26. No employee of the Bank is allowed to work as a contractor for a period of 2 years of his/her retirement from Bank Services without previous permission of the Bank. This contract is liable to be cancelled, if either the contractor or any of his employees is any time to be such a person who had not obtained the permission of Bank as aforesaid before submission of the tender or engagement in the contractor’s service. 27. Contractor should get approval of the samples of materials in advance with Bank’s Engineer before use of the same in the work Tender Document : Page 6 of 35 28. Bank has the right to offer the contractor to modify the old material wherever/ whenever necessary instead of new supplies 29. The quoted rate should be inclusive of materials, labour, fixtures, transportation, installation, all taxes, wastages, Octroi, machinery, temporary works such as scaffolding, cleaning, overheads, profit, statutory expenses, incidental charges and all related expenses to complete the work 30. Dully filled-in Tender Document shall bear the signature and seal of contractor on all pages (otherwise the tender shall be summarily rejected) and such tender document shall be submitted in two separate sealed cover addressed to The Deputy General Manager, State Bank of Hyderabad, Zonal Office, 9th Floor, ‘KONNECTUS’ Tower – 1, Bhavbhuti marg, (opposite New Delhi Metro Station) New Delhi-110006; on or before the Date & Time stipulated above. 31. The name of work should be clearly super scribed on respective sealed cover of technical bid and price bid. No paper/ sheet/ drawing should be altered in or detached from the tender documents downloaded/ issued to the contractor (otherwise the tender shall be summarily rejected). 32. The tenders shall summarily rejected, if any one of the above said requirements has not been complied with. 33. The Bank will not be bound to accept the lowest tender and reserves the right to accept or reject any or all the tenders without assigning any reason whatsoever 34. The contractor should fulfill the labour regulation guidelines stipulated by the governments 35. No advance payment will be granted for the works proposed 36. Period of taking up the final bill will be one month from/ after satisfactory virtual completion or the date of submission of the final bill whichever is latter. 37. The Initial Security Deposit shall be released after satisfactory virtual completion and certification of final bill. The F.S.D./ Retention money shall be released after defect liability period (12 months) provided all defects are attended satisfactorily in accordance with by the contractor. DEPUTY GENERAL MANAGER READ, UNDERSTOD AND ACCEPTED SIGNATURE OF THE CONTRACTOR WITH SEAL DATE: Tender Document : Page 7 of 35 FROM OF SUBMISSION OF TENDER (To be filled by the tenderer) The Deputy General Manager, State Bank of Hyderabad, Zonal Office, 9th Floor, ‘KONNECTUS’ Tower – 1, Bhavbhuti marg, New Delhi-110006 Tel : 011 – Dear Sir/s, Ref: TENDER FOR ELECTRICAL WORKS OF GARSHANKAR BRANCH I/We hereby declare that I/ We have carefully gone through the conditions laid down in the Notice Inviting Tender, General notes, General Conditions of Contract, Special conditions, Schedule of approximate quantities and rates , Form of Agreement, General Specification, Approved manufacturers/ natural source of materials (i.e. all parts of Technical bid), Technical Specifications of schedule of quantities (i.e. all parts of Price bid), and clearly understood all the same and on the basis of the same I/ We have quoted our rates in the Schedule of Quantities (i.e. Price-Bid, Part-II Tender document) attached with the tender documents. I / We do here by undertaken to execute and complete the whole or part of the work (as desired by you) at the respective rates quoted. I/ We are depositing a sum of Rs. 3200/(Rupees 3200/only ) as earnest money deposit by way of demand draft drawn in favour of D.G.M. , S.B.H., ZONAL OFFICE, NEW DELHI; payable at NEW DELHI; along with this tender for due execution of the work at my/ our tendered rates. In the event of this Tender being accepted I/ We agree to enter into the agreement and submit the declaration on requisite non-judicial stamp papers as and when required and execute the contract according to your form of Agreement etc., in default whereof, I/ We do hereby bind my-self / ourselves to forfeit the aforesaid deposit. In the event of this Tender being accepted I/ We agree to obtain the labor license and the CAR insurance policy and deposit the balance E.M.D. amount and adhere/ comply to all other instructions as given in Technical bid and Price bid of the Tender document. I / We further agree to complete the work included in the said schedule of quantities within FOUR weeks from the date of the work order issued to commence the same. Date of commencement shall be either one week from the date of work order issued to the contractor or the date on which mark out of work at site has been given to contractor; whichever is later. I / We agree not to employ sub-contractors other than those that may be approved by Employer. I / We agree to pay General and Sales Tax (State and Central), Excise and Octroi duties, insurance charges and all other taxes including works contract extra, turnover tax, VAT etc as prevailing from time to time, on such items for whom same is to be levied by/ for the government, and the rates quoted by me / us are inclusive of all the same. Yours Faithfully, Signature of Witness: Contractor’s Signature_______________________ 1. Name : _______________________________ 2. Address: ___________________________________ 3. Tender Document : Page 8 of 35 GENERAL NOTES 1. PROCEDURE OF FILLING AND SUBMISSION OF TENDER i) The tenderer should quote their rates in figures and words where the quantities have been indicated in the relevant items of the schedule of quantities, failures to do so may invalidate the tender. Erasing or over writing shall not be allowed. Corrections in the tender should be avoided if this becomes unavoidable, the entire rate (and not a portion only) shall be scored out and signed (not simply initiated) by the tenderer as token of such cancellation. A fresh rate in specified manner shall then be correctly written. ii) In the event of the tender being submitted by a firm, it must be signed by a member or members of the firm having legal authority to do so, and if called for, the legal documents in support thereof must be produced for inspection and the same in the case of the firm carried out by one member of a joint family. It must disclose that the firm is duly registered under the India Partnership Act. Any tender signed by a member not holding a power of attorney shall be treated as informal. iii) All corrections are to be initialed. iv) The tenderer is to quote the rate in ink both in words and figures in English. In case of any variation, the rates quoted in the words in the “Original” copy of the tender shall only be valid. The tender shall be clearly and legibly written and whole writing must be by the hand of the person signing the tender and with the same pen and ink. Failure to do so may invalidate the tender. The employer reserves to itself the right to accept the lowest or any tender or split up and distribute any items of work to any specialist firm or firms without assigning any reason. The employer reserves the right to split up and distribute the work to more than one tenderer, if necessary. Person tendering shall submit and return together with his tender, this condition of contract, specifications and the priced schedule of quantities and all set of papers signed on all the pages in a sealed cover. Signature will be deemed to be the acceptance of the contents of these tender papers by the tenderer. All enclosures to the tender shall be in duplicate. Tenderer shall note that their tenders shall remain open for acceptance for a minimum period of three months from the date of opening the tenders. The tender must be unconditional. Conditional tenders may be summarily rejected. Submission of tenders: The tenders are to be submitted along with the copy of “General Clause of Contract and Technical Specifications” duly signed by the tenderer in a sealed cover at the office as mentioned in the tender notice. The authorized representatives of tenderer with valid authorization letter will be allowed to present during opening of the tender. 2. RATES TO INCLUDE: While quoting their rates the tenderer should include the following if otherwise not stated herein before. a) Necessary cost of taking samples of materials supplied by them for work including plywood, wood/tiles etc., testing of the same at Govt.’s / approved laboratory including transportation, cost of the samples, as and when required. b) Submission of test reports of other materials as may be specified by Bank’s Engineer. 3. WORKING HOURS: Since the site is a Working/ running branch, the Contractor has to execute the work after working hours, nights & on holidays. No extra payments will be made for the work being done during odd hours. 4. STORAGE OF MATERIALS: Tender Document : Page 9 of 35 The contractor shall not store their materials and debris within the premises other than the work site handed over to him. 5. LABOUR HUTMENT: Shelter or stay and other amenities for the labors have to be arranged by the contractor at his own expense and responsibility. 6. IDLE LABOUR: In case the work is held up for any site conditions not attributable to the contractors or for any decisions instructions / want of details from Employer or for any of the conditions, the contractor shall be allowed reasonable extension of time by the employer but any claim for idle labour shall not be entertained by the employer. Contractor’s quoted rates should include for all such contingencies. 7. The contractor shall engage one competent person at site who shall take the instructions from the Employer. The work should not suffer due to lack of supervision, manpower and materials. 8. The Contractor is required to co-ordinate his works along with other agencies working at site. He has to reimburse any of the damage made by him or any of his representatives for any of the other agency or owner at site. 9. Making of any cut-out / opening for electrical wiring / fitting in any of false ceiling, partition, Paneling, masonry work etc., and providing panels of the same finish in partitions, paneling shall not be paid extra. 10. The contractor is required to fabricate a sample where required, or any item so installed for approval. Any changes made by the Architect/Employer, in the sample to the specifications as mentioned in the tender, shall not be deducted or paid extra. The bulk production of the furniture can only be taken up after the final approval of the sample of the item. 11. The partitions shall be so fixed that all joinery work is in plumb and true in line. The partition frame shall be firmly fixed to the floor and ceiling by using suitable wall plugs and screws. 12. The contractor shall check all dimensions before fabricating and fixing the partitions or any other items in position at site. 13. All measurements given in the schedule hereunder are for the purpose of tender only. Payment will be made on actual measurement of the work done. 14. All measurements shall be as per relevant I.S. standards. GENERAL CONDITIONS OF CONTRACT Except where provided for in the description of the individual items in the schedule of quantities and in the specifications and conditions laid down hereinafter and in the drawings, the work shall be carried out as per standard specifications and under the direction of Employer. 