2015 Project for Updating Reliability Standards

advertisement
Unofficial Comment Form
Revisions to the NERC Standard Processes Manual (SPM)
Section 6 Processes for Conducting Field Tests and Collecting
and Analyzing Data
Do not respond using this form, as it is provided for explanation only. Use the electronic form to provide
comments on the Revisions to the NERC Standard Processes Manual Section 6 – Processes for
Conducting Field Tests and Collecting and Analyzing Data. The electronic comment form must be
completed and submitted by 8:00 p.m. Eastern, Wednesday, October 28, 2015.
If you have questions, contact the Manager of Standards Information, Barb Nutter (via email) or at 404446-9692.
Background Information
At the March 2015 Standards Committee (SC) meeting, NERC staff and the SC supported developing
more concise language for the SPM section 6, Process for Conducting Field Tests and Collecting and
Analyzing Data. The purpose of updating the Field Test language was to increase coordination between
the SC and the technical committees when field tests are conducted. NERC staff along with the Planning
Committee, Operating Committee, and Critical Infrastructure Protection Committee worked together to
develop a more concise process for Field Tests.
Questions
1.
Do you agree with the revisions to Section 6 of the Standard Processes Manual?
Yes
No
Comments:
2. Do you agree the technical committees (e.g., Operating Committee, Planning Committee, and
Critical Infrastructure Protection Committee) should administer the Field Tests?
Yes
No
Comments:
3. Do you have any other comments concerning Section 6 of the Standard Processes Manual?
Comments:
Download