UNITED NATIONS ENVIRONMENT PROGRAMME PART II INVENTORY OF SKILLS AND GAPS TO DETERMINE GEOTHERMAL TRAINING NEEDS IN AFRICA Nairobi, Kenya 1 DECEMBER 2014 PART II: (I) INVENTORY OF SKILL GAPS/GEOTHERMAL TRAINING NEEDS IN AFRICA 1. Country ---------------------------------------------------------------------2. Name of Institution / Organization -----------------------------------------------3. Mandate – The above named Ministry is mainly in charge of: ---------------------------------------------------4. Main Stakeholders ---------------------------------------------5. Status Public Private 6. Full Address P. O. Box ______________________________________ Telephone _____________________ Email _____________________________________________________ 2 7. What is the strategy/plan to explore and develop geothermal resource in your country or institution in the coming 10-15 years? Please elaborate in terms of phases of development using the enclosed background information (Every 5 years) . (a) 0 - 5 Year plan Year Geothermal Prospects Prefeasibility phase Reconnaissance Detaile d surface Feasibility Phase Explorat ory drilling Appraisal Drilling Reservoir evaluation Development Phase Feasibility study Production Drill. Wel Testing Detailed design Power production (Mwe)/(MWt) 2015 2016 2017 2018 2019 (b) 5 – 10 Year Plan Year Geothermal Prospects Prefeasibility phase Reconnaissance Detaile d surface Feasibility Phase Explorat ory drilling Appraisal Drilling Reservoir evaluation Development Phase Feasibility study Production Drill. Wel Testing Detailed design Power production (Mwe)/(MWt) 2020 2023 2024 2025 (c) 10 -15 Year Plan Year Geothermal Prospects Prefeasibility phase Reconnaissance Detaile d surface Feasibility Phase Explorat ory drilling Appraisal Drilling Reservoir evaluation 3 Development Phase Feasibility study Production Drill. Wel Testing Detailed design Power production (Mwe)/(MWt) 8. How many staff members are working in geothermal sector at your institution/company at present (2014)? Please provide details using the following table. *(a) Professional (P); (b) Technician (T); (c) Manager at various levels (M) No. Name of staff Gender Employment status *P/T/M (Age- Range) 20-30 30-40 Qualification 40-50 50-60 N.B: For the time being, we haven‘t yet a formal organized Unit in charge of Geothermal issues. Meanwhile, the process to create the Unit is very advanced by the Minister. I will communicate you the names as soon as the process will finish 9. How many staff members have completed the following geothermal training and when? No. Name of staff Gender Field of training Iceland/year Italy/year Training Japan/year NewZealand/year Email address Others: 1. 2 3. 4. 5. N.B: Those members have been to KENYA for short course on Exploration for Geothermal Resources 10. How many staff members do you expect to work in geothermal (among items 8/9) between 2015- 2020 to meet your strategic objective? Year Geothermal Prospects For Prefeasibility phase Reconnaissance Detaile d surface For Feasibility Phase Explorat ory drilling Appraisal Drilling Reservoir evaluation 4 For Development Phase Feasibility study Production Drill. Wel Testing Detailed design Power production (Mwe)/(MWt) NB: The number will depend on the size of the Unit which will have been created. 11. How many new staff members do you expect to hire for geothermal during 2015-2020 (first phase); (2020-25) Second phase; (202530) third phase ? (a) 2015 – 2020 phase Year Geothermal Prospects For Prefeasibility phase Reconnaissance Detaile d surface For Feasibility Phase Explorat ory drilling Appraisal Drilling Reservoir evaluation For Development Phase Feasibility study Production Drill. Wel Testing Detailed design Power production (Mwe)/(MWt) (B) 2020 – 2025 Year Geothermal Prospects For Prefeasibility phase Reconnaissance Detaile d surface For Feasibility Phase Explorat ory drilling Appraisal Drilling Reservoir evaluation For Development Phase Feasibility study Production Drill. Wel Testing Detailed design Power production (Mwe)/(MWt) (C) 2025 – 2030 Year Geothermal Prospects For Prefeasibility phase Reconnaissance Detaile d surface For Feasibility Phase Explorat ory drilling Appraisal Drilling Reservoir evaluation 5 For Development Phase Feasibility study Production Drill. Wel Testing Detailed design Power production (Mwe)/(MWt) N.B.: For a ,b and c : The number of expected staff memebers to work in geothermal will depend on the evolution of geothermal projects‘ issues EXPECTED OUTPUT Strategy for development of geothermal resource in each country identified Skill gap in all geothermal scientific and engineering disciplines to achieve the above targets determined Expected number of experts in line with expected generation/direct use and strategic objectives for each country identified. Skills level and skills gap report Training plan 6