1. INTERPRETATION In constructing these conditions, the specifications, the schedule of quantities, tender and agreement, the following words shall have the meaning herein assigned to them except where the subject or context otherwise requires. i. Employer: The term employer shall denote State Bank of Hyderabad with their Head office at Gunfoundry, Hyderabad and any of its employees representative authorized on their behalf. Tender Document : Page 10 of 35 ii. Architects / Consultants: The term Architects shall mean the Architects appointed by the employer for the purpose of preparing detailed drawing, supervision etc. It is the Bank to decide whether to appoint Architect or not and to change the Architect at any stage of work. iii. Contractor: The term contractor shall mean _____________ (Name and address of the contractor) and his / their heirs, legal representives, assigns &successors. iv. Site: The site shall mean the site where the works are to be executed, i.e State Bank of Hyderabad, GARSHANKAR branch including any building and erection thereon, allotted by the employer for the contractors use. v. Site Engineer: Any Engineer appointed from time to time by the Employer and certified in writing to the Architects and the Contractor, to be positioned at site to supervise the work. vi. Drawings: The work is to be carried out in accordance with drawings, specifications, the schedule of quantities and any further drawings which may be supplied or any other instruction, which may be given by the Employer or Architects during the execution of the work. All drawings relating to work given to the contractor together with a copy of schedule of quantities are to be kept at site and the Employer / Architects shall be given access to such drawings or schedule of quantities wherever necessary. In case any detailed Drawings are necessary contractor shall prepare such detailed drawings and / or dimensional sketches therefore and have it confirmed by the Employer as case may be prior to taking up such work. The contractor shall ask in writing for all clarifications on matters occurring anywhere in drawings, specifications and schedule of quantities or to additional instructions at least 10 days ahead from the time when it is required for implementation so that the Employer may be able to give decision thereon. vii. “The Works” shall mean the work or works to be executed or done under this contract. viii. “Act of Insolvency” shall mean any act as such as defined by the Presidency Towns Insolvency Act or in Provincial Insolvency act or any amending status. ix. “The Schedule of Quantities” shall mean the schedule of quantities as specified and forming part of this contract. x. “Priced Schedule of Quantities” shall mean the schedule of quantities duly priced with the accepted quoted rates of the contractor. xi. “Contract” shall mean the Articles of Agreement, the general conditions special conditions, the appendix, the schedule of quantities, specifications and drawings attached here to and duly signed. xii. ‘Contract Price’ shall mean the sum named in the Tender subject to such additions thereto or deductions their from as may be made under the provisions hereafter contained. xiii. ‘Notice in Writing’ or written notice shall mean a notice in writing, type or printed characters sent (unless delivered personally or otherwise provided to have been received) by registered post to the last known private or business address or registered office of the addressee and shall be deemed to have been received when in the ordinary course of post it would have been delivered. xiv. ‘Net Prices’ any arriving at the Contract amount the Contractor shall have added to or deducted from the total of the items if the Tender any sum, either as a percentage or otherwise, then the net price of any item in the tender shall be the sum arrived at by adding to or deducting from the actual figure appearing in the tender as the price of that item a similar percentage or proportionate sum. Providing always that in determining the percentage or proportion of the sum Tender Document : Page 11 of 35 so added or deducted by the contractor, the total amount of any Prime Cost items and provisional sums of money shall be deducted from the total amount of the Tender. The expression ‘net rates’ or ‘net prices’ when used with reference to the contract or account shall be hold to mean rates or prices so arrived at. xv. ‘Virtual Completion’ shall mean the premises is in the opinion of the Employer fit for occupation. xvi. Words importing persons include firms and corporations. Words importing the singular only, also include the plural and vice verse where the Context requires. 2. SCOPE OF CONTRACT The Contractor shall carry out and complete the said work in every respect in accordance with this Contract and with the directions of and to the satisfaction of the Employer. The Architect with approval of Employer or Employer issue further drawings and/or written instructions, detailed directions and explanations which hereafter collectively referred to as ‘Instructions’ in regard to: a) The variation or modification of the design quality or quantity of works or the addition or omission or substitution of any work. b) Any discrepancy in the drawings or between the schedule of quantities and / or drawings and / or specification. c) The removal from the site of any defective material brought thereon by the contractor and the substitution of any other material thereof. d) The demolition removal and / or re-execution of any work executed by the contractor/s. e) The dismissal from the work of any persons employed there upon. f) The opening up for inspection of any work covered up. g) The rectification and making good of any defects under clauses hereinafter mentioned and those arising during the maintenance period (Defect Liability Period). The contractor shall forthwith comply with and duly execute any work comprised in such Employer’s or his agent / Architect’s instructions, provided always that verbal instructions, directions and explanations given to the contractor’s or his representative upon the works by the Employer’s or his agent / Architects shall, if involving a variation, be confirmed in writing to the contractor/s within seven days. No works, for which rates are not specifically mentioned in the priced schedule of quantities, shall be taken up without written permission of the Employer. The employer as provided in clause “variation” shall fix rates of items not mentioned in the priced schedule of quantities. Regarding all factory made products for which ISI marked products are available, only products bearing ISI marking shall be used in the work. 3. TENDERER SHALL VISIT THE SITE Intending tenderer shall visit the site and make himself thoroughly acquainted with the local site condition, nature and requirements of the works, facilities of transport conditions, effective labour and materials, access and storage for materials and removal of rubbish. The tenderer shall provide in their tender for cost of carriage, freight and other charges as also for any special difficulties and including police restriction for transport etc., for proper execution of work as indicated in the drawings. The successful tenderer will not be entitled to any claim of compensation for difficulties faced or losses incurred on account of any site condition. 4. TENDERS The entire set of tender paper issued to the tenderer should be submitted fully priced and also signed on all the pages. Initial / signature will indicate the acceptance of the tender papers by the tenderer. Tender Document : Page 12 of 35 (Also see general rules and instructions for the guidance of Tenderers) The schedule of quantities shall be filled in as follows: I. The “Rate” column to be legibly filled in ink in both English figures and English words. II. Amount column to be filled in for each item and the amount for each sub head as detailed in the “Schedule of Quantities”. III. All corrections are to be initialed. IV. In case of any errors / omissions in the quoted rates, the rates given in the tender marked “original’ shall be taken as correct rates. No modifications, writings or corrections can be made in the tender papers by the tenderer, but may at his option offer his comments or modifications in a separate sheet of paper attached to the original tender paper. The Employer reserves the right to reject the lowest or any tender and also to discharge any or all of the tenders of each section or to split up and distribute any item of work to any specialist firm or firms, without assigning reasons. The tenderers should note that the tender is strictly on the item rate basis and their attention is drawn to the fact that the rates for each and every item should be correct, workable and self-supporting. If called upon by the Employer/Architects detailed analysis of any or all the rates shall be submitted. The Employer/Architects shall not be bound to recognize the contractor’s analysis. The works will be paid for as “measured work” on the basis of actual work done and not as “lump sum” contract, unless otherwise specified. All items of work described in the schedule of quantities are to be deemed and paid as complete works in all respects and details including preparatory and finishing works involved, directly related to and reasonably detectable from the drawings, specifications and schedule of quantities and no further extra charges will be allowed in this connection. In the case of lump-sum charges in the tender in respect of any items of work will be made for the actual work done on the basis of lump sum charges as will be assessed to be payable by the Employer / Architects. The employer has power to add, omit from any work as shown in drawings or described in specifications or include in schedule of quantities and intimate the same in writing but no addition, omission or variation shall be made by the contractor without authorization from the Employer. No variation shall vitiate the contract. The tenderer shall note that his tender shall remain open for consideration for a period of three months from the date of opening of the tender. 5. AGREEMENT The successful contractor will be required to sign agreement in accordance with the draft agreement enclosed and the schedule conditions. The contractor shall pay for all stamps and legal expenses, incidental thereto. However the written acceptance by the employer of a tender will constitute a binding contract between the employer and the person so tendering such formal agreement is subsequently executed. 6. AUTHORITIES, NOTICES, PATENT RIGHTS AND ROYALTIES: The contractor shall conform to the provisions of any Acts of the Legislature relating to the work, and to the Regulations and Bye-Laws of any authorities, and / or any water, lighting and other companies, and / or authorities with whose systems the structures were proposed to have connection and shall before making any variations from the drawings or specifications that may be associated to so conform, give the Employer / Architects written notices specifying the variations proposed to be made Tender Document : Page 13 of 35 and reasons for making them and apply for instruction thereon. The Employer / Architects on receipt of such intimation shall give a decision within a reasonable time. The contractor/s shall arrange to give all notices required for by the said Acts, Regulations or Byelaws to be given to any authority, and to pay to such authority or to any public officer all fees that may be properly chargeable in respect of the work and lodge the receipts with the Employer The Contractor shall identify the Employer against all claims in respect of patent rights, designs, trade marks or name or the protected rights in respect of any constructional plant, machine, work or material used for or in connection with the works or temporary works and from and against all claims, demands, proceedings, damages, costs, charges, and expenses whatsoever in respect thereof or in relation thereto. The Contractor shall defend all actions arising from such claims, unless he has informed the Architects, before any such infringement and received their permission to proceed and shall himself pay all royalties, license fees, damages, coat and charges of all and every sort that may be legally incurred in respect thereof. 7. TAXES AND DUTIES The tenderers must include in their tender prices quoted for all taxes and duties royalties, cess and sales tax, works contract tax or any other taxes or local charges if applicable. No extra claim on this account will in any case be entertained. 8. NOTICES AND STATUTORY REGULATIONS: The contractor shall give all notices and pay all fees and shall comply all Acts and Regulations for the successful completion of the contract works. The whole of the work is to be complied with as per the requirements and bylaws of the relevant statutory authorities including contract labour (Regulation and Abolition) Act 1970. 9. QUANTITY OF WORK TO BE EXECUTED The Schedule of Quantities unless otherwise stated shall be deemed to have been prepared in accordance with the Standard Procedure shall be considered to be approximate and no liability shall attach to the employer for any error may be discovered therein. The Employer reserves the right to execute only a part or the whole or any excess thereof without assigning any reason therefore. The Contractor shall be deemed to have satisfied himself before tendering to the correctness and sufficiency of his tender for the works and of the prices stated in the Schedule of Quantities and / or the Schedule of Rates and Prices, which rates and prices shall cover all things necessary for the completion of the works. 10. OTHER PERSONS ENGAGED BY THE EMPLOYER The Employer reserves the right to execute any part of the work included in this contract or any work, which is not included in this contract by the other Agency, or persons and contractor shall allow all reasonable facilities and use of his scaffoldings for the execution of such work. The main contractor shall extend all cooperation in his regard. 11. EARNEST MONEY AND SECURITY DEPOSITS The tenderer will have to deposit an amount of 1% of the estimated cost of work in the form of Bank draft drawn in favour of Deputy General Manager, State Bank of Hyderabad, New Delhi at the time of submission of tender as an Earnest money. The employer is not liable to pay any interest on the earnest money. The Earnest money of the unsuccessful tenderers will be refunded without any interest soon after the decision to award the work is taken after the expiry of the validity period of the tender. The successful tenderer to whom the contract is awarded will have to deposit an initial security deposit/performance security a further sum to make up 2% of the value of the accepted tender Tender Document : Page 14 of 35 including the Earnest Money. The initial security deposit will have to be made within 14 days from the date of acceptance of tender, failing which the employer at his discretion may revoke the letter of acceptance and forfeit the earnest money deposit furnished along with the tender. The initial security deposit shall be refunded to the contractor within 14 days on virtual completion of work. Apart from the initial security deposit made as above, retention money(FSD) shall be deducted from progressive running bills @ 8% of the gross value of each running bill subject to following: a) 10.00% on the first Rs. 1,00,000 of the cost of work. b) 7.5% on the next Rs.1,,00,000 of the cost of work. c) 5.0% on the Balance amount. Total Security Deposit will be 2% of Tender amount including EMD + FSD (8%) The initial security deposit including EMD will be refunded after virtual completion of work without any interest. The Retention Money (FSD) will be refunded after completion of defect liability period of one year from virtual completion of work without any interest. 12. CONTRACTOR TO PROVIDE EVERYTHING NECESSARY The Contractor shall provide everything necessary for the proper execution of the work according to the intent and meaning of the drawings, schedule of quantities and specifications taken together whether the same may or may not be particularly shown or described therein provide that the same can reasonably be inferred there from and if the contractor finds any discrepancies therein he shall immediately and in writing , refer the same to the Employer / Architects whose decision shall be final and binding. 13. TIME OF COMPLETION, EXTENSION OFTIME&PROGRESS CHART The Contractor shall be allowed admittance to the site on the ‘Date of Commencement’ stated in the Appendix, and he shall thereupon and forthwith begin the works and shall regularly proceed with to complete the same. On or before the ‘Day of Completion’ stated in the Appendix subject nevertheless the provision for the extension of time hereinafter contained. If in the opinion of the Employer/Architect the works be delayed: a) By force major or b) By reason of any exceptionally inclement weather or c) By reason of proceedings taken or threatened by or dispute with adjoining or neighboring owners of public authorities arising, than through the Contractor’s won default or d) By the works or delays of the contractors tradesmen engaged or nominated by the Employer / Architect and not referred in the Schedule of Quantities and / or specifications or e) By reason of civil, commotion, local combination of workmen or strike or lock-out effecting any of the buildings traders or f) In consequence of the Contractor not having in due time, necessary instructions from the Employer for which he shall have specifically applied in writing ahead of time, giving reasonable time to prepare such instructions, the employer shall make a fair and reasonable extension of time for completion of the Contract works In case of such strike or lock-out, the Contractor shall as soon as possible give written notice thereof to the employer, but the Contractor shall nevertheless constantly use his endeavors to prevent delay and shall do all they may reasonably be required, to the satisfaction of the employer to proceed with the work. The Contractor on starting the works shall furnish to the Employer / Architect a PERT / CPM Programme for carrying out the work stage in the stipulated time for the approval of Architect / Employer and follow strictly the approved time schedule incorporating charges if any, to ensure the Tender Document : Page 15 of 35 completion of the work in stipulated time. A graph or chart on individual work shall be maintained showing the proportionate progress of work week by week a weekly progress report stating the number of skilled and un skilled laborers employed on the work, working hours done, place, type, and quantity of work done during the period. The Contractor must inform the employer within 10 days in advance of all drawings and detailed required by him from time to time. The Contractor shall adhere to the approved program and arrange for the materials and labour etc accordingly. Despite repeated instructions, if the Contractor fails to show proportionate progress of the work, the Architect / Employer may take suitable action and deemed fit without prejudice to any terms and conditions of the contract 14. LIQUIDATED DAMAGES Should the work be not completed to the satisfaction of the Employer /Architects within the stipulated period, the contractor shall be bound to pay to the Employer a sum calculated as given below by way of liquidated damages and not as penalty during which the work remains un-commenced or unfinished after the expiry of the completion date. If the contractor fails to complete the work by the Scheduled date of completion or within any sanctioned extended time, he will have to pay liquidated damages at 1% of contract amount for each week beyond the date that the work remains incomplete subject to maximum of 10%of the contract value (without extra items). 15. MATERIALS, WORKMANSHIP, SAMPLES, TESTING OF MATERIALS. All the works specified and provided for in the specifications or which may be required to be done in order to perform and complete any part thereof shall be executed in the best and most workmanlike manner with materials of the best and approved quality of the respective kinds in accordance with the particulars contained in and implied by the specifications and as represented by the drawings or according to such other additional particulars, and instructions as may from time to time be given by the Employer / Architects during the execution of the work and to his entire satisfaction. All mandatory tests shall be carried out as per CPWD specifications. If required by the Employer / Architects, the contractor shall have to carry out tests on materials and workmanship in approved materials testing laboratories or as prescribed by the Employer / Architects at his own cost to prove that the materials etc., under test conform to the relevant I.S Standards or as specified in the specifications. The necessary charges, transporting, testing etc., shall have to be bome by the contractor. No extra payment on this account should in any case be entertained. All the materials (except where otherwise described) stores and equipment required for the full performance of the work under the contract must be provided through normal channels and must include charges for import duties, sales tax, octroi and other charges and must be the best of their kind available and the contractors must be entirely responsible for the proper and efficient carrying out of the work. The work must be done in the best workmanlike manner. Samples of all materials to be used must be submitted to the Employer when so directed by the Engineer and written approval from Employer must be obtain prior to placement of order. Any damage (during the work) to any part of the work or to the premises for any reasons due to rain, storm or neglect of contractor shall be rectified by the contractor in an approved manner at no extra cost. Should the work be suspended by reason of rain, strike, lock-outs or any other cause, the contractor shall take all precautions necessary for the protection of work and at his own expenses shall make good any damage arising from any of these causes. The contractor shall cover up and protect from damage, from any cause, all new work and supply all temporary doors, protection to windows, and any other requisite protection for the execution of the work whether by himself or special tradesmen or sub-contractor and any damage caused must be made good by the contractor at his own expenses. Tender Document : Page 16 of 35 Contractor should take all precaution to safeguard the flooring and if any damages to the flooring should be rectified by the contractor in the same quality at his own cost. 16. REMOVAL OF IMPROPER WORK The Employer shall during the progress of the work have power to order in writing from time to time the removal from the work within such reasonable time or times as may be specified in the order of any materials which in the opinion of the Employer / Architects are not in accordance with specification or instructions, the substitution or proper re-execution of any work executed with materials or workmanship not in accordance with the drawings and specifications or instructions. In case the contractor refuses to comply with the order the Employer shall have the power to employ and pay other agencies to carry out the work and all expenses consequent thereon or incidental thereto as certified by the Employer / Architects shall be bome by the contractor or may be deducted from any money due to or that may become due to the contractor. No certificate, shall relieve the contractor from his liability in respect of unsound work or bad materials. 17. DISMISSAL OF WORKMEN The contractor shall on the request of the Employer immediately dismiss from works any person employed thereon by him, who in the opinion of the Employer be unsuitable or incompetent or who may misconduct him. Such discharges shall not be the basis of any claim for compensation or damages against the Employer or any of their officer or employee. 18. ASSIGNMENT The whole of the works included in the contract shall be executed by the contractor and the contractor shall not directly or indirectly transfer, assign or underlet the contract or any part, share or interest therein nor, shall take a new partner, without written consent of the Employer and no subletting shall relieve the contractor from the full and entire responsibility of the contract or from active superintendence of the work during their progress. 19. DAMAGE TO PERSONS AND PROPERTY INSURANCE ETC. The contractor shall be responsible for all injury to the work or workmen to persons, animals or things and for all damages to the structural and / or decorative part of property which may arise from the operations or neglect of himself or of any sub-contractor or of any of his or a subcontractor’s employees, whether such injury or damage arise from carelessness, accident or any other cause whatsoever in any way connected with the carrying out of this contract. The clause shall be held to include inter-alias, any damage to buildings whether immediately adjacent or otherwise, and any damage to roads, streets, foot paths or ways as well as damages caused to the buildings and the works forming the subject of this contract by rain, wind or other inclemency of the weather. The contractor shall indemnify the Employer and hold harmless in respect of all and any expenses arising from any such injury or damages to the person or property as aforesaid and also in respect of any claim made in respect of injury of damage under any acts on compensation or damage consequent upon such claim. The contractor shall reinstate all damages of every sort mentioned in this clause so as to deliver the whole of the contract works complete and perfect in every respect and so as to make good or otherwise satisfy all claims for damages to the property of third parties. The contractor shall affect the insurance necessary and indemnify the Employer entirely from all responsibility in this respect. The insurance must be placed with a company approved by the Employer and must be effected jointly in the name of the Employer and contractor and the policy lodged with the Employer. The scope of insurance is to include damage or loss to the contract itself till this is made over in a complete state. Insurance is compulsory and must be affected from the very initial stage. The contractor shall also be responsible for any thing, which may be excluded from damage to any property arising out of incidents, negligence or defective carrying out of this contract. Tender Document : Page 17 of 35 The Employer shall be at liberty and is hereby empowered to deduct the amount of any damages, compensations, costs, charges and expenses arising or accruing from or in respect of any such claim or damages from any sums due to or to become due to the contractor. 20. MEASUREMENTS Before taking any measurement of any work the Site Engineer or employer’s representative shall give reasonable notice to the contractor. If the contractor fails to attend at the measurements after such notice or fails to countersign or to record the difference within a week from the date of measurement in the manner required by Site Engineer or by the subordinate deputed by him as the case may be is final and binding on the contractor and contractor shall have no right to dispute the same. The Employer / Architect shall issue a certificate after due scrutiny of the contractor’s bill stating the amount due to the contractor from the Employer and the contractor shall be entitled to payment thereof, within the period of honoring certificates named in these documents. 21. PAYMENTS All bills shall be prepared by the contractor in the form prescribed by the Employer’s / Architects. Normally one interim bill shall be prepared each month subject to minimum value as stated in these documents. The bills in proper forms must be duly accompanied by detailed measurements in M-book in support of the qualities of work done and must show deductions for all previous payments, retention money, etc. The Employer / Architect shall issue a certificate after due scrutiny of the contractor’s bill stating the amount due to the contractor from the Employer and the contractor shall be entitled to payment thereof, within the period of honoring certificates named in these documents. The Employer will deduct all statutory deductions such as IT, WCT and retention money as described in this document. The refund of retention money will be made as specified. If the Employer has supplied any materials or goods to the contractor, the cost of any such materials or goods will be progressively deducted from the amount due to the contractor in accordance with the quantities consumed in the work. All the interim payments shall be regarded as payments by way of advance against the final payment only and not as payments for work actually done and completed, and shall not preclude the requiring of bad, unsound, and imperfect or unskilled work to be removal and taken away and reconstructed, or re-erected or be considered as and admission of the due performance of the contract, or any part thereof in any respect or the accruing of any claim, nor shall, it conclude, determine or affect in any way the power of the Employer under these conditions or any of them as to the final settlement and adjustment of the accounts or otherwise or in any other way vary or affect the contract. The final bill shall be submitted by the contractor within one week of the date fixed for completion of the work or of the date of certificate of completion and payment shall be made within one month from the date of receipt of the bill. Final Payment The final bill shall be accompanied by a certificate of completion from the Employer / Architects. Payments of final bill shall be made after deduction of Retention Money as specified, which shall be refunded after the completion of the Defects Liability Period after receiving the Branch Manager’s certificate that the contractor has rectified all defects to the satisfaction of the Employer. The acceptance of the payment of the final bill by the contractor would indicate that he has no further claim in respect of the work executed. 22. VARIATION / DEVIATION The tender rates shall be fixed and applicable for any increase or decrease in the tendered quantities. The Employer / Architect can increase or decrease any quantities to any extend or even delete particular item as per the site requirements and the contractor shall not be paid any thing extra on this Tender Document : Page 18 of 35 account. Nothing extra will be paid by the Bank on account of omission / deletion of items or decrease in the quantity of items. The Bank shall not entertain any claim whatsoever from the contractor on this account. The price of all additional items/non-tendered items will be worked out on the basis of rates quoted for similar items in the contract wherever existing. If similar items are not available, the rates for such items will be derived as per standard method of rate analysis based on prevalent fair price of labour, material and other components as required with 15% towards contractor’s profit and overheads. 23. SUBSTITUTION Should be contractor desire to substitute any materials and workmanship, he/they must obtain the approval of the Employer/ Architects in writing for any such substitution well in advance. Materials designated in this specification indefinitely by such term as “Equal” or “Other approved” etc. specific approval of the Employer / Architect has to be obtained in writing. 24. CLEARING SITE ON COMPLETION On completion of the works the contractor shall clear away and remove from the site all machinery, surplus materials, rubbish and temporary works of every kind and leave the whole of the site and the works clean and in a workmanlike condition to the satisfaction of the Employer/Architects. 25. DEFECTS AFTER COMPLETION The contractor shall make good at his own cost and to the satisfaction of the Employer all defects, peeling off laminate, false ceiling cracks, or any other faults, which may appear within 12 months after completion of the work. In the default, the Employer may employ and pay other persons to amend and make good such damages, losses and expenses consequent thereon or incidental thereto shall be made good and borne by the contractor and such damages, loss and expenses shall be recoverable from him by the Employer or may be deducted by the employer, in lieu of such amending and making good by the contractor, deduct from any money due to the contractor a sum equivalent to the cost of amending such work and in the event of the amount retained being insufficient recover that balance from the contractor from the amount retained(retention money) together with any expenses the Employer may have incurred in connection therewith. 26. CONCEALED WORK The contractor shall give due notice to the Employer/Architects whenever any work is to be covered up or finished up or otherwise becoming inaccessible later on, in order that the work may be inspected and correct dimensions taken before such covering, in default whereof the same shall, at the opinion of the Employer/ Architect be either opened up for measurement at the contractor’s expenses or no payment may be made for such materials. Should any dispute or differences arise after the execution of any work as to measurements etc., or other matters which cannot be conveniently tested or checked, the notes of the Employer / Architects shall be accepted as correct and binding on the contractor. 27. IDLE LABOUR Whatever the reasons may be, no claim for idle labour, additional establishment cost of hire and labour charges of tools and plants would be entertained under any circumstances. 28. SUSPENSION OF WORKS If the contractor except on account of any legal restraint upon the Employer preventing the continuance of the work or in the opinion of the Employer shall neglect or fail to proceed with due diligence in the performance of his part of the contract or if he shall more than once make default, the Employer shall have the power to give notice in writing to the contractor requiring the work to be proceeded within a reasonable manner and with reasonable dispatch, such notice purport to be a notice under this clause. After such notice shall have been given, the contractor shall not be at liberty to remove from the site of the works or from any ground contiguous thereto any plant or materials to subsist from the date of Tender Document : Page 19 of 35 such notice being given until the notice shall have been compiled with. If the contractor fails to start the work within seven days after such notice has been given to proceed with the works as therein prescribed, the employer may proceed as provided in clause 31 (Termination of Contract by Employer) 29. TERMINATION OF CONTRACT BY EMPLOYER If the contractor being a company go into liquidation whether voluntary or compulsory or being a firm shall be dissolved or being an individual shall be adjudicated insolvent or shall make an assignment or a composition for the benefit of the greater part, in number of amount of his creditors or shall enter into a Deed or arrangement with his creditors, or if the Official Assignee in insolvency, or the Receiver of the contractor in insolvency, shall repudiate the contract, or if a receiver of the contractor’s firm appointed by the court shall be unable within fourteen days after notice to him requiring him to do so, to show to the reasonable satisfaction of the employer that he is able to carry out and fulfill the contract, and if so required by the employer to give reasonable security therefore, or if the contractor shall suffer execution to be issued, or shall suffer any payment under this contract to be attached by or on behalf of and of the creditors of the contractor, or shall assign, charge or encumber this contract or any payments due or which may become due to contractor, there under, or shall neglect or fail to observe and perform all or any of the acts matters of things by this contract, to be observed and performed by the contractor within three clear days after the notice shall have been given to the contractor in manner hereinafter mentioned requiring the contractor to observe or perform the same or shall use improper materials of workmanship in carrying on the works, or shall in the opinion of the employer not exercise such due diligence and make such progress as would enable the work to be completed within due time agreed upon, and shall fail to proceed to the satisfaction of the employer after three clear das notice requiring the contractor so to do shall have been given to the contractor as hereinafter mentioned or shall abandon the contract, then and in any of the said cases, the Bank may notwithstanding previous waiver determine the contract by a notice in writing to the effect as hereinafter mentioned, but without thereby effecting the powers of the employer of the obligations and liabilities of the contractor the whole of which shall continue in force as fully as if the contract, had not been so determine and as if the works subsequently executed by or on behalf of the contractor (without thereby creating any trust in favor of the contractor) further the employer or his agent, or servants, may enter upon and take possession of the work and all plants tools scaffolding sheds machinery, steam, and other power, utensils and materials lying upon premises or the adjoining lands or roads and sell the same as his own property or may employ the same by means of his own servants and workmen in carrying on and completing the works or by employing any other contractors or other persons or person to complete the works, and the contractor shall not in any way interrupt or do any act, matter or thing to prevent or hinder such other contractors or other persons or person employed from completing and finishing or using the materials and plants for the works when the works shall be completed, or as soon thereafter as conveniently may be the employer shall give notice in writing to the contractor to remove his surplus materials and plants and should the contractor to remove his surplus materials after receipt by him the employer may sell the same by Public Auction and shall give credit to the contractor for the amount so realized. Any expenses or losses incurred by the contractor for the amount so realized. Any expenses or losses incurred by the employer in getting the amount payable to the contractor by way of selling his tools and plants or due on account of work carried out by the contractor prior to engaging other contractors or against the Security Deposit. 30. ARBITRATION All disputes or differences of any kind whatsoever which shall at any time arise between the parties hereto touching or concerning the works or the execution or maintenance thereof this contract or effect thereof or to the rights or liabilities of the parties or arising out of or in relation thereto whether during or after determination foreclosure or breach of the contract (other than those in respect of which the decision of any person is by the contract expressed to be final and binding) shall after written notice by either party to the contract to the other of them and to the Employer hereinafter mentioned be referred for adjudication to a sole Arbitrator to be appointed as hereinafter provided. For the purpose of appointing the sole Arbitrator referred to above, the Employer will send within thirty days of receipt of the notice, to the contractor a panel of three names of persons who shall be presently unconnected with the organization for which the work is executed from the following categories of Arbitrators”:a) Retired High Court/Supreme Court judge who have experienced in handling Arbitration Cases. b) Member of Council of Arbitrators Tender Document : Page 20 of 35 c) Fellow of the Institution of Engineers d) Eminent Retired Chief Engineer from State/Central PWD/Public sector reputation and integrity e) Fellow of Indian Institute of Architects undertaking of good The contractor shall on receipt of the names as aforesaid, select any one of the persons name to be appointed as a sole Arbitrator and communicate his name to the Employer within thirty days of receipt of the names. The Employer shall thereupon without any delay appoint the said person as the Sole Arbitrator. If the contractor fails to communicate such selection as provided above within the period specified, the Competent Authority shall make the selection and appoint the selected person as the Sole Arbitrator. If the Employer fails to send to the contractor the panel of three names as aforesaid within the period specified, the contractor shall send to the Employer a panel of three names of persons who shall all be unconnected with either party. The Employer shall on receipt appoint him as the Sole Arbitrator. If the Employer fails to select the person and appoint him as the Sole Arbitrator within 30days of receipt of the panel and inform the contractor accordingly, the contractor shall be entitled to appoint one of the persons from panel as the Sole Arbitrator and communicate his name to the Employer. If the Arbitrator so appointed is unable or unwilling to act or resigns his appointment or vacates his office due to any reason whatsoever another Sole Arbitrator shall be appointed as aforesaid. The work under the Contract shall, however, continue during the arbitration proceedings and no payment due or payable to the contractor shall be withheld on account of such proceedings. The Arbitrator shall be deemed to have entered on the reference on the date he issued notice to both the parties fixing date of the first hearing. The Arbitrator may from time to time, with the consent of the parties, enlarge the time for making and publishing the award. The arbitrator shall give a separate award in respect of each dispute or difference referred to him. The Arbitrator shall decide each dispute in accordance with the terms of the contract and give a reasoned award. The venue of arbitration shall be such place as may be fixed by the Arbitrator in his Sole discretion. The award of the Arbitrator shall be final and binding on the both the parties. Subject to aforesaid the provisions to the Arbitration Act. 1992 or any statutory modification or reenactment thereof and the rules made there under, and for the time being in force, shall apply to the arbitration proceeding under this clause. The Employer and the contractor hereby also agree that arbitration under clause shall be condition precedent to any right to action under the contract with regard to the matters hereby expressly agreed to be so referred to arbitration. SCHEDULE OF APPROXIMATE QUANTITIES AND RATE 1. The quantities given herein are approximate and they are subjected to alterations omissions, deductions or additions as provided for in the conditions of this contract and do not necessarily show the actual quantities of the work to be done. 2. It is to be expressly understood that the measured work is to be taken net (notwithstanding) any custom or practice to the contrary according to the actual quantities when in place and finished according to the drawings or as may be directed from time to time by the employer and the cost calculated by measurements or weight, at the respective prices, without any additional charge for any necessary or contingent works connected there with. The rates quoted are for work in site and complete in every respects. Tender Document : Page 21 of 35 3. If any operation of work, which is specified in the respective items mentioned in the schedule of quantities, is not executed by the contractor then proportionately the rate quoted in the schedule shall be re-fixed. READ, UNDERSTOD AND ACCEPTED SIGNATURE OF THE CONTRACTOR WITH SEAL DATE: FORM OF AGREEMENT ARTICLES of AGREEMENT made this _________ day of __________ year 2011 between the Asst. General Manager, Head office, State Bank of Hyderabad, Premises Department, Gunfoundry, Hyderabad-500001(Hereinafter referred to as the “Employer/Owner/client” which expression shall, unless excluded by or repugnant to the context, includes its successors and assigns) of the ONE PART and ___________ of ___________ (Hereinafter referred to as “Contractor” unless excluded by or repugnant to the context, includes its successors and assigns) of the OTHER PART. WHEREAS the Employer intends to carry out SUPPLY AND INSTALLATION OF MOBILE STORAGE UNIT SYSTEM (COMPACTOR) works of GARSHANKAR Branch of the State Bank of Hyderabad (having it’s Head Office at Gunfoundry Hyderabad – 500 001) and shall herein after referred to as “Project”. AND WHEREAS the Employer in order to effectively carry out the above said project has engaged __________________ (Hereinafter referred to as “Architects”) to prepare plans, drawings and specifications describing the works to be executed by the contractors, namely, SUPPLY AND INSTALLATION OF MOBILE STORAGE UNIT SYSTEM (COMPACTOR) etc. for the project, to open tenders received at the office of the Employer, to scrutinize and recommend to the Employer the name(s) of the Contractor(s) from whom tenders were received and recommended to the Employer for the issue of work order to the contractor. AND WHEREAS for the purpose of the above said project, the Employer invited sealed tenders from experienced, resourceful and bonafide contractors vide his Notice Inviting Tender (NO._______________dated. 10.10.2014). WHEREAS the contractor submitted his Tender Documents containing Notice Inviting Tender, General notes, General Conditions of Contract, Special conditions, Schedule of approximate quantities and rates , Form of Agreement, General Specification, Approved manufacturers/ natural source of materials, Declaration, Technical Specifications as in Schedule of Quantities etc. for the above said project, (Hereinafter collectively referred to as the “said conditions”), duly signed on each page as a token of his acceptance of the same, along with requisite Earnest Money Deposit of Rs. 3200/AND WHEREAS out of the Tenders received, the Tender of the contractor was found to be most suitable for the project. AND WHEREAS the Employer has accordingly issued the work order (NO._____dt.__________) to the contractor subject to his furnishing the requisite Security Deposit. Tender Document : Page 22 of 35 AND WHEREAS the Contractor has accepted the aforesaid Work Order vide his letter of acceptance NO.____________ dt.______________ and has also deposited with the Employer a sum of Rs._____________ which with the Earnest Money of RS._________ forms the requisite Security Deposit @ 2 % of the accepted Tender Value of Rs._________. AND WHEREAS the Employer has caused the plans, drawings, specifications, schedule of quantities etc. relating to the above said project at the work site are to be issued to the Contractor. NOW, therefore, it is hereby agreed to and between the parties as follows: 1) Contract documents The following documents shall constitute the Contract Documents. I. This Article of Agreement. II. Tender Document submitted by the Contractor including the “said conditions”, N.I.T and Schedule of quantity. III. All correspondence between the Employer and the Contractor from the date of issue of N.I.T and the date of issue of work order. IV. Work order No. ______________dt.______________ 2) In consideration of the payments to be made to the Contractor as hereinafter provided the Contractor shall upon and subject to the said conditions, execute and complete the contracted project works shown upon the said drawings etc. and such further detailed drawings as may be furnished to the contractor by the said Employer and described in the said Specifications and the said Schedule of Quantities. 3) Notwithstanding what are stated in the N.I.T conditions of Tendering, Conditions of Contract of herein stated before, the Employer reserves itself the right of altering the drawings and the nature of the work and addition to or omitting any items of work or of having portions of same carried out departmentally or otherwise and such alterations or variations shall be carried out without prejudice to this contract. 4) As mentioned in Article 1 above, the “said conditions” shall be read and be treated as forming part of this agreement and parties hereto will respectively be bound thereby and to abide by and submit themselves to the conditions and stipulations and perform the same on their parts to be respectively observed and preferred. 5) Any dispute arising under this agreement shall be referred to the Arbitration in a manner specified in the General Conditions of the Contract and all legal disputes shall be limited within the territorial jurisdiction of the Hyderabad thereto. The decision of the arbitration shall be final and binding on both the parties. IN WITNESS WHEREOF THE PARTIES to there present have hereunder set and subscribed their hands, the day, month and year first above written. Signed and delivered for and on behalf of State Bank of Hyderabad Shri._______________ ____________________ Its duly authorized official In the presence of – 1. (Name and Address) 2. (Name and Address) Tender Document : Page 23 of 35 Signed and delivered for and on behalf of The Contractor _________________by Shri__________________________his Duly authorised official In the presence of – 1. (Name and Address) 2. (Name and Address) DECLARATION I/We have inspected the site for ELECTRICAL WORKS of GARSHANKAR Branch of State Bank of Hyderabad and I/We have made me/ us fully acquainted with the local conditions in and around the sites of works and Lay out drawings of works, drawings of each items etc. complete. I/We hereby declare that I/ We have carefully gone through the conditions laid down in the Notice Inviting Tender, General notes, General Conditions of Contract, Special conditions, Schedule of approximate quantities and rates , Form of Agreement, General Specification, Approved manufacturers/ natural source of materials (i.e. all parts of Technical bid), Technical Specifications of schedule of quantities (i.e. all parts of Price bid), and clearly understood all the same and on the basis of the same I/ We have quoted our rates in the Schedule of Quantities (i.e. Price-Bid, Part-II Tender document) attached with the tender documents. I/ We hereby declare that, in particular during execution of all works at site; it will be my/ our sole responsibility to strictly adhere to/ meticulously follow the General Specification, Approved manufacturers/ natural source of materials, Technical Specifications of schedule of quantities, all drawings of layout and items. For any type of deviation (to any of above or subsequent instructions), it will be my/ our responsibility to obtain the written instruction of the Engineer-in-charge for the same failing which it shall be deemed that I have carried out any such deviations at my own and I shall be duty bound to replace the all deviated material/ works from the site at my/ our cost as well as I shall be liable to penalized by the employer as deemed fit and for all such loses made thereof, I/ we shall not have any right to arbitrate in any manner. I/ We hereby declare that I/ We shall obtain necessary drawings of items from employer in time and also shall uniformly maintain such progress as may be directed by the employer to ensure completion of same within the target date/ time as mentioned in the tender document. Date: Signature and seal of Contractor/ Tenderer Witness: 1. 2. Tender Document : Page 24 of 35 GENERAL SPECIFICATIONS TECHNICAL SPECIFICATION 1.0 2.0 INTRODUCTION: 1.1 The components, fittings, parts and accessories forming part of the specification shall be complete technically and any part or whole equipment not mentioned in this document shall be included in the scope of supply and offered as part of the compete package. The Tenderer shall clearly indicate in his offer such additional equipment / components with all technical details and also include prices for the same in the price schedule. 1.2 The total responsibility for the guaranteed operation of individual equipment / components / fittings and the system as whole rests with the Tenderer as regards performance and reliable trouble free working. In this context the Tenderer shall study the specification carefully and critically and establish the correctness and workability of the system. BASIC REQUIREMENTS 2.1 2.2 2.3 2.4 2.5 2.6 2.7 3.0 The equipment covered under this specification shall be designed, manufactured and installed in accordance with the practices outlined in relevant standards of the Bureau of Indian Standards. The equipment, systems and installation shall conform to the latest Indian Electricity Rules with respect to safety aspects, earthing and other essential features outlined therein, as well as fire safety aspects, in accordance with the recommendations of the Tariff Advisory Committee – General Insurance. The successful Tenderer shall obtain approval for the installation from the Central Electricity Authority (CEA), Karnataka. For this purpose he shall prepare all drawings submit the drawings for approval, follow-up to get the drawings approved, arrange for CEA’s inspection, carryout modifications and rectification as demanded by the authority and obtain safety certificate for the installation. All costs for approval by CEA has to be included by the Tenderer in his offer and the bank shall not entertain any extra claim on this account except for inspection fees (legal amounts) which will be reimbursed, on claim. All modifications, rectification also shall have to be carried out without extra cost to Purchaser. The electrical installation shall conform to IE rules and regulations as interpreted by CEA and the standards laid down by EB as well as requirements indicated in the National Building Code 1983. The successful Tenderer shall furnish the relevant factory and site test reports. The installation has to be carried out by an agency holding a valid license issued by the State Government for carrying out installation work of the voltage classes involved under the direct supervision of persons holding valid certificate of competency issued or recognized by the State Government. The Tenderer shall furnish the particulars of the license held by him for carrying out the installation work along with particulars of certificates of competency held by his supervisory staff. The Tenderer shall visit the Bank premises and ascertain site conditions, existing arrangement and structures and other obstructions if any and suitable allow for these exigencies in his offer. No extra claims will be admissible later on these grounds. All items and equipment covered under this specification have to be procured indigenously and no foreign exchange or import license will be arranged or provided by SBT The make of individual equipment covered under this specification shall be from only among those indicated in the approved vendor list enclosed. The Tenderer shall clearly indicate in his offer, make of various items of equipment or components offered by him. In case the offer does not indicate the makes, the Tenderer shall supply equipment and components of particular makes insisted by SBT SCOPE OF WORK Tender Document : Page 25 of 35 3.1 3.2 a) Dismantle, remove and hand over to SBT, all the light fittings ceiling fans, point wiring materials, switches, sockets etc along with associated lighting and power distribution boards where the rewiring is proposed Supply and installation of switch fuse type emergency distribution boards Supply and installation of MCB type non emergency distribution board for power sockets Supply and installation of MCB type distribution board for lighting, 5A sockets and fans Supply and installation of point and power wiring materials and accessories which shall include conduits and conduits fittings, wiring cables, switch boards along with switches and sockets, junction boxes etc to be embedded in floor, concealed in wall by chase cutting and laying through partitions at no extra cost. Installation of fans Installation of lighting fittings. Supply and installation of incoming power cables for the emergency and non emergency distribution boards Supply and installation of push button stations for remote control of lighting fittings Supply and installation of Public Address system compete with pre and booster amplifiers rack, speakers along with conduits and wires as applicable b) c) d) e) f) g) h) i) j) 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 4.0 The scope of work of the Contractor shall cover manufacture / procurement, assembly, testing, packaging, supply at site, storage, erection and installation, and necessary site fabrication of various equipments forming part of the specification. The scope of work shall also include carrying out of various pre commissioning checks on individual equipment and system, testing and commissioning and handing over of all equipment covered in the specification. The scope of work shall cover the following equipment, installation accessories and other materials. Supply and fixing of danger / caution notice boards in English and vernacular in accordance with Indian Electricity Rules Supply of all foundations bolts and any special type of embedment and inserts that may be required and grouting of all foundation bolts, in the pockets as a part of the installation work Preparation and submission of drawings for distribution boards, working drawings for carrying out lighting and power installation and test certificates Carrying out all routine tests in the manufacturer’s works and various type tests in independent testing laboratories / authorities before dispatch of equipment to site and carrying out various site tests after installation Obtaining approval from CEA Arrangement of temporary work facilities that may be required for installation / fabrication at site and upon completing the work, dismantling and clearing of above facilities inclusive of all erection equipment and packaging materials EQUIPMENT The technical specifications for the various items of the equipment under the Tenderers scope of work shall be as follows: 4.1 Emergency Distribution Board 4.1.1 The emergency distribution board shall be factory assembled ad wired, industrial, floor mounted, totally enclosed cubicle compartmental type, dead front design conforming to IS: 13947 and IS: 8623. The degree of protection of the enclosure shall be IP 50 in accordance with IS: 2147. The unit shall be of pressed CRCA sheet steel and the thickness offload bearing members doors and side panels being not less than 2 mm. However thickness of partitions and other non-load bearing members shall be of 1.6-mm. Base frames shall comprise of 3 mm thick fabricated channel painted black. Operating height of devices in the panel shall not be less than 300 mm or beyond 2000mm.Neiprene / special rubber gaskets shall be provided in all Tender Document : Page 26 of 35 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7 4.1.8 4.1.9 mating metallic joints to make enclosure dust proof. Ventilation openings shall have wire mesh screen to limit the ingress of dust The emergency distribution board shall have incoming and outgoing feeders controlled by fuse switch units The incoming and outgoing feeders shall be suitable for cable connections and cable entry shall be at the top. The cable termination at each outgoing feeder shall be adequate for the number and size of cables. Single compression type brass cable glands shall be provided for each feeder. In addition, extra knockouts shall be provided in the detachable top gland plat for future cables. Separate bus bar compartment shall be provided at the bottom, housing three phase and neutral electrolytic grade Aluminium bus bars conforming to IS. 5082 and mounted on fiber-reinforced plastic support insulators. The temperature rise of bus bars shall be limited to 45 deg C over an ambient of 45 deg C while carrying rated current and the bus bar support insulators shall have adequate creep age distance and anti tracking properties with bus bars mounted flexibly to enable expansion / contraction without strain on the insulators. Vertical droppers located on the rear / sides of outgoing feeder panels shall have adequately rated bus bars commensurate with the total current rating of each vertical panel and identical to the horizontal main bus at the top in respect of temperature rise, bus bar material, insulator details etc. The entire bus bar system should have been type tested at CPRI or other authorised testing facility for temperature rise at rated current as wall as short time current test of at least 45 KA for 1 sec The incoming and outgoing feeders shall be arranged in multi tier formation and located in separate compartments. The switching device inside each outgoing feeder compartment shall have facility for interlock feature with compartment door so that the door can be opened only when the switching device is off. The emergency distribution board shall have access form the front only with rear side bolted cover The incoming and outgoing feeders shall be controlled buy fuse switch units with load break isolating switches of double break design and non deteriorating link type HRC fuses. The isolating switching shall be of AC 23 utilization category at the specified current rating. The HRC fuse links used shall conform to IS: 2208 and the fault interrupting rating shall be at least 50 KA. The operating handle of the fuse switch unit shall be interlocked with the compartment door such that the door can be operated only when the switch is in OFF position. Arrangement with fuse links in dead condition when isolator is in OFF position would be preferred The switchboard shall be provided with adequate size aluminium earth bus at the bottom. Non current carrying parts of the circuit breaker feeders and other devices shall be connected to this earth bus using adequate cross section cables / wires Identification labels shall be provided for control devices and other components. Identification label shall be of durable metal type with lettering etched / engraved in a legible manner ad fixed in a readily visible location. The switch board also shall be provided with caution notice boards conforming to IS: 2551 The details of ratings of incoming and outgoing feeders, instruments, control devices, CTs and other accessories, feeder wise, shall be as per the single line diagram 5.2 MCB Lighting and Power Distribution Boards 5.2.1 MCB - type lighting and power distribution boards shall comprise of the following: MCB lighting distribution board for lighting and 5A sockets MCB distribution board for fans MCB power distribution board for 15 A power sockets Tender Document : Page 27 of 35 The lighting and fan distribution boards shall be fed from the Emergency Distribution Boards described above. The power distribution board shall be bon emergency type and directly fed from the main switchboard in the substation. 5.2.2 5.2.6 The MCB lighting and power distribution boards shall be of industrial totally enclosed sheet steel wall mounted type The boards shall have welded back and sides and gasketted hinged door at the front with door handle land suitable locking device. Detectable over plates shall be provided at the top and bottom for cable / conduit entry and suitable knockouts shall be provided for this purpose. Operating knobs of both incoming MCB isolators ad outgoing MCBs shall be accessible only after opening the front door of the board. Protective cover pates shall be provided inside the board to shroud all the live parts with only the operating knobs of MCB isolators / MCBs protruding outside the cover plate. Adequate space shall be provided within the board to multicore and wiring cables. The board shall be factory assembled and wired. The incoming ELCB units and MCB outgoing feeders shall be suitable for mounting on the DIN rail provided in the board. Tinned copper bus bar shall be used in the board Earth leakage Circuit Breakers (ELCB) and Miniature Circuit Breakers (MCB) used in the board shall be made of heat resisting plastic mounted body with adequately designed contacts and quick break, trip free mechanism in accordance with IS. 8828 –1978. The short circuit breaking capacity of the MCBs shall not be les than 9 KA. The MCBs shall be capable of operating in an ambient temperature of 45 deg C without excessive derating. The MCB unit shall have time delayed over lad and instantaneous short circuit releases of the direct acting design. In case of ELCB, necessary residual current sensing arrangement with zero sequence current transformer and tripping device shall be provided which shall have a sensitivity of 30 mA or 100 mA as specified All the MCB boards shall be of 3-phase ad neutral (TPN) type with incoming feeder controlled by 4 poles ELCB and outgoing feeders controlled by single pole MCB units. On the outgoing side, each phase group shall be segregated and provided with double pole phase incomer using MCB units. In case of lighting MCB DBs, on the incoming side after the ELCB, 4-pole lighting control contactor shall be provided. All the lighting and socket points shall be directly controlled form the MCB outgoing feeders, except for specific area lighting like in AHU rooms etc., where additional lighting control switches are envisaged. The control of all loads in each MCB board shall be done either automatically using 24 hours programmable time switch of the micro processor based design with Ni-Cd battery backup or from remote push buttons under manual mode of control. Necessary time switch, auto manual selector switch, ON/OF push buttons shall be provided in the lighting MCB DBs. In case of MCB DB for fans no contactor and associated controls are required The no. of ways in each MCB board shall be as per single line diagram 5.3 WIRING MEATERIALS AND ACCESSORIES 5.3.1 Surface conduit wiring shall carry out the lighting, fans as well as power socket inside the building premises. The wiring shall commence at the outgoing terminals of The MCB distribution boards and shall be carried out up to the switchboards, light fittings, sockets and fan points as applicable. The conduits wiring accessories shall generally include the following but not be limited to these items only. Conduits and conduit fittings Wiring cables Switch boards with switches and sockets, junction boxes etc., CONDUITS AND CONDUIT FITTINGS Black steel conduit pipes and conduit fittings like couplers, bends, elbows, junction boxes etc., used for conduit wiring shall be of good quality conforming to IS 9537 part 2 and IS: 2667. Conduits of 20 mm, 25 mm and 32 mm diameter in 16 gauge with I.S.I. mark and M.S. spacers in an approved manner shall be used depending upon the size and no. of wires to be drawn in, in accordance with IS: 732 5.2.3 5.2.4 5.2.5 5.3.2 5.3.3 WIRING CABLE: Wiring cable used shall be 1100 volts Grade, FRLS PVC insulated, stranded copper conductor single core cables conforming to IS: 694-1977, for phase, neutral and earth conductor. Size of wiring cable shall be as follows: Tender Document : Page 28 of 35 2.5 sq.mm for phase, neural and 1.5 sq.mm for earth conductor for lighting, fan and 5A sockets wiring 4.0 sq.mm for phase and neutral and 2.5 sq.mm for earth conductor for 15 A socket wiring - 5.3.4 SWITCH BOARDS, JUNCITON BOXES, CEILING ROSES ETC., Switch and junction boxes shall consist of galvanized or cadmium coated and passivated sheet steel factory made assembly o standardized dimensions with knockouts for cable entry / conduit entry on all four sides. The switch and junction boxes shall be suitable for flush mounting in a wall recess. The switch plates and switch socket assemblies shall be of modular design moulded out of white light stabilized engineering plastic to give excellent surface finish and high durability. All switch socket assemblies shall be sturdily built to ensure long trouble free service. The switch contact tips shall be of silver to ensure good contact. The sockets shall be of 3-pin design with earth pin actuated safety shutt3er for the phase and neutral terminals. All 15 Amps power sockets hall be 5 / 15 A, 3 pin combined version. Junction boxes shall be identical to the switch boxes except that these shall be provided with blank cover plats. A junction boxes and switchboxes shall have provision for earth connection. The switches and sockets shall conform to IS3854 and IS 1293. Thermosetting plastic moulded ceiling roses suitable for conduit entry shall be provided to facilitate wiring to the fittings at the end of conduit wiring at the locations of light and fan points 5.3.5 POWER SOCKETS FOR AIR – CONDIITONERS 5.4 15 A power sockets for air conditioners shall be of the porcelain metal clad type with double pole 16 A MCB unit for control mounted in galvanized sheet steel box with powder coated front plate. The Bank shall supply wall fans. The scope of work include only installation of fans. 5.5 PUSH BUTTON STATIONS Push Button stations shall be installed at the entrance to the office area for remote control of lighting. Each lighting MCB DB shall have one push button station. The push button station shall have 1 set of ON and OFF push buttons. The enclosure of the push button station shall be either of fabricated and powder coated sheet steel or of suitable plastic material with elegant finish. Push button station shall be suitable for wall mounting and shall have 2 nos. 22 mm dia push button actuators and control elements fully assembled. The contacts of the push button shall be spring loaded snap action type with silver used as contact material. Sheet steel push button stations shall have earthing terminals. 5.6 EARTHING The method adopted for system as well as equipment earthing shall be in accordance with the code of practice for earthing IS: 3043 –1966 and shall also comply with the relevant clauses of Indian Electricity Rules. All earthing shall be subject to approval of CEA. All non-current carrying metallic parts of various electrical equipment as well as cable armoring, cable racks / trays, brackets, supporting structures etc., shall be effectively earthed. Earthing of medium voltage equipment shall be done by means of two separate earth continuity conductors PROGRESS REPORTS: The Contractor shall submit fortnightly progress reports on or about the 15 th & 30th day of every month, giving the status of the contract work indicating the various stages of erection at site. Te report shall include: A manufacturing status report detailing the progress of procurement of raw material, manufacture, when the particular item or sub-assembly is expected to be ready for delivery A report detailing materials and equipment received at site. An erection status report indicating the progress of erection giving equipment, tools and tackle deployed by Tender Document : Page 29 of 35 them for purpose of erection and the number of personnel employed on the work. The list of personnel shall be given under supervisory, skilled and unskilled categories TESTS AND INSPECTION All equipment included under the supply scope of this specification shall be designed and manufactured to national and international standards. After manufacture, the various equipment shall be subjected to inspection and testing in the manufacturers works in the presence of the Bank’s Engineer. The various tests to be carried out on the major equipment shall be as follows LV Switchgear and Distribution Boards 1. 2. Assembly inspection Functional test on control circuits COMMISSIONING CHECKS AND TESTS After completion of installation of various equipment at site, prior to commissioning the following checks and tests shall be carried out on equipment and systems. These shall be carried out in accordance with relevant standards, codes of practices published by the Bureau of Indian Standards and manufacturer’s recommendation. a) The new cables, panels etc should be tested for insulation value using 500V meggar and readings should be recorded in the presence of Banks Engineer/ representative. b) Earth resistance of each earth pit should be measured with earth meggar and the readings should be recorded. PERFORMANCE GUARANTEE The Contractor for workmanship and materials and satisfactory performance shall guarantee all equipment covered under this specification for a period of twelve (12) months from final handing over of the system. The guarantee for performance shall be inclusive of individual equipment and the system as a whole for their ratings / output as well as for the integrated operation of the equipment. If any equipment or system fails to meet the performance requirements due to defect material and workmanship the contractors shall replace the same free. LIST OF APPROVED MAKES The tenderer shall indicate against each item of equipment the make or manufacturer’s name from whom the equipment will be procured. The make of equipment shall be from among those mentioned in this section only. Emergency Switch Board MCB Distribution Boards : Fuse Switch Units L&T, LEGRAND, SIEMENS : SIEMENS, GE, L&T ELCB and MCB Units : Havell’s, GE, SIEMENS, LEGRAND 24 HRS time switches : GE, L&T Contactor : SIEMENS, GE, L&T, SCHNEIDER Push Button Stations : SIEMENS, GE, L&T, SCHNEIDER Wiring cable Wiring Accessories (Switches, Sockets, Switch) Boxes etc., Metal Clad Power Sockets : FINOLEX : MK, LK : C&G, BCH Tender Document : Page 30 of 35 PA System LT Cables Copper Wires : PVC Pipe and Accessories : Flush Type switches, sockets Bulbs / Tube / CFL Fittings MCCB : : : MCB SFU/Changeover switches Telephone Cables Exhaust Fans Ceiling Fans Data Cables I/O Jacks : : : : PHILIPS, AHUJA : CCI, ICC, FINOLEX, UNIVERSAL, NICCO Finolex / V – Guard / Havells Precision / Atul / Elephant / MODI (Having ISI Mark) Anchor / Crabtree Philips / Crompton Greaves Siemens/L&T/ LEGRAND : Siemens/L&T/ LEGRAND Siemens/L&T/Standard/Havells : Deltan Crompton Greaves Crompton Greaves : AT & T CAT - 5 E, D-Link / Avaya : Avaya, Krone B.O.Q. for ELECTRICAL WORK at GARSHANKAR BRANCH, PUNJAB. Sl 1 2 3 4 Items MODULAR POINT (UPS) 1st type Supply, fixing, wiring and connecting a set of 4 nos. of 3 pin 5 amps modular Socket with switch control of approved type connected from u.p.s. d.b. with 3 runs of 1.5 sq mm ISI mark multi stranded / solid copper PVC insulated wire of 1.1 KV grade in conduit. The modular switch and sockets shall be fitted on required type modular plate and metal box / non metallic unbreakable box flush on wall/ surface. MODULAR POINT (direct line) 2nd type Supply, fixing, wiring and connecting a set of 2 nos. of 3 pin 5 amps modular Socket with switch control of approved type connected from power supply d. b. with 3 runs of 1.5 sq mm ISI mark multi stranded / solid copper PVC insulated wire of 1.1 KV grade in conduit. The modular switch and sockets shall be fitted on required type modular plate and metal box / non metallic unbreakable box flush on wall/ surface. The average length of 3x1.5mm connecting wire per point from light db shall be 8 mts and excess of it shall be considered extra in per running meter length. VTPN DB WITH MCCB Supplying and fixing of 4 pole VTPN DB fitted with 125 A 4 Pole MCCB with short circuit rating of 10 K.A. capacity on incoming side as main switch and connected with outgoing side in duly approved manner. For distribution purpose, the 8Way VTPN DB shall be also fitted with 1 no 63A 4P MCB 10KA for incoming, 2 nos 40/ 32A SP MCB 10KA & 6 nos 10-32A SP MCB 10KA for outgoing duly complete in an approved manner. 12 WAY SPN DB Supplying and erecting surface / flush mounted single pole and neutral distribution board made from 18gauge sheet / CRCA with stove enamel paint / powder coated Tender Document : Page 31 of 35 Qty 18 Unit No 10 No 1 1 Set Set Rate Amount 5 6 7 8 9 10 11 12 of approved make suitable for incorporating one 40 amp DP MCB as incoming and 10 nos 6-20A SP MCB 10KA for outgoing duly complete in an approved manner and db shall have electrolytic copper bus bar of 100 Amps erected on angle iron frame complete and the earth bar in side db shall be insulated from the body. 8 WAY SPN DB Supplying and erecting surface / flush mounted single pole and neutral distribution board made from 18gauge sheet / CRCA with stove enamel paint / powder coated of approved make suitable for incorporating one 40 amp DP MCB as incoming and 6 nos 6-20A SP MCB 10KA for outgoing duly complete in an approved manner and db shall have electrolytic copper bus bar of 100 Amps erected on angle iron frame complete and the earth bar in side db shall be insulated from the body. 2 WAY SPN DB (ups) Supplying and erecting surface / flush mounted single pole and neutral distribution board made from 18gauge sheet / CRCA with stove enamel paint / powder coated suitable for incorporating only one 63 amp DP MCB. 2 WAY SPN DB (ac) Supplying and erecting surface / flush mounted single pole and neutral distribution board made from 18gauge sheet / CRCA with stove enamel paint / powder coated suitable for incorporating only one 20 amp DP MCB. 6 SQ MM WIRING Supplying and erecting mains with 2 x 6.0 Sq. mm ISI mark multi stranded / solid copper PVC insulated wire of 1.1 KV grade with 1 Run of 2.5 sq mm ISI mark stranded / solid copper wire of 1.1 KV grade in conduit. 4 SQ MM WIRING Supplying and erecting mains with 2 x 4.0 Sq. mm ISI mark multi stranded / solid copper PVC insulated wire of 1.1 KV grade with 1 Run of 2.5 sq mm ISI mark stranded / solid copper wire of 1.1 KV grade in conduit. 2.5 SQ MM WIRING Supplying and erecting mains with 2 x 2.5 Sq. mm ISI mark multi stranded / solid copper PVC insulated wire of 1.1 KV grade with 1 Run of 1.5 sq mm ISI mark stranded / solid copper wire of 1.1 KV grade in conduit. PRIMARY POINT WIRING ( 2X1.5MM) Point wiring for Light / Fan / Bell concealed type with 2 x 1.5 sq. mm ISI mark multi stranded / solid copper PVC insulated wire 1.1 KV grade ISI marked with appropriate colour coating and limitation to no. of wires with respect to pipe size duly drawing in conduit all duly concealed in ceiling, RCC slab, beam while casting and in walls by making channel finished with cement mortar to match background complete and terminating the wires with pin type lugs in ceiling rose / lamp holder / connector / batten holder / angle holder erected on acrylics / hylam plate on provided box. The modular switch and sockets / bell push of approved make shall be fitted on required type modular plate and metal box / non metallic unbreakable box flush on wall/ surface. SECONDARY POINT WIRING ( 2X1.5MM) Point wiring by extension for Light / Fan / Bell with 2 x 1.5 sq. mm ISI mark multi stranded / solid copper PVC Tender Document : Page 32 of 35 2 Set 4 Set 2 Set 70 Mt. 120 Mt. 40 Mt. 60 No 40 No 13 14 15 16 17 18 19 20 21 insulated wire 1.1 KV grade ISI marked with appropriate colour coating. 15A POWER POINT WIRING Power Point wiring with 2 x 2.5 sq. mm & 1x1.5 sq.mm. ISI mark multi stranded / solid copper PVC insulated wire of 1.1 KV grade with appropriate color coating and limitation to no. of wires with respect to pipe size duly drawing in conduit all duly concealed in ceiling, RCC slab, beam while casting and in walls by making channel finished with cement mortar to match background complete The 15A modular switch and sockets of approved make with indicator shall be fitted on required type modular plate and metal box / non metallic unbreakable box flush on wall/ surface. The average length of 2x2.5mm & 1x1.5mm connecting wire per point from light db shall be 8 mts and excess of it shall be considered extra in per running meter length. EARTH STATION Supply and providing of 600 x 600 x 3.15 mm copper plate Earth station as per IS 3043 with G.I. Pipe “B” Class (2.5 mt. Long) with 115 mm alternate layers of coal, salt and sand with inspection chamber in Brick work and C.I. inspection cover complete. 8 SWG COPPER WIRE Supplying, fixing and connecting the 8 SWG copper wire in conduit. 12 SWG COPPER WIRE Supplying, fixing and connecting the 12 SWG copper wire in conduit. GI STRIP Supplying, fixing and connecting the 25mmx3mm G.I. Strip bar EARTH PIT WIRING Supplying, fixing and connecting the Earth pit to UPS with 2 runs of 4.0 sq mm PVC copper wire in conduit. MAIN BUS FOR ISOLATED EARTH Supplying, fixing and connecting the Main bus for isolated earth comprising of 200mm x 40mm x 6mm copper bar fixed on insulated support and having 20 nos of holes and nut bolts studs for clamping the earth leads,all contained in MS/PVCbox of size 300mm x 200mm x 50mm deep and having transparent acrylic cover as approved by the Bank/ Architect. 3.5 CORE 35 SQ MM CABLE Supplying and erecting PVC armored 1100 V, grade with I.S.I. mark 3 1/2 Core 35 Sq. mm. stranded / solid aluminum cable conforming to IS:1554 fitted on wall/ ceiling with 6 mm. thick 25 mm width M.S. spacers & G.I. saddles screwed, with continuous 12 SWG G.I. earth wire complete erected on wall on trusses with 22 gauge x 25 mm width G.I. strip / erected on pole with 25 x 3 mm M.S. clamps / in provided trench / in provided pipe in an approved manner. JOINTING KIT FOR 50MM CABLE Providing and erecting epoxy straight through joint for L.T. PVC armored cable 1.1 KV grade complete with both end termination including compressed type brass glands, crimping type copper lugs,ferrule bushing and Tender Document : Page 33 of 35 4 No 2 No. 30 Mt 45 Mt 20 Mt 40 Mt. 1 Set 40 Mt. 4 No 22 23 24 25 26 27 28 accessories and suitable clamps duly erected and connected to the supply for all cores cable of 25 to 50 Sq. mm. size. STEP UP REGULATOR Supply and fixing of step up regulator at locations as instructed at site. ANCHOR FASTNER Supply and fixing of anchor fastener at locations as instructed at site. INSTALLATION OF MIRROR OPTIC LIGHTS Installation of 2x2 mirror optic light fixture of flush mounted fitting at locations as instructed at site. Rate quoted should include cost of requisite connecting wiring from the existing nearest electrical outlet from the wall/ceiling all-complete. INSTALLATION OF SPOT LIGHTS Installation of Spot light fitting at locations as instructed at site. Rate quoted should include cost of requisite connecting wiring from the existing nearest electrical outlet from the wall/ceiling all-complete. INSTALLATION OF BOX/ PATTI TYPE LIGHTS Installation of Box/ Patti type tube light fitting at locations as instructed at site. Rate quoted should include cost of requisite connecting wiring from the existing nearest electrical outlet from the wall/ceiling all-complete. INSTALLATION OF CEILING/ WALL/ EXHAUST FANS Installation of Ceiling/ Wall/ Exhaust fans at locations as instructed at site. Rate quoted should include cost of requisite connecting wiring from the existing nearest electrical outlet from the wall/ceiling to the fan allcomplete. P V C CONDUIT Supplying and laying rigid PVC conduit heavy gauge (HMS) 25 mm. dia. with ISI mark embossed and with PVC accessories conforming to I.S. No. 3419 for drawing wires and duly sealed at joints with original resin / adhesive to make the complete piping rigid erected on wall / ceiling with PVC spacers and PVC saddles clamped to pipe complete. 8 30 No No 25 No 20 No 20 No 15 No 80 Mt. TOTAL CONTRACTOR Tender Document : Page 34 of 35 Tender Document : Page 35 of 35